Bid Tabulations
Letting of
10/10/2012
LA DOTD Headquarters
| Lead Project: H.002403.6 | |
| Parish: Livingston | |
| Routes: La 16 | |
| Description: LA 16: LA 1019 - ST. HELENA PARISH LINE | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT REHABILITATION, AND RELATED WORK. | |
| Estimated Construction Cost: $4,418,397.36 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,538,622.37 |
| 2 | 06276 | Barriere Construction Co., LLC. | $4,051,686.77 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $4,169,257.30 |
| 4 | 00481 | Coastal Bridge Co., L.L.C. | $4,279,327.02 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $4,455,371.35 |
| 6 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $4,561,146.02 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Barriere Construction Co., LLC. |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Coastal Bridge Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 110 | SQYD | 14.00 | 1,540.00 | 11.00 | 1,210.00 | 20.00 | 2,200.00 | 40.00 | 4,400.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 100 | LNFT | 5.00 | 500.00 | 9.00 | 900.00 | 12.00 | 1,200.00 | 5.00 | 500.00 |
| 0003 | 202-02-14500 | Removal of Guard Rail | 440 | LNFT | 8.25 | 3,630.00 | 5.50 | 2,420.00 | 5.00 | 2,200.00 | 5.00 | 2,200.00 |
| 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 200.00 | 800.00 | 130.00 | 520.00 | 80.00 | 320.00 | 100.00 | 400.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 4,223 | SQYD | 2.80 | 11,824.40 | 3.00 | 12,669.00 | 6.00 | 25,338.00 | 11.50 | 48,564.50 |
| 0006 | 203-04-00300 | Nonplastic Embankment (Stone) | 350 | CUYD | 150.00 | 52,500.00 | 88.00 | 30,800.00 | 65.00 | 22,750.00 | 200.00 | 70,000.00 |
| 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,999 | CUYD | 19.00 | 37,981.00 | 22.50 | 44,977.50 | 20.00 | 39,980.00 | 10.00 | 19,990.00 |
| 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 44 | EACH | 16.00 | 704.00 | 16.50 | 726.00 | 15.00 | 660.00 | 15.00 | 660.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,100 | LNFT | 2.00 | 2,200.00 | 3.00 | 3,300.00 | 1.30 | 1,430.00 | 2.00 | 2,200.00 |
| 0010 | 304-05-00100 | Lime Treatment (Type E) | 87.5 | TON | 410.00 | 35,875.00 | 50.00 | 4,375.00 | 450.00 | 39,375.00 | 200.00 | 17,500.00 |
| 0011 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 61,776 | GAL | 3.50 | 216,216.00 | 3.70 | 228,571.20 | 3.50 | 216,216.00 | 3.40 | 210,038.40 |
| 0012 | 507-02-00200 | Aggregate (S2) | 90,848 | SQYD | 0.85 | 77,220.80 | 1.00 | 90,848.00 | 0.90 | 81,763.20 | 0.85 | 77,220.80 |
| 0013 | 507-02-00300 | Aggregate (S3) | 90,848 | SQYD | 0.68 | 61,776.64 | 0.70 | 63,593.60 | 0.70 | 63,593.60 | 0.65 | 59,051.20 |
| 0014 | 509-01-00100 | Cold Planing Asphaltic Pavement | 91,207 | SQYD | 1.25 | 114,008.75 | 0.50 | 45,603.50 | 0.60 | 54,724.20 | 3.25 | 296,422.75 |
| 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -5,066 | CUYD | 10.00 | -50,660.00 | 10.00 | -50,660.00 | 1.00 | -5,066.00 | 0.01 | -50.66 |
| 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,830 | SQYD | 60.00 | 169,800.00 | 97.00 | 274,510.00 | 80.00 | 226,400.00 | 70.00 | 198,100.00 |
| 0017 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 19,200 | LNFT | 1.55 | 29,760.00 | 1.00 | 19,200.00 | 1.95 | 37,440.00 | 1.50 | 28,800.00 |
| 0018 | 602-03-00100 | Cleaning and Sealing Random cracks | 250 | LNFT | 3.10 | 775.00 | 0.55 | 137.50 | 2.25 | 562.50 | 3.00 | 750.00 |
| 0019 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 290 | SQYD | 155.00 | 44,950.00 | 137.00 | 39,730.00 | 210.00 | 60,900.00 | 150.00 | 43,500.00 |
| 0020 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 400 | SQYD | 145.00 | 58,000.00 | 115.00 | 46,000.00 | 185.00 | 74,000.00 | 150.00 | 60,000.00 |
| 0021 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 1,100 | SQYD | 125.00 | 137,500.00 | 99.00 | 108,900.00 | 165.00 | 181,500.00 | 125.00 | 137,500.00 |
| 0022 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,500.00 | 1,500.00 | 322.00 | 322.00 | 1,500.00 | 1,500.00 | 1,250.00 | 1,250.00 |
