Bid Tabulations
Letting of
03/14/2012
LA DOTD Headquarters
| Lead Project: H.002575.6 | |
| Parish: Claiborne | |
| Routes: LA 518 | |
| Description: BEAR CREEK AND RELIEF BRIDGES | |
| Type Const: GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST - PRESTRESSED CONCRETE GIRDER BRIDGE, AND RELATED WORK. | |
| Estimated Construction Cost: $2,941,685.68 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34567 | James Construction Group LLC | $2,728,522.01 |
| 2 | 39462 | Jb James Construction Llc | $2,821,879.47 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $2,867,588.45 |
| 4 | 12135 | Blount Bros. Construction, Inc. | $2,960,011.61 |
| 5 | 14788 | Louisiana Bridge, Inc. | $3,071,888.30 |
| 6 | 14422 | T. L. Wallace Construction, Inc. | $3,141,883.92 |
| 7 | 01012 | Cecil D. Gassiott, LLC | $3,599,228.62 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - James Construction Group LLC |
- 2 - Jb James Construction Llc |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Blount Bros. Construction, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 45,000.00 | 45,000.00 | 163,000.00 | 163,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,000.00 | 4,000.00 | 15,000.00 | 15,000.00 | 3,500.00 | 3,500.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-02020 | Removal of Asphalt Pavement | 6,355.56 | SQYD | 5.00 | 31,777.80 | 4.00 | 25,422.24 | 2.00 | 12,711.12 | 5.00 | 31,777.80 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 118+00, 25'X97' Precast Deck Bridge & Steel Piling) | 1 | EACH | 20,000.00 | 20,000.00 | 8,000.00 | 8,000.00 | 45,000.00 | 45,000.00 | 20,000.00 | 20,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge (Sta. 115+50 25' X 40" Timber Trestle Bridge) | 1 | EACH | 7,000.00 | 7,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 |
| 0006 | 203-01-00100 | General Excavation | 15,262.28 | CUYD | 3.50 | 53,417.98 | 9.00 | 137,360.52 | 5.50 | 83,942.54 | 4.00 | 61,049.12 |
| 0007 | 203-03-00100 | Embankment includes 300 cuyd for approaches to bridge | 22,539.1 | CUYD | 9.25 | 208,486.68 | 9.00 | 202,851.90 | 12.00 | 270,469.20 | 12.00 | 270,469.20 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 42 | EACH | 155.00 | 6,510.00 | 140.00 | 5,880.00 | 150.00 | 6,300.00 | 125.00 | 5,250.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 4,467 | LNFT | 2.85 | 12,730.95 | 3.00 | 13,401.00 | 1.50 | 6,700.50 | 3.00 | 13,401.00 |
| 0010 | 302-02-06000 | Class II Base Course (12" Thick) | 7,762.22 | SQYD | 33.00 | 256,153.26 | 24.00 | 186,293.28 | 28.00 | 217,342.16 | 21.50 | 166,887.73 |
| 0011 | 304-05-00100 | Lime Treatment (Type E) | 66.15 | TON | 227.00 | 15,016.05 | 350.00 | 23,152.50 | 340.00 | 22,491.00 | 350.00 | 23,152.50 |
| 0012 | 401-01-00100 | Aggregate Surface Course (Net Section) | 576.22 | CUYD | 42.00 | 24,201.24 | 85.00 | 48,978.70 | 78.00 | 44,945.16 | 80.00 | 46,097.60 |
| 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 15 | CUYD | 120.00 | 1,800.00 | 250.00 | 3,750.00 | 50.00 | 750.00 | 45.00 | 675.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete includes approach slab 32.4 tons | 1,564.46 | TON | 136.00 | 212,766.56 | 122.00 | 190,864.12 | 130.00 | 203,379.80 | 160.00 | 250,313.60 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 256.69 | TON | 147.00 | 37,733.43 | 150.00 | 38,503.50 | 165.00 | 42,353.85 | 185.00 | 47,487.65 |
