Bid Tabulations
Letting of
07/11/2012
LA DOTD Headquarters
| Lead Project: H.002158.6 | |
| Parish: Lafayette | |
| Routes: LA 93 | |
| Description: ROUNDABOUT AT INTER. LA 93 & LA 3168 | |
| Type Const: CLEARING AND GRUBBING, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $2,409,456.52 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 14807 | Richard Price Contracting Co, Llc | $2,325,496.29 |
| 2 | 52306 | Cecil Perry Improvements Llc | $2,531,220.00 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $2,684,891.49 |
| 4 | 39462 | Jb James Construction Llc | $3,018,357.59 |
| 5 | 53750 | Texas Sterling Construction Co. | $3,091,234.15 |
| 6 | 12312 | Gilchrist Construction Co. LLC | $3,160,126.75 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Richard Price Contracting Co, Llc |
- 2 - Cecil Perry Improvements Llc |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 102,181.18 | 102,181.18 | 25,000.00 | 25,000.00 | 85,000.00 | 85,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 21,097.35 | 21,097.35 | 17,000.00 | 17,000.00 | 30,000.00 | 30,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 400 | SQYD | 7.00 | 2,800.00 | 3.16 | 1,264.00 | 8.60 | 3,440.00 | 7.00 | 2,800.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 525.00 | 1,575.00 | 598.36 | 1,795.08 | 300.00 | 900.00 | 450.00 | 1,350.00 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 745 | SQYD | 5.25 | 3,911.25 | 2.95 | 2,197.75 | 6.00 | 4,470.00 | 10.00 | 7,450.00 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" | 241 | LNFT | 13.00 | 3,133.00 | 12.19 | 2,937.79 | 20.00 | 4,820.00 | 12.00 | 2,892.00 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 24" | 428 | LNFT | 13.00 | 5,564.00 | 13.73 | 5,876.44 | 6.00 | 2,568.00 | 12.00 | 5,136.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 450 | SQYD | 5.25 | 2,362.50 | 4.53 | 2,038.50 | 8.00 | 3,600.00 | 10.00 | 4,500.00 |
| 0009 | 202-02-38500 | Removal of Surfacing and Stablized Base | 12,196.4 | SQYD | 4.25 | 51,834.70 | 3.38 | 41,223.83 | 8.00 | 97,571.20 | 5.00 | 60,982.00 |
| 0010 | 203-01-00100 | General Excavation | 8,242 | CUYD | 6.75 | 55,633.50 | 5.62 | 46,320.04 | 12.00 | 98,904.00 | 9.00 | 74,178.00 |
| 0011 | 203-03-00100 | Embankment | 8,116 | CUYD | 11.00 | 89,276.00 | 15.17 | 123,119.72 | 15.95 | 129,450.20 | 18.00 | 146,088.00 |
| 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 50.00 | 1,000.00 | 18.72 | 374.40 | 25.00 | 500.00 | 15.00 | 300.00 |
| 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 33.00 | 1,650.00 | 64.10 | 3,205.00 | 100.00 | 5,000.00 | 100.00 | 5,000.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 1,650 | LNFT | 2.50 | 4,125.00 | 1.21 | 1,996.50 | 3.15 | 5,197.50 | 2.00 | 3,300.00 |
| 0015 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 883.4 | SQYD | 25.50 | 22,526.70 | 28.07 | 24,797.04 | 25.00 | 22,085.00 | 25.00 | 22,085.00 |
| 0016 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 12,114.6 | SQYD | 26.25 | 318,008.25 | 19.69 | 238,536.47 | 27.00 | 327,094.20 | 28.00 | 339,208.80 |
| 0017 | 303-01-00300 | In-Place Cement Stabilzed Base Course (10" Thick) | 1,552 | SQYD | 6.25 | 9,700.00 | 20.18 | 31,319.36 | 9.20 | 14,278.40 | 9.00 | 13,968.00 |
| 0018 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 1,220 | SQYD | 13.00 | 15,860.00 | 18.05 | 22,021.00 | 12.00 | 14,640.00 | 9.00 | 10,980.00 |
