LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.002287.6
Parish: East Feliciana
Routes: LA 68
Description: LA 68: LA 964 - LA 10
Type Const: COLD PLANING ASPHALTIC CONCRETE PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK
Estimated Construction Cost: $4,057,028.60


RankLicenseBidderConstruction Bid
1 00481 Coastal Bridge Co., L.L.C. $3,691,876.60
2 12312 Gilchrist Construction Co. LLC $3,784,465.47
3 00046 Barber Bros. Contracting Co., L.L.C $3,876,745.30
4 12487 Diamond B Construction Co., L.L.C. $4,409,281.75
5 00849 F.G. Sullivan, Jr. Contractor LLC $4,506,920.15


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Coastal Bridge Co., L.L.C.
- 2 -
Gilchrist Construction Co. LLC
- 3 -
Barber Bros. Contracting Co., L.L.C
- 4 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 398.1    SQYD 9.00 3,582.90 11.00 4,379.10 15.00 5,971.50 15.00 5,971.50
0002 202-02-14500 Removal of Guard Rail 1,375      LNFT 10.45 14,368.75 5.00 6,875.00 5.00 6,875.00 3.50 4,812.50
0003 202-02-32180 Removal of Pipe Headwalls FOR WORK NEAR STA 100+02 1      EACH 875.00 875.00 1,700.00 1,700.00 1,500.00 1,500.00 900.00 900.00
0004 203-01-00100 General Excavation 5,000      CUYD 1.00 5,000.00 6.25 31,250.00 8.00 40,000.00 10.00 50,000.00
0005 203-03-00100 Embankment 5,000      CUYD 1.00 5,000.00 21.25 106,250.00 18.00 90,000.00 25.00 125,000.00
0006 203-05-00100 Excavation and Embankment 1      LUMP 13,000.00 13,000.00 18,000.00 18,000.00 15,000.00 15,000.00 30,000.00 30,000.00
0007 203-07-00100 Borrow (Vehicular Measurement) 500      CUYD 20.00 10,000.00 21.00 10,500.00 30.00 15,000.00 20.00 10,000.00
0008 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 1,129      CUYD 35.00 39,515.00 21.00 23,709.00 25.00 28,225.00 20.00 22,580.00
0009 204-02-00100 Temporary Hay or Straw Bales 1,237      EACH 10.75 13,297.75 6.00 7,422.00 20.00 24,740.00 12.00 14,844.00
0010 204-06-00100 Temporary Silt Fencing 1,310      LNFT 2.10 2,751.00 1.60 2,096.00 1.75 2,292.50 2.25 2,947.50
0011 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 124,827      SQYD 5.50 686,548.50 5.45 680,307.15 5.00 624,135.00 7.95 992,374.65
0012 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 465      CUYD 25.00 11,625.00 55.00 25,575.00 60.00 27,900.00 80.00 37,200.00
0013 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 380      CUYD 30.00 11,400.00 25.00 9,500.00 40.00 15,200.00 21.00 7,980.00
0014 502-01-00100 Superpave Asphaltic Concrete 25,204.4    TON 80.00 2,016,352.00 86.00 2,167,578.40 80.00 2,016,352.00 88.00 2,217,987.20
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,007      TON 110.00 110,770.00 138.00 138,966.00 125.00 125,875.00 165.00 166,155.00
0016 509-01-00100 Cold Planing Asphaltic Pavement 96,358      SQYD 1.20 115,629.60 0.75 72,268.50 2.00 192,716.00 1.75 168,626.50
0017 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -2,141      CUYD 0.10 -214.10 1.00 -2,141.00 0.00 0.00 0.10 -214.10
0018 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) FOR WORK NEAR STA 189+52 160      LNFT 60.00 9,600.00 57.00 9,120.00 45.00 7,200.00 120.00 19,200.00
0019 701-08-00100 Relaying Pipe FOR WORK NEAR STA 57+52 8      LNFT 210.00 1,680.00 90.00 720.00 275.00 2,200.00 70.00 560.00
0020 701-08-00100 Relaying Pipe FOR WORK NEAR STA 31+12 16      LNFT 100.00 1,600.00 90.00 1,440.00 200.00 3,200.00 70.00 1,120.00