| 0023 | 704-03-00100 | Blocked Out Guard Rail | 125 | LNFT | 21.00 | 2,625.00 | 25.00 | 3,125.00 | 22.00 | 2,750.00 | 25.00 | 3,125.00 |
| 0024 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 67.00 | 6,700.00 | 72.00 | 7,200.00 | 72.00 | 7,200.00 | 65.00 | 6,500.00 |
| 0025 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,200.00 | 8,800.00 | 2,500.00 | 10,000.00 | 2,300.00 | 9,200.00 | 2,500.00 | 10,000.00 |
| 0026 | 707-01-00300 | Concrete Curb (Mountable) | 100 | LNFT | 10.00 | 1,000.00 | 23.00 | 2,300.00 | 30.00 | 3,000.00 | 5.00 | 500.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 125,000.00 | 125,000.00 | 25,000.00 | 25,000.00 | 125,000.00 | 125,000.00 |
| 0028 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,650 | LNFT | 0.26 | 429.00 | 0.25 | 412.50 | 0.25 | 412.50 | 0.25 | 412.50 |
| 0029 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,027 | LNFT | 0.76 | 780.52 | 0.80 | 821.60 | 0.85 | 872.95 | 0.75 | 770.25 |
| 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.087 | MILE | 165.00 | 2,159.36 | 100.00 | 1,308.70 | 500.00 | 6,543.50 | 175.00 | 2,290.23 |
| 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.056 | MILE | 175.00 | 1,759.80 | 10.00 | 100.56 | 100.00 | 1,005.60 | 400.00 | 4,022.40 |
| 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 47.744 | MILE | 300.00 | 14,323.20 | 10.00 | 477.44 | 100.00 | 4,774.40 | 450.00 | 21,484.80 |
| 0033 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 22 | EACH | 21.00 | 462.00 | 22.00 | 484.00 | 25.00 | 550.00 | 20.00 | 440.00 |
| 0034 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 8 | EACH | 51.00 | 408.00 | 22.00 | 176.00 | 25.00 | 200.00 | 20.00 | 160.00 |
| 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,500 | SQYD | 1.25 | 3,125.00 | 2.20 | 5,500.00 | 1.30 | 3,250.00 | 2.50 | 6,250.00 |
| 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 197,500.00 | 197,500.00 | 300,000.00 | 300,000.00 | 300,000.00 | 300,000.00 | 375,000.00 | 375,000.00 |
| 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 102.00 | 408.00 | 90.00 | 360.00 | 85.00 | 340.00 |
| 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,386 | EACH | 4.50 | 6,237.00 | 5.50 | 7,623.00 | 5.60 | 7,761.60 | 5.00 | 6,930.00 |
| 0039 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,215 | LNFT | 1.60 | 1,944.00 | 1.70 | 2,065.50 | 1.60 | 1,944.00 | 1.50 | 1,822.50 |
| 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 560 | LNFT | 5.10 | 2,856.00 | 5.50 | 3,080.00 | 5.60 | 3,136.00 | 5.00 | 2,800.00 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.873 | MILE | 2,700.00 | 64,457.10 | 2,600.00 | 62,069.80 | 2,600.00 | 62,069.80 | 2,550.00 | 60,876.15 |
| 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.029 | MILE | 700.00 | 3,520.30 | 930.00 | 4,676.97 | 950.00 | 4,777.55 | 900.00 | 4,526.10 |
| 0043 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) See Sheet 2h | 0.148 | MILE | 2,000.00 | 296.00 | 1,350.00 | 199.80 | 1,400.00 | 207.20 | 1,300.00 | 192.40 |
| 0044 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.202 | MILE | 3,000.00 | 606.00 | 3,300.00 | 666.60 | 3,300.00 | 666.60 | 3,100.00 | 626.20 |
| 0045 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 7 | EACH | 205.00 | 1,435.00 | 240.00 | 1,680.00 | 240.00 | 1,680.00 | 225.00 | 1,575.00 |
| 0046 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 205.00 | 1,025.00 | 240.00 | 1,200.00 | 240.00 | 1,200.00 | 225.00 | 1,125.00 |
| 0047 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 310.00 | 620.00 | 275.00 | 550.00 | 280.00 | 560.00 | 250.00 | 500.00 |
| 0048 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 310.00 | 1,860.00 | 250.00 | 1,500.00 | 250.00 | 1,500.00 | 225.00 | 1,350.00 |
| 0049 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 2 | EACH | 725.00 | 1,450.00 | 330.00 | 660.00 | 330.00 | 660.00 | 300.00 | 600.00 |
| 0050 | 735-01-00100 | Mailboxes | 124 | EACH | 1.00 | 124.00 | 11.00 | 1,364.00 | 10.00 | 1,240.00 | 10.00 | 1,240.00 |
