Bid Tabulations
Letting of
11/16/2011
LA DOTD Headquarters
| Lead Project: H.001912.6 | |
| Parish: Avoyelles | |
| Routes: LA 105 | |
| Description: LA 1183 - SIMMESPORT | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $2,661,488.92 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08815 | W. E. Mcdonald & Son, LLC. | $2,185,723.56 |
| 2 | 41115 | Kdc Construction Co., Llc | $2,419,400.50 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $2,474,129.44 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $2,602,792.78 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - W. E. Mcdonald & Son, LLC. |
- 2 - Kdc Construction Co., Llc |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Diamond B Construction Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 60,000.00 | 60,000.00 | 17,500.00 | 17,500.00 | 58,000.00 | 58,000.00 | 50,000.00 | 50,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 18 | SQYD | 50.00 | 900.00 | 14.00 | 252.00 | 60.00 | 1,080.00 | 10.00 | 180.00 |
| 0004 | 202-02-05000 | Removal of Building REMOVAL OF 2245 SQ. FT. BRICK VENEER RESIDENCE ON SLAB (LT. OF STA. 48+62) (CONTAINS ASBESTOS) | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 100.00 | 100.00 | 10,000.00 | 10,000.00 |
| 0005 | 202-02-05000 | Removal of Building REMOVAL OF BUILDING (METAL SHED LT. OF STA. 53+35; 8' X 8') | 1 | EACH | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | 100.00 | 100.00 | 1,000.00 | 1,000.00 |
| 0006 | 202-02-05000 | Removal of Building REMOVAL OF 345 SQ. FT. METAL SHED (RT. OF STA. 56+34) (CONTAINS ASBESTOS) | 1 | EACH | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 100.00 | 100.00 | 2,000.00 | 2,000.00 |
| 0007 | 202-02-05000 | Removal of Building REMOVAL OF 1035 SQ. FT. WOOD FRAME RESIDENCE ON SLAB (RT. OF STA. 53+30) (CONTAINS ASBESTOS) | 1 | EACH | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | 100.00 | 100.00 | 5,000.00 | 5,000.00 |
| 0008 | 202-02-05000 | Removal of Building REMOVAL OF BUILDING (METAL ANIMAL PEN LT. OF STA. 56+47; 20' X 12') | 1 | EACH | 250.00 | 250.00 | 2,500.00 | 2,500.00 | 100.00 | 100.00 | 1,200.00 | 1,200.00 |
| 0009 | 202-02-05000 | Removal of Building REMOVAL OF BUILDING (WOOD FRAME RESIDENCE RT. OF STA. 57+13; 24' X 66') | 1 | EACH | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 | 100.00 | 100.00 | 8,000.00 | 8,000.00 |
| 0010 | 202-02-06100 | Removal of Concrete Walks and Drives | 578 | SQYD | 15.00 | 8,670.00 | 15.00 | 8,670.00 | 7.00 | 4,046.00 | 10.00 | 5,780.00 |
| 0011 | 202-02-38500 | Removal of Surfacing and Stablized Base | 5,509.7 | SQYD | 2.50 | 13,774.25 | 4.10 | 22,589.77 | 6.00 | 33,058.20 | 6.00 | 33,058.20 |
| 0012 | 203-01-00100 | General Excavation | 4,459 | CUYD | 3.50 | 15,606.50 | 4.85 | 21,626.15 | 9.00 | 40,131.00 | 13.00 | 57,967.00 |
| 0013 | 203-03-00100 | Embankment | 16,066 | CUYD | 10.00 | 160,660.00 | 9.65 | 155,036.90 | 14.00 | 224,924.00 | 17.00 | 273,122.00 |
| 0014 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 2,500 | CUYD | 10.00 | 25,000.00 | 10.85 | 27,125.00 | 14.00 | 35,000.00 | 17.00 | 42,500.00 |
| 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 30 | EACH | 100.00 | 3,000.00 | 145.00 | 4,350.00 | 150.00 | 4,500.00 | 130.00 | 3,900.00 |
| 0016 | 204-06-00100 | Temporary Silt Fencing | 7,080 | LNFT | 1.40 | 9,912.00 | 1.95 | 13,806.00 | 1.50 | 10,620.00 | 1.75 | 12,390.00 |
| 0017 | 303-02-00100 | Removal of Existing Patches | 250 | SQYD | 15.00 | 3,750.00 | 5.60 | 1,400.00 | 5.00 | 1,250.00 | 16.00 | 4,000.00 |
| 0018 | 304-05-00100 | Lime Treatment (Type E) | 634.4 | TON | 400.00 | 253,760.00 | 330.00 | 209,352.00 | 150.00 | 95,160.00 | 450.00 | 285,480.00 |
| 0019 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 55,944 | SQYD | 5.25 | 293,706.00 | 7.60 | 425,174.40 | 6.20 | 346,852.80 | 6.00 | 335,664.00 |
| 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 213 | CUYD | 45.49 | 9,689.37 | 25.00 | 5,325.00 | 90.00 | 19,170.00 | 44.00 | 9,372.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 400 | CUYD | 25.00 | 10,000.00 | 25.00 | 10,000.00 | 40.00 | 16,000.00 | 60.00 | 24,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 12,267.5 | TON | 79.00 | 969,132.50 | 90.00 | 1,104,075.00 | 85.00 | 1,042,737.50 | 79.00 | 969,132.50 |
