Bid Tabulations
Letting of
04/24/2013
LA DOTD Headquarters
| Lead Project: H.002114.6-R1 | |
| Parish: Vermilion | |
| Routes: LA 35 | |
| Description: LA 35 BRIDGES NEAR KAPLAN | |
| Type Const: GRADING, EARTHWORK, SUPERPAVE ASPHALTIC CONCRETE, DRAINAGE STRUCTURES, CONCRETE SLAB SPAN BRIDGE | |
| Estimated Construction Cost: $2,705,009.37 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $2,661,151.43 |
| 2 | 56288 | Guinn Services, LLC | $2,784,777.25 |
| 3 | 14422 | T. L. Wallace Construction, Inc. | $2,903,972.31 |
| 4 | 00044 | Guinn Construction, LLC | $2,939,777.60 |
| 5 | 39462 | Jb James Construction Llc | $2,946,350.55 |
| 6 | 08815 | W. E. Mcdonald & Son, LLC. | $3,133,793.10 |
| 7 | 34567 | James Construction Group LLC | $3,145,406.25 |
| 8 | 01012 | Cecil D. Gassiott, LLC | $3,181,728.94 |
| 9 | 00481 | Coastal Bridge Co., L.L.C. | $3,256,661.68 |
| 10 | 40312 | Gray Construction Corp. | $3,277,831.46 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Guinn Services, LLC |
- 3 - T. L. Wallace Construction, Inc. |
- 4 - Guinn Construction, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 27,000.00 | 27,000.00 | 20,000.00 | 20,000.00 | 90,000.00 | 90,000.00 | 21,000.00 | 21,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 9,000.00 | 9,000.00 | 5,100.00 | 5,100.00 | 15,000.00 | 15,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Sta. 110+51.76 TO 111+73.76) 27.8' X 22' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070204011 | 1 | EACH | 15,000.00 | 15,000.00 | 4,250.00 | 4,250.00 | 7,650.00 | 7,650.00 | 6,500.00 | 6,500.00 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 210+64.07 TO 211+40.34 ) 25.9' X 55' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070209041 | 1 | EACH | 15,000.00 | 15,000.00 | 5,500.00 | 5,500.00 | 18,000.00 | 18,000.00 | 7,000.00 | 7,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge (Sta. 310+40.98 TO 310+80.62) 27.4' X 39' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070211261 | 1 | EACH | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 11,000.00 | 11,000.00 | 12,500.00 | 12,500.00 |
| 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 68 | SQYD | 12.00 | 816.00 | 50.00 | 3,400.00 | 27.55 | 1,873.40 | 10.00 | 680.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 6,710.9 | SQYD | 5.75 | 38,587.68 | 5.00 | 33,554.50 | 8.15 | 54,693.84 | 5.00 | 33,554.50 |
| 0008 | 203-01-00100 | General Excavation | 15,239 | CUYD | 6.00 | 91,434.00 | 6.50 | 99,053.50 | 9.20 | 140,198.80 | 7.00 | 106,673.00 |
| 0009 | 203-02-00100 | Drainage Excavation | 1,090 | CUYD | 11.00 | 11,990.00 | 8.00 | 8,720.00 | 16.85 | 18,366.50 | 10.00 | 10,900.00 |
| 0010 | 203-03-00100 | Embankment | 6,915 | CUYD | 13.50 | 93,352.50 | 17.00 | 117,555.00 | 13.25 | 91,623.75 | 15.00 | 103,725.00 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 32 | EACH | 160.00 | 5,120.00 | 100.00 | 3,200.00 | 122.00 | 3,904.00 | 100.00 | 3,200.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 3,698 | LNFT | 1.60 | 5,916.80 | 2.00 | 7,396.00 | 1.70 | 6,286.60 | 1.75 | 6,471.50 |
