LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.002575.6
Parish: Claiborne
Routes: LA 518
Description: BEAR CREEK AND RELIEF BRIDGES
Type Const: GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST - PRESTRESSED CONCRETE GIRDER BRIDGE, AND RELATED WORK.
Estimated Construction Cost: $2,941,685.68


RankLicenseBidderConstruction Bid
1 34567 James Construction Group LLC $2,728,522.01
2 39462 Jb James Construction Llc $2,821,879.47
3 12312 Gilchrist Construction Co. LLC $2,867,588.45
4 12135 Blount Bros. Construction, Inc. $2,960,011.61
5 14788 Louisiana Bridge, Inc. $3,071,888.30
6 14422 T. L. Wallace Construction, Inc. $3,141,883.92
7 01012 Cecil D. Gassiott, LLC $3,599,228.62


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
James Construction Group LLC
- 2 -
Jb James Construction Llc
- 3 -
Gilchrist Construction Co. LLC
- 4 -
Blount Bros. Construction, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 45,000.00 45,000.00 163,000.00 163,000.00 25,000.00 25,000.00 10,000.00 10,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 4,000.00 4,000.00 15,000.00 15,000.00 3,500.00 3,500.00 10,000.00 10,000.00
0003 202-02-02020 Removal of Asphalt Pavement 6,355.56   SQYD 5.00 31,777.80 4.00 25,422.24 2.00 12,711.12 5.00 31,777.80
0004 202-02-04000 Removal of Bridge (Sta. 118+00, 25'X97' Precast Deck Bridge & Steel Piling) 1      EACH 20,000.00 20,000.00 8,000.00 8,000.00 45,000.00 45,000.00 20,000.00 20,000.00
0005 202-02-04000 Removal of Bridge (Sta. 115+50 25' X 40" Timber Trestle Bridge) 1      EACH 7,000.00 7,000.00 5,000.00 5,000.00 25,000.00 25,000.00 12,000.00 12,000.00
0006 203-01-00100 General Excavation 15,262.28   CUYD 3.50 53,417.98 9.00 137,360.52 5.50 83,942.54 4.00 61,049.12
0007 203-03-00100 Embankment includes 300 cuyd for approaches to bridge 22,539.1    CUYD 9.25 208,486.68 9.00 202,851.90 12.00 270,469.20 12.00 270,469.20
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 42      EACH 155.00 6,510.00 140.00 5,880.00 150.00 6,300.00 125.00 5,250.00
0009 204-06-00100 Temporary Silt Fencing 4,467      LNFT 2.85 12,730.95 3.00 13,401.00 1.50 6,700.50 3.00 13,401.00
0010 302-02-06000 Class II Base Course (12" Thick) 7,762.22   SQYD 33.00 256,153.26 24.00 186,293.28 28.00 217,342.16 21.50 166,887.73
0011 304-05-00100 Lime Treatment (Type E) 66.15   TON 227.00 15,016.05 350.00 23,152.50 340.00 22,491.00 350.00 23,152.50
0012 401-01-00100 Aggregate Surface Course (Net Section) 576.22   CUYD 42.00 24,201.24 85.00 48,978.70 78.00 44,945.16 80.00 46,097.60
0013 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 15      CUYD 120.00 1,800.00 250.00 3,750.00 50.00 750.00 45.00 675.00
0014 502-01-00100 Superpave Asphaltic Concrete includes approach slab 32.4 tons 1,564.46   TON 136.00 212,766.56 122.00 190,864.12 130.00 203,379.80 160.00 250,313.60
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 256.69   TON 147.00 37,733.43 150.00 38,503.50 165.00 42,353.85 185.00 47,487.65
0016 509-01-00100 Cold Planing Asphaltic Pavement 733.34   SQYD 15.00 11,000.10 10.00 7,333.40 3.00 2,200.02 4.00 2,933.36
0017 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -22.92   CUYD 0.10 -2.29 0.01 -0.23 1.00 -22.92 10.00 -229.20
0018 701-01-01020 Cross Drain Pipe (30" RCP/PP) 88      LNFT 90.00 7,920.00 125.00 11,000.00 160.00 14,080.00 80.00 7,040.00
0019 701-01-01180 Cross Drain Pipe (96" RCP) 208      LNFT 680.00 141,440.00 460.00 95,680.00 570.00 118,560.00 500.00 104,000.00
0020 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 84      LNFT 52.00 4,368.00 50.00 4,200.00 68.00 5,712.00 35.00 2,940.00
0021 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 140      LNFT 60.00 8,400.00 55.00 7,700.00 70.00 9,800.00 50.00 7,000.00
0022 704-03-00100 Blocked Out Guard Rail 437.5    LNFT 0.50 218.75 0.50 218.75 2.00 875.00 30.00 13,125.00
0023 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 130.00 13,000.00 135.00 13,500.00 140.00 14,000.00 75.00 7,500.00
0024 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,000.00 8,000.00 2,000.00 8,000.00 2,200.00 8,800.00 3,000.00 12,000.00
0025 705-01-00100 Barbed Wire Fence 2,087      LNFT 6.50 13,565.50 7.00 14,609.00 7.00 14,609.00 7.50 15,652.50
