Bid Tabulations
Letting of
09/12/2012
LA DOTD Headquarters
| Lead Project: H.002095.6 | |
| Parish: Jefferson Davis | |
| Routes: LA 97 | |
| Description: LA 97 WIDENING | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, PAVEMENT WIDENING, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $4,726,807.88 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 52306 | Cecil Perry Improvements Llc | $4,363,371.86 |
| 2 | 55505 | Merrick, LLC | $4,437,143.67 |
| 3 | 39462 | Jb James Construction Llc | $4,588,580.11 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $5,983,807.05 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Cecil Perry Improvements Llc |
- 2 - Merrick, LLC |
- 3 - Jb James Construction Llc |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 4,850.00 | 4,850.00 | 35,000.00 | 35,000.00 | 95,000.00 | 95,000.00 | 100,000.00 | 100,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 38,500.00 | 38,500.00 | 70,000.00 | 70,000.00 | 35,000.00 | 35,000.00 | 125,000.00 | 125,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 31 | SQYD | 9.05 | 280.55 | 4.75 | 147.25 | 12.00 | 372.00 | 20.00 | 620.00 |
| 0004 | 202-02-02020 | Removal of Asphalt Pavement | 760.8 | SQYD | 4.30 | 3,271.44 | 6.00 | 4,564.80 | 5.50 | 4,184.40 | 20.00 | 15,216.00 |
| 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 8,555.3 | LNFT | 1.15 | 9,838.60 | 3.00 | 25,665.90 | 3.50 | 29,943.55 | 4.00 | 34,221.20 |
| 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,313 | SQYD | 5.50 | 12,721.50 | 3.35 | 7,748.55 | 8.00 | 18,504.00 | 8.00 | 18,504.00 |
| 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 12,414 | SQYD | 5.65 | 70,139.10 | 3.70 | 45,931.80 | 5.00 | 62,070.00 | 7.00 | 86,898.00 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 342.6 | SQYD | 8.00 | 2,740.80 | 5.00 | 1,713.00 | 6.00 | 2,055.60 | 15.00 | 5,139.00 |
| 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,580.00 | 4,580.00 | 1,270.00 | 1,270.00 | 3,500.00 | 3,500.00 | 2,000.00 | 2,000.00 |
| 0010 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 363.00 | 363.00 | 425.00 | 425.00 | 700.00 | 700.00 | 1,000.00 | 1,000.00 |
| 0011 | 203-01-00100 | General Excavation | 10,115 | CUYD | 4.80 | 48,552.00 | 4.00 | 40,460.00 | 10.00 | 101,150.00 | 10.00 | 101,150.00 |
| 0012 | 203-03-00100 | Embankment | 1,598 | CUYD | 9.40 | 15,021.20 | 12.00 | 19,176.00 | 9.00 | 14,382.00 | 22.00 | 35,156.00 |
| 0013 | 204-02-00100 | Temporary Hay or Straw Bales | 974 | EACH | 10.50 | 10,227.00 | 6.25 | 6,087.50 | 12.00 | 11,688.00 | 16.00 | 15,584.00 |
| 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 143.00 | 1,859.00 | 45.00 | 585.00 | 130.00 | 1,690.00 | 200.00 | 2,600.00 |
| 0015 | 204-06-00100 | Temporary Silt Fencing | 647 | LNFT | 2.00 | 1,294.00 | 1.00 | 647.00 | 3.00 | 1,941.00 | 1.50 | 970.50 |
| 0016 | 302-02-05020 | Class II Base Course (10" Thick) (Soil Cement) | 23,549.4 | SQYD | 12.35 | 290,835.09 | 12.25 | 288,480.15 | 12.00 | 282,592.80 | 13.00 | 306,142.20 |
| 0017 | 305-01-04000 | Subgrade Layer (12" Thick) | 24,029 | SQYD | 14.70 | 353,226.30 | 11.75 | 282,340.75 | 10.00 | 240,290.00 | 13.00 | 312,377.00 |