| 0013 | 302-02-03000 | Class II Base Course (8" Thick) | 9,738.1 | SQYD | 24.50 | 238,583.45 | 23.00 | 223,976.30 | 29.60 | 288,247.76 | 21.00 | 204,500.10 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 306.5 | CUYD | 55.00 | 16,857.50 | 100.00 | 30,650.00 | 66.35 | 20,336.28 | 85.00 | 26,052.50 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 38.00 | 1,900.00 | 100.00 | 5,000.00 | 45.90 | 2,295.00 | 50.00 | 2,500.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 3,168.3 | TON | 100.00 | 316,830.00 | 132.00 | 418,215.60 | 117.00 | 370,691.10 | 130.00 | 411,879.00 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 500.5 | TON | 150.00 | 75,075.00 | 168.00 | 84,084.00 | 153.00 | 76,576.50 | 175.00 | 87,587.50 |
| 0018 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 952 | LNFT | 50.00 | 47,600.00 | 48.00 | 45,696.00 | 56.10 | 53,407.20 | 31.00 | 29,512.00 |
| 0019 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 60 | LNFT | 60.00 | 3,600.00 | 48.00 | 2,880.00 | 56.10 | 3,366.00 | 31.00 | 1,860.00 |
| 0020 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 308 | LNFT | 34.00 | 10,472.00 | 48.00 | 14,784.00 | 56.10 | 17,278.80 | 31.00 | 9,548.00 |
| 0021 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 2,100.00 | 8,400.00 | 3,000.00 | 12,000.00 | 2,810.00 | 11,240.00 | 3,500.00 | 14,000.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 431.3 | LNFT | 16.00 | 6,900.80 | 23.00 | 9,919.90 | 15.30 | 6,598.89 | 25.00 | 10,782.50 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 57.00 | 17,100.00 | 68.00 | 20,400.00 | 56.10 | 16,830.00 | 72.00 | 21,600.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 7 | EACH | 2,500.00 | 17,500.00 | 2,300.00 | 16,100.00 | 2,450.00 | 17,150.00 | 2,450.00 | 17,150.00 |
| 0025 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 2,600.00 | 5,200.00 | 2,800.00 | 5,600.00 | 2,550.00 | 5,100.00 | 2,800.00 | 5,600.00 |
| 0026 | 705-01-00100 | Barbed Wire Fence | 820 | LNFT | 10.00 | 8,200.00 | 7.00 | 5,740.00 | 9.40 | 7,708.00 | 10.00 | 8,200.00 |
| 0027 | 705-04-00100 | Single Swinging Driveway Gates | 2 | EACH | 900.00 | 1,800.00 | 600.00 | 1,200.00 | 867.00 | 1,734.00 | 1,000.00 | 2,000.00 |
| 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 57.5 | SQYD | 87.00 | 5,002.50 | 85.00 | 4,887.50 | 92.85 | 5,338.88 | 60.00 | 3,450.00 |
| 0029 | 712-04-00100 | Flexible Revetment | 2,540 | SQYD | 44.00 | 111,760.00 | 55.00 | 139,700.00 | 57.15 | 145,161.00 | 65.00 | 165,100.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 24,500.00 | 24,500.00 | 45,065.00 | 45,065.00 | 21,000.00 | 21,000.00 | 30,000.00 | 30,000.00 |
| 0034 | 717-01-00100 | Seeding | 213 | LB | 11.00 | 2,343.00 | 10.00 | 2,130.00 | 10.20 | 2,172.60 | 15.00 | 3,195.00 |
| 0035 | 718-01-00100 | Fertilizer | 7,110 | LB | 0.70 | 4,977.00 | 0.80 | 5,688.00 | 0.65 | 4,621.50 | 1.00 | 7,110.00 |
| 0036 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,431 | SQYD | 1.25 | 3,038.75 | 1.60 | 3,889.60 | 1.20 | 2,917.20 | 1.50 | 3,646.50 |
| 0037 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 3,000.00 | 3,000.00 | 7,500.00 | 7,500.00 | 14,000.00 | 14,000.00 | 7,500.00 | 7,500.00 |
| 0038 | 726-01-00100 | Bedding Material | 92.3 | CUYD | 110.00 | 10,153.00 | 100.00 | 9,230.00 | 96.95 | 8,948.49 | 100.00 | 9,230.00 |
| 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 260,000.00 | 260,000.00 | 170,000.00 | 170,000.00 | 250,000.00 | 250,000.00 | 260,000.00 | 260,000.00 |
| 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 75.00 | 900.00 | 100.00 | 1,200.00 | 71.45 | 857.40 | 100.00 | 1,200.00 |
