LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.002071.6
Parish: Jefferson Davis
Routes: LA 14
Description: BAYOU LACASSINE BRIDGE
Type Const: GRADING, CLASS II BASE COURSE, SUBGRADE LAYER, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, GIRDER SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost: $9,939,767.43
Maximum Number of Days Allowed for Construction: 9999
Calculated Daily User Cost: $1,000.00


RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 12312 Gilchrist Construction Co. LLC $8,321,612.32 400 $8,721,612.32
2 00755 L & A Contracting Co. $10,362,742.18 335 $10,697,742.18
3 00060 F. Miller Construction Llc $10,423,029.79 505 $10,928,029.79
4 56565 Aquaterra Contracting, LLC $10,486,230.16 480 $10,966,230.16
5 34567 James Construction Group LLC $10,912,231.23 550 $11,462,231.23
6 00481 Coastal Bridge Co., L.L.C. $10,882,112.78 700 $11,582,112.78
7 39462 Jb James Construction Llc $11,437,027.98 600 $12,037,027.98
8 07740 Cajun Constructors, Inc. $11,877,348.49 525 $12,402,348.49
9 02179 Boh Bros. Construction Co., LLC. $12,247,199.37 425 $12,672,199.37
10 36827 Shavers-Whittle Construction LLC $12,782,005.63 600 $13,382,005.63


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Gilchrist Construction Co. LLC
- 2 -
L & A Contracting Co.
- 3 -
F. Miller Construction Llc
- 4 -
Aquaterra Contracting, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 125,000.00 125,000.00 250,000.00 250,000.00 157,253.33 157,253.33 90,000.00 90,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 5,000.00 5,000.00 95,000.00 95,000.00 12,580.27 12,580.27 4,000.00 4,000.00
0003 202-02-04000 Removal of Bridge (STA. 128+00, 811'X24' Low Level Truss Swing Span Bridge) 1      EACH 180,000.00 180,000.00 600,000.00 600,000.00 375,193.29 375,193.29 1,000,000.00 1,000,000.00
0004 202-02-05000 Removal of Building ONE 12x47 WOOD FRAME CAMP 1      EACH 500.00 500.00 2,000.00 2,000.00 2,516.05 2,516.05 3,500.00 3,500.00
0005 202-02-05000 Removal of Building ONE 20x44 WOOD FRAME CAMP 1      EACH 500.00 500.00 3,000.00 3,000.00 3,774.09 3,774.09 4,000.00 4,000.00
0006 202-02-14500 Removal of Guard Rail 260      LNFT 9.80 2,548.00 11.50 2,990.00 2.52 655.20 35.00 9,100.00
0007 202-02-38500 Removal of Surfacing and Stablized Base 10,300      SQYD 7.00 72,100.00 4.95 50,985.00 10.69 110,107.00 4.60 47,380.00
0008 203-01-00100 General Excavation 29,132      CUYD 5.25 152,943.00 13.50 393,282.00 16.35 476,308.20 11.00 320,452.00
0009 203-03-00100 Embankment 76,155      CUYD 14.25 1,085,208.75 16.00 1,218,480.00 19.50 1,485,022.50 20.00 1,523,100.00
0010 203-04-00200 Nonplastic Embankment (Sand) 7,000      CUYD 20.00 140,000.00 29.00 203,000.00 35.22 246,540.00 23.00 161,000.00
0011 203-08-00100 Geotextile Fabric 17,000      SQYD 1.50 25,500.00 4.00 68,000.00 2.52 42,840.00 3.00 51,000.00
0012 204-02-00100 Temporary Hay or Straw Bales 40      EACH 20.00 800.00 100.00 4,000.00 18.87 754.80 22.00 880.00
0013 204-05-00100 Temporary Sediment Check Dams (Hay) 50      EACH 145.00 7,250.00 300.00 15,000.00 157.25 7,862.50 184.00 9,200.00
0014 204-06-00100 Temporary Silt Fencing 10,000      LNFT 1.50 15,000.00 4.10 41,000.00 1.51 15,100.00 2.00 20,000.00
0015 302-02-03121 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 8,779.4    SQYD 18.00 158,029.20 25.00 219,485.00 30.19 265,050.09 2.00 17,558.80
0016 305-01-04000 Subgrade Layer (12" Thick) 7,264      SQYD 8.00 58,112.00 13.75 99,880.00 16.35 118,766.40 25.00 181,600.00
0017 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 429      CUYD 85.00 36,465.00 80.00 34,320.00 25.16 10,793.64 59.00 25,311.00
0018 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 500      CUYD 25.00 12,500.00 100.00 50,000.00 18.87 9,435.00 58.00 29,000.00
0019 502-01-00100 Superpave Asphaltic Concrete 3,326      TON 108.00 359,208.00 112.00 372,512.00 135.05 449,176.30 212.00 705,112.00