| 0019 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 330 | CUYD | 92.00 | 30,360.00 | 53.68 | 17,714.40 | 80.00 | 26,400.00 | 70.00 | 23,100.00 |
| 0020 | 502-01-00100 | Superpave Asphaltic Concrete | 2,395.4 | TON | 143.00 | 342,542.20 | 120.00 | 287,448.00 | 132.50 | 317,390.50 | 130.00 | 311,402.00 |
| 0021 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 187.4 | TON | 170.00 | 31,858.00 | 165.00 | 30,921.00 | 160.00 | 29,984.00 | 150.00 | 28,110.00 |
| 0022 | 509-01-00100 | Cold Planing Asphaltic Pavement | 5,198 | SQYD | 5.75 | 29,888.50 | 3.50 | 18,193.00 | 5.30 | 27,549.40 | 5.00 | 25,990.00 |
| 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -289 | CUYD | 1.00 | -289.00 | 1.00 | -289.00 | 1.00 | -289.00 | 0.01 | -2.89 |
| 0024 | 510-02-00100 | Pavement Widening (10" Thick) | 180.6 | SQYD | 93.00 | 16,795.80 | 44.00 | 7,946.40 | 65.00 | 11,739.00 | 90.00 | 16,254.00 |
| 0025 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 9,558.7 | SQYD | 50.79 | 485,486.37 | 71.00 | 678,667.70 | 60.00 | 573,522.00 | 66.00 | 630,874.20 |
| 0026 | 601-01-01300 | Portland Cement Concrete Pavement (14" Thick) | 653.5 | SQYD | 77.00 | 50,319.50 | 110.00 | 71,885.00 | 125.00 | 81,687.50 | 110.00 | 71,885.00 |
| 0027 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 364 | LNFT | 80.00 | 29,120.00 | 73.18 | 26,637.52 | 135.00 | 49,140.00 | 110.00 | 40,040.00 |
| 0028 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 182 | LNFT | 88.00 | 16,016.00 | 92.46 | 16,827.72 | 140.00 | 25,480.00 | 130.00 | 23,660.00 |
| 0029 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 8 | LNFT | 52.00 | 416.00 | 107.12 | 856.96 | 150.00 | 1,200.00 | 120.00 | 960.00 |
| 0030 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 277 | LNFT | 79.00 | 21,883.00 | 93.18 | 25,810.86 | 75.00 | 20,775.00 | 85.00 | 23,545.00 |
| 0031 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 60 | LNFT | 54.00 | 3,240.00 | 61.37 | 3,682.20 | 53.50 | 3,210.00 | 60.00 | 3,600.00 |
| 0032 | 701-07-00600 | Yard Drain Pipe (15") | 32 | LNFT | 39.00 | 1,248.00 | 45.00 | 1,440.00 | 50.00 | 1,600.00 | 54.00 | 1,728.00 |
| 0033 | 701-11-01020 | Reinforced Concrete Pipe Arch (Extension) (18" Equiv.) | 12 | LNFT | 79.00 | 948.00 | 76.50 | 918.00 | 150.00 | 1,800.00 | 150.00 | 1,800.00 |
| 0034 | 701-15-00100 | Concrete Collar | 2 | EACH | 900.00 | 1,800.00 | 520.00 | 1,040.00 | 400.00 | 800.00 | 600.00 | 1,200.00 |
| 0035 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 2,500.00 | 17,500.00 | 2,680.00 | 18,760.00 | 2,500.00 | 17,500.00 | 2,400.00 | 16,800.00 |
| 0036 | 702-03-00300 | Catch Basins (CB-04) | 4 | EACH | 1,900.66 | 7,602.64 | 1,500.00 | 6,000.00 | 2,000.00 | 8,000.00 | 3,000.00 | 12,000.00 |
| 0037 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 3,200.00 | 3,200.00 | 3,130.00 | 3,130.00 | 2,800.00 | 2,800.00 | 4,000.00 | 4,000.00 |
| 0038 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 742.07 | 742.07 | 545.00 | 545.00 | 400.00 | 400.00 | 1,200.00 | 1,200.00 |
| 0039 | 706-02-00200 | Concrete Drive (6" Thick) | 800.4 | SQYD | 45.00 | 36,018.00 | 44.00 | 35,217.60 | 60.00 | 48,024.00 | 50.00 | 40,020.00 |
| 0040 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 263.2 | SQYD | 45.00 | 11,844.00 | 69.50 | 18,292.40 | 57.00 | 15,002.40 | 50.00 | 13,160.00 |
| 0041 | 707-01-00200 | Concrete Curb (Barrier) | 566.6 | LNFT | 5.25 | 2,974.65 | 6.50 | 3,682.90 | 14.00 | 7,932.40 | 10.00 | 5,666.00 |