| 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 107 | EACH | 9.00 | 963.00 | 15.00 | 1,605.00 | 4.10 | 438.70 | 6.00 | 642.00 |
| 0042 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 2.042 | MILE | 1,850.00 | 3,777.70 | 2,500.00 | 5,105.00 | 2,550.00 | 5,207.10 | 3,000.00 | 6,126.00 |
| 0043 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 0.511 | MILE | 650.00 | 332.15 | 1,500.00 | 766.50 | 1,020.00 | 521.22 | 1,500.00 | 766.50 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | 35,000.00 | 35,000.00 | 21,000.00 | 21,000.00 |
| 0045 | 804-01-00300 | Precast Concrete Piles (16") | 5,570 | LNFT | 50.00 | 278,500.00 | 62.00 | 345,340.00 | 42.05 | 234,218.50 | 60.00 | 334,200.00 |
| 0046 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 1,000.00 | 3,000.00 | 1.00 | 3.00 | 20,000.00 | 60,000.00 | 1.00 | 3.00 |
| 0047 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | 2,010.00 | 8,040.00 | 1,500.00 | 6,000.00 |
| 0048 | 805-01-00700 | Class A Concrete (Bents) | 120.38 | CUYD | 900.00 | 108,342.00 | 900.00 | 108,342.00 | 732.00 | 88,118.16 | 1,000.00 | 120,380.00 |
| 0049 | 805-03-00100 | Class AA Concrete | 428.58 | CUYD | 760.00 | 325,720.80 | 700.00 | 300,006.00 | 672.00 | 288,005.76 | 750.00 | 321,435.00 |
| 0050 | 806-01-00100 | Deformed Reinforcing Steel | 109,521 | LB | 0.80 | 87,616.80 | 0.85 | 93,092.85 | 0.80 | 87,616.80 | 1.00 | 109,521.00 |
| 0051 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 60.00 | 28,800.00 | 65.00 | 31,200.00 | 64.50 | 30,960.00 | 85.00 | 40,800.00 |
| 0052 | 813-01-00100 | Concrete Approach Slabs | 1,093.32 | SQYD | 200.00 | 218,664.00 | 200.00 | 218,664.00 | 199.00 | 217,570.68 | 225.00 | 245,997.00 |
| 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 234 | LNFT | 12.50 | 2,925.00 | 8.00 | 1,872.00 | 2.85 | 666.90 | 10.00 | 2,340.00 |
| 0054 | NS-700-00240 | Special Guard Rail Anchor Section | 3 | EACH | 1,000.00 | 3,000.00 | 2,000.00 | 6,000.00 | 969.00 | 2,907.00 | 1,800.00 | 5,400.00 |
| 0055 | 304-05-00100 | Lime Treatment (Type E) | 70.4 | TON | 375.00 | 26,400.00 | 165.00 | 11,616.00 | 520.00 | 36,608.00 | 650.00 | 45,760.00 |
| 0056 | 708-01-00100 | Right-of-Way Monument | 30 | EACH | 220.00 | 6,600.00 | 250.00 | 7,500.00 | 143.00 | 4,290.00 | 150.00 | 4,500.00 |
| 0057 | 708-02-00100 | Right-of-Way Monument Witness Post | 30 | EACH | 220.00 | 6,600.00 | 250.00 | 7,500.00 | 51.00 | 1,530.00 | 150.00 | 4,500.00 |
| CONTRACTOR TOTAL | 2,661,151.43 | 2,784,777.25 | 2,903,972.31 | 2,939,777.60 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Jb James Construction Llc |
- 6 - W. E. Mcdonald & Son, LLC. |
- 7 - James Construction Group LLC |
- 8 - Cecil D. Gassiott, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 3,105.00 | 3,105.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 14,000.00 | 14,000.00 | 3,105.00 | 3,105.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Sta. 110+51.76 TO 111+73.76) 27.8' X 22' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070204011 | 1 | EACH | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 210+64.07 TO 211+40.34 ) 25.9' X 55' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070209041 | 1 | EACH | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge (Sta. 310+40.98 TO 310+80.62) 27.4' X 39' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070211261 | 1 | EACH | 8,500.00 | 8,500.00 | 11,000.00 | 11,000.00 | 12,500.00 | 12,500.00 | 50,000.00 | 50,000.00 |
