Bid Tabulations
Letting of
08/28/2013
LA DOTD Headquarters
| Lead Project: H.002578.6 | |
| Parish: Bienville | |
| Routes: LA 516 | |
| Description: Madden Mill CR & Black Lake Bayou Bridge | |
| Type Const: CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK. | |
| Estimated Construction Cost: $3,791,132.15 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 39462 | Jb James Construction Llc | $3,586,488.15 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $3,755,363.19 |
| 3 | 56288 | Guinn Services, LLC | $3,879,746.20 |
| 4 | 34567 | James Construction Group LLC | $3,957,793.75 |
| 5 | 14422 | T. L. Wallace Construction, Inc. | $3,999,368.00 |
| 6 | 00044 | Guinn Construction, LLC | $4,160,551.50 |
| 7 | 01012 | Cecil D. Gassiott, LLC | $4,610,047.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jb James Construction Llc |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Guinn Services, LLC |
- 4 - James Construction Group LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 250,000.00 | 250,000.00 | 30,000.00 | 30,000.00 | 150,000.00 | 150,000.00 | 147,000.00 | 147,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA. 209+98.44; 24' X 228' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 20,000.00 | 20,000.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA. 99+97.63; 24' X 57' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 10,000.00 | 10,000.00 | 25,200.00 | 25,200.00 | 15,000.00 | 15,000.00 | 16,000.00 | 16,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge (STA. 225+33.50; 24' X 95' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 12,000.00 | 12,000.00 | 22,000.00 | 22,000.00 | 28,500.00 | 28,500.00 | 15,000.00 | 15,000.00 |
| 0005 | 202-02-12000 | Removal of Fence | 200 | LNFT | 5.00 | 1,000.00 | 3.50 | 700.00 | 3.00 | 600.00 | 2.70 | 540.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 11,503.3 | SQYD | 2.00 | 23,006.60 | 3.60 | 41,411.88 | 5.00 | 57,516.50 | 3.00 | 34,509.90 |
| 0007 | 203-01-00100 | General Excavation | 8,674 | CUYD | 6.00 | 52,044.00 | 8.50 | 73,729.00 | 7.00 | 60,718.00 | 6.00 | 52,044.00 |
| 0008 | 203-02-00100 | Drainage Excavation | 7,730 | CUYD | 9.00 | 69,570.00 | 9.75 | 75,367.50 | 9.00 | 69,570.00 | 12.00 | 92,760.00 |
| 0009 | 203-03-00100 | Embankment | 26,526 | CUYD | 13.00 | 344,838.00 | 17.00 | 450,942.00 | 16.00 | 424,416.00 | 16.00 | 424,416.00 |
| 0010 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 15.00 | 150.00 | 17.00 | 170.00 | 10.00 | 100.00 | 15.00 | 150.00 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 150.00 | 1,200.00 | 200.00 | 1,600.00 | 100.00 | 800.00 | 175.00 | 1,400.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 5,800 | LNFT | 2.00 | 11,600.00 | 2.30 | 13,340.00 | 1.40 | 8,120.00 | 2.50 | 14,500.00 |
| 0013 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 10,891.9 | SQYD | 22.50 | 245,067.75 | 27.00 | 294,081.30 | 21.00 | 228,729.90 | 26.50 | 288,635.35 |
| 0014 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 10,891.9 | SQYD | 12.00 | 130,702.80 | 10.25 | 111,641.98 | 16.50 | 179,716.35 | 9.00 | 98,027.10 |
| 0015 | 401-01-00100 | Aggregate Surface Course (Net Section) | 36.7 | CUYD | 100.00 | 3,670.00 | 51.00 | 1,871.70 | 120.00 | 4,404.00 | 110.00 | 4,037.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 2,158.5 | TON | 130.00 | 280,605.00 | 120.00 | 259,020.00 | 148.00 | 319,458.00 | 128.00 | 276,288.00 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 271.3 | TON | 180.00 | 48,834.00 | 170.00 | 46,121.00 | 180.00 | 48,834.00 | 180.00 | 48,834.00 |
