Bid Tabulations
Letting of
12/14/2011
LA DOTD Headquarters
| Lead Project: H.002303.6 | |
| Parish: East Baton Rouge | |
| Routes: LA 37 | |
| Description: LA 37 at Central Thruway | |
| Type Const: GRADING, DRAIN STRUCT, SEWER FORCE MAINS, CLASS II BC, SUPERPAVE ACP, PCCP, TRAFFIC SIGNALIZATION, CONCRETE GIRDER SPAN AND PRECAST CONCRETE SPAN BRIDGES, AND RELATED WORK; ADDITIVE ALTERNATE 1, SEWER FORCE MAINS. | |
| Estimated Construction Cost: $7,843,084.84 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 39462 | Jb James Construction Llc | $7,571,012.55 |
| 2 | 34567 | James Construction Group LLC | $7,731,017.30 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $7,750,993.13 |
| 4 | 48896 | Command Construction Industries LLC | $9,276,980.70 |
| 5 | 05693 | Industrial Enterprises, Inc. | $9,995,498.60 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jb James Construction Llc |
- 2 - James Construction Group LLC |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Command Construction Industries LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 200,000.00 | 200,000.00 | 45,000.00 | 45,000.00 | 75,000.00 | 75,000.00 | 235,000.00 | 235,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Sta. 402+25; 18'x20') | 1 | EACH | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 | 25,000.00 | 25,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 408+70; 76'x43' Precast Slab Span on Timber Piles) | 1 | EACH | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 250,000.00 | 250,000.00 |
| 0005 | 202-02-05000 | Removal of Building (42'x18' Building on Concrete Slab) | 1 | EACH | 100.00 | 100.00 | 10,000.00 | 10,000.00 | 100.00 | 100.00 | 25,000.00 | 25,000.00 |
| 0006 | 202-02-05000 | Removal of Building (60' x 60' Metal Building on Concrete Slab) | 1 | EACH | 100.00 | 100.00 | 10,000.00 | 10,000.00 | 100.00 | 100.00 | 25,000.00 | 25,000.00 |
| 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,861 | SQYD | 8.00 | 14,888.00 | 8.00 | 14,888.00 | 5.00 | 9,305.00 | 10.00 | 18,610.00 |
| 0008 | 202-02-14500 | Removal of Guard Rail | 322 | LNFT | 6.00 | 1,932.00 | 5.00 | 1,610.00 | 7.00 | 2,254.00 | 7.00 | 2,254.00 |
| 0009 | 202-02-38500 | Removal of Surfacing and Stablized Base | 8,715 | SQYD | 4.00 | 34,860.00 | 6.00 | 52,290.00 | 6.00 | 52,290.00 | 10.00 | 87,150.00 |
| 0010 | 203-01-00100 | General Excavation | 6,126 | CUYD | 10.00 | 61,260.00 | 12.00 | 73,512.00 | 7.75 | 47,476.50 | 1.00 | 6,126.00 |
| 0011 | 203-02-00100 | Drainage Excavation | 15,693 | CUYD | 8.00 | 125,544.00 | 15.00 | 235,395.00 | 8.50 | 133,390.50 | 10.00 | 156,930.00 |
| 0012 | 203-03-00100 | Embankment | 23,266 | CUYD | 17.00 | 395,522.00 | 16.00 | 372,256.00 | 17.00 | 395,522.00 | 1.00 | 23,266.00 |
| 0013 | 203-04-00300 | Nonplastic Embankment (Stone) | 747.6 | CUYD | 50.00 | 37,380.00 | 60.00 | 44,856.00 | 100.00 | 74,760.00 | 100.00 | 74,760.00 |
| 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 100 | EACH | 10.00 | 1,000.00 | 15.00 | 1,500.00 | 20.00 | 2,000.00 | 15.00 | 1,500.00 |
| 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 120.00 | 840.00 | 200.00 | 1,400.00 | 220.00 | 1,540.00 | 150.00 | 1,050.00 |
| 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 500.00 | 4,000.00 | 400.00 | 3,200.00 | 650.00 | 5,200.00 | 300.00 | 2,400.00 |
| 0017 | 204-06-00100 | Temporary Silt Fencing | 1,940 | LNFT | 1.70 | 3,298.00 | 2.50 | 4,850.00 | 1.80 | 3,492.00 | 10.00 | 19,400.00 |
| 0018 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 2,500.00 | 7,500.00 | 4,000.00 | 12,000.00 | 1,500.00 | 4,500.00 | 2,000.00 | 6,000.00 |
| 0019 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 30,366.7 | SQYD | 11.00 | 334,033.70 | 8.00 | 242,933.60 | 8.65 | 262,671.96 | 10.00 | 303,667.00 |
| 0020 | 302-02-01561 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) (Stone or Recycled Portland Cement Concrete Only) | 2,985.4 | SQYD | 7.00 | 20,897.80 | 10.00 | 29,854.00 | 10.00 | 29,854.00 | 11.00 | 32,839.40 |
| 0021 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 34,978.6 | SQYD | 9.00 | 314,807.40 | 13.00 | 454,721.80 | 12.00 | 419,743.20 | 11.00 | 384,764.60 |
| 0022 | 304-05-00100 | Lime Treatment (Type E) | 247.91 | TON | 150.00 | 37,186.50 | 150.00 | 37,186.50 | 150.00 | 37,186.50 | 400.00 | 99,164.00 |
| 0023 | 401-01-00100 | Aggregate Surface Course (Net Section) | 255.5 | CUYD | 80.00 | 20,440.00 | 65.00 | 16,607.50 | 85.00 | 21,717.50 | 75.00 | 19,162.50 |
| 0024 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,000 | CUYD | 50.00 | 100,000.00 | 80.00 | 160,000.00 | 40.00 | 80,000.00 | 10.00 | 20,000.00 |
| 0025 | 502-01-00100 | Superpave Asphaltic Concrete | 2,581.9 | TON | 100.00 | 258,190.00 | 98.00 | 253,026.20 | 110.00 | 284,009.00 | 120.00 | 309,828.00 |
| 0026 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 15.8 | TON | 140.00 | 2,212.00 | 140.00 | 2,212.00 | 250.00 | 3,950.00 | 150.00 | 2,370.00 |