0020 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 570.3    TON 170.00 96,951.00 152.00 86,685.60 148.45 84,661.04 243.00 138,582.90
0021 509-01-00100 Cold Planing Asphaltic Pavement 4,539      SQYD 2.80 12,709.20 1.10 4,992.90 6.29 28,550.31 7.50 34,042.50
0022 701-10-01060 Reinforced Concrete Pipe (Extension) (24") 56      LNFT 80.00 4,480.00 175.00 9,800.00 138.38 7,749.28 162.00 9,072.00
0023 701-10-01100 Reinforced Concrete Pipe (Extension) (36") 20      LNFT 125.00 2,500.00 275.00 5,500.00 150.96 3,019.20 177.00 3,540.00
0024 701-15-00100 Concrete Collar 4      EACH 850.00 3,400.00 600.00 2,400.00 1,258.03 5,032.12 1,500.00 6,000.00
0025 704-03-00100 Blocked Out Guard Rail 575      LNFT 18.00 10,350.00 22.00 12,650.00 22.64 13,018.00 30.00 17,250.00
0026 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 55.00 5,500.00 68.00 6,800.00 69.19 6,919.00 88.00 8,800.00
0027 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,600.00 10,400.00 2,500.00 10,000.00 2,516.05 10,064.20 3,250.00 13,000.00
0028 708-01-00100 Right-of-Way Monument 15      EACH 230.00 3,450.00 240.00 3,600.00 239.03 3,585.45 450.00 6,750.00
0029 708-02-00100 Right-of-Way Monument Witness Post 15      EACH 230.00 3,450.00 240.00 3,600.00 119.51 1,792.65 450.00 6,750.00
0030 712-04-00100 Flexible Revetment 1,165      SQYD 55.00 64,075.00 45.00 52,425.00 81.14 94,528.10 65.00 75,725.00
0031 713-01-00100 Temporary Signs and Barricades 1      LUMP 100,000.00 100,000.00 15,000.00 15,000.00 7,850.08 7,850.08 12,000.00 12,000.00
0032 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 6.124  MILE 650.00 3,980.60 525.00 3,215.10 627.58 3,843.30 590.00 3,613.16
0033 713-06-00100 Temporary Reflectorized Raised Pavement Markers 80      EACH 6.00 480.00 6.00 480.00 6.29 503.20 11.00 880.00
0034 713-08-00100 Temporary Precast Concrete Barrier (Department Furnished) 86      EACH 500.00 43,000.00 150.00 12,900.00 70.50 6,063.00 310.00 26,660.00
0035 713-10-00100 Temporary Precast Concrete Barrier Movement 86      EACH 25.00 2,150.00 150.00 12,900.00 51.10 4,394.60 175.00 15,050.00
0036 716-01-00100 Mulch (Vegetative) 17.9    TON 650.00 11,635.00 600.00 10,740.00 691.91 12,385.19 810.00 14,499.00
0037 717-01-00100 Seeding 268      LB 9.00 2,412.00 10.00 2,680.00 10.06 2,696.08 12.00 3,216.00
0038 718-01-00100 Fertilizer 8,930      LB 0.60 5,358.00 2.50 22,325.00 0.94 8,394.20 1.10 9,823.00
0039 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 10,000.00 10,000.00 50,000.00 50,000.00 11,602.16 11,602.16 40,000.00 40,000.00
0040 725-01-00100 Temporary Detour Roads 3,533.4    SQYD 76.00 268,538.40 140.00 494,676.00 147.81 522,271.85 134.00 473,475.60
0041 727-01-00100 Mobilization 1      LUMP 800,000.00 800,000.00 650,000.00 650,000.00 554,931.42 554,931.42 325,000.00 325,000.00
0042 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 80.00 320.00 85.00 340.00 94.35 377.40 120.00 480.00
0043 731-02-00100 Reflectorized Raised Pavement Markers 344      EACH 6.00 2,064.00 6.00 2,064.00 6.29 2,163.76 15.00 5,160.00
0044 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 3.774  MILE 3,100.00 11,699.40 2,750.00 10,378.50 3,267.40 12,331.17 4,700.00 17,737.80
0045 740-01-00100 Construction Layout 1      LUMP 100,000.00 100,000.00 125,000.00 125,000.00 41,721.20 41,721.20 30,000.00 30,000.00
0046 741-11-00200 Adjusting Water Valve and Meter Box 1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 1.26 1.26 2,200.00 2,200.00
0047 803-05-00100 Temporary Sheeting 1      LUMP 20,000.00 20,000.00 32,000.00 32,000.00 115,167.73 115,167.73 75,000.00 75,000.00
0048 804-01-00200 Precast Concrete Piles (14") 100      LNFT 70.00 7,000.00 115.00 11,500.00 162.46 16,246.00 55.00 5,500.00
0049 804-01-00600 Precast Concrete Piles (24") 1,240      LNFT 84.00 104,160.00 75.00 93,000.00 113.44 140,665.60 85.00 105,400.00
