Bid Tabulations
Letting of
03/14/2012
LA DOTD Headquarters
| Lead Project: H.002071.6 | |
| Parish: Jefferson Davis | |
| Routes: LA 14 | |
| Description: BAYOU LACASSINE BRIDGE | |
| Type Const: GRADING, CLASS II BASE COURSE, SUBGRADE LAYER, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, GIRDER SPAN BRIDGE AND RELATED WORK. | |
| Estimated Construction Cost: $9,939,767.43 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $1,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $8,321,612.32 | 400 | $8,721,612.32 |
| 2 | 00755 | L & A Contracting Co. | $10,362,742.18 | 335 | $10,697,742.18 |
| 3 | 00060 | F. Miller Construction Llc | $10,423,029.79 | 505 | $10,928,029.79 |
| 4 | 56565 | Aquaterra Contracting, LLC | $10,486,230.16 | 480 | $10,966,230.16 |
| 5 | 34567 | James Construction Group LLC | $10,912,231.23 | 550 | $11,462,231.23 |
| 6 | 00481 | Coastal Bridge Co., L.L.C. | $10,882,112.78 | 700 | $11,582,112.78 |
| 7 | 39462 | Jb James Construction Llc | $11,437,027.98 | 600 | $12,037,027.98 |
| 8 | 07740 | Cajun Constructors, Inc. | $11,877,348.49 | 525 | $12,402,348.49 |
| 9 | 02179 | Boh Bros. Construction Co., LLC. | $12,247,199.37 | 425 | $12,672,199.37 |
| 10 | 36827 | Shavers-Whittle Construction LLC | $12,782,005.63 | 600 | $13,382,005.63 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - L & A Contracting Co. |
- 3 - F. Miller Construction Llc |
- 4 - Aquaterra Contracting, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 125,000.00 | 125,000.00 | 250,000.00 | 250,000.00 | 157,253.33 | 157,253.33 | 90,000.00 | 90,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 95,000.00 | 95,000.00 | 12,580.27 | 12,580.27 | 4,000.00 | 4,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA. 128+00, 811'X24' Low Level Truss Swing Span Bridge) | 1 | EACH | 180,000.00 | 180,000.00 | 600,000.00 | 600,000.00 | 375,193.29 | 375,193.29 | 1,000,000.00 | 1,000,000.00 |
| 0004 | 202-02-05000 | Removal of Building ONE 12x47 WOOD FRAME CAMP | 1 | EACH | 500.00 | 500.00 | 2,000.00 | 2,000.00 | 2,516.05 | 2,516.05 | 3,500.00 | 3,500.00 |
| 0005 | 202-02-05000 | Removal of Building ONE 20x44 WOOD FRAME CAMP | 1 | EACH | 500.00 | 500.00 | 3,000.00 | 3,000.00 | 3,774.09 | 3,774.09 | 4,000.00 | 4,000.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 260 | LNFT | 9.80 | 2,548.00 | 11.50 | 2,990.00 | 2.52 | 655.20 | 35.00 | 9,100.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 10,300 | SQYD | 7.00 | 72,100.00 | 4.95 | 50,985.00 | 10.69 | 110,107.00 | 4.60 | 47,380.00 |
| 0008 | 203-01-00100 | General Excavation | 29,132 | CUYD | 5.25 | 152,943.00 | 13.50 | 393,282.00 | 16.35 | 476,308.20 | 11.00 | 320,452.00 |
| 0009 | 203-03-00100 | Embankment | 76,155 | CUYD | 14.25 | 1,085,208.75 | 16.00 | 1,218,480.00 | 19.50 | 1,485,022.50 | 20.00 | 1,523,100.00 |
| 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 7,000 | CUYD | 20.00 | 140,000.00 | 29.00 | 203,000.00 | 35.22 | 246,540.00 | 23.00 | 161,000.00 |
| 0011 | 203-08-00100 | Geotextile Fabric | 17,000 | SQYD | 1.50 | 25,500.00 | 4.00 | 68,000.00 | 2.52 | 42,840.00 | 3.00 | 51,000.00 |
| 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 40 | EACH | 20.00 | 800.00 | 100.00 | 4,000.00 | 18.87 | 754.80 | 22.00 | 880.00 |
| 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 145.00 | 7,250.00 | 300.00 | 15,000.00 | 157.25 | 7,862.50 | 184.00 | 9,200.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 10,000 | LNFT | 1.50 | 15,000.00 | 4.10 | 41,000.00 | 1.51 | 15,100.00 | 2.00 | 20,000.00 |
| 0015 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 8,779.4 | SQYD | 18.00 | 158,029.20 | 25.00 | 219,485.00 | 30.19 | 265,050.09 | 2.00 | 17,558.80 |
| 0016 | 305-01-04000 | Subgrade Layer (12" Thick) | 7,264 | SQYD | 8.00 | 58,112.00 | 13.75 | 99,880.00 | 16.35 | 118,766.40 | 25.00 | 181,600.00 |
| 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 429 | CUYD | 85.00 | 36,465.00 | 80.00 | 34,320.00 | 25.16 | 10,793.64 | 59.00 | 25,311.00 |