| 0042 | 707-03-00100 | Combination Concrete Curb and Gutter | 4,078.9 | LNFT | 20.00 | 81,578.00 | 18.50 | 75,459.65 | 23.75 | 96,873.88 | 15.80 | 64,446.62 |
| 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,949.74 | 55,949.74 | 32,300.00 | 32,300.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 |
| 0044 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,344 | LNFT | 0.29 | 1,259.76 | 0.29 | 1,259.76 | 0.26 | 1,129.44 | 0.25 | 1,086.00 |
| 0045 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 315 | LNFT | 0.69 | 217.35 | 0.69 | 217.35 | 0.64 | 201.60 | 0.60 | 189.00 |
| 0046 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 341 | LNFT | 1.15 | 392.15 | 1.15 | 392.15 | 1.06 | 361.46 | 1.00 | 341.00 |
| 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1 | MILE | 545.00 | 545.00 | 631.88 | 631.88 | 4,250.00 | 4,250.00 | 550.00 | 550.00 |
| 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3 | MILE | 630.00 | 1,890.00 | 631.88 | 1,895.64 | 585.00 | 1,755.00 | 550.00 | 1,650.00 |
| 0049 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 3 | EACH | 51.50 | 154.50 | 51.70 | 155.10 | 50.00 | 150.00 | 50.00 | 150.00 |
| 0050 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 51.50 | 51.50 | 51.70 | 51.70 | 50.00 | 50.00 | 50.00 | 50.00 |
| 0051 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 550 | EACH | 6.00 | 3,300.00 | 6.00 | 3,300.00 | 6.00 | 3,300.00 | 5.50 | 3,025.00 |
| 0052 | 715-01-00100 | Topsoil | 200 | CUYD | 30.25 | 6,050.00 | 19.65 | 3,930.00 | 1.00 | 200.00 | 14.00 | 2,800.00 |
| 0053 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 1,250.00 | 1,250.00 | 10,900.00 | 10,900.00 | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 |
| 0054 | 725-01-00100 | Temporary Detour Roads | 2,420.3 | SQYD | 49.00 | 118,594.70 | 66.50 | 160,949.95 | 55.00 | 133,116.50 | 67.20 | 162,644.16 |
| 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 73,812.00 | 73,812.00 | 105,000.00 | 105,000.00 | 290,000.00 | 290,000.00 |
| 0056 | 729-01-00100 | Sign (Type A) | 197 | SQFT | 22.68 | 4,467.96 | 22.50 | 4,432.50 | 22.70 | 4,471.90 | 32.00 | 6,304.00 |
| 0057 | 729-02-00100 | Sign (Type B) | 50.1 | SQFT | 23.82 | 1,193.38 | 23.50 | 1,177.35 | 23.75 | 1,189.88 | 36.00 | 1,803.60 |
| 0058 | 729-04-00100 | Sign (Type D) | 120.7 | SQFT | 32.15 | 3,880.51 | 32.00 | 3,862.40 | 32.40 | 3,910.68 | 40.00 | 4,828.00 |
| 0059 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 86.11 | 1,033.32 | 86.00 | 1,032.00 | 81.00 | 972.00 | 80.00 | 960.00 |
| 0060 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 1,377.80 | 1,377.80 | 1,376.00 | 1,376.00 | 1,300.00 | 1,300.00 | 2,200.00 | 2,200.00 |
| 0061 | 730-01-00100 | Trenching and Backfilling | 100 | LNFT | 12.63 | 1,263.00 | 12.50 | 1,250.00 | 11.65 | 1,165.00 | 10.00 | 1,000.00 |
| 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 550 | EACH | 6.03 | 3,316.50 | 6.00 | 3,300.00 | 5.85 | 3,217.50 | 5.00 | 2,750.00 |
| 0064 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 63 | LNFT | 5.17 | 325.71 | 5.17 | 325.71 | 5.00 | 315.00 | 5.00 | 315.00 |
| 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 108 | LNFT | 5.74 | 619.92 | 5.74 | 619.92 | 5.40 | 583.20 | 5.50 | 594.00 |
| 0066 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.8 | MILE | 2,985.23 | 8,358.64 | 2,982.00 | 8,349.60 | 2,810.00 | 7,868.00 | 2,700.00 | 7,560.00 |