| 0027 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 24,250.4 | SQYD | 45.00 | 1,091,268.00 | 50.00 | 1,212,520.00 | 45.00 | 1,091,268.00 | 45.00 | 1,091,268.00 |
| 0028 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 1,584.7 | SQYD | 52.00 | 82,404.40 | 88.00 | 139,453.60 | 54.00 | 85,573.80 | 65.00 | 103,005.50 |
| 0029 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 20 | EACH | 100.00 | 2,000.00 | 100.00 | 2,000.00 | 85.00 | 1,700.00 | 100.00 | 2,000.00 |
| 0030 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 273 | LNFT | 220.00 | 60,060.00 | 240.00 | 65,520.00 | 200.00 | 54,600.00 | 250.00 | 68,250.00 |
| 0031 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 468 | LNFT | 50.00 | 23,400.00 | 42.00 | 19,656.00 | 48.00 | 22,464.00 | 35.00 | 16,380.00 |
| 0032 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 220 | LNFT | 60.00 | 13,200.00 | 51.00 | 11,220.00 | 50.00 | 11,000.00 | 40.00 | 8,800.00 |
| 0033 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 664 | LNFT | 62.00 | 41,168.00 | 60.00 | 39,840.00 | 55.00 | 36,520.00 | 65.00 | 43,160.00 |
| 0034 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 178 | LNFT | 125.00 | 22,250.00 | 145.00 | 25,810.00 | 120.00 | 21,360.00 | 150.00 | 26,700.00 |
| 0035 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 20 | LNFT | 80.00 | 1,600.00 | 33.00 | 660.00 | 80.00 | 1,600.00 | 40.00 | 800.00 |
| 0036 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 36 | LNFT | 75.00 | 2,700.00 | 49.00 | 1,764.00 | 82.00 | 2,952.00 | 70.00 | 2,520.00 |
| 0037 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 121 | LNFT | 85.00 | 10,285.00 | 98.00 | 11,858.00 | 84.00 | 10,164.00 | 75.00 | 9,075.00 |
| 0038 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 28 | LNFT | 160.00 | 4,480.00 | 156.00 | 4,368.00 | 200.00 | 5,600.00 | 175.00 | 4,900.00 |
| 0039 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 45 | LNFT | 75.00 | 3,375.00 | 66.00 | 2,970.00 | 75.00 | 3,375.00 | 70.00 | 3,150.00 |
| 0040 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 381 | LNFT | 100.00 | 38,100.00 | 96.00 | 36,576.00 | 85.00 | 32,385.00 | 100.00 | 38,100.00 |
| 0041 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 577 | LNFT | 130.00 | 75,010.00 | 148.00 | 85,396.00 | 135.00 | 77,895.00 | 175.00 | 100,975.00 |
| 0042 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 485 | LNFT | 54.00 | 26,190.00 | 36.00 | 17,460.00 | 55.00 | 26,675.00 | 35.00 | 16,975.00 |
| 0043 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 88 | LNFT | 62.00 | 5,456.00 | 65.00 | 5,720.00 | 65.00 | 5,720.00 | 45.00 | 3,960.00 |
| 0044 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 40 | LNFT | 48.00 | 1,920.00 | 45.00 | 1,800.00 | 60.00 | 2,400.00 | 35.00 | 1,400.00 |
| 0045 | 701-05-03040 | Side Drain Pipe (Bridge Drains) (18" PP/CMP) | 4 | LNFT | 100.00 | 400.00 | 85.00 | 340.00 | 300.00 | 1,200.00 | 125.00 | 500.00 |
| 0046 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 4,500.00 | 4,500.00 | 4,660.00 | 4,660.00 | 5,500.00 | 5,500.00 | 3,000.00 | 3,000.00 |
| 0047 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 4,500.00 | 9,000.00 | 3,600.00 | 7,200.00 | 6,600.00 | 13,200.00 | 3,500.00 | 7,000.00 |
| 0048 | 702-02-00600 | Manholes (R-CB-36) | 4 | EACH | 3,500.00 | 14,000.00 | 5,400.00 | 21,600.00 | 4,400.00 | 17,600.00 | 3,000.00 | 12,000.00 |
| 0049 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 2,200.00 | 19,800.00 | 2,075.00 | 18,675.00 | 3,000.00 | 27,000.00 | 3,000.00 | 27,000.00 |
| 0050 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 3,000.00 | 9,000.00 | 3,000.00 | 9,000.00 | 3,500.00 | 10,500.00 | 3,500.00 | 10,500.00 |
| 0051 | 702-03-00500 | Catch Basins (CB-06) | 12 | EACH | 4,000.00 | 48,000.00 | 3,500.00 | 42,000.00 | 5,200.00 | 62,400.00 | 4,000.00 | 48,000.00 |
| 0052 | 702-03-00600 | Catch Basins (CB-07) | 3 | EACH | 3,800.00 | 11,400.00 | 4,000.00 | 12,000.00 | 4,500.00 | 13,500.00 | 5,000.00 | 15,000.00 |
| 0053 | 702-03-00700 | Catch Basins (CB-08) | 2 | EACH | 5,500.00 | 11,000.00 | 6,750.00 | 13,500.00 | 6,500.00 | 13,000.00 | 8,000.00 | 16,000.00 |
| 0054 | 703-03-00100 | Perforated Pipe Underdrains | 1,700 | LNFT | 11.00 | 18,700.00 | 12.00 | 20,400.00 | 15.00 | 25,500.00 | 10.00 | 17,000.00 |
| 0055 | 704-03-00100 | Blocked Out Guard Rail | 56.3 | LNFT | 20.00 | 1,126.00 | 20.00 | 1,126.00 | 22.00 | 1,238.60 | 20.00 | 1,126.00 |
| 0056 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 65.00 | 1,625.00 | 65.00 | 1,625.00 | 75.00 | 1,875.00 | 80.00 | 2,000.00 |
| 0057 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,000.00 | 2,000.00 | 2,250.00 | 2,250.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 |
| 0058 | 705-01-00100 | Barbed Wire Fence | 40 | LNFT | 10.00 | 400.00 | 10.00 | 400.00 | 11.00 | 440.00 | 12.00 | 480.00 |
| 0059 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 286 | LNFT | 10.00 | 2,860.00 | 8.50 | 2,431.00 | 9.00 | 2,574.00 | 12.00 | 3,432.00 |