| 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 25.00 | 12,500.00 | 100.00 | 50,000.00 | 18.87 | 9,435.00 | 58.00 | 29,000.00 |
| 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 3,326 | TON | 108.00 | 359,208.00 | 112.00 | 372,512.00 | 135.05 | 449,176.30 | 212.00 | 705,112.00 |
| 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 570.3 | TON | 170.00 | 96,951.00 | 152.00 | 86,685.60 | 148.45 | 84,661.04 | 243.00 | 138,582.90 |
| 0021 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,539 | SQYD | 2.80 | 12,709.20 | 1.10 | 4,992.90 | 6.29 | 28,550.31 | 7.50 | 34,042.50 |
| 0022 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 56 | LNFT | 80.00 | 4,480.00 | 175.00 | 9,800.00 | 138.38 | 7,749.28 | 162.00 | 9,072.00 |
| 0023 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 20 | LNFT | 125.00 | 2,500.00 | 275.00 | 5,500.00 | 150.96 | 3,019.20 | 177.00 | 3,540.00 |
| 0024 | 701-15-00100 | Concrete Collar | 4 | EACH | 850.00 | 3,400.00 | 600.00 | 2,400.00 | 1,258.03 | 5,032.12 | 1,500.00 | 6,000.00 |
| 0025 | 704-03-00100 | Blocked Out Guard Rail | 575 | LNFT | 18.00 | 10,350.00 | 22.00 | 12,650.00 | 22.64 | 13,018.00 | 30.00 | 17,250.00 |
| 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 55.00 | 5,500.00 | 68.00 | 6,800.00 | 69.19 | 6,919.00 | 88.00 | 8,800.00 |
| 0027 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,600.00 | 10,400.00 | 2,500.00 | 10,000.00 | 2,516.05 | 10,064.20 | 3,250.00 | 13,000.00 |
| 0028 | 708-01-00100 | Right-of-Way Monument | 15 | EACH | 230.00 | 3,450.00 | 240.00 | 3,600.00 | 239.03 | 3,585.45 | 450.00 | 6,750.00 |
| 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 15 | EACH | 230.00 | 3,450.00 | 240.00 | 3,600.00 | 119.51 | 1,792.65 | 450.00 | 6,750.00 |
| 0030 | 712-04-00100 | Flexible Revetment | 1,165 | SQYD | 55.00 | 64,075.00 | 45.00 | 52,425.00 | 81.14 | 94,528.10 | 65.00 | 75,725.00 |
| 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 15,000.00 | 15,000.00 | 7,850.08 | 7,850.08 | 12,000.00 | 12,000.00 |
| 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.124 | MILE | 650.00 | 3,980.60 | 525.00 | 3,215.10 | 627.58 | 3,843.30 | 590.00 | 3,613.16 |
| 0033 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 80 | EACH | 6.00 | 480.00 | 6.00 | 480.00 | 6.29 | 503.20 | 11.00 | 880.00 |
| 0034 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 86 | EACH | 500.00 | 43,000.00 | 150.00 | 12,900.00 | 70.50 | 6,063.00 | 310.00 | 26,660.00 |
| 0035 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 86 | EACH | 25.00 | 2,150.00 | 150.00 | 12,900.00 | 51.10 | 4,394.60 | 175.00 | 15,050.00 |
| 0036 | 716-01-00100 | Mulch (Vegetative) | 17.9 | TON | 650.00 | 11,635.00 | 600.00 | 10,740.00 | 691.91 | 12,385.19 | 810.00 | 14,499.00 |
| 0037 | 717-01-00100 | Seeding | 268 | LB | 9.00 | 2,412.00 | 10.00 | 2,680.00 | 10.06 | 2,696.08 | 12.00 | 3,216.00 |
| 0038 | 718-01-00100 | Fertilizer | 8,930 | LB | 0.60 | 5,358.00 | 2.50 | 22,325.00 | 0.94 | 8,394.20 | 1.10 | 9,823.00 |
| 0039 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | 11,602.16 | 11,602.16 | 40,000.00 | 40,000.00 |
| 0040 | 725-01-00100 | Temporary Detour Roads | 3,533.4 | SQYD | 76.00 | 268,538.40 | 140.00 | 494,676.00 | 147.81 | 522,271.85 | 134.00 | 473,475.60 |
| 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 800,000.00 | 800,000.00 | 650,000.00 | 650,000.00 | 554,931.42 | 554,931.42 | 325,000.00 | 325,000.00 |
| 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 85.00 | 340.00 | 94.35 | 377.40 | 120.00 | 480.00 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 344 | EACH | 6.00 | 2,064.00 | 6.00 | 2,064.00 | 6.29 | 2,163.76 | 15.00 | 5,160.00 |
| 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.774 | MILE | 3,100.00 | 11,699.40 | 2,750.00 | 10,378.50 | 3,267.40 | 12,331.17 | 4,700.00 | 17,737.80 |
| 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 41,721.20 | 41,721.20 | 30,000.00 | 30,000.00 |
| 0046 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 | 1.26 | 1.26 | 2,200.00 | 2,200.00 |