| 0067 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.306 | MILE | 7,316.73 | 2,238.92 | 7,455.00 | 2,281.23 | 7,020.00 | 2,148.12 | 6,600.00 | 2,019.60 |
| 0068 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.009 | MILE | 1,084.44 | 9.76 | 974.50 | 8.77 | 920.00 | 8.28 | 1,000.00 | 9.00 |
| 0069 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.105 | MILE | 3,608.48 | 378.89 | 3,440.00 | 361.20 | 3,250.00 | 341.25 | 3,200.00 | 336.00 |
| 0070 | 732-03-02050 | Plastic Pvmt Strip (Dotted Line)(12" W)(2' L)(Thermo 90 mil) | 0.03 | MILE | 5,740.67 | 172.22 | 5,744.33 | 172.33 | 5,400.00 | 162.00 | 5,200.00 | 156.00 |
| 0071 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 235.37 | 235.37 | 235.00 | 235.00 | 222.00 | 222.00 | 220.00 | 220.00 |
| 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 246.86 | 493.72 | 246.00 | 492.00 | 233.00 | 466.00 | 220.00 | 440.00 |
| 0073 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 246.86 | 246.86 | 246.00 | 246.00 | 233.00 | 233.00 | 220.00 | 220.00 |
| 0074 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 258.34 | 258.34 | 258.00 | 258.00 | 245.00 | 245.00 | 240.00 | 240.00 |
| 0075 | 732-05-00100 | Removal of Existing Markings | 2.5 | MILE | 4,018.58 | 10,046.45 | 4,014.00 | 10,035.00 | 3,800.00 | 9,500.00 | 3,500.00 | 8,750.00 |
| 0076 | 735-01-00100 | Mailboxes | 10 | EACH | 11.48 | 114.80 | 85.00 | 850.00 | 11.00 | 110.00 | 1.00 | 10.00 |
| 0077 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 218.15 | 1,308.90 | 125.00 | 750.00 | 205.00 | 1,230.00 | 150.00 | 900.00 |
| 0078 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 298.53 | 298.53 | 194.00 | 194.00 | 280.00 | 280.00 | 250.00 | 250.00 |
| 0079 | 736-11-00500 | Conduit (4" HDPE, Schedule 80) | 200 | LNFT | 5.22 | 1,044.00 | 5.23 | 1,046.00 | 4.90 | 980.00 | 9.00 | 1,800.00 |
| 0080 | 739-01-00100 | Hydro-Seeding | 6.09 | ACRE | 2,000.00 | 12,180.00 | 2,040.00 | 12,423.60 | 2,335.00 | 14,220.15 | 1,200.00 | 7,308.00 |
| 0081 | 740-01-00100 | Construction Layout | 1 | LUMP | 58,000.00 | 58,000.00 | 10,520.00 | 10,520.00 | 33,500.00 | 33,500.00 | 80,000.00 | 80,000.00 |
| 0082 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,042 | INLF | 0.75 | 2,281.50 | 1.00 | 3,042.00 | 0.70 | 2,129.40 | 0.70 | 2,129.40 |
| 0083 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,511 | INLF | 1.09 | 2,736.99 | 1.00 | 2,511.00 | 1.05 | 2,636.55 | 1.10 | 2,762.10 |
| 0084 | NS-706-00200 | Integrally Colored Portland Cement Concrete | 328.2 | SQYD | 43.00 | 14,112.60 | 118.00 | 38,727.60 | 70.00 | 22,974.00 | 90.00 | 29,538.00 |
| 0085 | NS-713-00001 | Dynamic Message Sign Unit | 6 | EACH | 6,400.00 | 38,400.00 | 8,028.00 | 48,168.00 | 7,500.00 | 45,000.00 | 12,000.00 | 72,000.00 |
| 0086 | NS-729-00004 | Square Steel Tubular Sign Posts and Hardware (2" x 2")(1.74lb/ft) | 530 | LNFT | 11.48 | 6,084.40 | 11.50 | 6,095.00 | 11.00 | 5,830.00 | 9.00 | 4,770.00 |
| 0087 | NS-729-00006 | Square Steel Tubular Sign Posts and Hardware (2 1/4" x 2 1/4") | 159 | LNFT | 11.48 | 1,825.32 | 11.50 | 1,828.50 | 11.00 | 1,749.00 | 16.00 | 2,544.00 |
| 0088 | NS-MSC-00120 | Drainage Structure Paved Gutter Drain | 11 | EACH | 1,711.11 | 18,822.21 | 1,967.00 | 21,637.00 | 2,700.00 | 29,700.00 | 2,500.00 | 27,500.00 |