| 0060 | 705-04-00100 | Single Swinging Driveway Gates | 4 | EACH | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 575.00 | 2,300.00 | 750.00 | 3,000.00 |
| 0061 | 705-09-00100 | Rebuilt Fence | 294 | LNFT | 30.00 | 8,820.00 | 20.00 | 5,880.00 | 6.50 | 1,911.00 | 10.00 | 2,940.00 |
| 0062 | 706-02-00200 | Concrete Drive (6" Thick) | 1,441.7 | SQYD | 46.00 | 66,318.20 | 50.00 | 72,085.00 | 75.00 | 108,127.50 | 50.00 | 72,085.00 |
| 0063 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 8.9 | SQYD | 120.00 | 1,068.00 | 100.00 | 890.00 | 225.00 | 2,002.50 | 75.00 | 667.50 |
| 0064 | 707-01-00200 | Concrete Curb (Barrier) | 347.1 | LNFT | 12.00 | 4,165.20 | 20.00 | 6,942.00 | 20.00 | 6,942.00 | 8.00 | 2,776.80 |
| 0065 | 707-01-00300 | Concrete Curb (Mountable) | 3,222.9 | LNFT | 8.00 | 25,783.20 | 13.00 | 41,897.70 | 12.00 | 38,674.80 | 5.00 | 16,114.50 |
| 0066 | 708-01-00100 | Right-of-Way Monument | 13 | EACH | 150.00 | 1,950.00 | 200.00 | 2,600.00 | 220.00 | 2,860.00 | 300.00 | 3,900.00 |
| 0067 | 708-02-00100 | Right-of-Way Monument Witness Post | 13 | EACH | 150.00 | 1,950.00 | 200.00 | 2,600.00 | 220.00 | 2,860.00 | 300.00 | 3,900.00 |
| 0068 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,280 | SQYD | 55.00 | 125,400.00 | 45.00 | 102,600.00 | 46.00 | 104,880.00 | 70.00 | 159,600.00 |
| 0069 | 711-04-00100 | Geotextile Fabric | 2,280 | SQYD | 2.50 | 5,700.00 | 3.00 | 6,840.00 | 1.90 | 4,332.00 | 2.00 | 4,560.00 |
| 0070 | 712-04-00100 | Flexible Revetment | 146 | SQYD | 45.00 | 6,570.00 | 50.00 | 7,300.00 | 55.00 | 8,030.00 | 70.00 | 10,220.00 |
| 0071 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 | 10,000.00 | 10,000.00 |
| 0072 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.921 | MILE | 600.00 | 2,352.60 | 550.00 | 2,156.55 | 600.00 | 2,352.60 | 500.00 | 1,960.50 |
| 0073 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.045 | MILE | 10,000.00 | 20,450.00 | 9,500.00 | 19,427.50 | 10,000.00 | 20,450.00 | 9,650.00 | 19,734.25 |
| 0074 | 716-01-00100 | Mulch (Vegetative) | 2.44 | TON | 700.00 | 1,708.00 | 890.00 | 2,171.60 | 1,000.00 | 2,440.00 | 900.00 | 2,196.00 |
| 0075 | 717-01-00100 | Seeding | 1,000 | LB | 6.00 | 6,000.00 | 5.00 | 5,000.00 | 5.75 | 5,750.00 | 1.00 | 1,000.00 |
| 0076 | 718-01-00100 | Fertilizer | 2,000 | LB | 0.60 | 1,200.00 | 1.10 | 2,200.00 | 1.25 | 2,500.00 | 5.00 | 10,000.00 |
| 0077 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,652 | SQYD | 1.50 | 3,978.00 | 1.20 | 3,182.40 | 1.35 | 3,580.20 | 2.00 | 5,304.00 |
| 0078 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 |
| 0079 | 725-01-00100 | Temporary Detour Roads | 4,710.3 | SQYD | 35.00 | 164,860.50 | 130.00 | 612,339.00 | 83.00 | 390,954.90 | 100.00 | 471,030.00 |
| 0080 | 725-02-00100 | Temporary Detour Bridging | 120 | LNFT | 1,600.00 | 192,000.00 | 1,000.00 | 120,000.00 | 1,800.00 | 216,000.00 | 6,000.00 | 720,000.00 |
| 0081 | 726-01-00100 | Bedding Material | 887.84 | CUYD | 55.00 | 48,831.20 | 65.00 | 57,709.60 | 75.00 | 66,588.00 | 50.00 | 44,392.00 |
| 0082 | 727-01-00100 | Mobilization | 1 | LUMP | 750,000.00 | 750,000.00 | 638,000.00 | 638,000.00 | 620,000.00 | 620,000.00 | 900,000.00 | 900,000.00 |
| 0083 | 729-01-00100 | Sign (Type A) | 93 | SQFT | 75.00 | 6,975.00 | 15.00 | 1,395.00 | 45.00 | 4,185.00 | 25.00 | 2,325.00 |
| 0084 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 80.00 | 320.00 | 90.00 | 360.00 | 100.00 | 400.00 |
| 0085 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,070 | EACH | 5.50 | 5,885.00 | 5.25 | 5,617.50 | 6.00 | 6,420.00 | 4.75 | 5,082.50 |
| 0086 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 682 | LNFT | 5.00 | 3,410.00 | 5.00 | 3,410.00 | 5.75 | 3,921.50 | 5.00 | 3,410.00 |
| 0087 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.042 | MILE | 2,800.00 | 11,317.60 | 2,750.00 | 11,115.50 | 3,000.00 | 12,126.00 | 3,100.00 | 12,530.20 |
| 0088 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.237 | MILE | 6,600.00 | 1,564.20 | 6,500.00 | 1,540.50 | 7,200.00 | 1,706.40 | 6,200.00 | 1,469.40 |
| 0089 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) (10'/30') | 2.119 | MILE | 900.00 | 1,907.10 | 850.00 | 1,801.15 | 980.00 | 2,076.62 | 950.00 | 2,013.05 |
| 0090 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) (3'/6') | 0.32 | MILE | 3,000.00 | 960.00 | 3,000.00 | 960.00 | 3,300.00 | 1,056.00 | 2,400.00 | 768.00 |
| 0091 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 19 | EACH | 220.00 | 4,180.00 | 215.00 | 4,085.00 | 225.00 | 4,275.00 | 185.00 | 3,515.00 |
| 0092 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 220.00 | 660.00 | 215.00 | 645.00 | 225.00 | 675.00 | 185.00 | 555.00 |
| 0093 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 250.00 | 500.00 | 250.00 | 500.00 | 265.00 | 530.00 | 220.00 | 440.00 |
| 0094 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 230.00 | 690.00 | 225.00 | 675.00 | 250.00 | 750.00 | 200.00 | 600.00 |