0050 804-01-00700 Precast Concrete Piles (30") 7,520      LNFT 110.00 827,200.00 125.00 940,000.00 126.34 950,076.80 124.00 932,480.00
0051 804-05-00700 Precast Concrete Test Piles (30") 3      EACH 50,000.00 150,000.00 35,000.00 105,000.00 38,785.85 116,357.55 60,000.00 180,000.00
0052 804-09-00100 Loading Test Piles 3      EACH 35,000.00 105,000.00 70,000.00 210,000.00 4,536.65 13,609.95 16,500.00 49,500.00
0053 804-10-00100 Reloading Test Piles 9      EACH 3,000.00 27,000.00 6,000.00 54,000.00 3,944.46 35,500.14 14,500.00 130,500.00
0054 804-11-00100 Redriving Test Piles 3      EACH 1,500.00 4,500.00 6,200.00 18,600.00 2,579.50 7,738.50 830.00 2,490.00
0055 804-12-00100 Loading Permanent Piles 3      EACH 1,500.00 4,500.00 50,000.00 150,000.00 4,217.46 12,652.38 32,000.00 96,000.00
0056 804-17-00100 Dynamic Monitoring 24      EACH 700.00 16,800.00 2,000.00 48,000.00 1,258.03 30,192.72 1,350.00 32,400.00
0057 805-01-00700 Class A Concrete (Bents) 368.17   CUYD 650.00 239,310.50 700.00 257,719.00 816.08 300,456.17 785.00 289,013.45
0058 805-04-00100 Class AA(M) Concrete 1,386.88   CUYD 585.00 811,324.80 685.00 950,012.80 837.82 1,161,955.80 630.00 873,734.40
0059 805-08-00300 Precast-Prestressed Concrete Girder (Type III) 6,755.8    LNFT 88.00 594,510.40 100.00 675,580.00 111.78 755,163.32 115.00 776,917.00
0060 805-11-00100 Strip Seal Joints 72      LNFT 180.00 12,960.00 200.00 14,400.00 156.97 11,301.84 190.00 13,680.00
0061 806-01-00100 Deformed Reinforcing Steel 492,578      LB 0.88 433,468.64 1.00 492,578.00 1.28 630,499.84 0.95 467,949.10
0062 807-08-00100 Structural Metalwork 1      LUMP 30,000.00 30,000.00 35,000.00 35,000.00 27,503.45 27,503.45 40,000.00 40,000.00
0063 810-01-00100 Concrete Railing (Standard Barrier) 392      LNFT 65.00 25,480.00 65.00 25,480.00 76.74 30,082.08 70.00 27,440.00
0064 810-01-00200 Concrete Railing (Slotted Barrier) 2,400      LNFT 62.00 148,800.00 61.00 146,400.00 71.71 172,104.00 68.00 163,200.00
0065 813-01-00100 Concrete Approach Slabs 328.88   SQYD 220.00 72,353.60 260.00 85,508.80 264.19 86,886.81 240.00 78,931.20
0066 NS-700-00180 Impact Attenuator (Construction Zone) 4      EACH 8,000.00 32,000.00 8,500.00 34,000.00 1,258.03 5,032.12 1,450.00 5,800.00
0067 NS-700-00181 Impact Attenuator Relocation (Construction Zone) 2      EACH 1,200.00 2,400.00 1,800.00 3,600.00 8,799.90 17,599.80 2,250.00 4,500.00
0068 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 2      EACH 1,800.00 3,600.00 9,500.00 19,000.00 1,887.05 3,774.10 2,200.00 4,400.00
0069 NS-800-00005 Embedded Pile Monitoring Instrumentation & Accessories 1      LUMP 50,000.00 50,000.00 43,000.00 43,000.00 28,364.91 28,364.91 60,000.00 60,000.00
0070 NS-813-00001 Settlement Plate Installation & Monitoring 8      EACH 1,500.00 12,000.00 1,000.00 8,000.00 905.78 7,246.24 1,200.00 9,600.00
0071 NS-DEV-60303 NS Approach Slab Instrumentation 1      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 6,290.13 6,290.13 5,000.00 5,000.00
0072 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -252.167  CUYD 1.00 -252.17 0.01 -2.52 0.63 -158.87 1.50 -378.25
0073 803-03-00100 Steel Sheet Pile Wall 25,615      SQFT 22.00 563,530.00 22.00 563,530.00 19.32 494,881.80 21.50 550,722.50
0074 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 30      LNFT 80.00 2,400.00 175.00 5,250.00 188.70 5,661.00 165.00 4,950.00
                         
    ITEM TOTAL (CONSTRUCTION BID)       8,321,612.32   10,362,742.18   10,423,029.79   10,486,230.16
    NUMBER OF DAYS BID AT $1000 PER DAY.       400,000.00   335,000.00   505,000.00   480,000.00
    TOTAL BID       8,721,612.32   10,697,742.18   10,928,029.79   10,966,230.16



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
James Construction Group LLC
- 6 -
Coastal Bridge Co., L.L.C.