| 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 40.00 | 40,000.00 | 30.00 | 30,000.00 | 60.00 | 60,000.00 | 40.00 | 40,000.00 |
| 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 480.3 | TON | 125.35 | 60,205.61 | 118.34 | 56,838.70 | 150.00 | 72,045.00 | 135.00 | 64,840.50 |
| 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 38.4 | TON | 163.50 | 6,278.40 | 303.02 | 11,635.97 | 180.00 | 6,912.00 | 400.00 | 15,360.00 |
| 0021 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 12,481 | GAL | 4.35 | 54,292.35 | 3.65 | 45,555.65 | 3.80 | 47,427.80 | 4.00 | 49,924.00 |
| 0022 | 507-02-00200 | Aggregate (S2) | 23,549 | SQYD | 0.92 | 21,665.08 | 1.00 | 23,549.00 | 1.00 | 23,549.00 | 2.00 | 47,098.00 |
| 0023 | 507-02-00300 | Aggregate (S3) | 23,549 | SQYD | 0.92 | 21,665.08 | 0.75 | 17,661.75 | 0.80 | 18,839.20 | 1.75 | 41,210.75 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,387 | SQYD | 2.50 | 5,967.50 | 8.00 | 19,096.00 | 5.30 | 12,651.10 | 5.00 | 11,935.00 |
| 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -99 | CUYD | 1.00 | -99.00 | 1.00 | -99.00 | 0.01 | -0.99 | 1.00 | -99.00 |
| 0026 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 20,047 | SQYD | 43.00 | 862,021.00 | 48.00 | 962,256.00 | 42.00 | 841,974.00 | 48.00 | 962,256.00 |
| 0027 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 2,234.7 | SQYD | 59.70 | 133,411.59 | 48.00 | 107,265.60 | 52.00 | 116,204.40 | 75.00 | 167,602.50 |
| 0028 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 30 | EACH | 70.00 | 2,100.00 | 60.00 | 1,800.00 | 100.00 | 3,000.00 | 115.00 | 3,450.00 |
| 0029 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 236 | LNFT | 78.00 | 18,408.00 | 33.00 | 7,788.00 | 75.00 | 17,700.00 | 85.00 | 20,060.00 |
| 0030 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 940 | LNFT | 55.50 | 52,170.00 | 36.00 | 33,840.00 | 58.00 | 54,520.00 | 90.00 | 84,600.00 |
| 0031 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,561 | LNFT | 66.25 | 103,416.25 | 49.00 | 76,489.00 | 70.00 | 109,270.00 | 98.00 | 152,978.00 |
| 0032 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 554 | LNFT | 83.50 | 46,259.00 | 62.00 | 34,348.00 | 90.00 | 49,860.00 | 135.00 | 74,790.00 |
| 0033 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 2,642 | LNFT | 94.25 | 249,008.50 | 80.00 | 211,360.00 | 100.00 | 264,200.00 | 150.00 | 396,300.00 |
| 0034 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 3,839 | LNFT | 135.00 | 518,265.00 | 105.00 | 403,095.00 | 125.00 | 479,875.00 | 160.00 | 614,240.00 |
| 0035 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 46 | LNFT | 160.00 | 7,360.00 | 105.00 | 4,830.00 | 130.00 | 5,980.00 | 170.00 | 7,820.00 |
| 0036 | 701-03-02100 | Storm Drain Pipe (Outfall) (42" PP or 48" CMP) | 85 | LNFT | 133.70 | 11,364.50 | 130.00 | 11,050.00 | 150.00 | 12,750.00 | 185.00 | 15,725.00 |
| 0037 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 12 | LNFT | 83.97 | 1,007.64 | 45.00 | 540.00 | 100.00 | 1,200.00 | 200.00 | 2,400.00 |