0021 701-08-00100 Relaying Pipe FOR WORK NEAR STA 68+08 16      LNFT 100.00 1,600.00 90.00 1,440.00 200.00 3,200.00 70.00 1,120.00
0022 701-08-00100 Relaying Pipe FOR WORK NEAR STA 99+76 8      LNFT 210.00 1,680.00 90.00 720.00 275.00 2,200.00 70.00 560.00
0023 701-08-00100 Relaying Pipe FOR WORK NEAR STA 62+80 8      LNFT 210.00 1,680.00 90.00 720.00 275.00 2,200.00 70.00 560.00
0024 701-10-01040 Reinforced Concrete Pipe (Extension) (18") FOR WORK NEAR STA 395+44 16      LNFT 150.00 2,400.00 90.00 1,440.00 250.00 4,000.00 250.00 4,000.00
0025 701-10-01100 Reinforced Concrete Pipe (Extension) (36") FOR WORK NEAR STA 100+02 8      LNFT 250.00 2,000.00 90.00 720.00 600.00 4,800.00 300.00 2,400.00
0026 701-14-00100 Cleaning Existing Pipes 138      LNFT 16.00 2,208.00 20.00 2,760.00 60.00 8,280.00 20.00 2,760.00
0027 701-15-00100 Concrete Collar 9      EACH 850.00 7,650.00 1,000.00 9,000.00 1,300.00 11,700.00 1,000.00 9,000.00
0028 702-03-00100 Catch Basins (CB-01) FOR WORK NEAR STA 189+52 2      EACH 3,000.00 6,000.00 3,300.00 6,600.00 2,500.00 5,000.00 3,800.00 7,600.00
0029 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 274.5    LNFT 40.00 10,980.00 38.00 10,431.00 40.00 10,980.00 40.00 10,980.00
0030 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 574      LNFT 40.00 22,960.00 40.00 22,960.00 45.00 25,830.00 42.00 24,108.00
0031 704-03-00100 Blocked Out Guard Rail 656.5    LNFT 20.00 13,130.00 22.00 14,443.00 23.00 15,099.50 22.00 14,443.00
0032 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,200.00 8,800.00 2,300.00 9,200.00 2,400.00 9,600.00 2,200.00 8,800.00
0033 704-11-00200 Guard Rail End Treatment (Tangent) 2      EACH 2,300.00 4,600.00 2,400.00 4,800.00 2,500.00 5,000.00 2,400.00 4,800.00
0034 711-01-03020 Riprap (30 lb, 18" Thick) 50      SQYD 100.00 5,000.00 60.00 3,000.00 100.00 5,000.00 175.00 8,750.00
0035 711-04-00100 Geotextile Fabric 80      SQYD 2.25 180.00 8.00 640.00 8.00 640.00 3.25 260.00
0036 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 274+00 50      SQYD 65.00 3,250.00 75.00 3,750.00 100.00 5,000.00 160.00 8,000.00
0037 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 99+76 20      SQYD 80.00 1,600.00 75.00 1,500.00 95.00 1,900.00 160.00 3,200.00
0038 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 295+12 50      SQYD 60.00 3,000.00 75.00 3,750.00 85.00 4,250.00 160.00 8,000.00
0039 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 100+02 10      SQYD 100.00 1,000.00 75.00 750.00 220.00 2,200.00 160.00 1,600.00
0040 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 62+80 20      SQYD 80.00 1,600.00 75.00 1,500.00 95.00 1,900.00 160.00 3,200.00
0041 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 337+36 40      SQYD 65.00 2,600.00 75.00 3,000.00 85.00 3,400.00 160.00 6,400.00
0042 713-01-00100 Temporary Signs and Barricades 1      LUMP 25,000.00 25,000.00 45,000.00 45,000.00 35,000.00 35,000.00 14,000.00 14,000.00
0043 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 15.9    MILE 175.00 2,782.50 300.00 4,770.00 300.00 4,770.00 180.00 2,862.00
0044 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 15      MILE 450.00 6,750.00 1.00 15.00 460.00 6,900.00 210.00 3,150.00
0045 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 131.3    MILE 550.00 72,215.00 1.00 131.30 600.00 78,780.00 310.00 40,703.00