| 0047 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 20,000.00 | 20,000.00 | 32,000.00 | 32,000.00 | 115,167.73 | 115,167.73 | 75,000.00 | 75,000.00 |
| 0048 | 804-01-00200 | Precast Concrete Piles (14") | 100 | LNFT | 70.00 | 7,000.00 | 115.00 | 11,500.00 | 162.46 | 16,246.00 | 55.00 | 5,500.00 |
| 0049 | 804-01-00600 | Precast Concrete Piles (24") | 1,240 | LNFT | 84.00 | 104,160.00 | 75.00 | 93,000.00 | 113.44 | 140,665.60 | 85.00 | 105,400.00 |
| 0050 | 804-01-00700 | Precast Concrete Piles (30") | 7,520 | LNFT | 110.00 | 827,200.00 | 125.00 | 940,000.00 | 126.34 | 950,076.80 | 124.00 | 932,480.00 |
| 0051 | 804-05-00700 | Precast Concrete Test Piles (30") | 3 | EACH | 50,000.00 | 150,000.00 | 35,000.00 | 105,000.00 | 38,785.85 | 116,357.55 | 60,000.00 | 180,000.00 |
| 0052 | 804-09-00100 | Loading Test Piles | 3 | EACH | 35,000.00 | 105,000.00 | 70,000.00 | 210,000.00 | 4,536.65 | 13,609.95 | 16,500.00 | 49,500.00 |
| 0053 | 804-10-00100 | Reloading Test Piles | 9 | EACH | 3,000.00 | 27,000.00 | 6,000.00 | 54,000.00 | 3,944.46 | 35,500.14 | 14,500.00 | 130,500.00 |
| 0054 | 804-11-00100 | Redriving Test Piles | 3 | EACH | 1,500.00 | 4,500.00 | 6,200.00 | 18,600.00 | 2,579.50 | 7,738.50 | 830.00 | 2,490.00 |
| 0055 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 1,500.00 | 4,500.00 | 50,000.00 | 150,000.00 | 4,217.46 | 12,652.38 | 32,000.00 | 96,000.00 |
| 0056 | 804-17-00100 | Dynamic Monitoring | 24 | EACH | 700.00 | 16,800.00 | 2,000.00 | 48,000.00 | 1,258.03 | 30,192.72 | 1,350.00 | 32,400.00 |
| 0057 | 805-01-00700 | Class A Concrete (Bents) | 368.17 | CUYD | 650.00 | 239,310.50 | 700.00 | 257,719.00 | 816.08 | 300,456.17 | 785.00 | 289,013.45 |
| 0058 | 805-04-00100 | Class AA(M) Concrete | 1,386.88 | CUYD | 585.00 | 811,324.80 | 685.00 | 950,012.80 | 837.82 | 1,161,955.80 | 630.00 | 873,734.40 |
| 0059 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 6,755.8 | LNFT | 88.00 | 594,510.40 | 100.00 | 675,580.00 | 111.78 | 755,163.32 | 115.00 | 776,917.00 |
| 0060 | 805-11-00100 | Strip Seal Joints | 72 | LNFT | 180.00 | 12,960.00 | 200.00 | 14,400.00 | 156.97 | 11,301.84 | 190.00 | 13,680.00 |
| 0061 | 806-01-00100 | Deformed Reinforcing Steel | 492,578 | LB | 0.88 | 433,468.64 | 1.00 | 492,578.00 | 1.28 | 630,499.84 | 0.95 | 467,949.10 |
| 0062 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 27,503.45 | 27,503.45 | 40,000.00 | 40,000.00 |
| 0063 | 810-01-00100 | Concrete Railing (Standard Barrier) | 392 | LNFT | 65.00 | 25,480.00 | 65.00 | 25,480.00 | 76.74 | 30,082.08 | 70.00 | 27,440.00 |
| 0064 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 2,400 | LNFT | 62.00 | 148,800.00 | 61.00 | 146,400.00 | 71.71 | 172,104.00 | 68.00 | 163,200.00 |
| 0065 | 813-01-00100 | Concrete Approach Slabs | 328.88 | SQYD | 220.00 | 72,353.60 | 260.00 | 85,508.80 | 264.19 | 86,886.81 | 240.00 | 78,931.20 |
| 0066 | NS-700-00180 | Impact Attenuator (Construction Zone) | 4 | EACH | 8,000.00 | 32,000.00 | 8,500.00 | 34,000.00 | 1,258.03 | 5,032.12 | 1,450.00 | 5,800.00 |
| 0067 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 1,200.00 | 2,400.00 | 1,800.00 | 3,600.00 | 8,799.90 | 17,599.80 | 2,250.00 | 4,500.00 |
| 0068 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 2 | EACH | 1,800.00 | 3,600.00 | 9,500.00 | 19,000.00 | 1,887.05 | 3,774.10 | 2,200.00 | 4,400.00 |
| 0069 | NS-800-00005 | Embedded Pile Monitoring Instrumentation & Accessories | 1 | LUMP | 50,000.00 | 50,000.00 | 43,000.00 | 43,000.00 | 28,364.91 | 28,364.91 | 60,000.00 | 60,000.00 |
| 0070 | NS-813-00001 | Settlement Plate Installation & Monitoring | 8 | EACH | 1,500.00 | 12,000.00 | 1,000.00 | 8,000.00 | 905.78 | 7,246.24 | 1,200.00 | 9,600.00 |
| 0071 | NS-DEV-60303 | NS Approach Slab Instrumentation | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 6,290.13 | 6,290.13 | 5,000.00 | 5,000.00 |
| 0072 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -252.167 | CUYD | 1.00 | -252.17 | 0.01 | -2.52 | 0.63 | -158.87 | 1.50 | -378.25 |
| 0073 | 803-03-00100 | Steel Sheet Pile Wall | 25,615 | SQFT | 22.00 | 563,530.00 | 22.00 | 563,530.00 | 19.32 | 494,881.80 | 21.50 | 550,722.50 |