| 0051 | 735-02-00100 | Mailbox Supports (Single) | 120 | EACH | 110.00 | 13,200.00 | 140.00 | 16,800.00 | 115.00 | 13,800.00 | 125.00 | 15,000.00 |
| 0052 | 735-04-00100 | Mailbox Supports (Multiple) | 4 | EACH | 185.00 | 740.00 | 550.00 | 2,200.00 | 200.00 | 800.00 | 500.00 | 2,000.00 |
| 0053 | 739-01-00100 | Hydro-Seeding | 4.5 | ACRE | 1,200.00 | 5,400.00 | 2,750.00 | 12,375.00 | 1,300.00 | 5,850.00 | 1,250.00 | 5,625.00 |
| 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 13,000.00 | 13,000.00 | 7,500.00 | 7,500.00 | 100,000.00 | 100,000.00 |
| 0055 | DEV-502-0001 | Superpave Asphaltic Concrete | 28,551.7 | TON | 74.00 | 2,112,825.80 | 75.00 | 2,141,377.50 | 78.00 | 2,227,032.60 | 75.00 | 2,141,377.50 |
| 0056 | DEV-502-0002 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,915.7 | TON | 1.00 | 1,915.70 | 135.00 | 258,619.50 | 150.00 | 287,355.00 | 5.00 | 9,578.50 |
| 0057 | DEV-504-0001 | Asphalt Tack Coat | 10,663 | GAL | 3.00 | 31,989.00 | 4.00 | 42,652.00 | 2.50 | 26,657.50 | 3.50 | 37,320.50 |
| 0058 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 47,320 | INLF | 0.20 | 9,464.00 | 1.00 | 47,320.00 | 0.35 | 16,562.00 | 1.00 | 47,320.00 |
| 0059 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 340 | INLF | 5.00 | 1,700.00 | 1.00 | 340.00 | 3.40 | 1,156.00 | 0.50 | 170.00 |
| 0060 | NS-602-00001 | Milling Concrete Pavement | 148 | SQYD | 28.00 | 4,144.00 | 25.00 | 3,700.00 | 7.00 | 1,036.00 | 10.00 | 1,480.00 |
| CONTRACTOR TOTAL | 3,538,622.37 | 4,051,686.77 | 4,169,257.30 | 4,279,327.02 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Barber Bros. Contracting Co., L.L.C |
- 6 - F.G. Sullivan, Jr. Contractor LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 110 | SQYD | 15.00 | 1,650.00 | 15.00 | 1,650.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 100 | LNFT | 10.00 | 1,000.00 | 5.00 | 500.00 |
| 0003 | 202-02-14500 | Removal of Guard Rail | 440 | LNFT | 5.00 | 2,200.00 | 5.00 | 2,200.00 |
| 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 125.00 | 500.00 | 1.00 | 4.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 4,223 | SQYD | 4.00 | 16,892.00 | 15.00 | 63,345.00 |
| 0006 | 203-04-00300 | Nonplastic Embankment (Stone) | 350 | CUYD | 200.00 | 70,000.00 | 265.00 | 92,750.00 |
| 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,999 | CUYD | 20.00 | 39,980.00 | 12.00 | 23,988.00 |
| 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 44 | EACH | 18.00 | 792.00 | 15.00 | 660.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,100 | LNFT | 1.50 | 1,650.00 | 2.00 | 2,200.00 |
| 0010 | 304-05-00100 | Lime Treatment (Type E) | 87.5 | TON | 400.00 | 35,000.00 | 450.00 | 39,375.00 |
| 0011 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 61,776 | GAL | 4.00 | 247,104.00 | 3.50 | 216,216.00 |
| 0012 | 507-02-00200 | Aggregate (S2) | 90,848 | SQYD | 1.00 | 90,848.00 | 1.00 | 90,848.00 |
| 0013 | 507-02-00300 | Aggregate (S3) | 90,848 | SQYD | 0.75 | 68,136.00 | 0.90 | 81,763.20 |
| 0014 | 509-01-00100 | Cold Planing Asphaltic Pavement | 91,207 | SQYD | 2.50 | 228,017.50 | 2.00 | 182,414.00 |
| 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -5,066 | CUYD | 0.00 | 0.00 | 0.00 | 0.00 |
| 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,830 | SQYD | 45.00 | 127,350.00 | 85.00 | 240,550.00 |
| 0017 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 19,200 | LNFT | 1.75 | 33,600.00 | 1.50 | 28,800.00 |
| 0018 | 602-03-00100 | Cleaning and Sealing Random cracks | 250 | LNFT | 3.50 | 875.00 | 3.00 | 750.00 |
| 0019 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 290 | SQYD | 170.00 | 49,300.00 | 150.00 | 43,500.00 |
| 0020 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 400 | SQYD | 160.00 | 64,000.00 | 140.00 | 56,000.00 |
| 0021 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 1,100 | SQYD | 140.00 | 154,000.00 | 120.00 | 132,000.00 |
| 0022 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,000.00 | 2,000.00 | 1,500.00 | 1,500.00 |