| 0018 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 46 | LNFT | 70.00 | 3,220.00 | 84.00 | 3,864.00 | 55.00 | 2,530.00 | 64.00 | 2,944.00 |
| 0019 | 704-03-00100 | Blocked Out Guard Rail | 448.5 | LNFT | 20.00 | 8,970.00 | 18.00 | 8,073.00 | 19.50 | 8,745.75 | 17.00 | 7,624.50 |
| 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 75.00 | 22,500.00 | 66.00 | 19,800.00 | 68.50 | 20,550.00 | 65.00 | 19,500.00 |
| 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 2,000.00 | 24,000.00 | 2,100.00 | 25,200.00 | 2,400.00 | 28,800.00 | 1,950.00 | 23,400.00 |
| 0022 | 705-01-00100 | Barbed Wire Fence | 200 | LNFT | 10.00 | 2,000.00 | 16.00 | 3,200.00 | 7.50 | 1,500.00 | 15.00 | 3,000.00 |
| 0023 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 700.00 | 700.00 | 1,100.00 | 1,100.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 |
| 0024 | 708-01-00100 | Right-of-Way Monument | 21 | EACH | 150.00 | 3,150.00 | 145.00 | 3,045.00 | 200.00 | 4,200.00 | 140.00 | 2,940.00 |
| 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 21 | EACH | 150.00 | 3,150.00 | 55.00 | 1,155.00 | 200.00 | 4,200.00 | 50.00 | 1,050.00 |
| 0026 | 712-04-00100 | Flexible Revetment | 3,947 | SQYD | 50.00 | 197,350.00 | 42.00 | 165,774.00 | 52.00 | 205,244.00 | 50.00 | 197,350.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 28,000.00 | 28,000.00 | 8,000.00 | 8,000.00 |
| 0028 | 716-01-00100 | Mulch (Vegetative) | 15 | TON | 750.00 | 11,250.00 | 700.00 | 10,500.00 | 600.00 | 9,000.00 | 650.00 | 9,750.00 |
| 0029 | 717-01-00100 | Seeding | 225 | LB | 10.00 | 2,250.00 | 13.00 | 2,925.00 | 8.00 | 1,800.00 | 12.00 | 2,700.00 |
| 0030 | 718-01-00100 | Fertilizer | 7,500 | LB | 0.65 | 4,875.00 | 0.50 | 3,750.00 | 0.55 | 4,125.00 | 0.45 | 3,375.00 |
| 0031 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 16,000.00 | 16,000.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 350,000.00 | 350,000.00 | 370,000.00 | 370,000.00 | 335,000.00 | 335,000.00 | 395,000.00 | 395,000.00 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 70.00 | 840.00 | 80.00 | 960.00 | 100.00 | 1,200.00 | 75.00 | 900.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 164 | EACH | 10.00 | 1,640.00 | 6.25 | 1,025.00 | 7.00 | 1,148.00 | 10.00 | 1,640.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.67 | MILE | 2,500.00 | 6,675.00 | 3,100.00 | 8,277.00 | 3,250.00 | 8,677.50 | 2,500.00 | 6,675.00 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.179 | MILE | 800.00 | 143.20 | 850.00 | 152.15 | 1,200.00 | 214.80 | 700.00 | 125.30 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 14,000.00 | 14,000.00 | 48,000.00 | 48,000.00 | 35,000.00 | 35,000.00 |
| 0038 | 804-01-00300 | Precast Concrete Piles (16") | 6,816 | LNFT | 55.00 | 374,880.00 | 68.00 | 463,488.00 | 58.00 | 395,328.00 | 90.00 | 613,440.00 |
| 0039 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 100.00 | 300.00 | 1,300.00 | 3,900.00 | 5.00 | 15.00 | 3,000.00 | 9,000.00 |
| 0040 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,000.00 | 4,000.00 | 1,100.00 | 4,400.00 | 1,250.00 | 5,000.00 | 1,000.00 | 4,000.00 |
| 0041 | 805-01-00700 | Class A Concrete (Bents) | 172.89 | CUYD | 1,000.00 | 172,890.00 | 1,250.00 | 216,112.50 | 900.00 | 155,601.00 | 1,100.00 | 190,179.00 |
| 0042 | 805-03-00100 | Class AA Concrete | 747.24 | CUYD | 500.00 | 373,620.00 | 685.00 | 511,859.40 | 750.00 | 560,430.00 | 650.00 | 485,706.00 |