| 0038 | 701-09-00100 | Fabricating Pipe Fittings | 9 | EACH | 2,000.00 | 18,000.00 | 1,500.00 | 13,500.00 | 1,500.00 | 13,500.00 | 850.00 | 7,650.00 |
| 0039 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 12 | LNFT | 48.00 | 576.00 | 37.00 | 444.00 | 95.00 | 1,140.00 | 200.00 | 2,400.00 |
| 0040 | 701-15-00100 | Concrete Collar | 6 | EACH | 510.00 | 3,060.00 | 390.00 | 2,340.00 | 550.00 | 3,300.00 | 700.00 | 4,200.00 |
| 0041 | 702-01-00100 | Junction Boxes (Sta. 203+46.12, RT.) | 1 | EACH | 2,070.00 | 2,070.00 | 2,000.00 | 2,000.00 | 4,000.00 | 4,000.00 | 3,300.00 | 3,300.00 |
| 0042 | 702-02-00200 | Manholes (R-CB-11) | 8 | EACH | 2,850.00 | 22,800.00 | 3,000.00 | 24,000.00 | 3,200.00 | 25,600.00 | 2,500.00 | 20,000.00 |
| 0043 | 702-02-00600 | Manholes (R-CB-36) | 2 | EACH | 2,600.00 | 5,200.00 | 5,000.00 | 10,000.00 | 5,000.00 | 10,000.00 | 8,300.00 | 16,600.00 |
| 0044 | 702-03-00100 | Catch Basins (CB-01) | 31 | EACH | 1,950.00 | 60,450.00 | 2,000.00 | 62,000.00 | 2,400.00 | 74,400.00 | 2,800.00 | 86,800.00 |
| 0045 | 702-03-00500 | Catch Basins (CB-06) | 41 | EACH | 3,200.00 | 131,200.00 | 3,500.00 | 143,500.00 | 3,600.00 | 147,600.00 | 4,800.00 | 196,800.00 |
| 0046 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 5,500.00 | 5,500.00 | 3,750.00 | 3,750.00 | 4,000.00 | 4,000.00 | 9,000.00 | 9,000.00 |
| 0047 | 702-03-00700 | Catch Basins (CB-08) | 6 | EACH | 7,300.00 | 43,800.00 | 6,000.00 | 36,000.00 | 6,200.00 | 37,200.00 | 6,500.00 | 39,000.00 |
| 0048 | 702-03-00800 | Catch Basins (CB-09) | 14 | EACH | 3,300.00 | 46,200.00 | 3,800.00 | 53,200.00 | 3,600.00 | 50,400.00 | 5,000.00 | 70,000.00 |
| 0049 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 800.00 | 4,000.00 | 500.00 | 2,500.00 | 1,200.00 | 6,000.00 | 1,200.00 | 6,000.00 |
| 0050 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 6 | EACH | 11.80 | 70.80 | 500.00 | 3,000.00 | 600.00 | 3,600.00 | 1,500.00 | 9,000.00 |
| 0051 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 190 | LNFT | 16.50 | 3,135.00 | 15.75 | 2,992.50 | 24.00 | 4,560.00 | 22.00 | 4,180.00 |
| 0052 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 103 | LNFT | 21.50 | 2,214.50 | 22.00 | 2,266.00 | 50.00 | 5,150.00 | 35.00 | 3,605.00 |
| 0053 | 706-01-00100 | Concrete Walk (4" Thick) | 1,871.9 | SQYD | 32.00 | 59,900.80 | 27.00 | 50,541.30 | 34.00 | 63,644.60 | 33.00 | 61,772.70 |
| 0054 | 706-02-00200 | Concrete Drive (6" Thick) | 1,843.8 | SQYD | 46.00 | 84,814.80 | 37.00 | 68,220.60 | 47.00 | 86,658.60 | 64.00 | 118,003.20 |
| 0055 | 706-04-00100 | Handicapped Curb Ramps | 9 | EACH | 580.00 | 5,220.00 | 350.00 | 3,150.00 | 400.00 | 3,600.00 | 1,200.00 | 10,800.00 |
| 0056 | 707-01-00200 | Concrete Curb (Barrier) | 7,919 | LNFT | 3.40 | 26,924.60 | 4.00 | 31,676.00 | 2.50 | 19,797.50 | 8.00 | 63,352.00 |
| 0057 | 707-03-00100 | Combination Concrete Curb and Gutter | 217.5 | LNFT | 34.00 | 7,395.00 | 20.00 | 4,350.00 | 30.00 | 6,525.00 | 45.00 | 9,787.50 |
| 0058 | 708-01-00100 | Right-of-Way Monument | 38 | EACH | 150.00 | 5,700.00 | 10.00 | 380.00 | 120.00 | 4,560.00 | 230.00 | 8,740.00 |