| 0074 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 30 | LNFT | 80.00 | 2,400.00 | 175.00 | 5,250.00 | 188.70 | 5,661.00 | 165.00 | 4,950.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 8,321,612.32 | 10,362,742.18 | 10,423,029.79 | 10,486,230.16 | ||||||||
| NUMBER OF DAYS BID AT $1000 PER DAY. | 400,000.00 | 335,000.00 | 505,000.00 | 480,000.00 | ||||||||
| TOTAL BID | 8,721,612.32 | 10,697,742.18 | 10,928,029.79 | 10,966,230.16 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - James Construction Group LLC |
- 6 - Coastal Bridge Co., L.L.C. |
- 7 - Jb James Construction Llc |
- 8 - Cajun Constructors, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 249,800.00 | 249,800.00 | 500,000.00 | 500,000.00 | 640,000.00 | 640,000.00 | 235,000.00 | 235,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 250,000.00 | 250,000.00 | 33,000.00 | 33,000.00 | 40,000.00 | 40,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA. 128+00, 811'X24' Low Level Truss Swing Span Bridge) | 1 | EACH | 370,000.00 | 370,000.00 | 200,000.00 | 200,000.00 | 300,000.00 | 300,000.00 | 520,000.00 | 520,000.00 |
| 0004 | 202-02-05000 | Removal of Building ONE 12x47 WOOD FRAME CAMP | 1 | EACH | 15,000.00 | 15,000.00 | 2,000.00 | 2,000.00 | 100.00 | 100.00 | 1,000.00 | 1,000.00 |
| 0005 | 202-02-05000 | Removal of Building ONE 20x44 WOOD FRAME CAMP | 1 | EACH | 15,000.00 | 15,000.00 | 3,000.00 | 3,000.00 | 100.00 | 100.00 | 1,000.00 | 1,000.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 260 | LNFT | 8.00 | 2,080.00 | 5.00 | 1,300.00 | 5.00 | 1,300.00 | 6.00 | 1,560.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 10,300 | SQYD | 3.25 | 33,475.00 | 15.00 | 154,500.00 | 4.20 | 43,260.00 | 4.00 | 41,200.00 |
| 0008 | 203-01-00100 | General Excavation | 29,132 | CUYD | 11.00 | 320,452.00 | 13.00 | 378,716.00 | 7.00 | 203,924.00 | 13.00 | 378,716.00 |
| 0009 | 203-03-00100 | Embankment | 76,155 | CUYD | 17.00 | 1,294,635.00 | 15.50 | 1,180,402.50 | 22.00 | 1,675,410.00 | 15.50 | 1,180,402.50 |
| 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 7,000 | CUYD | 26.00 | 182,000.00 | 28.00 | 196,000.00 | 30.00 | 210,000.00 | 28.00 | 196,000.00 |
| 0011 | 203-08-00100 | Geotextile Fabric | 17,000 | SQYD | 2.00 | 34,000.00 | 2.00 | 34,000.00 | 1.50 | 25,500.00 | 2.00 | 34,000.00 |
| 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 40 | EACH | 20.00 | 800.00 | 14.00 | 560.00 | 15.00 | 600.00 | 20.00 | 800.00 |
| 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 150.00 | 7,500.00 | 150.00 | 7,500.00 | 130.00 | 6,500.00 | 160.00 | 8,000.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 10,000 | LNFT | 2.25 | 22,500.00 | 2.00 | 20,000.00 | 1.50 | 15,000.00 | 2.00 | 20,000.00 |
| 0015 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 8,779.4 | SQYD | 20.00 | 175,588.00 | 24.00 | 210,705.60 | 22.00 | 193,146.80 | 25.00 | 219,485.00 |
| 0016 | 305-01-04000 | Subgrade Layer (12" Thick) | 7,264 | SQYD | 14.00 | 101,696.00 | 13.00 | 94,432.00 | 13.00 | 94,432.00 | 13.00 | 94,432.00 |
| 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 429 | CUYD | 85.00 | 36,465.00 | 50.00 | 21,450.00 | 80.00 | 34,320.00 | 75.00 | 32,175.00 |
| 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 85.00 | 42,500.00 | 50.00 | 25,000.00 | 65.00 | 32,500.00 | 75.00 | 37,500.00 |
| 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 3,326 | TON | 135.00 | 449,010.00 | 100.00 | 332,600.00 | 100.00 | 332,600.00 | 100.00 | 332,600.00 |
| 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 570.3 | TON | 170.00 | 96,951.00 | 110.00 | 62,733.00 | 110.00 | 62,733.00 | 110.00 | 62,733.00 |
| 0021 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,539 | SQYD | 4.00 | 18,156.00 | 4.00 | 18,156.00 | 4.00 | 18,156.00 | 4.00 | 18,156.00 |
| 0022 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 56 | LNFT | 136.00 | 7,616.00 | 175.00 | 9,800.00 | 100.00 | 5,600.00 | 135.00 | 7,560.00 |