0046 722-01-00100 Project Site Laboratory 1      EACH 5,500.00 5,500.00 1,500.00 1,500.00 7,500.00 7,500.00 7,000.00 7,000.00
0047 726-01-00100 Bedding Material 110.3    CUYD 100.00 11,030.00 95.00 10,478.50 10.00 1,103.00 60.00 6,618.00
0048 727-01-00100 Mobilization 1      LUMP 300,000.00 300,000.00 210,000.00 210,000.00 250,000.00 250,000.00 230,000.00 230,000.00
0049 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 80.00 640.00 80.00 640.00 90.00 720.00 80.00 640.00
0050 731-02-00100 Reflectorized Raised Pavement Markers 1,487      EACH 5.50 8,178.50 5.00 7,435.00 6.00 8,922.00 5.00 7,435.00
0051 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.028  MILE 2,800.00 47,678.40 2,800.00 47,678.40 2,850.00 48,529.80 2,600.00 44,272.80
0052 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.964  MILE 950.00 3,765.80 830.00 3,290.12 1,000.00 3,964.00 800.00 3,171.20
0053 735-01-00100 Mailboxes 25      EACH 13.00 325.00 15.00 375.00 10.00 250.00 9.00 225.00
0054 735-02-00100 Mailbox Supports (Single) 25      EACH 130.00 3,250.00 125.00 3,125.00 150.00 3,750.00 135.00 3,375.00
0055 739-01-00100 Hydro-Seeding 10.94   ACRE 1,300.00 14,222.00 1,200.00 13,128.00 1,250.00 13,675.00 1,100.00 12,034.00
0056 740-01-00100 Construction Layout 1      LUMP 10,000.00 10,000.00 12,000.00 12,000.00 32,000.00 32,000.00 20,000.00 20,000.00
0057 NS-200-00020 Cleaning Existing Ditches 60      LNFT 20.00 1,200.00 28.00 1,680.00 10.00 600.00 4.50 270.00
0058 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 360      INLF 1.50 540.00 5.50 1,980.00 2.00 720.00 6.50 2,340.00
0059 NS-700-00240 Special Guard Rail Anchor Section 2      EACH 1,250.00 2,500.00 1,300.00 2,600.00 1,500.00 3,000.00 1,300.00 2,600.00
                         
    CONTRACTOR TOTAL       3,691,876.60   3,784,465.47   3,876,745.30   4,409,281.75



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
F.G. Sullivan, Jr. Contractor LLC
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 398.1    SQYD 10.00 3,981.00
0002 202-02-14500 Removal of Guard Rail 1,375      LNFT 3.00 4,125.00
0003 202-02-32180 Removal of Pipe Headwalls FOR WORK NEAR STA 100+02 1      EACH 850.00 850.00
0004 203-01-00100 General Excavation 5,000      CUYD 7.00 35,000.00
0005 203-03-00100 Embankment 5,000      CUYD 7.00 35,000.00
0006 203-05-00100 Excavation and Embankment 1      LUMP 12,500.00 12,500.00
0007 203-07-00100 Borrow (Vehicular Measurement) 500      CUYD 12.00 6,000.00
0008 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 1,129      CUYD 12.00 13,548.00
0009 204-02-00100 Temporary Hay or Straw Bales 1,237      EACH 10.50 12,988.50
0010 204-06-00100 Temporary Silt Fencing 1,310      LNFT 2.00 2,620.00
0011 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 124,827      SQYD 7.00 873,789.00
0012 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 465      CUYD 20.00 9,300.00
0013 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 380      CUYD 75.00 28,500.00
0014 502-01-00100 Superpave Asphaltic Concrete 25,204.4    TON 100.00 2,520,440.00
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,007      TON 170.00 171,190.00
0016 509-01-00100 Cold Planing Asphaltic Pavement 96,358      SQYD 3.00 289,074.00
0017 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -2,141      CUYD 0.00 0.00
0018 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) FOR WORK NEAR STA 189+52 160      LNFT 70.00 11,200.00