| 0059 | 708-02-00100 | Right-of-Way Monument Witness Post | 38 | EACH | 150.00 | 5,700.00 | 22.50 | 855.00 | 120.00 | 4,560.00 | 230.00 | 8,740.00 |
| 0060 | 712-02-00100 | Sacked Concrete Revetment | 21 | SQYD | 117.00 | 2,457.00 | 200.00 | 4,200.00 | 90.00 | 1,890.00 | 115.00 | 2,415.00 |
| 0061 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 44,000.00 | 44,000.00 | 85,000.00 | 85,000.00 | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 |
| 0062 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 46 | LNFT | 0.65 | 29.90 | 0.60 | 27.60 | 0.75 | 34.50 | 10.00 | 460.00 |
| 0063 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.066 | MILE | 871.00 | 57.49 | 850.00 | 56.10 | 850.00 | 56.10 | 875.00 | 57.75 |
| 0064 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.735 | MILE | 872.00 | 640.92 | 800.00 | 588.00 | 600.00 | 441.00 | 650.00 | 477.75 |
| 0065 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.139 | MILE | 6,540.00 | 7,449.06 | 6,000.00 | 6,834.00 | 8,000.00 | 9,112.00 | 9,000.00 | 10,251.00 |
| 0066 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 5 | EACH | 27.25 | 136.25 | 25.00 | 125.00 | 50.00 | 250.00 | 50.00 | 250.00 |
| 0067 | 717-01-00100 | Seeding | 150 | LB | 32.40 | 4,860.00 | 1.00 | 150.00 | 11.00 | 1,650.00 | 30.00 | 4,500.00 |
| 0068 | 718-01-00100 | Fertilizer | 5,000 | LB | 0.65 | 3,250.00 | 1.00 | 5,000.00 | 0.60 | 3,000.00 | 0.60 | 3,000.00 |
| 0069 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 |
| 0070 | 726-01-00100 | Bedding Material | 1,306.4 | CUYD | 77.00 | 100,592.80 | 35.00 | 45,724.00 | 60.00 | 78,384.00 | 95.00 | 124,108.00 |
| 0071 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 440,000.00 | 440,000.00 | 460,000.00 | 460,000.00 | 600,000.00 | 600,000.00 |
| 0072 | 729-01-00100 | Sign (Type A) | 22.5 | SQFT | 45.00 | 1,012.50 | 41.50 | 933.75 | 22.00 | 495.00 | 50.00 | 1,125.00 |
| 0073 | 731-02-00100 | Reflectorized Raised Pavement Markers | 442 | EACH | 5.70 | 2,519.40 | 6.00 | 2,652.00 | 5.50 | 2,431.00 | 6.00 | 2,652.00 |
| 0074 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 857 | LNFT | 1.50 | 1,285.50 | 2.00 | 1,714.00 | 1.40 | 1,199.80 | 1.60 | 1,371.20 |
| 0075 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 445 | LNFT | 6.54 | 2,910.30 | 6.00 | 2,670.00 | 5.00 | 2,225.00 | 5.85 | 2,603.25 |
| 0076 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.372 | MILE | 3,161.00 | 13,819.89 | 3,000.00 | 13,116.00 | 2,500.00 | 10,930.00 | 3,000.00 | 13,116.00 |
| 0077 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.179 | MILE | 872.00 | 1,028.09 | 800.00 | 943.20 | 900.00 | 1,061.10 | 1,000.00 | 1,179.00 |
| 0078 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.092 | MILE | 2,180.00 | 200.56 | 2,000.00 | 184.00 | 1,300.00 | 119.60 | 1,400.00 | 128.80 |
| 0079 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 272.50 | 817.50 | 250.00 | 750.00 | 220.00 | 660.00 | 240.00 | 720.00 |
| 0080 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 20 | EACH | 272.50 | 5,450.00 | 250.00 | 5,000.00 | 230.00 | 4,600.00 | 250.00 | 5,000.00 |