| 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 733.34 | SQYD | 15.00 | 11,000.10 | 10.00 | 7,333.40 | 3.00 | 2,200.02 | 4.00 | 2,933.36 |
| 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -22.92 | CUYD | 0.10 | -2.29 | 0.01 | -0.23 | 1.00 | -22.92 | 10.00 | -229.20 |
| 0018 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 88 | LNFT | 90.00 | 7,920.00 | 125.00 | 11,000.00 | 160.00 | 14,080.00 | 80.00 | 7,040.00 |
| 0019 | 701-01-01180 | Cross Drain Pipe (96" RCP) | 208 | LNFT | 680.00 | 141,440.00 | 460.00 | 95,680.00 | 570.00 | 118,560.00 | 500.00 | 104,000.00 |
| 0020 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 84 | LNFT | 52.00 | 4,368.00 | 50.00 | 4,200.00 | 68.00 | 5,712.00 | 35.00 | 2,940.00 |
| 0021 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 140 | LNFT | 60.00 | 8,400.00 | 55.00 | 7,700.00 | 70.00 | 9,800.00 | 50.00 | 7,000.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 437.5 | LNFT | 0.50 | 218.75 | 0.50 | 218.75 | 2.00 | 875.00 | 30.00 | 13,125.00 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 130.00 | 13,000.00 | 135.00 | 13,500.00 | 140.00 | 14,000.00 | 75.00 | 7,500.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,000.00 | 8,000.00 | 2,000.00 | 8,000.00 | 2,200.00 | 8,800.00 | 3,000.00 | 12,000.00 |
| 0025 | 705-01-00100 | Barbed Wire Fence | 2,087 | LNFT | 6.50 | 13,565.50 | 7.00 | 14,609.00 | 7.00 | 14,609.00 | 7.50 | 15,652.50 |
| 0026 | 708-01-00100 | Right-of-Way Monument | 20 | EACH | 190.00 | 3,800.00 | 125.00 | 2,500.00 | 230.00 | 4,600.00 | 250.00 | 5,000.00 |
| 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 20 | EACH | 95.00 | 1,900.00 | 125.00 | 2,500.00 | 230.00 | 4,600.00 | 250.00 | 5,000.00 |
| 0028 | 712-04-00100 | Flexible Revetment | 800 | SQYD | 52.00 | 41,600.00 | 52.00 | 41,600.00 | 55.00 | 44,000.00 | 65.00 | 52,000.00 |
| 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,000.00 | 17,000.00 | 18,500.00 | 18,500.00 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 |
| 0030 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,600 | LNFT | 0.25 | 400.00 | 0.30 | 480.00 | 0.30 | 480.00 | 1.00 | 1,600.00 |
| 0031 | 716-01-00100 | Mulch (Vegetative) | 15.05 | TON | 650.00 | 9,782.50 | 655.00 | 9,857.75 | 560.00 | 8,428.00 | 650.00 | 9,782.50 |
| 0032 | 717-01-00100 | Seeding | 516 | LB | 8.00 | 4,128.00 | 8.00 | 4,128.00 | 10.00 | 5,160.00 | 10.00 | 5,160.00 |
| 0033 | 718-01-00100 | Fertilizer | 8,600 | LB | 0.60 | 5,160.00 | 0.60 | 5,160.00 | 0.50 | 4,300.00 | 1.00 | 8,600.00 |
| 0034 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,607.7 | SQYD | 1.50 | 2,411.55 | 1.55 | 2,491.94 | 2.42 | 3,890.63 | 2.50 | 4,019.25 |
| 0035 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| 0036 | 726-01-00100 | Bedding Material | 82 | CUYD | 90.00 | 7,380.00 | 70.00 | 5,740.00 | 100.00 | 8,200.00 | 75.00 | 6,150.00 |
| 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 270,000.00 | 270,000.00 | 280,000.00 | 280,000.00 | 280,000.00 | 280,000.00 | 100,000.00 | 100,000.00 |
| 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 70.00 | 280.00 | 75.00 | 300.00 | 80.00 | 320.00 | 100.00 | 400.00 |
| 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 75.00 | 300.00 | 88.00 | 352.00 | 150.00 | 600.00 |
| 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 95 | EACH | 7.00 | 665.00 | 7.00 | 665.00 | 8.00 | 760.00 | 6.00 | 570.00 |