- 7 -
Jb James Construction Llc
- 8 -
Cajun Constructors, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 249,800.00 249,800.00 500,000.00 500,000.00 640,000.00 640,000.00 235,000.00 235,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 20,000.00 20,000.00 250,000.00 250,000.00 33,000.00 33,000.00 40,000.00 40,000.00
0003 202-02-04000 Removal of Bridge (STA. 128+00, 811'X24' Low Level Truss Swing Span Bridge) 1      EACH 370,000.00 370,000.00 200,000.00 200,000.00 300,000.00 300,000.00 520,000.00 520,000.00
0004 202-02-05000 Removal of Building ONE 12x47 WOOD FRAME CAMP 1      EACH 15,000.00 15,000.00 2,000.00 2,000.00 100.00 100.00 1,000.00 1,000.00
0005 202-02-05000 Removal of Building ONE 20x44 WOOD FRAME CAMP 1      EACH 15,000.00 15,000.00 3,000.00 3,000.00 100.00 100.00 1,000.00 1,000.00
0006 202-02-14500 Removal of Guard Rail 260      LNFT 8.00 2,080.00 5.00 1,300.00 5.00 1,300.00 6.00 1,560.00
0007 202-02-38500 Removal of Surfacing and Stablized Base 10,300      SQYD 3.25 33,475.00 15.00 154,500.00 4.20 43,260.00 4.00 41,200.00
0008 203-01-00100 General Excavation 29,132      CUYD 11.00 320,452.00 13.00 378,716.00 7.00 203,924.00 13.00 378,716.00
0009 203-03-00100 Embankment 76,155      CUYD 17.00 1,294,635.00 15.50 1,180,402.50 22.00 1,675,410.00 15.50 1,180,402.50
0010 203-04-00200 Nonplastic Embankment (Sand) 7,000      CUYD 26.00 182,000.00 28.00 196,000.00 30.00 210,000.00 28.00 196,000.00
0011 203-08-00100 Geotextile Fabric 17,000      SQYD 2.00 34,000.00 2.00 34,000.00 1.50 25,500.00 2.00 34,000.00
0012 204-02-00100 Temporary Hay or Straw Bales 40      EACH 20.00 800.00 14.00 560.00 15.00 600.00 20.00 800.00
0013 204-05-00100 Temporary Sediment Check Dams (Hay) 50      EACH 150.00 7,500.00 150.00 7,500.00 130.00 6,500.00 160.00 8,000.00
0014 204-06-00100 Temporary Silt Fencing 10,000      LNFT 2.25 22,500.00 2.00 20,000.00 1.50 15,000.00 2.00 20,000.00
0015 302-02-03121 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 8,779.4    SQYD 20.00 175,588.00 24.00 210,705.60 22.00 193,146.80 25.00 219,485.00
0016 305-01-04000 Subgrade Layer (12" Thick) 7,264      SQYD 14.00 101,696.00 13.00 94,432.00 13.00 94,432.00 13.00 94,432.00
0017 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 429      CUYD 85.00 36,465.00 50.00 21,450.00 80.00 34,320.00 75.00 32,175.00
0018 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 500      CUYD 85.00 42,500.00 50.00 25,000.00 65.00 32,500.00 75.00 37,500.00
0019 502-01-00100 Superpave Asphaltic Concrete 3,326      TON 135.00 449,010.00 100.00 332,600.00 100.00 332,600.00 100.00 332,600.00
0020 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 570.3    TON 170.00 96,951.00 110.00 62,733.00 110.00 62,733.00 110.00 62,733.00
0021 509-01-00100 Cold Planing Asphaltic Pavement 4,539      SQYD 4.00 18,156.00 4.00 18,156.00 4.00 18,156.00 4.00 18,156.00
0022 701-10-01060 Reinforced Concrete Pipe (Extension) (24") 56      LNFT 136.00 7,616.00 175.00 9,800.00 100.00 5,600.00 135.00 7,560.00
0023 701-10-01100 Reinforced Concrete Pipe (Extension) (36") 20      LNFT 170.00 3,400.00 275.00 5,500.00 170.00 3,400.00 150.00 3,000.00
0024 701-15-00100 Concrete Collar 4      EACH 800.00 3,200.00 600.00 2,400.00 700.00 2,800.00 1,250.00 5,000.00
0025 704-03-00100 Blocked Out Guard Rail 575      LNFT 16.00 9,200.00 18.00 10,350.00 18.00 10,350.00 20.00 11,500.00