| 0043 | 806-01-00100 | Deformed Reinforcing Steel | 180,904 | LB | 0.90 | 162,813.60 | 0.75 | 135,678.00 | 0.80 | 144,723.20 | 0.80 | 144,723.20 |
| 0044 | 810-01-00100 | Concrete Railing (Standard Barrier) | 1,040 | LNFT | 70.00 | 72,800.00 | 64.00 | 66,560.00 | 63.00 | 65,520.00 | 56.00 | 58,240.00 |
| 0045 | 813-01-00100 | Concrete Approach Slabs | 879.54 | SQYD | 200.00 | 175,908.00 | 210.00 | 184,703.40 | 200.00 | 175,908.00 | 210.00 | 184,703.40 |
| 0046 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,194 | INLF | 0.80 | 955.20 | 2.25 | 2,686.50 | 2.10 | 2,507.40 | 0.70 | 835.80 |
| 0047 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 0.709 | MILE | 2,500.00 | 1,772.50 | 460.00 | 326.14 | 4,000.00 | 2,836.00 | 400.00 | 283.60 |
| 0048 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 1.419 | MILE | 2,500.00 | 3,547.50 | 460.00 | 652.74 | 4,200.00 | 5,959.80 | 400.00 | 567.60 |
| CONTRACTOR TOTAL | 3,586,488.15 | 3,755,363.19 | 3,879,746.20 | 3,957,793.75 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - T. L. Wallace Construction, Inc. |
- 6 - Guinn Construction, LLC |
- 7 - Cecil D. Gassiott, LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 145,000.00 | 145,000.00 | 100,000.00 | 100,000.00 | 87,241.00 | 87,241.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA. 209+98.44; 24' X 228' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 35,000.00 | 35,000.00 | 55,000.00 | 55,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA. 99+97.63; 24' X 57' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge (STA. 225+33.50; 24' X 95' CONCRETE PRECAST SLAB BRIDGE) | 1 | EACH | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 |
| 0005 | 202-02-12000 | Removal of Fence | 200 | LNFT | 5.55 | 1,110.00 | 5.00 | 1,000.00 | 10.00 | 2,000.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 11,503.3 | SQYD | 2.20 | 25,307.26 | 4.00 | 46,013.20 | 10.00 | 115,033.00 |
| 0007 | 203-01-00100 | General Excavation | 8,674 | CUYD | 5.55 | 48,140.70 | 7.00 | 60,718.00 | 10.00 | 86,740.00 |
| 0008 | 203-02-00100 | Drainage Excavation | 7,730 | CUYD | 9.45 | 73,048.50 | 10.00 | 77,300.00 | 10.00 | 77,300.00 |
| 0009 | 203-03-00100 | Embankment | 26,526 | CUYD | 13.35 | 354,122.10 | 15.00 | 397,890.00 | 22.15 | 587,550.90 |
| 0010 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 11.10 | 111.00 | 10.00 | 100.00 | 25.00 | 250.00 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 167.00 | 1,336.00 | 100.00 | 800.00 | 175.00 | 1,400.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 5,800 | LNFT | 3.35 | 19,430.00 | 1.50 | 8,700.00 | 2.00 | 11,600.00 |
| 0013 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 10,891.9 | SQYD | 25.00 | 272,297.50 | 20.00 | 217,838.00 | 23.15 | 252,147.49 |
| 0014 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 10,891.9 | SQYD | 11.10 | 120,900.09 | 20.00 | 217,838.00 | 15.00 | 163,378.50 |
| 0015 | 401-01-00100 | Aggregate Surface Course (Net Section) | 36.7 | CUYD | 111.00 | 4,073.70 | 100.00 | 3,670.00 | 100.00 | 3,670.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 2,158.5 | TON | 114.00 | 246,069.00 | 175.00 | 377,737.50 | 179.00 | 386,371.50 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 271.3 | TON | 155.00 | 42,051.50 | 190.00 | 51,547.00 | 189.00 | 51,275.70 |
| 0018 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 46 | LNFT | 61.10 | 2,810.60 | 80.00 | 3,680.00 | 100.00 | 4,600.00 |
| 0019 | 704-03-00100 | Blocked Out Guard Rail | 448.5 | LNFT | 18.90 | 8,476.65 | 20.00 | 8,970.00 | 20.00 | 8,970.00 |