| 0095 | 732-05-00100 | Removal of Existing Markings | 0.1 | MILE | 5,000.00 | 500.00 | 5,000.00 | 500.00 | 5,500.00 | 550.00 | 12,000.00 | 1,200.00 |
| 0096 | 735-01-00100 | Mailboxes | 15 | EACH | 1.00 | 15.00 | 5.00 | 75.00 | 85.00 | 1,275.00 | 1.00 | 15.00 |
| 0097 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 170.00 | 2,550.00 | 165.00 | 2,475.00 | 135.00 | 2,025.00 | 115.00 | 1,725.00 |
| 0098 | 736-01-00100 | Trenching and Backfilling | 1,285 | LNFT | 4.00 | 5,140.00 | 4.00 | 5,140.00 | 4.00 | 5,140.00 | 4.00 | 5,140.00 |
| 0099 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 375 | LNFT | 12.00 | 4,500.00 | 12.00 | 4,500.00 | 9.00 | 3,375.00 | 10.00 | 3,750.00 |
| 0100 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 525 | LNFT | 15.00 | 7,875.00 | 15.00 | 7,875.00 | 12.00 | 6,300.00 | 12.00 | 6,300.00 |
| 0101 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 15,000.00 | 30,000.00 | 12,000.00 | 24,000.00 | 13,000.00 | 26,000.00 | 14,000.00 | 28,000.00 |
| 0102 | 736-04-04220 | Signal Support (60' Single Mast Arm) | 2 | EACH | 20,000.00 | 40,000.00 | 13,500.00 | 27,000.00 | 14,500.00 | 29,000.00 | 15,000.00 | 30,000.00 |
| 0103 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 8 | EACH | 900.00 | 7,200.00 | 900.00 | 7,200.00 | 950.00 | 7,600.00 | 900.00 | 7,200.00 |
| 0104 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 4 | EACH | 900.00 | 3,600.00 | 900.00 | 3,600.00 | 950.00 | 3,800.00 | 900.00 | 3,600.00 |
| 0105 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,500.00 | 3,000.00 | 1,400.00 | 2,800.00 | 1,300.00 | 2,600.00 | 1,300.00 | 2,600.00 |
| 0106 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,500.00 | 4,500.00 | 1,400.00 | 4,200.00 | 1,300.00 | 3,900.00 | 1,300.00 | 3,900.00 |
| 0107 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 1,600.00 | 1,600.00 | 1,600.00 | 1,600.00 | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 |
| 0108 | 736-08-00111 | Sig Cntrlr (TS-2, Type 2)(Type 6E Cabinet)(Furnish & Install) | 1 | EACH | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 48,000.00 | 48,000.00 | 40,000.00 | 40,000.00 |
| 0109 | 736-09-00100 | Loop Detector | 365 | LNFT | 10.00 | 3,650.00 | 10.00 | 3,650.00 | 9.70 | 3,540.50 | 10.00 | 3,650.00 |
| 0110 | 736-10-00200 | Underground Junction Box (Type E) | 8 | EACH | 500.00 | 4,000.00 | 500.00 | 4,000.00 | 430.00 | 3,440.00 | 500.00 | 4,000.00 |
| 0111 | 736-10-00300 | Underground Junction Box (Type F) | 4 | EACH | 550.00 | 2,200.00 | 550.00 | 2,200.00 | 530.00 | 2,120.00 | 750.00 | 3,000.00 |
| 0112 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 |
| 0113 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 920 | LNFT | 1.00 | 920.00 | 1.00 | 920.00 | 2.30 | 2,116.00 | 2.00 | 1,840.00 |
| 0114 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 665 | LNFT | 2.00 | 1,330.00 | 2.00 | 1,330.00 | 3.58 | 2,380.70 | 4.00 | 2,660.00 |
| 0115 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 90 | LNFT | 3.00 | 270.00 | 3.00 | 270.00 | 5.50 | 495.00 | 5.00 | 450.00 |
| 0116 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 2,905 | LNFT | 1.00 | 2,905.00 | 1.00 | 2,905.00 | 1.30 | 3,776.50 | 2.00 | 5,810.00 |
| 0117 | 736-12-01020 | Conductor (2c, #6 awg) | 860 | LNFT | 3.00 | 2,580.00 | 3.00 | 2,580.00 | 5.60 | 4,816.00 | 5.00 | 4,300.00 |
| 0118 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 300 | LNFT | 4.00 | 1,200.00 | 4.00 | 1,200.00 | 6.40 | 1,920.00 | 6.00 | 1,800.00 |
| 0119 | 736-12-02020 | Conductor (3c, #14 awg) | 1,350 | LNFT | 1.50 | 2,025.00 | 1.25 | 1,687.50 | 1.35 | 1,822.50 | 1.00 | 1,350.00 |
| 0120 | 736-13-00400 | Cable (6C Signal) | 215 | LNFT | 2.00 | 430.00 | 2.00 | 430.00 | 1.75 | 376.25 | 2.00 | 430.00 |
| 0121 | 736-13-00500 | Cable (10C Signal) | 2,335 | LNFT | 2.50 | 5,837.50 | 2.50 | 5,837.50 | 2.40 | 5,604.00 | 2.00 | 4,670.00 |
| 0122 | 740-01-00100 | Construction Layout | 1 | LUMP | 180,000.00 | 180,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 |
| 0123 | 742-01-00400 | Sanitary Sewer Pipe (8") | 692 | LNFT | 45.00 | 31,140.00 | 35.00 | 24,220.00 | 115.00 | 79,580.00 | 100.00 | 69,200.00 |
| 0124 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 55,000.00 | 55,000.00 | 75,000.00 | 75,000.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 |
| 0125 | 804-01-00600 | Precast Concrete Piles (24") | 4,793 | LNFT | 94.00 | 450,542.00 | 76.00 | 364,268.00 | 90.00 | 431,370.00 | 200.00 | 958,600.00 |
| 0126 | 804-02-00100 | Treated Timber Piles (Noncoastal Treatment) | 600 | LNFT | 42.00 | 25,200.00 | 40.00 | 24,000.00 | 45.00 | 27,000.00 | 35.00 | 21,000.00 |
| 0127 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 |
| 0128 | 804-09-00100 | Loading Test Piles | 1 | EACH | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 24,000.00 | 24,000.00 | 40,000.00 | 40,000.00 |
| 0129 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 100.00 | 100.00 | 2,000.00 | 2,000.00 | 6,300.00 | 6,300.00 | 1,250.00 | 1,250.00 |