0026 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 50.00 5,000.00 55.00 5,500.00 55.00 5,500.00 62.00 6,200.00
0027 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,300.00 9,200.00 2,400.00 9,600.00 2,000.00 8,000.00 2,900.00 11,600.00
0028 708-01-00100 Right-of-Way Monument 15      EACH 325.00 4,875.00 250.00 3,750.00 150.00 2,250.00 240.00 3,600.00
0029 708-02-00100 Right-of-Way Monument Witness Post 15      EACH 180.00 2,700.00 250.00 3,750.00 150.00 2,250.00 120.00 1,800.00
0030 712-04-00100 Flexible Revetment 1,165      SQYD 70.00 81,550.00 75.00 87,375.00 50.00 58,250.00 86.00 100,190.00
0031 713-01-00100 Temporary Signs and Barricades 1      LUMP 50,000.00 50,000.00 75,000.00 75,000.00 40,000.00 40,000.00 30,000.00 30,000.00
0032 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 6.124  MILE 400.00 2,449.60 550.00 3,368.20 550.00 3,368.20 650.00 3,980.60
0033 713-06-00100 Temporary Reflectorized Raised Pavement Markers 80      EACH 7.00 560.00 5.50 440.00 5.50 440.00 10.00 800.00
0034 713-08-00100 Temporary Precast Concrete Barrier (Department Furnished) 86      EACH 225.00 19,350.00 400.00 34,400.00 240.00 20,640.00 475.00 40,850.00
0035 713-10-00100 Temporary Precast Concrete Barrier Movement 86      EACH 60.00 5,160.00 135.00 11,610.00 90.00 7,740.00 235.00 20,210.00
0036 716-01-00100 Mulch (Vegetative) 17.9    TON 550.00 9,845.00 650.00 11,635.00 550.00 9,845.00 750.00 13,425.00
0037 717-01-00100 Seeding 268      LB 8.00 2,144.00 9.50 2,546.00 8.00 2,144.00 11.00 2,948.00
0038 718-01-00100 Fertilizer 8,930      LB 0.75 6,697.50 0.65 5,804.50 0.80 7,144.00 1.00 8,930.00
0039 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 45,000.00 45,000.00 24,000.00 24,000.00 25,000.00 25,000.00 30,000.00 30,000.00
0040 725-01-00100 Temporary Detour Roads 3,533.4    SQYD 205.00 724,347.00 150.00 530,010.00 110.00 388,674.00 140.00 494,676.00
0041 727-01-00100 Mobilization 1      LUMP 1,050,000.00 1,050,000.00 1,000,000.00 1,000,000.00 1,100,000.00 1,100,000.00 950,000.00 950,000.00
0042 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 70.00 280.00 75.00 300.00 80.00 320.00 100.00 400.00
0043 731-02-00100 Reflectorized Raised Pavement Markers 344      EACH 10.00 3,440.00 6.00 2,064.00 5.50 1,892.00 7.00 2,408.00
0044 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 3.774  MILE 3,100.00 11,699.40 3,000.00 11,322.00 2,700.00 10,189.80 3,240.00 12,227.76
0045 740-01-00100 Construction Layout 1      LUMP 45,000.00 45,000.00 100,000.00 100,000.00 180,000.00 180,000.00 129,250.00 129,250.00
0046 741-11-00200 Adjusting Water Valve and Meter Box 1      EACH 450.00 450.00 1,500.00 1,500.00 800.00 800.00 1,000.00 1,000.00
0047 803-05-00100 Temporary Sheeting 1      LUMP 75,000.00 75,000.00 75,000.00 75,000.00 90,000.00 90,000.00 1.00 1.00
0048 804-01-00200 Precast Concrete Piles (14") 100      LNFT 135.00 13,500.00 75.00 7,500.00 90.00 9,000.00 75.00 7,500.00
0049 804-01-00600 Precast Concrete Piles (24") 1,240      LNFT 140.00 173,600.00 90.00 111,600.00 110.00 136,400.00 142.00 176,080.00
0050 804-01-00700 Precast Concrete Piles (30") 7,520      LNFT 145.00 1,090,400.00 120.00 902,400.00 135.00 1,015,200.00 180.00 1,353,600.00
0051 804-05-00700 Precast Concrete Test Piles (30") 3      EACH 40,000.00 120,000.00 40,000.00 120,000.00 40,000.00 120,000.00 94,000.00 282,000.00
0052 804-09-00100 Loading Test Piles 3      EACH 60,000.00 180,000.00 10,000.00 30,000.00 60,000.00 180,000.00 7,800.00 23,400.00