| 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 68 | SQYD | 14.00 | 952.00 | 100.00 | 6,800.00 | 10.00 | 680.00 | 7.00 | 476.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 6,710.9 | SQYD | 5.00 | 33,554.50 | 6.00 | 40,265.40 | 5.00 | 33,554.50 | 7.00 | 46,976.30 |
| 0008 | 203-01-00100 | General Excavation | 15,239 | CUYD | 7.25 | 110,482.75 | 8.00 | 121,912.00 | 10.00 | 152,390.00 | 17.00 | 259,063.00 |
| 0009 | 203-02-00100 | Drainage Excavation | 1,090 | CUYD | 15.00 | 16,350.00 | 20.00 | 21,800.00 | 20.00 | 21,800.00 | 17.00 | 18,530.00 |
| 0010 | 203-03-00100 | Embankment | 6,915 | CUYD | 18.00 | 124,470.00 | 14.00 | 96,810.00 | 12.00 | 82,980.00 | 20.00 | 138,300.00 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 32 | EACH | 120.00 | 3,840.00 | 250.00 | 8,000.00 | 130.00 | 4,160.00 | 150.00 | 4,800.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 3,698 | LNFT | 2.10 | 7,765.80 | 3.00 | 11,094.00 | 2.50 | 9,245.00 | 2.00 | 7,396.00 |
| 0013 | 302-02-03000 | Class II Base Course (8" Thick) | 9,738.1 | SQYD | 24.00 | 233,714.40 | 28.00 | 272,666.80 | 22.00 | 214,238.20 | 21.00 | 204,500.10 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 306.5 | CUYD | 100.00 | 30,650.00 | 85.00 | 26,052.50 | 140.00 | 42,910.00 | 100.00 | 30,650.00 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 125.00 | 6,250.00 | 85.00 | 4,250.00 | 90.00 | 4,500.00 | 100.00 | 5,000.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 3,168.3 | TON | 118.00 | 373,859.40 | 115.00 | 364,354.50 | 98.00 | 310,493.40 | 145.00 | 459,403.50 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 500.5 | TON | 118.00 | 59,059.00 | 151.00 | 75,575.50 | 128.00 | 64,064.00 | 160.00 | 80,080.00 |
| 0018 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 952 | LNFT | 50.00 | 47,600.00 | 75.00 | 71,400.00 | 58.00 | 55,216.00 | 68.00 | 64,736.00 |
| 0019 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 60 | LNFT | 60.00 | 3,600.00 | 130.00 | 7,800.00 | 54.00 | 3,240.00 | 130.00 | 7,800.00 |
| 0020 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 308 | LNFT | 55.00 | 16,940.00 | 89.00 | 27,412.00 | 53.00 | 16,324.00 | 85.00 | 26,180.00 |
| 0021 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 3,000.00 | 12,000.00 | 5,000.00 | 20,000.00 | 3,200.00 | 12,800.00 | 5,335.00 | 21,340.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 431.3 | LNFT | 22.00 | 9,488.60 | 21.00 | 9,057.30 | 21.00 | 9,057.30 | 25.00 | 10,782.50 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 62.50 | 18,750.00 | 65.00 | 19,500.00 | 65.00 | 19,500.00 | 69.00 | 20,700.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 7 | EACH | 2,200.00 | 15,400.00 | 2,100.00 | 14,700.00 | 2,100.00 | 14,700.00 | 2,400.00 | 16,800.00 |
| 0025 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 2,100.00 | 4,200.00 | 2,400.00 | 4,800.00 | 2,400.00 | 4,800.00 | 2,300.00 | 4,600.00 |
| 0026 | 705-01-00100 | Barbed Wire Fence | 820 | LNFT | 9.50 | 7,790.00 | 6.50 | 5,330.00 | 10.00 | 8,200.00 | 7.50 | 6,150.00 |
| 0027 | 705-04-00100 | Single Swinging Driveway Gates | 2 | EACH | 850.00 | 1,700.00 | 400.00 | 800.00 | 850.00 | 1,700.00 | 500.00 | 1,000.00 |