| 0130 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 100.00 | 100.00 | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 | 3,000.00 | 3,000.00 |
| 0131 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 2,500.00 | 2,500.00 | 100.00 | 100.00 | 40,000.00 | 40,000.00 |
| 0132 | 804-17-00100 | Dynamic Monitoring | 1 | EACH | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | 3,000.00 | 3,000.00 |
| 0133 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 14.45 | CUYD | 1,300.00 | 18,785.00 | 1,200.00 | 17,340.00 | 1,400.00 | 20,230.00 | 900.00 | 13,005.00 |
| 0134 | 805-01-00700 | Class A Concrete (Bents) | 221.08 | CUYD | 840.00 | 185,707.20 | 670.00 | 148,123.60 | 700.00 | 154,756.00 | 600.00 | 132,648.00 |
| 0135 | 805-03-00100 | Class AA Concrete | 428.7 | CUYD | 680.00 | 291,516.00 | 500.00 | 214,350.00 | 595.00 | 255,076.50 | 1,000.00 | 428,700.00 |
| 0136 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 3,326.6 | LNFT | 60.00 | 199,596.00 | 60.00 | 199,596.00 | 55.00 | 182,963.00 | 60.00 | 199,596.00 |
| 0137 | 805-10-00100 | Bridge Superstructure and Substructure | 2 | SPAN | 18,000.00 | 36,000.00 | 24,000.00 | 48,000.00 | 20,000.00 | 40,000.00 | 25,000.00 | 50,000.00 |
| 0138 | 805-11-00100 | Strip Seal Joints | 251.13 | LNFT | 170.00 | 42,692.10 | 150.00 | 37,669.50 | 165.00 | 41,436.45 | 200.00 | 50,226.00 |
| 0139 | 805-12-01000 | Reinforced Concrete Box Culverts (4' x 4') | 332 | LNFT | 200.00 | 66,400.00 | 200.00 | 66,400.00 | 345.00 | 114,540.00 | 225.00 | 74,700.00 |
| 0140 | 806-01-00100 | Deformed Reinforcing Steel | 166,719 | LB | 0.85 | 141,711.15 | 1.00 | 166,719.00 | 0.80 | 133,375.20 | 1.00 | 166,719.00 |
| 0141 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 20,000.00 | 20,000.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0142 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 60.00 | 28,800.00 | 70.00 | 33,600.00 | 58.00 | 27,840.00 | 75.00 | 36,000.00 |
| 0143 | 813-01-00100 | Concrete Approach Slabs | 673.06 | SQYD | 200.00 | 134,612.00 | 200.00 | 134,612.00 | 230.00 | 154,803.80 | 150.00 | 100,959.00 |
| 0144 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 8,000 | INLF | 0.70 | 5,600.00 | 1.00 | 8,000.00 | 0.90 | 7,200.00 | 1.00 | 8,000.00 |
| 0145 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 8,000 | INLF | 1.00 | 8,000.00 | 0.90 | 7,200.00 | 0.90 | 7,200.00 | 1.00 | 8,000.00 |
| 0146 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 9,600.00 | 9,600.00 | 9,000.00 | 9,000.00 |
| 0147 | NS-736-00006 | Video Detection Camera | 4 | EACH | 3,000.00 | 12,000.00 | 2,200.00 | 8,800.00 | 2,200.00 | 8,800.00 | 2,000.00 | 8,000.00 |
| 0148 | NS-736-00007 | Video Detection Training | 1 | LUMP | 1.00 | 1.00 | 1.00 | 1.00 | 1.15 | 1.15 | 1.00 | 1.00 |
| 0149 | NS-800-00080 | Dynamic Analysis | 1 | EACH | 1,200.00 | 1,200.00 | 1,500.00 | 1,500.00 | 1,300.00 | 1,300.00 | 3,500.00 | 3,500.00 |
| 0150 | NS-804-00001 | Vibration Monitoring | 50 | EACH | 450.00 | 22,500.00 | 400.00 | 20,000.00 | 475.00 | 23,750.00 | 500.00 | 25,000.00 |
| 0151 | NS-P17-00097 | Limestone Bedding and Backfill | 50 | CUYD | 40.00 | 2,000.00 | 100.00 | 5,000.00 | 270.00 | 13,500.00 | 100.00 | 5,000.00 |
| 0152 | NS-P17-00098 | Sand Backfill | 100 | CUYD | 25.00 | 2,500.00 | 43.00 | 4,300.00 | 105.00 | 10,500.00 | 50.00 | 5,000.00 |
| 0153 | NS-P17-00099 | Select Material for Backfill | 200 | CUYD | 25.00 | 5,000.00 | 17.00 | 3,400.00 | 105.00 | 21,000.00 | 10.00 | 2,000.00 |
| 0154 | NS-P17-00100 | Unrestrained Joint Ductile Iron Sewer Force Main (12" dia) | 208 | LNFT | 130.00 | 27,040.00 | 100.00 | 20,800.00 | 300.00 | 62,400.00 | 100.00 | 20,800.00 |
| 0155 | NS-P17-00102 | Restrained Joint Ductile Iron Sewer Force Main (12" diameter) | 60 | LNFT | 210.00 | 12,600.00 | 130.00 | 7,800.00 | 355.00 | 21,300.00 | 150.00 | 9,000.00 |
| 0156 | NS-P17-00104 | Remove Force Main | 1 | LUMP | 5,000.00 | 5,000.00 | 1,800.00 | 1,800.00 | 9,200.00 | 9,200.00 | 2,500.00 | 2,500.00 |
| 0157 | NS-P17-00105 | Fittings | 1,000 | LB | 10.00 | 10,000.00 | 14.00 | 14,000.00 | 8.00 | 8,000.00 | 5.00 | 5,000.00 |
| 0158 | NS-P17-00106 | Air Release/Vacuum Valve | 1 | EACH | 8,500.00 | 8,500.00 | 8,000.00 | 8,000.00 | 12,000.00 | 12,000.00 | 7,500.00 | 7,500.00 |
| 0159 | NS-P17-00107 | Force Main Tie-In (12" diameter) | 2 | EACH | 3,500.00 | 7,000.00 | 4,000.00 | 8,000.00 | 10,000.00 | 20,000.00 | 5,000.00 | 10,000.00 |
| SUBTOTAL GENERAL | 7,497,613 | 7,659,657 | 7,624,353 | 9,219,781 | ||||||||
| Alternate DA1 | ||||||||||||
| 0160 | NS-P17-00101 | Unrestrained Joint Ductile Iron Sewer Force Main (14" dia) | 188 | LNFT | 150.00 | 28,200.00 | 120.00 | 22,560.00 | 380.00 | 71,440.00 | 150.00 | 28,200.00 |
| 0161 | NS-P17-00103 | Restrained Joint Ductile Iron Sewer Force Main (14" diameter) | 80 | LNFT | 240.00 | 19,200.00 | 155.00 | 12,400.00 | 365.00 | 29,200.00 | 200.00 | 16,000.00 |
