LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.002147.6
Parish: St. Martin
Routes: LA 92
Description: LA 92: LA 182 - LA 31
Type Const: COLD PLANING ASPHALTIC PAVEMENT, SUBGRADE TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost: $3,018,743.74


RankLicenseBidderConstruction Bid
1 33663 Glenn Lege Construction Inc $2,630,668.67
2 12487 Diamond B Construction Co., L.L.C. $2,938,927.40
3 00481 Coastal Bridge Co., L.L.C. $2,986,438.79
4 08815 W. E. Mcdonald & Son, LLC. $3,139,918.79


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Glenn Lege Construction Inc
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
Coastal Bridge Co., L.L.C.
- 4 -
W. E. Mcdonald & Son, LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions 1      LUMP 4,040.00 4,040.00 3,600.00 3,600.00 1,600.00 1,600.00 15,000.00 15,000.00
0002 202-02-06100 Removal of Concrete Walks and Drives 98      SQYD 12.99 1,273.02 6.00 588.00 10.00 980.00 40.00 3,920.00
0003 203-01-00100 General Excavation 90      CUYD 7.50 675.00 48.00 4,320.00 10.00 900.00 25.00 2,250.00
0004 203-07-00100 Borrow (Vehicular Measurement) 720      CUYD 12.99 9,352.80 30.00 21,600.00 15.00 10,800.00 12.00 8,640.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 46      EACH 82.06 3,774.76 130.00 5,980.00 130.00 5,980.00 250.00 11,500.00
0006 303-01-00200 In-Place Cement Stabilized Base Course (8 1/2" Thick) 59,463      SQYD 4.09 243,203.67 6.20 368,670.60 5.75 341,912.25 6.00 356,778.00
0007 305-01-03020 Subgrade Layer (10" Thick) (Treated) 59,417      SQYD 7.99 474,741.83 10.25 609,024.25 11.00 653,587.00 9.75 579,315.75
0008 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 170      CUYD 32.00 5,440.00 75.00 12,750.00 25.00 4,250.00 100.00 17,000.00
0009 502-01-00100 Superpave Asphaltic Concrete 15,441.6    TON 71.35 1,101,758.16 85.00 1,312,536.00 75.00 1,158,120.00 90.00 1,389,744.00
0010 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 635      TON 104.57 66,401.95 160.00 101,600.00 125.00 79,375.00 185.00 117,475.00
0011 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 40,039      GAL 3.77 150,947.03 3.40 136,132.60 3.50 140,136.50 3.50 140,136.50
0012 507-02-00200 Aggregate (S2) 58,882      SQYD 0.99 58,293.18 0.90 52,993.80 0.90 52,993.80 1.00 58,882.00
0013 507-02-00300 Aggregate (S3) 58,882      SQYD 0.76 44,750.32 0.70 41,217.40 0.65 38,273.30 0.75 44,161.50
0014 509-01-00100 Cold Planing Asphaltic Pavement 66,928      SQYD 1.15 76,967.20 1.90 127,163.20 1.50 100,392.00 2.00 133,856.00
0015 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,626      CUYD 0.01 -46.26 17.00 -78,642.00 0.10 -462.60 0.01 -46.26
0016 510-01-00200 Pavement Patching (12" Minimum Thickness) 250      SQYD 88.00 22,000.00 90.00 22,500.00 75.00 18,750.00 200.00 50,000.00
0017 701-01-02001 Cross Drain Pipe (24" RCP/PP/CMP) 68      LNFT 69.44 4,721.92 155.00 10,540.00 75.00 5,100.00 120.00 8,160.00
0018 701-03-01020 Storm Drain Pipe (18" RCP/PP) 8      LNFT 83.33 666.64 65.00 520.00 65.00 520.00 100.00 800.00
0019 706-01-00100 Concrete Walk (4" Thick) 10      SQYD 56.00 560.00 67.00 670.00 65.00 650.00 100.00 1,000.00
0020 706-02-00200 Concrete Drive (6" Thick) 50      SQYD 50.50 2,525.00 75.00 3,750.00 70.00 3,500.00 100.00 5,000.00
0021 713-01-00100 Temporary Signs and Barricades 1      LUMP 17,769.13 17,769.13 15,000.00 15,000.00 15,000.00 15,000.00 25,000.00 25,000.00
0022 713-02-00300 Temporary Pavement Markings (8" Width) 140      LNFT 0.24 33.60 0.26 36.40 0.25 35.00 0.25 35.00