0026 708-01-00100 Right-of-Way Monument 20      EACH 190.00 3,800.00 125.00 2,500.00 230.00 4,600.00 250.00 5,000.00
0027 708-02-00100 Right-of-Way Monument Witness Post 20      EACH 95.00 1,900.00 125.00 2,500.00 230.00 4,600.00 250.00 5,000.00
0028 712-04-00100 Flexible Revetment 800      SQYD 52.00 41,600.00 52.00 41,600.00 55.00 44,000.00 65.00 52,000.00
0029 713-01-00100 Temporary Signs and Barricades 1      LUMP 17,000.00 17,000.00 18,500.00 18,500.00 50,000.00 50,000.00 15,000.00 15,000.00
0030 713-02-00100 Temporary Pavement Markings (4" Width) 1,600      LNFT 0.25 400.00 0.30 480.00 0.30 480.00 1.00 1,600.00
0031 716-01-00100 Mulch (Vegetative) 15.05   TON 650.00 9,782.50 655.00 9,857.75 560.00 8,428.00 650.00 9,782.50
0032 717-01-00100 Seeding 516      LB 8.00 4,128.00 8.00 4,128.00 10.00 5,160.00 10.00 5,160.00
0033 718-01-00100 Fertilizer 8,600      LB 0.60 5,160.00 0.60 5,160.00 0.50 4,300.00 1.00 8,600.00
0034 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 1,607.7    SQYD 1.50 2,411.55 1.55 2,491.94 2.42 3,890.63 2.50 4,019.25
0035 722-01-00100 Project Site Laboratory 1      EACH 10,000.00 10,000.00 15,000.00 15,000.00 5,000.00 5,000.00 15,000.00 15,000.00
0036 726-01-00100 Bedding Material 82      CUYD 90.00 7,380.00 70.00 5,740.00 100.00 8,200.00 75.00 6,150.00
0037 727-01-00100 Mobilization 1      LUMP 270,000.00 270,000.00 280,000.00 280,000.00 280,000.00 280,000.00 100,000.00 100,000.00
0038 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 70.00 280.00 75.00 300.00 80.00 320.00 100.00 400.00
0039 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 75.00 300.00 75.00 300.00 88.00 352.00 150.00 600.00
0040 731-02-00100 Reflectorized Raised Pavement Markers 95      EACH 7.00 665.00 7.00 665.00 8.00 760.00 6.00 570.00
0042 740-01-00100 Construction Layout 1      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 25,000.00 25,000.00 40,000.00 40,000.00
0043 804-01-00200 Precast Concrete Piles (14") 152      LNFT 50.00 7,600.00 75.00 11,400.00 60.00 9,120.00 100.00 15,200.00
0044 804-01-00300 Precast Concrete Piles (16") 950      LNFT 75.00 71,250.00 76.00 72,200.00 65.00 61,750.00 130.00 123,500.00
0045 804-01-00600 Precast Concrete Piles (24") 1,480      LNFT 90.00 133,200.00 92.00 136,160.00 100.00 148,000.00 180.00 266,400.00
0046 804-12-00100 Loading Permanent Piles 1      EACH 3,000.00 3,000.00 500.00 500.00 1,500.00 1,500.00 2,500.00 2,500.00
0047 804-17-00100 Dynamic Monitoring 6      EACH 900.00 5,400.00 500.00 3,000.00 750.00 4,500.00 1,250.00 7,500.00
0048 805-01-00200 Class A Concrete (Pipe Headwalls) 103.88   CUYD 1,130.00 117,384.40 750.00 77,910.00 1,000.00 103,880.00 900.00 93,492.00
0049 805-01-00700 Class A Concrete (Bents) 173.27   CUYD 735.00 127,353.45 820.00 142,081.40 700.00 121,289.00 650.00 112,625.50
0050 805-04-00100 Class AA(M) Concrete 402.48   CUYD 600.00 241,488.00 685.00 275,698.80 750.00 301,860.00 700.00 281,736.00
0051 805-08-00200 Precast-Prestressed Concrete Girder (Type II) 1,980      LNFT 75.00 148,500.00 75.00 148,500.00 74.00 146,520.00 80.00 158,400.00
0052 805-11-00100 Strip Seal Joints 72      LNFT 165.00 11,880.00 160.00 11,520.00 175.00 12,600.00 200.00 14,400.00
0053 806-01-00100 Deformed Reinforcing Steel 198,304      LB 0.90 178,473.60 0.85 168,558.40 0.80 158,643.20 1.50 297,456.00
0054 807-08-00100 Structural Metalwork 1      LUMP 16,500.00 16,500.00 15,000.00 15,000.00 15,000.00 15,000.00 1,500.00 1,500.00
0055 810-01-00100 Concrete Railing (Standard Barrier) 272      LNFT 51.00 13,872.00 60.00 16,320.00 65.00 17,680.00 100.00 27,200.00
0056 810-01-00200 Concrete Railing (Slotted Barrier) 600      LNFT 52.00 31,200.00 61.00 36,600.00 65.00 39,000.00 100.00 60,000.00
0057 813-01-00100 Concrete Approach Slabs 320      SQYD 220.00 70,400.00 190.00 60,800.00 235.00 75,200.00 250.00 80,000.00
0058 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.485  MILE 2,700.00 6,709.50 2,700.00 6,709.50 3,000.88 7,457.19 3,500.00 8,697.50
                         
    CONTRACTOR TOTAL       2,728,522.01   2,821,879.47   2,867,588.45   2,960,011.61



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Louisiana Bridge, Inc.