| 0081 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 272.50 | 1,635.00 | 250.00 | 1,500.00 | 230.00 | 1,380.00 | 250.00 | 1,500.00 |
| 0082 | 732-05-00100 | Removal of Existing Markings | 0.341 | MILE | 4,360.00 | 1,486.76 | 4,000.00 | 1,364.00 | 5,000.00 | 1,705.00 | 6,000.00 | 2,046.00 |
| 0083 | 735-01-00100 | Mailboxes | 3 | EACH | 43.30 | 129.90 | 15.00 | 45.00 | 1.00 | 3.00 | 1.20 | 3.60 |
| 0084 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 206.00 | 206.00 | 100.00 | 100.00 | 150.00 | 150.00 | 120.00 | 120.00 |
| 0085 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 230.00 | 230.00 | 150.00 | 150.00 | 200.00 | 200.00 | 200.00 | 200.00 |
| 0086 | 736-01-00100 | Trenching and Backfilling | 600 | LNFT | 4.50 | 2,700.00 | 4.15 | 2,490.00 | 4.20 | 2,520.00 | 7.50 | 4,500.00 |
| 0087 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 75 | LNFT | 11.00 | 825.00 | 10.30 | 772.50 | 24.00 | 1,800.00 | 25.00 | 1,875.00 |
| 0088 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 60 | LNFT | 13.75 | 825.00 | 12.65 | 759.00 | 25.00 | 1,500.00 | 25.00 | 1,500.00 |
| 0089 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 1 | EACH | 13,300.00 | 13,300.00 | 12,225.00 | 12,225.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 |
| 0090 | 736-04-05007 | Signal Support (40'span, 30' span add-on arm) | 1 | EACH | 15,300.00 | 15,300.00 | 14,100.00 | 14,100.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 |
| 0091 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 4 | EACH | 904.00 | 3,616.00 | 1,015.00 | 4,060.00 | 1,100.00 | 4,400.00 | 1,200.00 | 4,800.00 |
| 0092 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 1 | EACH | 1,375.00 | 1,375.00 | 1,265.00 | 1,265.00 | 1,500.00 | 1,500.00 | 1,700.00 | 1,700.00 |
| 0093 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,375.00 | 1,375.00 | 1,265.00 | 1,265.00 | 1,500.00 | 1,500.00 | 1,700.00 | 1,700.00 |
| 0094 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 1,880.00 | 1,880.00 | 1,725.00 | 1,725.00 | 1,500.00 | 1,500.00 | 1,700.00 | 1,700.00 |
| 0095 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 1 | EACH | 28,030.00 | 28,030.00 | 22,580.00 | 22,580.00 | 23,000.00 | 23,000.00 | 30,000.00 | 30,000.00 |
| 0096 | 736-10-00300 | Underground Junction Box (Type F) | 2 | EACH | 485.00 | 970.00 | 445.00 | 890.00 | 450.00 | 900.00 | 525.00 | 1,050.00 |
| 0097 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 874.00 | 874.00 | 880.00 | 880.00 | 900.00 | 900.00 | 1,000.00 | 1,000.00 |
| 0098 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 25 | LNFT | 1.85 | 46.25 | 2.40 | 60.00 | 2.50 | 62.50 | 2.80 | 70.00 |
| 0099 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 135 | LNFT | 3.25 | 438.75 | 3.00 | 405.00 | 5.00 | 675.00 | 5.80 | 783.00 |
| 0100 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 20 | LNFT | 3.30 | 66.00 | 3.20 | 64.00 | 3.20 | 64.00 | 3.80 | 76.00 |
| 0101 | 736-12-04000 | Conductor (6c, #14 awg) | 225 | LNFT | 1.72 | 387.00 | 2.05 | 461.25 | 2.20 | 495.00 | 2.40 | 540.00 |