| 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 71.75 | 21,525.00 | 80.00 | 24,000.00 | 100.00 | 30,000.00 |
| 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 2,160.00 | 25,920.00 | 2,200.00 | 26,400.00 | 2,100.00 | 25,200.00 |
| 0022 | 705-01-00100 | Barbed Wire Fence | 200 | LNFT | 8.90 | 1,780.00 | 10.00 | 2,000.00 | 15.00 | 3,000.00 |
| 0023 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 722.00 | 722.00 | 2,000.00 | 2,000.00 | 900.00 | 900.00 |
| 0024 | 708-01-00100 | Right-of-Way Monument | 21 | EACH | 156.00 | 3,276.00 | 175.00 | 3,675.00 | 260.00 | 5,460.00 |
| 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 21 | EACH | 55.55 | 1,166.55 | 75.00 | 1,575.00 | 175.00 | 3,675.00 |
| 0026 | 712-04-00100 | Flexible Revetment | 3,947 | SQYD | 64.45 | 254,384.15 | 65.00 | 256,555.00 | 50.31 | 198,573.57 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0028 | 716-01-00100 | Mulch (Vegetative) | 15 | TON | 889.00 | 13,335.00 | 750.00 | 11,250.00 | 825.00 | 12,375.00 |
| 0029 | 717-01-00100 | Seeding | 225 | LB | 8.90 | 2,002.50 | 15.00 | 3,375.00 | 11.00 | 2,475.00 |
| 0030 | 718-01-00100 | Fertilizer | 7,500 | LB | 0.65 | 4,875.00 | 0.75 | 5,625.00 | 1.00 | 7,500.00 |
| 0031 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 33,000.00 | 33,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 399,000.00 | 399,000.00 | 385,000.00 | 385,000.00 | 87,000.00 | 87,000.00 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 83.35 | 1,000.20 | 70.00 | 840.00 | 100.00 | 1,200.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 164 | EACH | 11.10 | 1,820.40 | 15.00 | 2,460.00 | 15.00 | 2,460.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.67 | MILE | 2,780.00 | 7,422.60 | 2,750.00 | 7,342.50 | 3,300.00 | 8,811.00 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.179 | MILE | 778.00 | 139.26 | 800.00 | 143.20 | 1,000.00 | 179.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 47,000.00 | 47,000.00 | 52,000.00 | 52,000.00 | 60,000.00 | 60,000.00 |
| 0038 | 804-01-00300 | Precast Concrete Piles (16") | 6,816 | LNFT | 48.55 | 330,916.80 | 55.00 | 374,880.00 | 85.00 | 579,360.00 |
| 0039 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 19,000.00 | 57,000.00 | 1.00 | 3.00 | 1.00 | 3.00 |
| 0040 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 2,040.00 | 8,160.00 | 1,000.00 | 4,000.00 | 2,500.00 | 10,000.00 |
| 0041 | 805-01-00700 | Class A Concrete (Bents) | 172.89 | CUYD | 1,000.00 | 172,890.00 | 1,000.00 | 172,890.00 | 1,650.00 | 285,268.50 |
| 0042 | 805-03-00100 | Class AA Concrete | 747.24 | CUYD | 906.00 | 676,999.44 | 900.00 | 672,516.00 | 1,200.00 | 896,688.00 |
| 0043 | 806-01-00100 | Deformed Reinforcing Steel | 180,904 | LB | 1.05 | 189,949.20 | 1.00 | 180,904.00 | 1.00 | 180,904.00 |
| 0044 | 810-01-00100 | Concrete Railing (Standard Barrier) | 1,040 | LNFT | 68.45 | 71,188.00 | 70.00 | 72,800.00 | 63.00 | 65,520.00 |
| 0045 | 813-01-00100 | Concrete Approach Slabs | 879.54 | SQYD | 227.00 | 199,655.58 | 215.00 | 189,101.10 | 231.00 | 203,173.74 |
| 0046 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,194 | INLF | 0.80 | 955.20 | 4.00 | 4,776.00 | 5.00 | 5,970.00 |
| 0047 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 0.709 | MILE | 1,330.00 | 942.97 | 7,000.00 | 4,963.00 | 2,000.00 | 1,418.00 |
| 0048 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 1.419 | MILE | 1,450.00 | 2,057.55 | 4,000.00 | 5,676.00 | 2,400.00 | 3,405.60 |
| CONTRACTOR TOTAL | 3,999,368.00 | 4,160,551.50 | 4,610,047.50 | |||||||