- 6 -
T. L. Wallace Construction, Inc.
- 7 -
Cecil D. Gassiott, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 15,000.00 15,000.00 155,000.00 155,000.00 50,000.00 50,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 5,500.00 5,500.00 3,200.00 3,200.00 15,000.00 15,000.00
0003 202-02-02020 Removal of Asphalt Pavement 6,355.56   SQYD 8.00 50,844.48 5.85 37,180.03 8.00 50,844.48
0004 202-02-04000 Removal of Bridge (Sta. 118+00, 25'X97' Precast Deck Bridge & Steel Piling) 1      EACH 75,000.00 75,000.00 20,000.00 20,000.00 35,000.00 35,000.00
0005 202-02-04000 Removal of Bridge (Sta. 115+50 25' X 40" Timber Trestle Bridge) 1      EACH 15,000.00 15,000.00 10,000.00 10,000.00 35,000.00 35,000.00
0006 203-01-00100 General Excavation 15,262.28   CUYD 7.50 114,467.10 6.00 91,573.68 4.50 68,680.26
0007 203-03-00100 Embankment includes 300 cuyd for approaches to bridge 22,539.1    CUYD 11.00 247,930.10 10.00 225,391.00 13.50 304,277.85
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 42      EACH 200.00 8,400.00 14.00 588.00 145.00 6,090.00
0009 204-06-00100 Temporary Silt Fencing 4,467      LNFT 3.00 13,401.00 2.90 12,954.30 2.00 8,934.00
0010 302-02-06000 Class II Base Course (12" Thick) 7,762.22   SQYD 9.65 74,905.42 39.00 302,726.58 30.00 232,866.60
0011 304-05-00100 Lime Treatment (Type E) 66.15   TON 340.50 22,524.08 470.00 31,090.50 275.00 18,191.25
0012 401-01-00100 Aggregate Surface Course (Net Section) 576.22   CUYD 120.00 69,146.40 140.00 80,670.80 65.00 37,454.30
0013 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 15      CUYD 130.00 1,950.00 99.00 1,485.00 200.00 3,000.00
0014 502-01-00100 Superpave Asphaltic Concrete includes approach slab 32.4 tons 1,564.46   TON 136.20 213,079.45 128.50 201,033.11 150.00 234,669.00
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 256.69   TON 170.25 43,701.47 158.00 40,557.02 160.00 41,070.40
0016 509-01-00100 Cold Planing Asphaltic Pavement 733.34   SQYD 11.35 8,323.41 26.50 19,433.51 22.00 16,133.48
0017 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -22.92   CUYD 0.01 -0.23 1.00 -22.92 1.00 -22.92
0018 701-01-01020 Cross Drain Pipe (30" RCP/PP) 88      LNFT 141.50 12,452.00 98.00 8,624.00 110.00 9,680.00
0019 701-01-01180 Cross Drain Pipe (96" RCP) 208      LNFT 650.00 135,200.00 510.00 106,080.00 250.00 52,000.00
0020 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 84      LNFT 79.00 6,636.00 85.00 7,140.00 80.00 6,720.00
0021 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 140      LNFT 87.00 12,180.00 96.00 13,440.00 85.00 11,900.00
0022 704-03-00100 Blocked Out Guard Rail 437.5    LNFT 0.60 262.50 19.00 8,312.50 18.00 7,875.00
0023 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 148.00 14,800.00 63.00 6,300.00 150.00 15,000.00
0024 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,270.00 9,080.00 2,300.00 9,200.00 2,000.00 8,000.00
0025 705-01-00100 Barbed Wire Fence 2,087      LNFT 9.00 18,783.00 7.35 15,339.45 8.00 16,696.00
0026 708-01-00100 Right-of-Way Monument 20      EACH 200.00 4,000.00 150.00 3,000.00 220.00 4,400.00
0027 708-02-00100 Right-of-Way Monument Witness Post 20      EACH 200.00 4,000.00 53.00 1,060.00 110.00 2,200.00
0028 712-04-00100 Flexible Revetment 800      SQYD 67.00 53,600.00 63.00 50,400.00 65.00 52,000.00