0053 804-10-00100 Reloading Test Piles 9      EACH 15,000.00 135,000.00 5,000.00 45,000.00 100.00 900.00 1,000.00 9,000.00
0054 804-11-00100 Redriving Test Piles 3      EACH 6,500.00 19,500.00 100.00 300.00 100.00 300.00 9,000.00 27,000.00
0055 804-12-00100 Loading Permanent Piles 3      EACH 50,000.00 150,000.00 100.00 300.00 100.00 300.00 70,000.00 210,000.00
0056 804-17-00100 Dynamic Monitoring 24      EACH 2,500.00 60,000.00 1,500.00 36,000.00 1,200.00 28,800.00 4,500.00 108,000.00
0057 805-01-00700 Class A Concrete (Bents) 368.17   CUYD 850.00 312,944.50 925.00 340,557.25 1,250.00 460,212.50 2,050.00 754,748.50
0058 805-04-00100 Class AA(M) Concrete 1,386.88   CUYD 700.00 970,816.00 900.00 1,248,192.00 870.00 1,206,585.60 920.00 1,275,929.60
0059 805-08-00300 Precast-Prestressed Concrete Girder (Type III) 6,755.8    LNFT 100.00 675,580.00 91.50 618,155.70 110.00 743,138.00 102.00 689,091.60
0060 805-11-00100 Strip Seal Joints 72      LNFT 200.00 14,400.00 150.00 10,800.00 180.00 12,960.00 335.00 24,120.00
0061 806-01-00100 Deformed Reinforcing Steel 492,578      LB 0.80 394,062.40 0.90 443,320.20 1.00 492,578.00 0.95 467,949.10
0062 807-08-00100 Structural Metalwork 1      LUMP 35,000.00 35,000.00 85,000.00 85,000.00 40,000.00 40,000.00 45,000.00 45,000.00
0063 810-01-00100 Concrete Railing (Standard Barrier) 392      LNFT 65.00 25,480.00 70.00 27,440.00 60.00 23,520.00 77.00 30,184.00
0064 810-01-00200 Concrete Railing (Slotted Barrier) 2,400      LNFT 55.00 132,000.00 67.00 160,800.00 60.00 144,000.00 71.00 170,400.00
0065 813-01-00100 Concrete Approach Slabs 328.88   SQYD 225.00 73,998.00 250.00 82,220.00 270.00 88,797.60 275.00 90,442.00
0066 NS-700-00180 Impact Attenuator (Construction Zone) 4      EACH 10,750.00 43,000.00 12,000.00 48,000.00 9,000.00 36,000.00 9,000.00 36,000.00
0067 NS-700-00181 Impact Attenuator Relocation (Construction Zone) 2      EACH 750.00 1,500.00 1,000.00 2,000.00 2,000.00 4,000.00 1,300.00 2,600.00
0068 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 2      EACH 1,500.00 3,000.00 2,500.00 5,000.00 7,000.00 14,000.00 1,900.00 3,800.00
0069 NS-800-00005 Embedded Pile Monitoring Instrumentation & Accessories 1      LUMP 45,000.00 45,000.00 35,000.00 35,000.00 90,000.00 90,000.00 85,000.00 85,000.00
0070 NS-813-00001 Settlement Plate Installation & Monitoring 8      EACH 1,500.00 12,000.00 3,000.00 24,000.00 3,000.00 24,000.00 1,850.00 14,800.00
0071 NS-DEV-60303 NS Approach Slab Instrumentation 1      LUMP 1.00 1.00 5,000.00 5,000.00 40,000.00 40,000.00 965.00 965.00
0072 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -252.167  CUYD 1.00 -252.17 1.00 -252.17 0.01 -2.52 1.00 -252.17
0073 803-03-00100 Steel Sheet Pile Wall 25,615      SQFT 22.00 563,530.00 30.00 768,450.00 24.00 614,760.00 25.00 640,375.00
0074 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 30      LNFT 80.00 2,400.00 175.00 5,250.00 80.00 2,400.00 110.00 3,300.00
                         
    ITEM TOTAL (CONSTRUCTION BID)       10,912,231.23   10,882,112.78   11,437,027.98   11,877,348.49
    NUMBER OF DAYS BID AT $1000 PER DAY.       550,000.00   700,000.00   600,000.00   525,000.00
    TOTAL BID       11,462,231.23   11,582,112.78   12,037,027.98   12,402,348.49



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 9 -
Boh Bros. Construction Co., LLC.