| 0023 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 224.2 | TON | 135.00 | 30,267.00 | 151.50 | 33,966.30 | 190.00 | 42,598.00 | 140.00 | 31,388.00 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 30,957 | SQYD | 1.90 | 58,818.30 | 1.85 | 57,270.45 | 1.20 | 37,148.40 | 1.50 | 46,435.50 |
| 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -967 | CUYD | 0.10 | -96.70 | 1.00 | -967.00 | 1.00 | -967.00 | 0.10 | -96.70 |
| 0026 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 104 | LNFT | 83.16 | 8,648.64 | 65.00 | 6,760.00 | 75.00 | 7,800.00 | 120.00 | 12,480.00 |
| 0027 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 384 | LNFT | 52.00 | 19,968.00 | 63.00 | 24,192.00 | 40.00 | 15,360.00 | 74.00 | 28,416.00 |
| 0028 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 224 | LNFT | 58.00 | 12,992.00 | 65.00 | 14,560.00 | 55.00 | 12,320.00 | 85.00 | 19,040.00 |
| 0029 | 705-01-00100 | Barbed Wire Fence | 1,625 | LNFT | 5.00 | 8,125.00 | 5.25 | 8,531.25 | 5.50 | 8,937.50 | 5.75 | 9,343.75 |
| 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 325.4 | SQYD | 51.00 | 16,595.40 | 35.45 | 11,535.43 | 155.00 | 50,437.00 | 60.00 | 19,524.00 |
| 0031 | 708-01-00100 | Right-of-Way Monument | 17 | EACH | 250.00 | 4,250.00 | 65.00 | 1,105.00 | 200.00 | 3,400.00 | 165.00 | 2,805.00 |
| 0032 | 708-02-00100 | Right-of-Way Monument Witness Post | 17 | EACH | 250.00 | 4,250.00 | 85.00 | 1,445.00 | 200.00 | 3,400.00 | 165.00 | 2,805.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 15,500.00 | 15,500.00 |
| 0034 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 48 | LNFT | 0.01 | 0.48 | 0.50 | 24.00 | 4.63 | 222.24 | 0.35 | 16.80 |
| 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.022 | MILE | 400.00 | 2,408.80 | 225.00 | 1,354.95 | 350.00 | 2,107.70 | 175.00 | 1,053.85 |
| 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.022 | MILE | 0.01 | 0.06 | 225.00 | 1,354.95 | 235.00 | 1,415.17 | 240.00 | 1,445.28 |
| 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.478 | MILE | 0.01 | 0.21 | 300.00 | 6,443.40 | 385.00 | 8,269.03 | 300.00 | 6,443.40 |
| 0038 | 716-01-00100 | Mulch (Vegetative) | 25 | TON | 300.00 | 7,500.00 | 650.00 | 16,250.00 | 350.00 | 8,750.00 | 340.00 | 8,500.00 |
| 0039 | 717-01-00100 | Seeding | 1,000 | LB | 8.00 | 8,000.00 | 8.00 | 8,000.00 | 9.26 | 9,260.00 | 9.00 | 9,000.00 |
| 0040 | 718-01-00100 | Fertilizer | 12,500 | LB | 0.30 | 3,750.00 | 0.50 | 6,250.00 | 0.35 | 4,375.00 | 0.32 | 4,000.00 |
| 0041 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 3,500.00 | 3,500.00 | 3,400.00 | 3,400.00 |
| 0042 | 726-01-00100 | Bedding Material | 43.6 | CUYD | 75.00 | 3,270.00 | 50.00 | 2,180.00 | 100.00 | 4,360.00 | 11.00 | 479.60 |
| 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 61,000.00 | 61,000.00 | 90,000.00 | 90,000.00 | 225,000.00 | 225,000.00 | 154,000.00 | 154,000.00 |
| 0044 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 75.00 | 150.00 | 100.00 | 200.00 | 85.00 | 170.00 | 85.00 | 170.00 |
| 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 433 | EACH | 5.25 | 2,273.25 | 6.50 | 2,814.50 | 5.90 | 2,554.70 | 6.00 | 2,598.00 |
| 0046 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 24 | LNFT | 2.50 | 60.00 | 3.00 | 72.00 | 8.30 | 199.20 | 3.00 | 72.00 |
| 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.739 | MILE | 2,850.00 | 30,606.15 | 2,850.00 | 30,606.15 | 3,000.00 | 32,217.00 | 3,400.00 | 36,512.60 |
| 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.011 | MILE | 850.00 | 2,559.35 | 1,000.00 | 3,011.00 | 1,000.00 | 3,011.00 | 1,000.00 | 3,011.00 |
| 0049 | 735-01-00100 | Mailboxes | 19 | EACH | 1.00 | 19.00 | 10.00 | 190.00 | 7.00 | 133.00 | 1.00 | 19.00 |
| 0050 | 735-02-00100 | Mailbox Supports (Single) | 18 | EACH | 120.00 | 2,160.00 | 200.00 | 3,600.00 | 175.00 | 3,150.00 | 130.00 | 2,340.00 |
| 0051 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 170.00 | 170.00 | 250.00 | 250.00 | 320.00 | 320.00 | 175.00 | 175.00 |
| 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | 25,000.00 | 25,000.00 | 34,000.00 | 34,000.00 |
| 0053 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 450 | INLF | 2.00 | 900.00 | 0.65 | 292.50 | 2.00 | 900.00 | 5.00 | 2,250.00 |
| 0054 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 384 | INLF | 2.00 | 768.00 | 0.85 | 326.40 | 3.00 | 1,152.00 | 5.00 | 1,920.00 |
| CONTRACTOR TOTAL | 2,185,723.56 | 2,419,400.50 | 2,474,129.44 | 2,602,792.78 | ||||||||