| 0023 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 20 | LNFT | 170.00 | 3,400.00 | 275.00 | 5,500.00 | 170.00 | 3,400.00 | 150.00 | 3,000.00 |
| 0024 | 701-15-00100 | Concrete Collar | 4 | EACH | 800.00 | 3,200.00 | 600.00 | 2,400.00 | 700.00 | 2,800.00 | 1,250.00 | 5,000.00 |
| 0025 | 704-03-00100 | Blocked Out Guard Rail | 575 | LNFT | 16.00 | 9,200.00 | 18.00 | 10,350.00 | 18.00 | 10,350.00 | 20.00 | 11,500.00 |
| 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 50.00 | 5,000.00 | 55.00 | 5,500.00 | 55.00 | 5,500.00 | 62.00 | 6,200.00 |
| 0027 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,300.00 | 9,200.00 | 2,400.00 | 9,600.00 | 2,000.00 | 8,000.00 | 2,900.00 | 11,600.00 |
| 0028 | 708-01-00100 | Right-of-Way Monument | 15 | EACH | 325.00 | 4,875.00 | 250.00 | 3,750.00 | 150.00 | 2,250.00 | 240.00 | 3,600.00 |
| 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 15 | EACH | 180.00 | 2,700.00 | 250.00 | 3,750.00 | 150.00 | 2,250.00 | 120.00 | 1,800.00 |
| 0030 | 712-04-00100 | Flexible Revetment | 1,165 | SQYD | 70.00 | 81,550.00 | 75.00 | 87,375.00 | 50.00 | 58,250.00 | 86.00 | 100,190.00 |
| 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 |
| 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.124 | MILE | 400.00 | 2,449.60 | 550.00 | 3,368.20 | 550.00 | 3,368.20 | 650.00 | 3,980.60 |
| 0033 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 80 | EACH | 7.00 | 560.00 | 5.50 | 440.00 | 5.50 | 440.00 | 10.00 | 800.00 |
| 0034 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 86 | EACH | 225.00 | 19,350.00 | 400.00 | 34,400.00 | 240.00 | 20,640.00 | 475.00 | 40,850.00 |
| 0035 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 86 | EACH | 60.00 | 5,160.00 | 135.00 | 11,610.00 | 90.00 | 7,740.00 | 235.00 | 20,210.00 |
| 0036 | 716-01-00100 | Mulch (Vegetative) | 17.9 | TON | 550.00 | 9,845.00 | 650.00 | 11,635.00 | 550.00 | 9,845.00 | 750.00 | 13,425.00 |
| 0037 | 717-01-00100 | Seeding | 268 | LB | 8.00 | 2,144.00 | 9.50 | 2,546.00 | 8.00 | 2,144.00 | 11.00 | 2,948.00 |
| 0038 | 718-01-00100 | Fertilizer | 8,930 | LB | 0.75 | 6,697.50 | 0.65 | 5,804.50 | 0.80 | 7,144.00 | 1.00 | 8,930.00 |
| 0039 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 45,000.00 | 45,000.00 | 24,000.00 | 24,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 |
| 0040 | 725-01-00100 | Temporary Detour Roads | 3,533.4 | SQYD | 205.00 | 724,347.00 | 150.00 | 530,010.00 | 110.00 | 388,674.00 | 140.00 | 494,676.00 |
| 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 1,050,000.00 | 1,050,000.00 | 1,000,000.00 | 1,000,000.00 | 1,100,000.00 | 1,100,000.00 | 950,000.00 | 950,000.00 |
| 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 70.00 | 280.00 | 75.00 | 300.00 | 80.00 | 320.00 | 100.00 | 400.00 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 344 | EACH | 10.00 | 3,440.00 | 6.00 | 2,064.00 | 5.50 | 1,892.00 | 7.00 | 2,408.00 |
| 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.774 | MILE | 3,100.00 | 11,699.40 | 3,000.00 | 11,322.00 | 2,700.00 | 10,189.80 | 3,240.00 | 12,227.76 |
| 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 100,000.00 | 100,000.00 | 180,000.00 | 180,000.00 | 129,250.00 | 129,250.00 |
| 0046 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 450.00 | 450.00 | 1,500.00 | 1,500.00 | 800.00 | 800.00 | 1,000.00 | 1,000.00 |
| 0047 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 90,000.00 | 90,000.00 | 1.00 | 1.00 |
| 0048 | 804-01-00200 | Precast Concrete Piles (14") | 100 | LNFT | 135.00 | 13,500.00 | 75.00 | 7,500.00 | 90.00 | 9,000.00 | 75.00 | 7,500.00 |
| 0049 | 804-01-00600 | Precast Concrete Piles (24") | 1,240 | LNFT | 140.00 | 173,600.00 | 90.00 | 111,600.00 | 110.00 | 136,400.00 | 142.00 | 176,080.00 |
| 0050 | 804-01-00700 | Precast Concrete Piles (30") | 7,520 | LNFT | 145.00 | 1,090,400.00 | 120.00 | 902,400.00 | 135.00 | 1,015,200.00 | 180.00 | 1,353,600.00 |
| 0051 | 804-05-00700 | Precast Concrete Test Piles (30") | 3 | EACH | 40,000.00 | 120,000.00 | 40,000.00 | 120,000.00 | 40,000.00 | 120,000.00 | 94,000.00 | 282,000.00 |