| 0102 | 736-12-06000 | Conductor (10c, #14 awg) | 235 | LNFT | 2.09 | 491.15 | 2.45 | 575.75 | 2.50 | 587.50 | 2.90 | 681.50 |
| 0103 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 42,000.00 | 42,000.00 | 45,000.00 | 45,000.00 |
| 0104 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 980.00 | 980.00 | 100,000.00 | 100,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| 0105 | 742-01-00400 | Sanitary Sewer Pipe (8") | 470 | LNFT | 54.50 | 25,615.00 | 54.00 | 25,380.00 | 50.00 | 23,500.00 | 175.00 | 82,250.00 |
| 0106 | 742-01-00600 | Sanitary Sewer Pipe (12") | 12 | LNFT | 70.85 | 850.20 | 200.00 | 2,400.00 | 250.00 | 3,000.00 | 235.00 | 2,820.00 |
| 0107 | 742-01-00700 | Sanitary Sewer Pipe (15") | 24 | LNFT | 81.75 | 1,962.00 | 250.00 | 6,000.00 | 400.00 | 9,600.00 | 300.00 | 7,200.00 |
| 0108 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 8 | EACH | 218.00 | 1,744.00 | 150.00 | 1,200.00 | 600.00 | 4,800.00 | 1,700.00 | 13,600.00 |
| 0109 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 48 | LNFT | 21.80 | 1,046.40 | 15.00 | 720.00 | 50.00 | 2,400.00 | 85.00 | 4,080.00 |
| 0110 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 2 | EACH | 550.00 | 1,100.00 | 2,000.00 | 4,000.00 | 1,000.00 | 2,000.00 | 900.00 | 1,800.00 |
| 0111 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,201 | INLF | 0.80 | 2,560.80 | 1.25 | 4,001.25 | 0.70 | 2,240.70 | 1.20 | 3,841.20 |
| 0112 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 6,535 | INLF | 0.89 | 5,816.15 | 1.25 | 8,168.75 | 0.85 | 5,554.75 | 1.00 | 6,535.00 |
| 0113 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 29,577 | INLF | 0.90 | 26,619.30 | 1.25 | 36,971.25 | 1.00 | 29,577.00 | 0.35 | 10,351.95 |
| 0114 | NS-713-00001 | Dynamic Message Sign Unit | 1 | EACH | 15,750.00 | 15,750.00 | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 |
| 0115 | NS-736-00001 | GPS | 1 | EACH | 1,025.00 | 1,025.00 | 950.00 | 950.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 |
| 0116 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 8,720.00 | 8,720.00 | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 |
| 0117 | NS-736-00006 | Video Detection Camera | 3 | EACH | 2,053.00 | 6,159.00 | 2,350.00 | 7,050.00 | 2,400.00 | 7,200.00 | 2,800.00 | 8,400.00 |
| 0118 | NS-736-00007 | Video Detection Training | 1 | LUMP | 0.55 | 0.55 | 100.00 | 100.00 | 1.00 | 1.00 | 120.00 | 120.00 |
| 0119 | NS-742-00100 | Cured In-Place Pipe Lining 8-in | 453 | LNFT | 41.97 | 19,012.41 | 38.50 | 17,440.50 | 40.00 | 18,120.00 | 45.00 | 20,385.00 |
| 0120 | NS-742-00105 | Cured In-Place Pipe Lining 10-in | 59 | LNFT | 218.00 | 12,862.00 | 200.00 | 11,800.00 | 210.00 | 12,390.00 | 235.00 | 13,865.00 |
| 0121 | NS-742-00110 | Cured In-Place Pipe Lining 15-in | 50 | LNFT | 277.95 | 13,897.50 | 255.00 | 12,750.00 | 260.00 | 13,000.00 | 300.00 | 15,000.00 |
| 0122 | NS-MSC-00120 | Drainage Structure (Convert Existing CB-01 to CB-06) | 1 | EACH | 1,950.00 | 1,950.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 3,500.00 | 3,500.00 |
| CONTRACTOR TOTAL | 4,363,371.86 | 4,437,143.67 | 4,588,580.11 | 5,983,807.05 | ||||||||