| 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 |
| 0043 | 804-01-00200 | Precast Concrete Piles (14") | 152 | LNFT | 50.00 | 7,600.00 | 75.00 | 11,400.00 | 60.00 | 9,120.00 | 100.00 | 15,200.00 |
| 0044 | 804-01-00300 | Precast Concrete Piles (16") | 950 | LNFT | 75.00 | 71,250.00 | 76.00 | 72,200.00 | 65.00 | 61,750.00 | 130.00 | 123,500.00 |
| 0045 | 804-01-00600 | Precast Concrete Piles (24") | 1,480 | LNFT | 90.00 | 133,200.00 | 92.00 | 136,160.00 | 100.00 | 148,000.00 | 180.00 | 266,400.00 |
| 0046 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 3,000.00 | 3,000.00 | 500.00 | 500.00 | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 |
| 0047 | 804-17-00100 | Dynamic Monitoring | 6 | EACH | 900.00 | 5,400.00 | 500.00 | 3,000.00 | 750.00 | 4,500.00 | 1,250.00 | 7,500.00 |
| 0048 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 103.88 | CUYD | 1,130.00 | 117,384.40 | 750.00 | 77,910.00 | 1,000.00 | 103,880.00 | 900.00 | 93,492.00 |
| 0049 | 805-01-00700 | Class A Concrete (Bents) | 173.27 | CUYD | 735.00 | 127,353.45 | 820.00 | 142,081.40 | 700.00 | 121,289.00 | 650.00 | 112,625.50 |
| 0050 | 805-04-00100 | Class AA(M) Concrete | 402.48 | CUYD | 600.00 | 241,488.00 | 685.00 | 275,698.80 | 750.00 | 301,860.00 | 700.00 | 281,736.00 |
| 0051 | 805-08-00200 | Precast-Prestressed Concrete Girder (Type II) | 1,980 | LNFT | 75.00 | 148,500.00 | 75.00 | 148,500.00 | 74.00 | 146,520.00 | 80.00 | 158,400.00 |
| 0052 | 805-11-00100 | Strip Seal Joints | 72 | LNFT | 165.00 | 11,880.00 | 160.00 | 11,520.00 | 175.00 | 12,600.00 | 200.00 | 14,400.00 |
| 0053 | 806-01-00100 | Deformed Reinforcing Steel | 198,304 | LB | 0.90 | 178,473.60 | 0.85 | 168,558.40 | 0.80 | 158,643.20 | 1.50 | 297,456.00 |
| 0054 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 16,500.00 | 16,500.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 1,500.00 | 1,500.00 |
| 0055 | 810-01-00100 | Concrete Railing (Standard Barrier) | 272 | LNFT | 51.00 | 13,872.00 | 60.00 | 16,320.00 | 65.00 | 17,680.00 | 100.00 | 27,200.00 |
| 0056 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 600 | LNFT | 52.00 | 31,200.00 | 61.00 | 36,600.00 | 65.00 | 39,000.00 | 100.00 | 60,000.00 |
| 0057 | 813-01-00100 | Concrete Approach Slabs | 320 | SQYD | 220.00 | 70,400.00 | 190.00 | 60,800.00 | 235.00 | 75,200.00 | 250.00 | 80,000.00 |
| 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.485 | MILE | 2,700.00 | 6,709.50 | 2,700.00 | 6,709.50 | 3,000.88 | 7,457.19 | 3,500.00 | 8,697.50 |
| CONTRACTOR TOTAL | 2,728,522.01 | 2,821,879.47 | 2,867,588.45 | 2,960,011.61 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Louisiana Bridge, Inc. |
- 6 - T. L. Wallace Construction, Inc. |
- 7 - Cecil D. Gassiott, LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 155,000.00 | 155,000.00 | 50,000.00 | 50,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,500.00 | 5,500.00 | 3,200.00 | 3,200.00 | 15,000.00 | 15,000.00 |
| 0003 | 202-02-02020 | Removal of Asphalt Pavement | 6,355.56 | SQYD | 8.00 | 50,844.48 | 5.85 | 37,180.03 | 8.00 | 50,844.48 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 118+00, 25'X97' Precast Deck Bridge & Steel Piling) | 1 | EACH | 75,000.00 | 75,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge (Sta. 115+50 25' X 40" Timber Trestle Bridge) | 1 | EACH | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 |