| 0052 | 804-09-00100 | Loading Test Piles | 3 | EACH | 60,000.00 | 180,000.00 | 10,000.00 | 30,000.00 | 60,000.00 | 180,000.00 | 7,800.00 | 23,400.00 |
| 0053 | 804-10-00100 | Reloading Test Piles | 9 | EACH | 15,000.00 | 135,000.00 | 5,000.00 | 45,000.00 | 100.00 | 900.00 | 1,000.00 | 9,000.00 |
| 0054 | 804-11-00100 | Redriving Test Piles | 3 | EACH | 6,500.00 | 19,500.00 | 100.00 | 300.00 | 100.00 | 300.00 | 9,000.00 | 27,000.00 |
| 0055 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 50,000.00 | 150,000.00 | 100.00 | 300.00 | 100.00 | 300.00 | 70,000.00 | 210,000.00 |
| 0056 | 804-17-00100 | Dynamic Monitoring | 24 | EACH | 2,500.00 | 60,000.00 | 1,500.00 | 36,000.00 | 1,200.00 | 28,800.00 | 4,500.00 | 108,000.00 |
| 0057 | 805-01-00700 | Class A Concrete (Bents) | 368.17 | CUYD | 850.00 | 312,944.50 | 925.00 | 340,557.25 | 1,250.00 | 460,212.50 | 2,050.00 | 754,748.50 |
| 0058 | 805-04-00100 | Class AA(M) Concrete | 1,386.88 | CUYD | 700.00 | 970,816.00 | 900.00 | 1,248,192.00 | 870.00 | 1,206,585.60 | 920.00 | 1,275,929.60 |
| 0059 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 6,755.8 | LNFT | 100.00 | 675,580.00 | 91.50 | 618,155.70 | 110.00 | 743,138.00 | 102.00 | 689,091.60 |
| 0060 | 805-11-00100 | Strip Seal Joints | 72 | LNFT | 200.00 | 14,400.00 | 150.00 | 10,800.00 | 180.00 | 12,960.00 | 335.00 | 24,120.00 |
| 0061 | 806-01-00100 | Deformed Reinforcing Steel | 492,578 | LB | 0.80 | 394,062.40 | 0.90 | 443,320.20 | 1.00 | 492,578.00 | 0.95 | 467,949.10 |
| 0062 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 35,000.00 | 35,000.00 | 85,000.00 | 85,000.00 | 40,000.00 | 40,000.00 | 45,000.00 | 45,000.00 |
| 0063 | 810-01-00100 | Concrete Railing (Standard Barrier) | 392 | LNFT | 65.00 | 25,480.00 | 70.00 | 27,440.00 | 60.00 | 23,520.00 | 77.00 | 30,184.00 |
| 0064 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 2,400 | LNFT | 55.00 | 132,000.00 | 67.00 | 160,800.00 | 60.00 | 144,000.00 | 71.00 | 170,400.00 |
| 0065 | 813-01-00100 | Concrete Approach Slabs | 328.88 | SQYD | 225.00 | 73,998.00 | 250.00 | 82,220.00 | 270.00 | 88,797.60 | 275.00 | 90,442.00 |
| 0066 | NS-700-00180 | Impact Attenuator (Construction Zone) | 4 | EACH | 10,750.00 | 43,000.00 | 12,000.00 | 48,000.00 | 9,000.00 | 36,000.00 | 9,000.00 | 36,000.00 |
| 0067 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 750.00 | 1,500.00 | 1,000.00 | 2,000.00 | 2,000.00 | 4,000.00 | 1,300.00 | 2,600.00 |
| 0068 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 2 | EACH | 1,500.00 | 3,000.00 | 2,500.00 | 5,000.00 | 7,000.00 | 14,000.00 | 1,900.00 | 3,800.00 |
| 0069 | NS-800-00005 | Embedded Pile Monitoring Instrumentation & Accessories | 1 | LUMP | 45,000.00 | 45,000.00 | 35,000.00 | 35,000.00 | 90,000.00 | 90,000.00 | 85,000.00 | 85,000.00 |
| 0070 | NS-813-00001 | Settlement Plate Installation & Monitoring | 8 | EACH | 1,500.00 | 12,000.00 | 3,000.00 | 24,000.00 | 3,000.00 | 24,000.00 | 1,850.00 | 14,800.00 |
| 0071 | NS-DEV-60303 | NS Approach Slab Instrumentation | 1 | LUMP | 1.00 | 1.00 | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 | 965.00 | 965.00 |
| 0072 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -252.167 | CUYD | 1.00 | -252.17 | 1.00 | -252.17 | 0.01 | -2.52 | 1.00 | -252.17 |
| 0073 | 803-03-00100 | Steel Sheet Pile Wall | 25,615 | SQFT | 22.00 | 563,530.00 | 30.00 | 768,450.00 | 24.00 | 614,760.00 | 25.00 | 640,375.00 |
| 0074 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 30 | LNFT | 80.00 | 2,400.00 | 175.00 | 5,250.00 | 80.00 | 2,400.00 | 110.00 | 3,300.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 10,912,231.23 | 10,882,112.78 | 11,437,027.98 | 11,877,348.49 | ||||||||
| NUMBER OF DAYS BID AT $1000 PER DAY. | 550,000.00 | 700,000.00 | 600,000.00 | 525,000.00 | ||||||||
| TOTAL BID | 11,462,231.23 | 11,582,112.78 | 12,037,027.98 | 12,402,348.49 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Boh Bros. Construction Co., LLC. |