| 0023 | 704-03-00100 | Blocked Out Guard Rail | 125 | LNFT | 25.00 | 3,125.00 | 22.00 | 2,750.00 |
| 0024 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 75.00 | 7,500.00 | 65.00 | 6,500.00 |
| 0025 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,500.00 | 10,000.00 | 2,300.00 | 9,200.00 |
| 0026 | 707-01-00300 | Concrete Curb (Mountable) | 100 | LNFT | 12.00 | 1,200.00 | 10.00 | 1,000.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 240,000.00 | 240,000.00 |
| 0028 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,650 | LNFT | 0.30 | 495.00 | 0.22 | 363.00 |
| 0029 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,027 | LNFT | 1.00 | 1,027.00 | 0.75 | 770.25 |
| 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.087 | MILE | 320.00 | 4,187.84 | 400.00 | 5,234.80 |
| 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.056 | MILE | 200.00 | 2,011.20 | 200.00 | 2,011.20 |
| 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 47.744 | MILE | 240.00 | 11,458.56 | 250.00 | 11,936.00 |
| 0033 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 22 | EACH | 25.00 | 550.00 | 20.00 | 440.00 |
| 0034 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 8 | EACH | 60.00 | 480.00 | 20.00 | 160.00 |
| 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,500 | SQYD | 1.50 | 3,750.00 | 1.20 | 3,000.00 |
| 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 300,000.00 | 300,000.00 |
| 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 85.00 | 340.00 |
| 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,386 | EACH | 5.00 | 6,930.00 | 5.00 | 6,930.00 |
| 0039 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,215 | LNFT | 2.00 | 2,430.00 | 1.50 | 1,822.50 |
| 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 560 | LNFT | 6.00 | 3,360.00 | 5.00 | 2,800.00 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 23.873 | MILE | 3,000.00 | 71,619.00 | 2,500.00 | 59,682.50 |
| 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.029 | MILE | 800.00 | 4,023.20 | 850.00 | 4,274.65 |
| 0043 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) See Sheet 2h | 0.148 | MILE | 2,500.00 | 370.00 | 1,260.00 | 186.48 |
| 0044 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.202 | MILE | 3,500.00 | 707.00 | 2,970.00 | 599.94 |
| 0045 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 7 | EACH | 250.00 | 1,750.00 | 224.00 | 1,568.00 |
| 0046 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 250.00 | 1,250.00 | 224.00 | 1,120.00 |
| 0047 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 350.00 | 700.00 | 260.00 | 520.00 |
| 0048 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 350.00 | 2,100.00 | 235.00 | 1,410.00 |
| 0049 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 2 | EACH | 800.00 | 1,600.00 | 312.00 | 624.00 |
| 0050 | 735-01-00100 | Mailboxes | 124 | EACH | 15.00 | 1,860.00 | 10.00 | 1,240.00 |
| 0051 | 735-02-00100 | Mailbox Supports (Single) | 120 | EACH | 150.00 | 18,000.00 | 126.00 | 15,120.00 |
| 0052 | 735-04-00100 | Mailbox Supports (Multiple) | 4 | EACH | 600.00 | 2,400.00 | 500.00 | 2,000.00 |
| 0053 | 739-01-00100 | Hydro-Seeding | 4.5 | ACRE | 1,500.00 | 6,750.00 | 1,200.00 | 5,400.00 |
| 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 75,000.00 | 75,000.00 |
| 0055 | DEV-502-0001 | Superpave Asphaltic Concrete | 28,551.7 | TON | 85.00 | 2,426,894.50 | 80.00 | 2,284,136.00 |
| 0056 | DEV-502-0002 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,915.7 | TON | 100.00 | 191,570.00 | 80.00 | 153,256.00 |
| 0057 | DEV-504-0001 | Asphalt Tack Coat | 10,663 | GAL | 3.85 | 41,052.55 | 2.50 | 26,657.50 |
| 0058 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 47,320 | INLF | 0.55 | 26,026.00 | 0.50 | 23,660.00 |
| 0059 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 340 | INLF | 2.00 | 680.00 | 3.00 | 1,020.00 |
| 0060 | NS-602-00001 | Milling Concrete Pavement | 148 | SQYD | 15.00 | 2,220.00 | 50.00 | 7,400.00 |
| CONTRACTOR TOTAL | 4,455,371.35 | 4,561,146.02 | ||||||