0023 713-02-00500 Temporary Pavement Markings (24" Width) 400      LNFT 0.82 328.00 0.52 208.00 1.00 400.00 0.50 200.00
0024 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 9.062  MILE 650.19 5,892.02 170.00 1,540.54 175.00 1,585.85 400.00 3,624.80
0025 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 7.419  MILE 436.32 3,237.06 200.00 1,483.80 410.00 3,041.79 200.00 1,483.80
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 22.995  MILE 490.86 11,287.33 350.00 8,048.25 465.00 10,692.68 350.00 8,048.25
0027 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 2      EACH 49.09 98.18 25.00 50.00 50.00 100.00 25.00 50.00
0028 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 2      EACH 49.09 98.18 25.00 50.00 50.00 100.00 25.00 50.00
0029 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 953      EACH 1.20 1,143.60 1.15 1,095.95 1.20 1,143.60 2.00 1,906.00
0030 717-01-00100 Seeding 2.43   LB 109.08 265.06 11.00 26.73 11.00 26.73 100.00 243.00
0031 718-01-00100 Fertilizer 4.94   LB 109.08 538.86 1.25 6.18 1.00 4.94 100.00 494.00
0032 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 5,176.25 5,176.25 4,000.00 4,000.00 5,000.00 5,000.00 3,000.00 3,000.00
0033 726-01-00100 Bedding Material 10      CUYD 75.00 750.00 87.00 870.00 90.00 900.00 100.00 1,000.00
0034 727-01-00100 Mobilization 1      LUMP 247,847.69 247,847.69 91,000.00 91,000.00 265,000.00 265,000.00 88,500.00 88,500.00
0035 729-16-00300 Object Marker Assembly (Type 3) 2      EACH 163.62 327.24 80.00 160.00 95.00 190.00 125.00 250.00
0036 731-02-00100 Reflectorized Raised Pavement Markers 600      EACH 5.73 3,438.00 6.00 3,600.00 5.50 3,300.00 5.75 3,450.00
0037 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 70      LNFT 1.47 102.90 4.25 297.50 1.50 105.00 4.00 280.00
0038 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 188      LNFT 4.91 923.08 4.25 799.00 4.75 893.00 4.00 752.00
0039 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 12      LNFT 5.45 65.40 4.25 51.00 5.25 63.00 4.00 48.00
0040 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 11.498  MILE 2,836.08 32,609.25 2,700.00 31,044.60 2,700.00 31,044.60 2,600.00 29,894.80
0041 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.709  MILE 927.18 3,438.91 900.00 3,338.10 900.00 3,338.10 850.00 3,152.65
0042 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 1      EACH 234.52 234.52 325.00 325.00 225.00 225.00 300.00 300.00
0043 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 1      EACH 245.43 245.43 425.00 425.00 250.00 250.00 400.00 400.00
0044 732-05-00100 Removal of Existing Markings 0.023  MILE 5,454.00 125.44 25,000.00 575.00 5,000.00 115.00 25,000.00 575.00
0045 735-01-00100 Mailboxes 36      EACH 16.36 588.96 1.00 36.00 6.00 216.00 1.00 36.00
0046 735-02-00100 Mailbox Supports (Single) 27      EACH 103.63 2,798.01 104.00 2,808.00 130.00 3,510.00 104.00 2,808.00
0047 735-03-00100 Mailbox Supports (Double) 5      EACH 136.35 681.75 125.00 625.00 200.00 1,000.00 125.00 625.00
0048 735-04-00100 Mailbox Supports (Multiple) 2      EACH 201.80 403.60 180.00 360.00 315.00 630.00 180.00 360.00
0049 740-01-00100 Construction Layout 1      LUMP 13,508.75 13,508.75 9,000.00 9,000.00 15,000.00 15,000.00 10,000.00 10,000.00
0050 NS-200-00020 Cleaning Existing Ditches 215      LNFT 9.00 1,935.00 10.00 2,150.00 16.00 3,440.00 15.00 3,225.00
0051 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 2,185      INLF 1.25 2,731.25 1.10 2,403.50 1.25 2,731.25 3.00 6,555.00
                         
    CONTRACTOR TOTAL       2,630,668.67   2,938,927.40   2,986,438.79   3,139,918.79