- 10 - Shavers-Whittle Construction LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 175,000.00 | 175,000.00 | 50,000.00 | 50,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 180,000.00 | 180,000.00 | 35,000.00 | 35,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA. 128+00, 811'X24' Low Level Truss Swing Span Bridge) | 1 | EACH | 400,000.00 | 400,000.00 | 450,000.00 | 450,000.00 |
| 0004 | 202-02-05000 | Removal of Building ONE 12x47 WOOD FRAME CAMP | 1 | EACH | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0005 | 202-02-05000 | Removal of Building ONE 20x44 WOOD FRAME CAMP | 1 | EACH | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 260 | LNFT | 25.00 | 6,500.00 | 8.00 | 2,080.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 10,300 | SQYD | 3.25 | 33,475.00 | 3.00 | 30,900.00 |
| 0008 | 203-01-00100 | General Excavation | 29,132 | CUYD | 13.70 | 399,108.40 | 15.00 | 436,980.00 |
| 0009 | 203-03-00100 | Embankment | 76,155 | CUYD | 17.25 | 1,313,673.75 | 25.00 | 1,903,875.00 |
| 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 7,000 | CUYD | 29.50 | 206,500.00 | 35.00 | 245,000.00 |
| 0011 | 203-08-00100 | Geotextile Fabric | 17,000 | SQYD | 2.10 | 35,700.00 | 4.00 | 68,000.00 |
| 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 40 | EACH | 10.00 | 400.00 | 12.00 | 480.00 |
| 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 50 | EACH | 130.00 | 6,500.00 | 150.00 | 7,500.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 10,000 | LNFT | 1.60 | 16,000.00 | 2.00 | 20,000.00 |
| 0015 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 8,779.4 | SQYD | 25.25 | 221,679.85 | 13.00 | 114,132.20 |
| 0016 | 305-01-04000 | Subgrade Layer (12" Thick) | 7,264 | SQYD | 13.50 | 98,064.00 | 20.00 | 145,280.00 |
| 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 429 | CUYD | 100.00 | 42,900.00 | 70.00 | 30,030.00 |
| 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 100.00 | 50,000.00 | 35.00 | 17,500.00 |
| 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 3,326 | TON | 102.00 | 339,252.00 | 120.00 | 399,120.00 |
| 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 570.3 | TON | 105.00 | 59,881.50 | 124.00 | 70,717.20 |
| 0021 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,539 | SQYD | 4.20 | 19,063.80 | 5.00 | 22,695.00 |
| 0022 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 56 | LNFT | 180.00 | 10,080.00 | 130.00 | 7,280.00 |
| 0023 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 20 | LNFT | 280.00 | 5,600.00 | 140.00 | 2,800.00 |
| 0024 | 701-15-00100 | Concrete Collar | 4 | EACH | 600.00 | 2,400.00 | 1,200.00 | 4,800.00 |
| 0025 | 704-03-00100 | Blocked Out Guard Rail | 575 | LNFT | 18.50 | 10,637.50 | 20.00 | 11,500.00 |
| 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 57.00 | 5,700.00 | 60.00 | 6,000.00 |
| 0027 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,800.00 | 11,200.00 |
| 0028 | 708-01-00100 | Right-of-Way Monument | 15 | EACH | 3,200.00 | 48,000.00 | 160.00 | 2,400.00 |
| 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 15 | EACH | 3,200.00 | 48,000.00 | 60.00 | 900.00 |
| 0030 | 712-04-00100 | Flexible Revetment | 1,165 | SQYD | 50.00 | 58,250.00 | 75.00 | 87,375.00 |
| 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 |
| 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.124 | MILE | 515.00 | 3,153.86 | 400.00 | 2,449.60 |
| 0033 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 80 | EACH | 5.00 | 400.00 | 8.00 | 640.00 |
| 0034 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 86 | EACH | 300.00 | 25,800.00 | 300.00 | 25,800.00 |
| 0035 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 86 | EACH | 125.00 | 10,750.00 | 150.00 | 12,900.00 |
| 0036 | 716-01-00100 | Mulch (Vegetative) | 17.9 | TON | 600.00 | 10,740.00 | 700.00 | 12,530.00 |
| 0037 | 717-01-00100 | Seeding | 268 | LB | 8.00 | 2,144.00 | 10.00 | 2,680.00 |
| 0038 | 718-01-00100 | Fertilizer | 8,930 | LB | 0.55 | 4,911.50 | 1.00 | 8,930.00 |
| 0039 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 |
| 0040 | 725-01-00100 | Temporary Detour Roads | 3,533.4 | SQYD | 150.00 | 530,010.00 | 140.00 | 494,676.00 |