| 0162 | NS-P17-00105 | Fittings | 2,600 | LB | 10.00 | 26,000.00 | 14.00 | 36,400.00 | 10.00 | 26,000.00 | 5.00 | 13,000.00 |
| SUBTOTAL ALT DA1 | 73,400.00 | 71,360.00 | 126,640.00 | 57,200.00 | ||||||||
| CONTRACTOR TOTAL | 7,571,012.55 | 7,731,017.30 | 7,750,993.13 | 9,276,980.70 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Industrial Enterprises, Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 150,000.00 | 150,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,422.00 | 25,422.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Sta. 402+25; 18'x20') | 1 | EACH | 1,800.00 | 1,800.00 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 408+70; 76'x43' Precast Slab Span on Timber Piles) | 1 | EACH | 42,000.00 | 42,000.00 |
| 0005 | 202-02-05000 | Removal of Building (42'x18' Building on Concrete Slab) | 1 | EACH | 3,600.00 | 3,600.00 |
| 0006 | 202-02-05000 | Removal of Building (60' x 60' Metal Building on Concrete Slab) | 1 | EACH | 7,200.00 | 7,200.00 |
| 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,861 | SQYD | 9.60 | 17,865.60 |
| 0008 | 202-02-14500 | Removal of Guard Rail | 322 | LNFT | 6.00 | 1,932.00 |
| 0009 | 202-02-38500 | Removal of Surfacing and Stablized Base | 8,715 | SQYD | 5.40 | 47,061.00 |
| 0010 | 203-01-00100 | General Excavation | 6,126 | CUYD | 20.17 | 123,561.42 |
| 0011 | 203-02-00100 | Drainage Excavation | 15,693 | CUYD | 12.00 | 188,316.00 |
| 0012 | 203-03-00100 | Embankment | 23,266 | CUYD | 18.17 | 422,743.22 |
| 0013 | 203-04-00300 | Nonplastic Embankment (Stone) | 747.6 | CUYD | 96.60 | 72,218.16 |
| 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 100 | EACH | 13.20 | 1,320.00 |
| 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 120.00 | 840.00 |
| 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 600.00 | 4,800.00 |
| 0017 | 204-06-00100 | Temporary Silt Fencing | 1,940 | LNFT | 1.58 | 3,065.20 |
| 0018 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 1,800.00 | 5,400.00 |
| 0019 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 30,366.7 | SQYD | 17.51 | 531,720.92 |
| 0020 | 302-02-01561 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) (Stone or Recycled Portland Cement Concrete Only) | 2,985.4 | SQYD | 20.40 | 60,902.16 |
| 0021 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 34,978.6 | SQYD | 10.44 | 365,176.58 |
| 0022 | 304-05-00100 | Lime Treatment (Type E) | 247.91 | TON | 475.97 | 117,997.72 |
| 0023 | 401-01-00100 | Aggregate Surface Course (Net Section) | 255.5 | CUYD | 96.00 | 24,528.00 |
| 0024 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,000 | CUYD | 60.50 | 121,000.00 |
| 0025 | 502-01-00100 | Superpave Asphaltic Concrete | 2,581.9 | TON | 116.38 | 300,481.52 |
| 0026 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 15.8 | TON | 139.73 | 2,207.73 |
| 0027 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 24,250.4 | SQYD | 78.42 | 1,901,716.37 |
| 0028 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 1,584.7 | SQYD | 86.26 | 136,696.22 |
| 0029 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 20 | EACH | 115.00 | 2,300.00 |
| 0030 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 273 | LNFT | 226.72 | 61,894.56 |
| 0031 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 468 | LNFT | 52.54 | 24,588.72 |
| 0032 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 220 | LNFT | 58.09 | 12,779.80 |
| 0033 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 664 | LNFT | 78.94 | 52,416.16 |
| 0034 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 178 | LNFT | 196.78 | 35,026.84 |
| 0035 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 20 | LNFT | 54.92 | 1,098.40 |
| 0036 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 36 | LNFT | 89.08 | 3,206.88 |
| 0037 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 121 | LNFT | 108.47 | 13,124.87 |
| 0038 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 28 | LNFT | 247.36 | 6,926.08 |
| 0039 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 45 | LNFT | 92.30 | 4,153.50 |
| 0040 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 381 | LNFT | 116.40 | 44,348.40 |
| 0041 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 577 | LNFT | 189.68 | 109,445.36 |
| 0042 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 485 | LNFT | 67.88 | 32,921.80 |
| 0043 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 88 | LNFT | 67.20 | 5,913.60 |
| 0044 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 40 | LNFT | 54.66 | 2,186.40 |
| 0045 | 701-05-03040 | Side Drain Pipe (Bridge Drains) (18" PP/CMP) | 4 | LNFT | 117.41 | 469.64 |
| 0046 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 3,892.73 | 3,892.73 |
| 0047 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 4,216.13 | 8,432.26 |
| 0048 | 702-02-00600 | Manholes (R-CB-36) | 4 | EACH | 2,970.00 | 11,880.00 |
| 0049 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 2,554.13 | 22,987.17 |