- 10 -
Shavers-Whittle Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 175,000.00 175,000.00 50,000.00 50,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 180,000.00 180,000.00 35,000.00 35,000.00
0003 202-02-04000 Removal of Bridge (STA. 128+00, 811'X24' Low Level Truss Swing Span Bridge) 1      EACH 400,000.00 400,000.00 450,000.00 450,000.00
0004 202-02-05000 Removal of Building ONE 12x47 WOOD FRAME CAMP 1      EACH 10,000.00 10,000.00 5,000.00 5,000.00
0005 202-02-05000 Removal of Building ONE 20x44 WOOD FRAME CAMP 1      EACH 10,000.00 10,000.00 6,000.00 6,000.00
0006 202-02-14500 Removal of Guard Rail 260      LNFT 25.00 6,500.00 8.00 2,080.00
0007 202-02-38500 Removal of Surfacing and Stablized Base 10,300      SQYD 3.25 33,475.00 3.00 30,900.00
0008 203-01-00100 General Excavation 29,132      CUYD 13.70 399,108.40 15.00 436,980.00
0009 203-03-00100 Embankment 76,155      CUYD 17.25 1,313,673.75 25.00 1,903,875.00
0010 203-04-00200 Nonplastic Embankment (Sand) 7,000      CUYD 29.50 206,500.00 35.00 245,000.00
0011 203-08-00100 Geotextile Fabric 17,000      SQYD 2.10 35,700.00 4.00 68,000.00
0012 204-02-00100 Temporary Hay or Straw Bales 40      EACH 10.00 400.00 12.00 480.00
0013 204-05-00100 Temporary Sediment Check Dams (Hay) 50      EACH 130.00 6,500.00 150.00 7,500.00
0014 204-06-00100 Temporary Silt Fencing 10,000      LNFT 1.60 16,000.00 2.00 20,000.00
0015 302-02-03121 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 8,779.4    SQYD 25.25 221,679.85 13.00 114,132.20
0016 305-01-04000 Subgrade Layer (12" Thick) 7,264      SQYD 13.50 98,064.00 20.00 145,280.00
0017 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 429      CUYD 100.00 42,900.00 70.00 30,030.00
0018 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 500      CUYD 100.00 50,000.00 35.00 17,500.00
0019 502-01-00100 Superpave Asphaltic Concrete 3,326      TON 102.00 339,252.00 120.00 399,120.00
0020 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 570.3    TON 105.00 59,881.50 124.00 70,717.20
0021 509-01-00100 Cold Planing Asphaltic Pavement 4,539      SQYD 4.20 19,063.80 5.00 22,695.00
0022 701-10-01060 Reinforced Concrete Pipe (Extension) (24") 56      LNFT 180.00 10,080.00 130.00 7,280.00
0023 701-10-01100 Reinforced Concrete Pipe (Extension) (36") 20      LNFT 280.00 5,600.00 140.00 2,800.00
0024 701-15-00100 Concrete Collar 4      EACH 600.00 2,400.00 1,200.00 4,800.00
0025 704-03-00100 Blocked Out Guard Rail 575      LNFT 18.50 10,637.50 20.00 11,500.00
0026 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 57.00 5,700.00 60.00 6,000.00
0027 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,100.00 8,400.00 2,800.00 11,200.00
0028 708-01-00100 Right-of-Way Monument 15      EACH 3,200.00 48,000.00 160.00 2,400.00
0029 708-02-00100 Right-of-Way Monument Witness Post 15      EACH 3,200.00 48,000.00 60.00 900.00
0030 712-04-00100 Flexible Revetment 1,165      SQYD 50.00 58,250.00 75.00 87,375.00
0031 713-01-00100 Temporary Signs and Barricades 1      LUMP 50,000.00 50,000.00 50,000.00 50,000.00
0032 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 6.124  MILE 515.00 3,153.86 400.00 2,449.60
0033 713-06-00100 Temporary Reflectorized Raised Pavement Markers 80      EACH 5.00 400.00 8.00 640.00
0034 713-08-00100 Temporary Precast Concrete Barrier (Department Furnished) 86      EACH 300.00 25,800.00 300.00 25,800.00
0035 713-10-00100 Temporary Precast Concrete Barrier Movement 86      EACH 125.00 10,750.00 150.00 12,900.00
0036 716-01-00100 Mulch (Vegetative) 17.9    TON 600.00 10,740.00 700.00 12,530.00
0037 717-01-00100 Seeding 268      LB 8.00 2,144.00 10.00 2,680.00
0038 718-01-00100 Fertilizer 8,930      LB 0.55 4,911.50 1.00 8,930.00