| 0006 | 203-01-00100 | General Excavation | 15,262.28 | CUYD | 7.50 | 114,467.10 | 6.00 | 91,573.68 | 4.50 | 68,680.26 |
| 0007 | 203-03-00100 | Embankment includes 300 cuyd for approaches to bridge | 22,539.1 | CUYD | 11.00 | 247,930.10 | 10.00 | 225,391.00 | 13.50 | 304,277.85 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 42 | EACH | 200.00 | 8,400.00 | 14.00 | 588.00 | 145.00 | 6,090.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 4,467 | LNFT | 3.00 | 13,401.00 | 2.90 | 12,954.30 | 2.00 | 8,934.00 |
| 0010 | 302-02-06000 | Class II Base Course (12" Thick) | 7,762.22 | SQYD | 9.65 | 74,905.42 | 39.00 | 302,726.58 | 30.00 | 232,866.60 |
| 0011 | 304-05-00100 | Lime Treatment (Type E) | 66.15 | TON | 340.50 | 22,524.08 | 470.00 | 31,090.50 | 275.00 | 18,191.25 |
| 0012 | 401-01-00100 | Aggregate Surface Course (Net Section) | 576.22 | CUYD | 120.00 | 69,146.40 | 140.00 | 80,670.80 | 65.00 | 37,454.30 |
| 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 15 | CUYD | 130.00 | 1,950.00 | 99.00 | 1,485.00 | 200.00 | 3,000.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete includes approach slab 32.4 tons | 1,564.46 | TON | 136.20 | 213,079.45 | 128.50 | 201,033.11 | 150.00 | 234,669.00 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 256.69 | TON | 170.25 | 43,701.47 | 158.00 | 40,557.02 | 160.00 | 41,070.40 |
| 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 733.34 | SQYD | 11.35 | 8,323.41 | 26.50 | 19,433.51 | 22.00 | 16,133.48 |
| 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -22.92 | CUYD | 0.01 | -0.23 | 1.00 | -22.92 | 1.00 | -22.92 |
| 0018 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 88 | LNFT | 141.50 | 12,452.00 | 98.00 | 8,624.00 | 110.00 | 9,680.00 |
| 0019 | 701-01-01180 | Cross Drain Pipe (96" RCP) | 208 | LNFT | 650.00 | 135,200.00 | 510.00 | 106,080.00 | 250.00 | 52,000.00 |
| 0020 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 84 | LNFT | 79.00 | 6,636.00 | 85.00 | 7,140.00 | 80.00 | 6,720.00 |
| 0021 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 140 | LNFT | 87.00 | 12,180.00 | 96.00 | 13,440.00 | 85.00 | 11,900.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 437.5 | LNFT | 0.60 | 262.50 | 19.00 | 8,312.50 | 18.00 | 7,875.00 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 148.00 | 14,800.00 | 63.00 | 6,300.00 | 150.00 | 15,000.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,270.00 | 9,080.00 | 2,300.00 | 9,200.00 | 2,000.00 | 8,000.00 |
| 0025 | 705-01-00100 | Barbed Wire Fence | 2,087 | LNFT | 9.00 | 18,783.00 | 7.35 | 15,339.45 | 8.00 | 16,696.00 |
| 0026 | 708-01-00100 | Right-of-Way Monument | 20 | EACH | 200.00 | 4,000.00 | 150.00 | 3,000.00 | 220.00 | 4,400.00 |
| 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 20 | EACH | 200.00 | 4,000.00 | 53.00 | 1,060.00 | 110.00 | 2,200.00 |
| 0028 | 712-04-00100 | Flexible Revetment | 800 | SQYD | 67.00 | 53,600.00 | 63.00 | 50,400.00 | 65.00 | 52,000.00 |
| 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,500.00 | 15,500.00 | 11,700.00 | 11,700.00 | 50,000.00 | 50,000.00 |
| 0030 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,600 | LNFT | 0.30 | 480.00 | 0.25 | 400.00 | 0.25 | 400.00 |
| 0031 | 716-01-00100 | Mulch (Vegetative) | 15.05 | TON | 650.00 | 9,782.50 | 700.00 | 10,535.00 | 700.00 | 10,535.00 |