| 0089 | NS-MSC-00120 | Drainage Structure Double Paved Gutter Drain | 8 | EACH | 3,468.22 | 27,745.76 | 3,076.00 | 24,608.00 | 3,600.00 | 28,800.00 | 3,500.00 | 28,000.00 |
| 0090 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (Location shown on plans) | 6 | EACH | 671.68 | 4,030.08 | 670.00 | 4,020.00 | 640.00 | 3,840.00 | 1,000.00 | 6,000.00 |
| 0091 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 6 | EACH | 814.60 | 4,887.60 | 350.00 | 2,100.00 | 340.00 | 2,040.00 | 500.00 | 3,000.00 |
| CONTRACTOR TOTAL | 2,325,496.29 | 2,531,220.00 | 2,684,891.49 | 3,018,357.59 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Texas Sterling Construction Co. |
- 6 - Gilchrist Construction Co. LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 400 | SQYD | 19.00 | 7,600.00 | 15.00 | 6,000.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 204.00 | 612.00 | 700.00 | 2,100.00 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 745 | SQYD | 12.00 | 8,940.00 | 9.00 | 6,705.00 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" | 241 | LNFT | 17.50 | 4,217.50 | 22.00 | 5,302.00 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 24" | 428 | LNFT | 19.50 | 8,346.00 | 22.00 | 9,416.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 450 | SQYD | 11.00 | 4,950.00 | 10.00 | 4,500.00 |
| 0009 | 202-02-38500 | Removal of Surfacing and Stablized Base | 12,196.4 | SQYD | 8.00 | 97,571.20 | 6.00 | 73,178.40 |
| 0010 | 203-01-00100 | General Excavation | 8,242 | CUYD | 12.00 | 98,904.00 | 9.00 | 74,178.00 |
| 0011 | 203-03-00100 | Embankment | 8,116 | CUYD | 7.00 | 56,812.00 | 24.00 | 194,784.00 |
| 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 15.00 | 300.00 | 15.00 | 300.00 |
| 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 50.00 | 2,500.00 | 125.00 | 6,250.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 1,650 | LNFT | 1.50 | 2,475.00 | 1.30 | 2,145.00 |
| 0015 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 883.4 | SQYD | 29.00 | 25,618.60 | 34.00 | 30,035.60 |
| 0016 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 12,114.6 | SQYD | 30.00 | 363,438.00 | 27.00 | 327,094.20 |
| 0017 | 303-01-00300 | In-Place Cement Stabilzed Base Course (10" Thick) | 1,552 | SQYD | 33.00 | 51,216.00 | 19.00 | 29,488.00 |
| 0018 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 1,220 | SQYD | 32.00 | 39,040.00 | 17.00 | 20,740.00 |
| 0019 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 330 | CUYD | 94.00 | 31,020.00 | 35.00 | 11,550.00 |
| 0020 | 502-01-00100 | Superpave Asphaltic Concrete | 2,395.4 | TON | 105.00 | 251,517.00 | 122.00 | 292,238.80 |
| 0021 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 187.4 | TON | 103.00 | 19,302.20 | 225.00 | 42,165.00 |
| 0022 | 509-01-00100 | Cold Planing Asphaltic Pavement | 5,198 | SQYD | 3.00 | 15,594.00 | 5.00 | 25,990.00 |
| 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -289 | CUYD | 0.15 | -43.35 | 1.00 | -289.00 |
| 0024 | 510-02-00100 | Pavement Widening (10" Thick) | 180.6 | SQYD | 128.00 | 23,116.80 | 98.00 | 17,698.80 |
| 0025 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 9,558.7 | SQYD | 75.00 | 716,902.50 | 73.00 | 697,785.10 |
| 0026 | 601-01-01300 | Portland Cement Concrete Pavement (14" Thick) | 653.5 | SQYD | 101.00 | 66,003.50 | 125.00 | 81,687.50 |
| 0027 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 364 | LNFT | 98.00 | 35,672.00 | 98.00 | 35,672.00 |