| 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 57.5 | SQYD | 60.00 | 3,450.00 | 100.00 | 5,750.00 | 85.00 | 4,887.50 | 100.00 | 5,750.00 |
| 0029 | 712-04-00100 | Flexible Revetment | 2,540 | SQYD | 50.00 | 127,000.00 | 60.00 | 152,400.00 | 75.00 | 190,500.00 | 62.00 | 157,480.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 | 17,500.00 | 17,500.00 |
| 0034 | 717-01-00100 | Seeding | 213 | LB | 10.00 | 2,130.00 | 15.00 | 3,195.00 | 12.00 | 2,556.00 | 11.00 | 2,343.00 |
| 0035 | 718-01-00100 | Fertilizer | 7,110 | LB | 0.70 | 4,977.00 | 0.75 | 5,332.50 | 1.00 | 7,110.00 | 1.00 | 7,110.00 |
| 0036 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,431 | SQYD | 1.30 | 3,160.30 | 2.25 | 5,469.75 | 1.25 | 3,038.75 | 1.50 | 3,646.50 |
| 0037 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 16,000.00 | 16,000.00 | 10,000.00 | 10,000.00 | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 |
| 0038 | 726-01-00100 | Bedding Material | 92.3 | CUYD | 90.00 | 8,307.00 | 100.00 | 9,230.00 | 77.00 | 7,107.10 | 100.00 | 9,230.00 |
| 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 274,000.00 | 274,000.00 | 175,000.00 | 175,000.00 | 320,000.00 | 320,000.00 | 27,000.00 | 27,000.00 |
| 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 80.00 | 960.00 | 85.00 | 1,020.00 | 85.00 | 1,020.00 | 100.00 | 1,200.00 |
| 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 107 | EACH | 8.00 | 856.00 | 4.00 | 428.00 | 4.00 | 428.00 | 5.00 | 535.00 |
| 0042 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 2.042 | MILE | 1,800.00 | 3,675.60 | 2,500.00 | 5,105.00 | 2,500.00 | 5,105.00 | 2,750.00 | 5,615.50 |
| 0043 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 0.511 | MILE | 600.00 | 306.60 | 1,000.00 | 511.00 | 1,000.00 | 511.00 | 1,100.00 | 562.10 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 12,000.00 | 12,000.00 | 60,000.00 | 60,000.00 | 7,500.00 | 7,500.00 |
| 0045 | 804-01-00300 | Precast Concrete Piles (16") | 5,570 | LNFT | 56.00 | 311,920.00 | 75.00 | 417,750.00 | 77.00 | 428,890.00 | 57.00 | 317,490.00 |
| 0046 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 100.00 | 300.00 | 1,000.00 | 3,000.00 | 5,000.00 | 15,000.00 | 10,000.00 | 30,000.00 |
| 0047 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,000.00 | 4,000.00 | 2,500.00 | 10,000.00 | 1,500.00 | 6,000.00 | 5,000.00 | 20,000.00 |
| 0048 | 805-01-00700 | Class A Concrete (Bents) | 120.38 | CUYD | 1,200.00 | 144,456.00 | 900.00 | 108,342.00 | 950.00 | 114,361.00 | 800.00 | 96,304.00 |
| 0049 | 805-03-00100 | Class AA Concrete | 428.58 | CUYD | 650.00 | 278,577.00 | 800.00 | 342,864.00 | 785.00 | 336,435.30 | 775.00 | 332,149.50 |
| 0050 | 806-01-00100 | Deformed Reinforcing Steel | 109,521 | LB | 1.00 | 109,521.00 | 1.45 | 158,805.45 | 1.00 | 109,521.00 | 2.00 | 219,042.00 |
| 0051 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 58.00 | 27,840.00 | 70.00 | 33,600.00 | 62.00 | 29,760.00 | 71.00 | 34,080.00 |
| 0052 | 813-01-00100 | Concrete Approach Slabs | 1,093.32 | SQYD | 180.00 | 196,797.60 | 220.00 | 240,530.40 | 210.00 | 229,597.20 | 207.00 | 226,317.24 |
| 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 234 | LNFT | 5.00 | 1,170.00 | 10.00 | 2,340.00 | 3.00 | 702.00 | 8.55 | 2,000.70 |