| 0032 | 717-01-00100 | Seeding | 516 | LB | 8.00 | 4,128.00 | 8.20 | 4,231.20 | 8.50 | 4,386.00 |
| 0033 | 718-01-00100 | Fertilizer | 8,600 | LB | 0.50 | 4,300.00 | 0.60 | 5,160.00 | 0.65 | 5,590.00 |
| 0034 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,607.7 | SQYD | 2.00 | 3,215.40 | 2.30 | 3,697.71 | 1.60 | 2,572.32 |
| 0035 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 25,000.00 | 25,000.00 | 11,900.00 | 11,900.00 | 22,000.00 | 22,000.00 |
| 0036 | 726-01-00100 | Bedding Material | 82 | CUYD | 100.00 | 8,200.00 | 84.00 | 6,888.00 | 86.00 | 7,052.00 |
| 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 185,000.00 | 185,000.00 | 300,000.00 | 300,000.00 | 410,000.00 | 410,000.00 |
| 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 79.50 | 318.00 | 79.00 | 316.00 | 80.00 | 320.00 |
| 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.13 | 340.52 | 79.00 | 316.00 | 80.00 | 320.00 |
| 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 95 | EACH | 8.00 | 760.00 | 7.35 | 698.25 | 8.00 | 760.00 |
| 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 27,600.00 | 27,600.00 | 24,300.00 | 24,300.00 |
| 0043 | 804-01-00200 | Precast Concrete Piles (14") | 152 | LNFT | 60.00 | 9,120.00 | 80.00 | 12,160.00 | 85.00 | 12,920.00 |
| 0044 | 804-01-00300 | Precast Concrete Piles (16") | 950 | LNFT | 70.00 | 66,500.00 | 62.00 | 58,900.00 | 80.00 | 76,000.00 |
| 0045 | 804-01-00600 | Precast Concrete Piles (24") | 1,480 | LNFT | 110.00 | 162,800.00 | 125.00 | 185,000.00 | 160.00 | 236,800.00 |
| 0046 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 45,000.00 | 45,000.00 | 1,000.00 | 1,000.00 |
| 0047 | 804-17-00100 | Dynamic Monitoring | 6 | EACH | 1,550.00 | 9,300.00 | 1,200.00 | 7,200.00 | 4,000.00 | 24,000.00 |
| 0048 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 103.88 | CUYD | 1,100.00 | 114,268.00 | 820.00 | 85,181.60 | 1,400.00 | 145,432.00 |
| 0049 | 805-01-00700 | Class A Concrete (Bents) | 173.27 | CUYD | 1,000.00 | 173,270.00 | 720.00 | 124,754.40 | 1,100.00 | 190,597.00 |
| 0050 | 805-04-00100 | Class AA(M) Concrete | 402.48 | CUYD | 950.00 | 382,356.00 | 720.00 | 289,785.60 | 1,200.00 | 482,976.00 |
| 0051 | 805-08-00200 | Precast-Prestressed Concrete Girder (Type II) | 1,980 | LNFT | 100.00 | 198,000.00 | 75.00 | 148,500.00 | 100.00 | 198,000.00 |
| 0052 | 805-11-00100 | Strip Seal Joints | 72 | LNFT | 210.00 | 15,120.00 | 180.00 | 12,960.00 | 165.00 | 11,880.00 |
| 0053 | 806-01-00100 | Deformed Reinforcing Steel | 198,304 | LB | 1.05 | 208,219.20 | 0.90 | 178,473.60 | 0.90 | 178,473.60 |
| 0054 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 32,000.00 | 32,000.00 | 12,500.00 | 12,500.00 | 16,000.00 | 16,000.00 |
| 0055 | 810-01-00100 | Concrete Railing (Standard Barrier) | 272 | LNFT | 70.00 | 19,040.00 | 71.00 | 19,312.00 | 75.00 | 20,400.00 |
| 0056 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 600 | LNFT | 75.00 | 45,000.00 | 66.00 | 39,600.00 | 75.00 | 45,000.00 |
| 0057 | 813-01-00100 | Concrete Approach Slabs | 320 | SQYD | 225.00 | 72,000.00 | 220.00 | 70,400.00 | 220.00 | 70,400.00 |
| 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.485 | MILE | 3,100.00 | 7,703.50 | 2,800.00 | 6,958.00 | 3,000.00 | 7,455.00 |
| CONTRACTOR TOTAL | 3,071,888.30 | 3,141,883.92 | 3,599,228.62 | |||||||