| 0050 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 3,282.53 | 9,847.59 |
| 0051 | 702-03-00500 | Catch Basins (CB-06) | 12 | EACH | 5,010.53 | 60,126.36 |
| 0052 | 702-03-00600 | Catch Basins (CB-07) | 3 | EACH | 5,815.13 | 17,445.39 |
| 0053 | 702-03-00700 | Catch Basins (CB-08) | 2 | EACH | 8,355.53 | 16,711.06 |
| 0054 | 703-03-00100 | Perforated Pipe Underdrains | 1,700 | LNFT | 12.73 | 21,641.00 |
| 0055 | 704-03-00100 | Blocked Out Guard Rail | 56.3 | LNFT | 21.20 | 1,193.56 |
| 0056 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 68.90 | 1,722.50 |
| 0057 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,385.00 | 2,385.00 |
| 0058 | 705-01-00100 | Barbed Wire Fence | 40 | LNFT | 10.60 | 424.00 |
| 0059 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 286 | LNFT | 9.01 | 2,576.86 |
| 0060 | 705-04-00100 | Single Swinging Driveway Gates | 4 | EACH | 530.00 | 2,120.00 |
| 0061 | 705-09-00100 | Rebuilt Fence | 294 | LNFT | 14.84 | 4,362.96 |
| 0062 | 706-02-00200 | Concrete Drive (6" Thick) | 1,441.7 | SQYD | 84.00 | 121,102.80 |
| 0063 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 8.9 | SQYD | 90.00 | 801.00 |
| 0064 | 707-01-00200 | Concrete Curb (Barrier) | 347.1 | LNFT | 7.20 | 2,499.12 |
| 0065 | 707-01-00300 | Concrete Curb (Mountable) | 3,222.9 | LNFT | 6.00 | 19,337.40 |
| 0066 | 708-01-00100 | Right-of-Way Monument | 13 | EACH | 165.00 | 2,145.00 |
| 0067 | 708-02-00100 | Right-of-Way Monument Witness Post | 13 | EACH | 165.00 | 2,145.00 |
| 0068 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,280 | SQYD | 72.00 | 164,160.00 |
| 0069 | 711-04-00100 | Geotextile Fabric | 2,280 | SQYD | 2.40 | 5,472.00 |
| 0070 | 712-04-00100 | Flexible Revetment | 146 | SQYD | 72.00 | 10,512.00 |
| 0071 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 91,610.83 | 91,610.83 |
| 0072 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.921 | MILE | 594.00 | 2,329.07 |
| 0073 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.045 | MILE | 10,260.00 | 20,981.70 |
| 0074 | 716-01-00100 | Mulch (Vegetative) | 2.44 | TON | 943.40 | 2,301.90 |
| 0075 | 717-01-00100 | Seeding | 1,000 | LB | 5.30 | 5,300.00 |
| 0076 | 718-01-00100 | Fertilizer | 2,000 | LB | 1.17 | 2,340.00 |
| 0077 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,652 | SQYD | 1.27 | 3,368.04 |
| 0078 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 9,000.00 | 9,000.00 |
| 0079 | 725-01-00100 | Temporary Detour Roads | 4,710.3 | SQYD | 89.95 | 423,691.49 |
| 0080 | 725-02-00100 | Temporary Detour Bridging | 120 | LNFT | 1,920.00 | 230,400.00 |
| 0081 | 726-01-00100 | Bedding Material | 887.84 | CUYD | 66.00 | 58,597.44 |
| 0082 | 727-01-00100 | Mobilization | 1 | LUMP | 731,700.00 | 731,700.00 |
| 0083 | 729-01-00100 | Sign (Type A) | 93 | SQFT | 41.87 | 3,893.91 |
| 0084 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 84.80 | 339.20 |
| 0085 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,070 | EACH | 5.67 | 6,066.90 |
| 0086 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 682 | LNFT | 5.40 | 3,682.80 |
| 0087 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.042 | MILE | 2,970.00 | 12,004.74 |
| 0088 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.237 | MILE | 7,020.00 | 1,663.74 |
| 0089 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) (10'/30') | 2.119 | MILE | 918.00 | 1,945.24 |
| 0090 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) (3'/6') | 0.32 | MILE | 3,240.00 | 1,036.80 |
| 0091 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 19 | EACH | 232.20 | 4,411.80 |
| 0092 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 232.20 | 696.60 |
| 0093 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 270.00 | 540.00 |
| 0094 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 243.00 | 729.00 |
| 0095 | 732-05-00100 | Removal of Existing Markings | 0.1 | MILE | 5,400.00 | 540.00 |
| 0096 | 735-01-00100 | Mailboxes | 15 | EACH | 5.30 | 79.50 |
| 0097 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 174.90 | 2,623.50 |
| 0098 | 736-01-00100 | Trenching and Backfilling | 1,285 | LNFT | 3.71 | 4,767.35 |
| 0099 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 375 | LNFT | 9.01 | 3,378.75 |
| 0100 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 525 | LNFT | 11.66 | 6,121.50 |
| 0101 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 12,913.98 | 25,827.96 |
| 0102 | 736-04-04220 | Signal Support (60' Single Mast Arm) | 2 | EACH | 14,373.60 | 28,747.20 |
| 0103 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 8 | EACH | 885.10 | 7,080.80 |
| 0104 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 4 | EACH | 882.45 | 3,529.80 |
| 0105 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,309.10 | 2,618.20 |
| 0106 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,309.10 | 3,927.30 |
| 0107 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 1,855.00 | 1,855.00 |