| 0054 | NS-700-00240 | Special Guard Rail Anchor Section | 3 | EACH | 1,250.00 | 3,750.00 | 1,500.00 | 4,500.00 | 1,500.00 | 4,500.00 | 1,400.00 | 4,200.00 |
| 0055 | 304-05-00100 | Lime Treatment (Type E) | 70.4 | TON | 200.00 | 14,080.00 | 600.00 | 42,240.00 | 310.00 | 21,824.00 | 500.00 | 35,200.00 |
| 0056 | 708-01-00100 | Right-of-Way Monument | 30 | EACH | 120.00 | 3,600.00 | 200.00 | 6,000.00 | 200.00 | 6,000.00 | 500.00 | 15,000.00 |
| 0057 | 708-02-00100 | Right-of-Way Monument Witness Post | 30 | EACH | 120.00 | 3,600.00 | 200.00 | 6,000.00 | 200.00 | 6,000.00 | 100.00 | 3,000.00 |
| CONTRACTOR TOTAL | 2,946,350.55 | 3,133,793.10 | 3,145,406.25 | 3,181,728.94 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Coastal Bridge Co., L.L.C. |
- 10 - Gray Construction Corp. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 60,000.00 | 60,000.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Sta. 110+51.76 TO 111+73.76) 27.8' X 22' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070204011 | 1 | EACH | 70,000.00 | 70,000.00 | 9,500.00 | 9,500.00 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 210+64.07 TO 211+40.34 ) 25.9' X 55' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070209041 | 1 | EACH | 100,000.00 | 100,000.00 | 12,500.00 | 12,500.00 |
| 0005 | 202-02-04000 | Removal of Bridge (Sta. 310+40.98 TO 310+80.62) 27.4' X 39' TREATED TIMBER TRESTLE BRIDGE STRUCTURE NO. 03572070211261 | 1 | EACH | 90,000.00 | 90,000.00 | 9,500.00 | 9,500.00 |
| 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 68 | SQYD | 20.00 | 1,360.00 | 41.00 | 2,788.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 6,710.9 | SQYD | 9.00 | 60,398.10 | 5.00 | 33,554.50 |
| 0008 | 203-01-00100 | General Excavation | 15,239 | CUYD | 5.00 | 76,195.00 | 9.00 | 137,151.00 |
| 0009 | 203-02-00100 | Drainage Excavation | 1,090 | CUYD | 16.50 | 17,985.00 | 14.75 | 16,077.50 |
| 0010 | 203-03-00100 | Embankment | 6,915 | CUYD | 13.50 | 93,352.50 | 25.00 | 172,875.00 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 32 | EACH | 100.00 | 3,200.00 | 120.00 | 3,840.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 3,698 | LNFT | 1.50 | 5,547.00 | 1.70 | 6,286.60 |
| 0013 | 302-02-03000 | Class II Base Course (8" Thick) | 9,738.1 | SQYD | 28.50 | 277,535.85 | 23.00 | 223,976.30 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 306.5 | CUYD | 55.00 | 16,857.50 | 114.00 | 34,941.00 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 67.00 | 3,350.00 | 78.00 | 3,900.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 3,168.3 | TON | 100.00 | 316,830.00 | 98.00 | 310,493.40 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 500.5 | TON | 160.00 | 80,080.00 | 128.00 | 64,064.00 |
| 0018 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 952 | LNFT | 42.00 | 39,984.00 | 37.30 | 35,509.60 |
| 0019 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 60 | LNFT | 52.00 | 3,120.00 | 37.50 | 2,250.00 |
| 0020 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 308 | LNFT | 42.00 | 12,936.00 | 37.00 | 11,396.00 |
| 0021 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 3,500.00 | 14,000.00 | 2,900.00 | 11,600.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 431.3 | LNFT | 23.50 | 10,135.55 | 22.00 | 9,488.60 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 73.00 | 21,900.00 | 63.00 | 18,900.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 7 | EACH | 2,350.00 | 16,450.00 | 2,200.00 | 15,400.00 |