0019 701-08-00100 Relaying Pipe FOR WORK NEAR STA 57+52 8      LNFT 220.00 1,760.00
0020 701-08-00100 Relaying Pipe FOR WORK NEAR STA 31+12 16      LNFT 115.00 1,840.00
0021 701-08-00100 Relaying Pipe FOR WORK NEAR STA 68+08 16      LNFT 115.00 1,840.00
0022 701-08-00100 Relaying Pipe FOR WORK NEAR STA 99+76 8      LNFT 220.00 1,760.00
0023 701-08-00100 Relaying Pipe FOR WORK NEAR STA 62+80 8      LNFT 220.00 1,760.00
0024 701-10-01040 Reinforced Concrete Pipe (Extension) (18") FOR WORK NEAR STA 395+44 16      LNFT 150.00 2,400.00
0025 701-10-01100 Reinforced Concrete Pipe (Extension) (36") FOR WORK NEAR STA 100+02 8      LNFT 260.00 2,080.00
0026 701-14-00100 Cleaning Existing Pipes 138      LNFT 15.00 2,070.00
0027 701-15-00100 Concrete Collar 9      EACH 900.00 8,100.00
0028 702-03-00100 Catch Basins (CB-01) FOR WORK NEAR STA 189+52 2      EACH 3,000.00 6,000.00
0029 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 274.5    LNFT 35.00 9,607.50
0030 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 574      LNFT 38.00 21,812.00
0031 704-03-00100 Blocked Out Guard Rail 656.5    LNFT 20.00 13,130.00
0032 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,100.00 8,400.00
0033 704-11-00200 Guard Rail End Treatment (Tangent) 2      EACH 2,200.00 4,400.00
0034 711-01-03020 Riprap (30 lb, 18" Thick) 50      SQYD 95.00 4,750.00
0035 711-04-00100 Geotextile Fabric 80      SQYD 2.00 160.00
0036 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 274+00 50      SQYD 65.00 3,250.00
0037 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 99+76 20      SQYD 85.00 1,700.00
0038 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 295+12 50      SQYD 65.00 3,250.00
0039 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 100+02 10      SQYD 105.00 1,050.00
0040 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 62+80 20      SQYD 85.00 1,700.00
0041 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 337+36 40      SQYD 70.00 2,800.00
0042 713-01-00100 Temporary Signs and Barricades 1      LUMP 120,000.00 120,000.00
0043 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 15.9    MILE 600.00 9,540.00
0044 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 15      MILE 100.00 1,500.00
0045 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 131.3    MILE 100.00 13,130.00
0046 722-01-00100 Project Site Laboratory 1      EACH 500.00 500.00
0047 726-01-00100 Bedding Material 110.3    CUYD 0.00 0.00
0048 727-01-00100 Mobilization 1      LUMP 100,000.00 100,000.00
0049 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 75.00 600.00
0050 731-02-00100 Reflectorized Raised Pavement Markers 1,487      EACH 5.25 7,806.75
0051 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.028  MILE 2,500.00 42,570.00
0052 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.964  MILE 850.00 3,369.40
0053 735-01-00100 Mailboxes 25      EACH 8.00 200.00
0054 735-02-00100 Mailbox Supports (Single) 25      EACH 130.00 3,250.00
0055 739-01-00100 Hydro-Seeding 10.94   ACRE 1,350.00 14,769.00
0056 740-01-00100 Construction Layout 1      LUMP 50,000.00 50,000.00
0057 NS-200-00020 Cleaning Existing Ditches 60      LNFT 20.00 1,200.00
0058 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 360      INLF 1.00 360.00
0059 NS-700-00240 Special Guard Rail Anchor Section 2      EACH 1,200.00 2,400.00
             
    CONTRACTOR TOTAL       4,506,920.15