| 0028 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 182 | LNFT | 105.00 | 19,110.00 | 120.00 | 21,840.00 |
| 0029 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 8 | LNFT | 135.00 | 1,080.00 | 110.00 | 880.00 |
| 0030 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 277 | LNFT | 90.00 | 24,930.00 | 100.00 | 27,700.00 |
| 0031 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 60 | LNFT | 95.00 | 5,700.00 | 80.00 | 4,800.00 |
| 0032 | 701-07-00600 | Yard Drain Pipe (15") | 32 | LNFT | 110.00 | 3,520.00 | 30.00 | 960.00 |
| 0033 | 701-11-01020 | Reinforced Concrete Pipe Arch (Extension) (18" Equiv.) | 12 | LNFT | 105.00 | 1,260.00 | 125.00 | 1,500.00 |
| 0034 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,500.00 | 3,000.00 | 900.00 | 1,800.00 |
| 0035 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 3,500.00 | 24,500.00 | 2,500.00 | 17,500.00 |
| 0036 | 702-03-00300 | Catch Basins (CB-04) | 4 | EACH | 2,500.00 | 10,000.00 | 3,300.00 | 13,200.00 |
| 0037 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 |
| 0038 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 845.00 | 845.00 |
| 0039 | 706-02-00200 | Concrete Drive (6" Thick) | 800.4 | SQYD | 67.50 | 54,027.00 | 60.00 | 48,024.00 |
| 0040 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 263.2 | SQYD | 66.00 | 17,371.20 | 90.00 | 23,688.00 |
| 0041 | 707-01-00200 | Concrete Curb (Barrier) | 566.6 | LNFT | 12.00 | 6,799.20 | 22.00 | 12,465.20 |
| 0042 | 707-03-00100 | Combination Concrete Curb and Gutter | 4,078.9 | LNFT | 13.00 | 53,025.70 | 30.00 | 122,367.00 |
| 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 30,000.00 | 30,000.00 |
| 0044 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,344 | LNFT | 0.20 | 868.80 | 0.30 | 1,303.20 |
| 0045 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 315 | LNFT | 0.50 | 157.50 | 1.00 | 315.00 |
| 0046 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 341 | LNFT | 1.00 | 341.00 | 1.15 | 392.15 |
| 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1 | MILE | 400.00 | 400.00 | 350.00 | 350.00 |
| 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3 | MILE | 800.00 | 2,400.00 | 690.00 | 2,070.00 |
| 0049 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 3 | EACH | 60.00 | 180.00 | 55.00 | 165.00 |
| 0050 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 60.00 | 60.00 | 55.00 | 55.00 |
| 0051 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 550 | EACH | 5.00 | 2,750.00 | 5.00 | 2,750.00 |
| 0052 | 715-01-00100 | Topsoil | 200 | CUYD | 35.00 | 7,000.00 | 28.00 | 5,600.00 |
| 0053 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 14,000.00 | 14,000.00 | 5,000.00 | 5,000.00 |
| 0054 | 725-01-00100 | Temporary Detour Roads | 2,420.3 | SQYD | 55.00 | 133,116.50 | 78.00 | 188,783.40 |
| 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 309,000.00 | 309,000.00 | 300,000.00 | 300,000.00 |
| 0056 | 729-01-00100 | Sign (Type A) | 197 | SQFT | 15.00 | 2,955.00 | 24.00 | 4,728.00 |
| 0057 | 729-02-00100 | Sign (Type B) | 50.1 | SQFT | 14.00 | 701.40 | 24.00 | 1,202.40 |
| 0058 | 729-04-00100 | Sign (Type D) | 120.7 | SQFT | 30.00 | 3,621.00 | 30.00 | 3,621.00 |
| 0059 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 63.50 | 762.00 | 45.00 | 540.00 |
| 0060 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 3,600.00 | 3,600.00 | 1,800.00 | 1,800.00 |