0039 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 35,000.00 35,000.00 50,000.00 50,000.00
0040 725-01-00100 Temporary Detour Roads 3,533.4    SQYD 150.00 530,010.00 140.00 494,676.00
0041 727-01-00100 Mobilization 1      LUMP 1,210,000.00 1,210,000.00 850,000.00 850,000.00
0042 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 80.00 320.00 80.00 320.00
0043 731-02-00100 Reflectorized Raised Pavement Markers 344      EACH 5.00 1,720.00 12.00 4,128.00
0044 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 3.774  MILE 2,700.00 10,189.80 4,000.00 15,096.00
0045 740-01-00100 Construction Layout 1      LUMP 275,000.00 275,000.00 95,000.00 95,000.00
0046 741-11-00200 Adjusting Water Valve and Meter Box 1      EACH 750.00 750.00 750.00 750.00
0047 803-05-00100 Temporary Sheeting 1      LUMP 180,000.00 180,000.00 100,000.00 100,000.00
0048 804-01-00200 Precast Concrete Piles (14") 100      LNFT 96.00 9,600.00 140.00 14,000.00
0049 804-01-00600 Precast Concrete Piles (24") 1,240      LNFT 110.00 136,400.00 150.00 186,000.00
0050 804-01-00700 Precast Concrete Piles (30") 7,520      LNFT 150.00 1,128,000.00 225.00 1,692,000.00
0051 804-05-00700 Precast Concrete Test Piles (30") 3      EACH 61,000.00 183,000.00 125,000.00 375,000.00
0052 804-09-00100 Loading Test Piles 3      EACH 166,000.00 498,000.00 50,000.00 150,000.00
0053 804-10-00100 Reloading Test Piles 9      EACH 12,500.00 112,500.00 6,500.00 58,500.00
0054 804-11-00100 Redriving Test Piles 3      EACH 1,000.00 3,000.00 1,250.00 3,750.00
0055 804-12-00100 Loading Permanent Piles 3      EACH 5,000.00 15,000.00 1,250.00 3,750.00
0056 804-17-00100 Dynamic Monitoring 24      EACH 6,800.00 163,200.00 1,350.00 32,400.00
0057 805-01-00700 Class A Concrete (Bents) 368.17   CUYD 1,100.00 404,987.00 1,250.00 460,212.50
0058 805-04-00100 Class AA(M) Concrete 1,386.88   CUYD 1,000.00 1,386,880.00 1,025.00 1,421,552.00
0059 805-08-00300 Precast-Prestressed Concrete Girder (Type III) 6,755.8    LNFT 150.00 1,013,370.00 150.00 1,013,370.00
0060 805-11-00100 Strip Seal Joints 72      LNFT 300.00 21,600.00 200.00 14,400.00
0061 806-01-00100 Deformed Reinforcing Steel 492,578      LB 0.75 369,433.50 1.00 492,578.00
0062 807-08-00100 Structural Metalwork 1      LUMP 75,000.00 75,000.00 35,000.00 35,000.00
0063 810-01-00100 Concrete Railing (Standard Barrier) 392      LNFT 75.00 29,400.00 75.00 29,400.00
0064 810-01-00200 Concrete Railing (Slotted Barrier) 2,400      LNFT 45.00 108,000.00 70.00 168,000.00
0065 813-01-00100 Concrete Approach Slabs 328.88   SQYD 200.00 65,776.00 260.00 85,508.80
0066 NS-700-00180 Impact Attenuator (Construction Zone) 4      EACH 7,000.00 28,000.00 10,000.00 40,000.00
0067 NS-700-00181 Impact Attenuator Relocation (Construction Zone) 2      EACH 1,000.00 2,000.00 2,000.00 4,000.00
0068 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 2      EACH 1,500.00 3,000.00 6,500.00 13,000.00
0069 NS-800-00005 Embedded Pile Monitoring Instrumentation & Accessories 1      LUMP 50,000.00 50,000.00 30,000.00 30,000.00
0070 NS-813-00001 Settlement Plate Installation & Monitoring 8      EACH 1,000.00 8,000.00 3,000.00 24,000.00
0071 NS-DEV-60303 NS Approach Slab Instrumentation 1      LUMP 3,000.00 3,000.00 12,000.00 12,000.00
0072 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -252.167  CUYD 12.50 -3,152.09 1.00 -252.17
0073 803-03-00100 Steel Sheet Pile Wall 25,615      SQFT 10.00 256,150.00 19.50 499,492.50
0074 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 30      LNFT 180.00 5,400.00 130.00 3,900.00
                 
    ITEM TOTAL (CONSTRUCTION BID)       12,247,199.37   12,782,005.63
    NUMBER OF DAYS BID AT $1000 PER DAY.       425,000.00   600,000.00
    TOTAL BID       12,672,199.37   13,382,005.63