| 0025 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 2,700.00 | 5,400.00 | 2,100.00 | 4,200.00 |
| 0026 | 705-01-00100 | Barbed Wire Fence | 820 | LNFT | 7.50 | 6,150.00 | 9.50 | 7,790.00 |
| 0027 | 705-04-00100 | Single Swinging Driveway Gates | 2 | EACH | 450.00 | 900.00 | 900.00 | 1,800.00 |
| 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 57.5 | SQYD | 60.00 | 3,450.00 | 87.00 | 5,002.50 |
| 0029 | 712-04-00100 | Flexible Revetment | 2,540 | SQYD | 50.00 | 127,000.00 | 60.00 | 152,400.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 20,000.00 | 20,000.00 |
| 0034 | 717-01-00100 | Seeding | 213 | LB | 10.00 | 2,130.00 | 10.00 | 2,130.00 |
| 0035 | 718-01-00100 | Fertilizer | 7,110 | LB | 0.60 | 4,266.00 | 0.65 | 4,621.50 |
| 0036 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,431 | SQYD | 2.50 | 6,077.50 | 1.20 | 2,917.20 |
| 0037 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 12,500.00 | 12,500.00 | 16,000.00 | 16,000.00 |
| 0038 | 726-01-00100 | Bedding Material | 92.3 | CUYD | 68.00 | 6,276.40 | 132.00 | 12,183.60 |
| 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 320,000.00 | 320,000.00 | 170,000.00 | 170,000.00 |
| 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 95.00 | 1,140.00 | 85.00 | 1,020.00 |
| 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 107 | EACH | 5.00 | 535.00 | 10.00 | 1,070.00 |
| 0042 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 2.042 | MILE | 2,800.00 | 5,717.60 | 2,500.00 | 5,105.00 |
| 0043 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 0.511 | MILE | 1,680.00 | 858.48 | 1,500.00 | 766.50 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 20,000.00 | 20,000.00 |
| 0045 | 804-01-00300 | Precast Concrete Piles (16") | 5,570 | LNFT | 57.50 | 320,275.00 | 82.00 | 456,740.00 |
| 0046 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 300.00 | 900.00 | 100.00 | 300.00 |
| 0047 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 480.00 | 1,920.00 | 3,000.00 | 12,000.00 |
| 0048 | 805-01-00700 | Class A Concrete (Bents) | 120.38 | CUYD | 900.00 | 108,342.00 | 1,650.00 | 198,627.00 |
| 0049 | 805-03-00100 | Class AA Concrete | 428.58 | CUYD | 780.00 | 334,292.40 | 1,100.00 | 471,438.00 |
| 0050 | 806-01-00100 | Deformed Reinforcing Steel | 109,521 | LB | 1.00 | 109,521.00 | 0.90 | 98,568.90 |
| 0051 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 63.00 | 30,240.00 | 158.00 | 75,840.00 |
| 0052 | 813-01-00100 | Concrete Approach Slabs | 1,093.32 | SQYD | 215.00 | 235,063.80 | 268.00 | 293,009.76 |
| 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 234 | LNFT | 10.00 | 2,340.00 | 5.00 | 1,170.00 |
| 0054 | NS-700-00240 | Special Guard Rail Anchor Section | 3 | EACH | 1,650.00 | 4,950.00 | 1,300.00 | 3,900.00 |
| 0055 | 304-05-00100 | Lime Treatment (Type E) | 70.4 | TON | 500.00 | 35,200.00 | 600.00 | 42,240.00 |
| 0056 | 708-01-00100 | Right-of-Way Monument | 30 | EACH | 400.00 | 12,000.00 | 100.00 | 3,000.00 |
| 0057 | 708-02-00100 | Right-of-Way Monument Witness Post | 30 | EACH | 100.00 | 3,000.00 | 100.00 | 3,000.00 |
| CONTRACTOR TOTAL | 3,256,661.68 | 3,277,831.46 | ||||||