| 0061 | 730-01-00100 | Trenching and Backfilling | 100 | LNFT | 10.00 | 1,000.00 | 12.00 | 1,200.00 |
| 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 550 | EACH | 4.50 | 2,475.00 | 5.75 | 3,162.50 |
| 0064 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 63 | LNFT | 4.50 | 283.50 | 4.60 | 289.80 |
| 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 108 | LNFT | 5.00 | 540.00 | 5.75 | 621.00 |
| 0066 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.8 | MILE | 2,800.00 | 7,840.00 | 3,000.00 | 8,400.00 |
| 0067 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.306 | MILE | 5,000.00 | 1,530.00 | 6,000.00 | 1,836.00 |
| 0068 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.009 | MILE | 5,600.00 | 50.40 | 5,700.00 | 51.30 |
| 0069 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.105 | MILE | 3,000.00 | 315.00 | 3,700.00 | 388.50 |
| 0070 | 732-03-02050 | Plastic Pvmt Strip (Dotted Line)(12" W)(2' L)(Thermo 90 mil) | 0.03 | MILE | 3,000.00 | 90.00 | 5,500.00 | 165.00 |
| 0071 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 205.00 | 205.00 | 225.00 | 225.00 |
| 0072 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 215.00 | 430.00 | 225.00 | 450.00 |
| 0073 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 215.00 | 215.00 | 225.00 | 225.00 |
| 0074 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 225.00 | 225.00 | 225.00 | 225.00 |
| 0075 | 732-05-00100 | Removal of Existing Markings | 2.5 | MILE | 3,500.00 | 8,750.00 | 3,000.00 | 7,500.00 |
| 0076 | 735-01-00100 | Mailboxes | 10 | EACH | 3.00 | 30.00 | 15.00 | 150.00 |
| 0077 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 125.00 | 750.00 | 225.00 | 1,350.00 |
| 0078 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 162.00 | 162.00 | 300.00 | 300.00 |
| 0079 | 736-11-00500 | Conduit (4" HDPE, Schedule 80) | 200 | LNFT | 4.50 | 900.00 | 5.25 | 1,050.00 |
| 0080 | 739-01-00100 | Hydro-Seeding | 6.09 | ACRE | 1,300.00 | 7,917.00 | 1,200.00 | 7,308.00 |
| 0081 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 35,000.00 | 35,000.00 |
| 0082 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,042 | INLF | 0.50 | 1,521.00 | 1.75 | 5,323.50 |
| 0083 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,511 | INLF | 1.50 | 3,766.50 | 1.75 | 4,394.25 |
| 0084 | NS-706-00200 | Integrally Colored Portland Cement Concrete | 328.2 | SQYD | 235.00 | 77,127.00 | 95.00 | 31,179.00 |
| 0085 | NS-713-00001 | Dynamic Message Sign Unit | 6 | EACH | 7,700.00 | 46,200.00 | 8,000.00 | 48,000.00 |
| 0086 | NS-729-00004 | Square Steel Tubular Sign Posts and Hardware (2" x 2")(1.74lb/ft) | 530 | LNFT | 11.50 | 6,095.00 | 8.42 | 4,462.60 |
| 0087 | NS-729-00006 | Square Steel Tubular Sign Posts and Hardware (2 1/4" x 2 1/4") | 159 | LNFT | 14.50 | 2,305.50 | 10.45 | 1,661.55 |
| 0088 | NS-MSC-00120 | Drainage Structure Paved Gutter Drain | 11 | EACH | 4,100.00 | 45,100.00 | 3,600.00 | 39,600.00 |
| 0089 | NS-MSC-00120 | Drainage Structure Double Paved Gutter Drain | 8 | EACH | 4,200.00 | 33,600.00 | 6,000.00 | 48,000.00 |
| 0090 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (Location shown on plans) | 6 | EACH | 500.00 | 3,000.00 | 675.00 | 4,050.00 |
| 0091 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 6 | EACH | 325.00 | 1,950.00 | 350.00 | 2,100.00 |
| CONTRACTOR TOTAL | 3,091,234.15 | 3,160,126.75 | ||||||