| 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 1,210,000.00 | 1,210,000.00 | 850,000.00 | 850,000.00 |
| 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 80.00 | 320.00 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 344 | EACH | 5.00 | 1,720.00 | 12.00 | 4,128.00 |
| 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.774 | MILE | 2,700.00 | 10,189.80 | 4,000.00 | 15,096.00 |
| 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 275,000.00 | 275,000.00 | 95,000.00 | 95,000.00 |
| 0046 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 750.00 | 750.00 | 750.00 | 750.00 |
| 0047 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 180,000.00 | 180,000.00 | 100,000.00 | 100,000.00 |
| 0048 | 804-01-00200 | Precast Concrete Piles (14") | 100 | LNFT | 96.00 | 9,600.00 | 140.00 | 14,000.00 |
| 0049 | 804-01-00600 | Precast Concrete Piles (24") | 1,240 | LNFT | 110.00 | 136,400.00 | 150.00 | 186,000.00 |
| 0050 | 804-01-00700 | Precast Concrete Piles (30") | 7,520 | LNFT | 150.00 | 1,128,000.00 | 225.00 | 1,692,000.00 |
| 0051 | 804-05-00700 | Precast Concrete Test Piles (30") | 3 | EACH | 61,000.00 | 183,000.00 | 125,000.00 | 375,000.00 |
| 0052 | 804-09-00100 | Loading Test Piles | 3 | EACH | 166,000.00 | 498,000.00 | 50,000.00 | 150,000.00 |
| 0053 | 804-10-00100 | Reloading Test Piles | 9 | EACH | 12,500.00 | 112,500.00 | 6,500.00 | 58,500.00 |
| 0054 | 804-11-00100 | Redriving Test Piles | 3 | EACH | 1,000.00 | 3,000.00 | 1,250.00 | 3,750.00 |
| 0055 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 5,000.00 | 15,000.00 | 1,250.00 | 3,750.00 |
| 0056 | 804-17-00100 | Dynamic Monitoring | 24 | EACH | 6,800.00 | 163,200.00 | 1,350.00 | 32,400.00 |
| 0057 | 805-01-00700 | Class A Concrete (Bents) | 368.17 | CUYD | 1,100.00 | 404,987.00 | 1,250.00 | 460,212.50 |
| 0058 | 805-04-00100 | Class AA(M) Concrete | 1,386.88 | CUYD | 1,000.00 | 1,386,880.00 | 1,025.00 | 1,421,552.00 |
| 0059 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 6,755.8 | LNFT | 150.00 | 1,013,370.00 | 150.00 | 1,013,370.00 |
| 0060 | 805-11-00100 | Strip Seal Joints | 72 | LNFT | 300.00 | 21,600.00 | 200.00 | 14,400.00 |
| 0061 | 806-01-00100 | Deformed Reinforcing Steel | 492,578 | LB | 0.75 | 369,433.50 | 1.00 | 492,578.00 |
| 0062 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 75,000.00 | 75,000.00 | 35,000.00 | 35,000.00 |
| 0063 | 810-01-00100 | Concrete Railing (Standard Barrier) | 392 | LNFT | 75.00 | 29,400.00 | 75.00 | 29,400.00 |
| 0064 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 2,400 | LNFT | 45.00 | 108,000.00 | 70.00 | 168,000.00 |
| 0065 | 813-01-00100 | Concrete Approach Slabs | 328.88 | SQYD | 200.00 | 65,776.00 | 260.00 | 85,508.80 |
| 0066 | NS-700-00180 | Impact Attenuator (Construction Zone) | 4 | EACH | 7,000.00 | 28,000.00 | 10,000.00 | 40,000.00 |
| 0067 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 1,000.00 | 2,000.00 | 2,000.00 | 4,000.00 |
| 0068 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 2 | EACH | 1,500.00 | 3,000.00 | 6,500.00 | 13,000.00 |
| 0069 | NS-800-00005 | Embedded Pile Monitoring Instrumentation & Accessories | 1 | LUMP | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 |
| 0070 | NS-813-00001 | Settlement Plate Installation & Monitoring | 8 | EACH | 1,000.00 | 8,000.00 | 3,000.00 | 24,000.00 |
| 0071 | NS-DEV-60303 | NS Approach Slab Instrumentation | 1 | LUMP | 3,000.00 | 3,000.00 | 12,000.00 | 12,000.00 |
| 0072 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -252.167 | CUYD | 12.50 | -3,152.09 | 1.00 | -252.17 |
| 0073 | 803-03-00100 | Steel Sheet Pile Wall | 25,615 | SQFT | 10.00 | 256,150.00 | 19.50 | 499,492.50 |
| 0074 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 30 | LNFT | 180.00 | 5,400.00 | 130.00 | 3,900.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 12,247,199.37 | 12,782,005.63 | ||||||
| NUMBER OF DAYS BID AT $1000 PER DAY. | 425,000.00 | 600,000.00 | ||||||
| TOTAL BID | 12,672,199.37 | 13,382,005.63 | ||||||