| 0108 | 736-08-00111 | Sig Cntrlr (TS-2, Type 2)(Type 6E Cabinet)(Furnish & Install) | 1 | EACH | 47,424.40 | 47,424.40 |
| 0109 | 736-09-00100 | Loop Detector | 365 | LNFT | 9.54 | 3,482.10 |
| 0110 | 736-10-00200 | Underground Junction Box (Type E) | 8 | EACH | 402.80 | 3,222.40 |
| 0111 | 736-10-00300 | Underground Junction Box (Type F) | 4 | EACH | 487.60 | 1,950.40 |
| 0112 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 938.10 | 938.10 |
| 0113 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 920 | LNFT | 2.12 | 1,950.40 |
| 0114 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 665 | LNFT | 3.39 | 2,254.35 |
| 0115 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 90 | LNFT | 5.09 | 458.10 |
| 0116 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 2,905 | LNFT | 1.27 | 3,689.35 |
| 0117 | 736-12-01020 | Conductor (2c, #6 awg) | 860 | LNFT | 5.14 | 4,420.40 |
| 0118 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 300 | LNFT | 5.88 | 1,764.00 |
| 0119 | 736-12-02020 | Conductor (3c, #14 awg) | 1,350 | LNFT | 1.27 | 1,714.50 |
| 0120 | 736-13-00400 | Cable (6C Signal) | 215 | LNFT | 1.64 | 352.60 |
| 0121 | 736-13-00500 | Cable (10C Signal) | 2,335 | LNFT | 2.23 | 5,207.05 |
| 0122 | 740-01-00100 | Construction Layout | 1 | LUMP | 135,000.00 | 135,000.00 |
| 0123 | 742-01-00400 | Sanitary Sewer Pipe (8") | 692 | LNFT | 27.59 | 19,092.28 |
| 0124 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 78,000.00 | 78,000.00 |
| 0125 | 804-01-00600 | Precast Concrete Piles (24") | 4,793 | LNFT | 98.80 | 473,548.40 |
| 0126 | 804-02-00100 | Treated Timber Piles (Noncoastal Treatment) | 600 | LNFT | 46.80 | 28,080.00 |
| 0127 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 52,000.00 | 52,000.00 |
| 0128 | 804-09-00100 | Loading Test Piles | 1 | EACH | 104.00 | 104.00 |
| 0129 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 104.00 | 104.00 |
| 0130 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 104.00 | 104.00 |
| 0131 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 104.00 | 104.00 |
| 0132 | 804-17-00100 | Dynamic Monitoring | 1 | EACH | 1,560.00 | 1,560.00 |
| 0133 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 14.45 | CUYD | 2,311.40 | 33,399.73 |
| 0134 | 805-01-00700 | Class A Concrete (Bents) | 221.08 | CUYD | 1,300.00 | 287,404.00 |
| 0135 | 805-03-00100 | Class AA Concrete | 428.7 | CUYD | 936.00 | 401,263.20 |
| 0136 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 3,326.6 | LNFT | 93.60 | 311,369.76 |
| 0137 | 805-10-00100 | Bridge Superstructure and Substructure | 2 | SPAN | 20,800.00 | 41,600.00 |
| 0138 | 805-11-00100 | Strip Seal Joints | 251.13 | LNFT | 192.40 | 48,317.41 |
| 0139 | 805-12-01000 | Reinforced Concrete Box Culverts (4' x 4') | 332 | LNFT | 347.12 | 115,243.84 |
| 0140 | 806-01-00100 | Deformed Reinforcing Steel | 166,719 | LB | 1.15 | 191,726.85 |
| 0141 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 28,600.00 | 28,600.00 |
| 0142 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 67.60 | 32,448.00 |
| 0143 | 813-01-00100 | Concrete Approach Slabs | 673.06 | SQYD | 207.00 | 139,323.42 |
| 0144 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 8,000 | INLF | 0.72 | 5,760.00 |
| 0145 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 8,000 | INLF | 1.10 | 8,800.00 |
| 0146 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 8,856.30 | 8,856.30 |
| 0147 | NS-736-00006 | Video Detection Camera | 4 | EACH | 2,096.68 | 8,386.72 |
| 0148 | NS-736-00007 | Video Detection Training | 1 | LUMP | 1.06 | 1.06 |
| 0149 | NS-800-00080 | Dynamic Analysis | 1 | EACH | 1,248.00 | 1,248.00 |
| 0150 | NS-804-00001 | Vibration Monitoring | 50 | EACH | 260.00 | 13,000.00 |
| 0151 | NS-P17-00097 | Limestone Bedding and Backfill | 50 | CUYD | 69.00 | 3,450.00 |
| 0152 | NS-P17-00098 | Sand Backfill | 100 | CUYD | 17.25 | 1,725.00 |
| 0153 | NS-P17-00099 | Select Material for Backfill | 200 | CUYD | 18.00 | 3,600.00 |
| 0154 | NS-P17-00100 | Unrestrained Joint Ductile Iron Sewer Force Main (12" dia) | 208 | LNFT | 94.73 | 19,703.84 |
| 0155 | NS-P17-00102 | Restrained Joint Ductile Iron Sewer Force Main (12" diameter) | 60 | LNFT | 122.51 | 7,350.60 |
| 0156 | NS-P17-00104 | Remove Force Main | 1 | LUMP | 1,608.00 | 1,608.00 |
| 0157 | NS-P17-00105 | Fittings | 1,000 | LB | 12.82 | 12,820.00 |
| 0158 | NS-P17-00106 | Air Release/Vacuum Valve | 1 | EACH | 7,332.31 | 7,332.31 |
| 0159 | NS-P17-00107 | Force Main Tie-In (12" diameter) | 2 | EACH | 3,600.00 | 7,200.00 |
| SUBTOTAL GENERAL | 9,928,087 | |||||
| Alternate DA1 | ||||||
| 0160 | NS-P17-00101 | Unrestrained Joint Ductile Iron Sewer Force Main (14" dia) | 188 | LNFT | 114.06 | 21,443.28 |
| 0161 | NS-P17-00103 | Restrained Joint Ductile Iron Sewer Force Main (14" diameter) | 80 | LNFT | 144.96 | 11,596.80 |
| 0162 | NS-P17-00105 | Fittings | 2,600 | LB | 13.22 | 34,372.00 |
| SUBTOTAL ALT DA1 | 67,412.08 | |||||
| CONTRACTOR TOTAL | 9,995,498.60 | |||||