0029 713-01-00100 Temporary Signs and Barricades 1      LUMP 15,500.00 15,500.00 11,700.00 11,700.00 50,000.00 50,000.00
0030 713-02-00100 Temporary Pavement Markings (4" Width) 1,600      LNFT 0.30 480.00 0.25 400.00 0.25 400.00
0031 716-01-00100 Mulch (Vegetative) 15.05   TON 650.00 9,782.50 700.00 10,535.00 700.00 10,535.00
0032 717-01-00100 Seeding 516      LB 8.00 4,128.00 8.20 4,231.20 8.50 4,386.00
0033 718-01-00100 Fertilizer 8,600      LB 0.50 4,300.00 0.60 5,160.00 0.65 5,590.00
0034 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 1,607.7    SQYD 2.00 3,215.40 2.30 3,697.71 1.60 2,572.32
0035 722-01-00100 Project Site Laboratory 1      EACH 25,000.00 25,000.00 11,900.00 11,900.00 22,000.00 22,000.00
0036 726-01-00100 Bedding Material 82      CUYD 100.00 8,200.00 84.00 6,888.00 86.00 7,052.00
0037 727-01-00100 Mobilization 1      LUMP 185,000.00 185,000.00 300,000.00 300,000.00 410,000.00 410,000.00
0038 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 79.50 318.00 79.00 316.00 80.00 320.00
0039 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 85.13 340.52 79.00 316.00 80.00 320.00
0040 731-02-00100 Reflectorized Raised Pavement Markers 95      EACH 8.00 760.00 7.35 698.25 8.00 760.00
0042 740-01-00100 Construction Layout 1      LUMP 50,000.00 50,000.00 27,600.00 27,600.00 24,300.00 24,300.00
0043 804-01-00200 Precast Concrete Piles (14") 152      LNFT 60.00 9,120.00 80.00 12,160.00 85.00 12,920.00
0044 804-01-00300 Precast Concrete Piles (16") 950      LNFT 70.00 66,500.00 62.00 58,900.00 80.00 76,000.00
0045 804-01-00600 Precast Concrete Piles (24") 1,480      LNFT 110.00 162,800.00 125.00 185,000.00 160.00 236,800.00
0046 804-12-00100 Loading Permanent Piles 1      EACH 1.00 1.00 45,000.00 45,000.00 1,000.00 1,000.00
0047 804-17-00100 Dynamic Monitoring 6      EACH 1,550.00 9,300.00 1,200.00 7,200.00 4,000.00 24,000.00
0048 805-01-00200 Class A Concrete (Pipe Headwalls) 103.88   CUYD 1,100.00 114,268.00 820.00 85,181.60 1,400.00 145,432.00
0049 805-01-00700 Class A Concrete (Bents) 173.27   CUYD 1,000.00 173,270.00 720.00 124,754.40 1,100.00 190,597.00
0050 805-04-00100 Class AA(M) Concrete 402.48   CUYD 950.00 382,356.00 720.00 289,785.60 1,200.00 482,976.00
0051 805-08-00200 Precast-Prestressed Concrete Girder (Type II) 1,980      LNFT 100.00 198,000.00 75.00 148,500.00 100.00 198,000.00
0052 805-11-00100 Strip Seal Joints 72      LNFT 210.00 15,120.00 180.00 12,960.00 165.00 11,880.00
0053 806-01-00100 Deformed Reinforcing Steel 198,304      LB 1.05 208,219.20 0.90 178,473.60 0.90 178,473.60
0054 807-08-00100 Structural Metalwork 1      LUMP 32,000.00 32,000.00 12,500.00 12,500.00 16,000.00 16,000.00
0055 810-01-00100 Concrete Railing (Standard Barrier) 272      LNFT 70.00 19,040.00 71.00 19,312.00 75.00 20,400.00
0056 810-01-00200 Concrete Railing (Slotted Barrier) 600      LNFT 75.00 45,000.00 66.00 39,600.00 75.00 45,000.00
0057 813-01-00100 Concrete Approach Slabs 320      SQYD 225.00 72,000.00 220.00 70,400.00 220.00 70,400.00
0058 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.485  MILE 3,100.00 7,703.50 2,800.00 6,958.00 3,000.00 7,455.00
                     
    CONTRACTOR TOTAL       3,071,888.30   3,141,883.92   3,599,228.62