Bid Tabulations
Letting of
10/12/2011
LA DOTD Headquarters
| Lead Project: H.001907.6 | |
| Parish: Rapides | |
| Routes: LA 107 | |
| Description: LA 107: RUBY WISE ELEM. - PINE GROVE DR. | |
| Type Const: GRADING, PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $3,042,790.75 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $2,694,823.90 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,772,537.55 |
| 3 | 05789 | D & J Construction Co., Inc. | $3,258,223.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - D & J Construction Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | 17,361 | SQYD | 2.00 | 34,722.00 | 3.00 | 52,083.00 | 6.00 | 104,166.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 1,664 | LNFT | 6.00 | 9,984.00 | 5.25 | 8,736.00 | 25.00 | 41,600.00 |
| 0003 | 203-01-00100 | General Excavation | 524 | CUYD | 10.00 | 5,240.00 | 26.00 | 13,624.00 | 35.00 | 18,340.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,500 | CUYD | 15.00 | 22,500.00 | 22.00 | 33,000.00 | 18.00 | 27,000.00 |
| 0005 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 4,970 | SQYD | 7.40 | 36,778.00 | 10.00 | 49,700.00 | 10.00 | 49,700.00 |
| 0006 | 304-05-00100 | Lime Treatment (Type E) | 176.2 | TON | 300.00 | 52,860.00 | 575.00 | 101,315.00 | 575.00 | 101,315.00 |
| 0007 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 12,512 | SQYD | 7.30 | 91,337.60 | 9.50 | 118,864.00 | 10.00 | 125,120.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 126 | CUYD | 100.00 | 12,600.00 | 50.00 | 6,300.00 | 65.00 | 8,190.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 24,944.9 | TON | 75.00 | 1,870,867.50 | 72.00 | 1,796,032.80 | 87.00 | 2,170,206.30 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 473.5 | TON | 195.00 | 92,332.50 | 175.00 | 82,862.50 | 125.00 | 59,187.50 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 116,427 | SQYD | 0.50 | 58,213.50 | 1.25 | 145,533.75 | 1.40 | 162,997.80 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -5,123 | CUYD | 1.00 | -5,123.00 | 0.10 | -512.30 | 0.10 | -512.30 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,000 | SQYD | 91.00 | 91,000.00 | 76.00 | 76,000.00 | 100.00 | 100,000.00 |
| 0014 | 704-03-00100 | Blocked Out Guard Rail | 200 | LNFT | 20.00 | 4,000.00 | 20.00 | 4,000.00 | 21.00 | 4,200.00 |
| 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 58.00 | 23,200.00 | 55.00 | 22,000.00 | 58.00 | 23,200.00 |
| 0016 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 16 | EACH | 2,500.00 | 40,000.00 | 2,500.00 | 40,000.00 | 2,400.00 | 38,400.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 22,000.00 | 22,000.00 | 15,000.00 | 15,000.00 |
| 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 72 | LNFT | 1.50 | 108.00 | 0.65 | 46.80 | 1.00 | 72.00 |
| 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14 | MILE | 250.00 | 3,500.00 | 160.00 | 2,240.00 | 250.00 | 3,500.00 |
| 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10 | MILE | 100.00 | 1,000.00 | 210.00 | 2,100.00 | 250.00 | 2,500.00 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 42 | MILE | 75.00 | 3,150.00 | 410.00 | 17,220.00 | 1.00 | 42.00 |
| 0022 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 3,000.00 | 3,000.00 | 3,100.00 | 3,100.00 | 6,500.00 | 6,500.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 74,700.00 | 74,700.00 | 90,000.00 | 90,000.00 |
| 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 85.00 | 1,360.00 | 77.00 | 1,232.00 | 100.00 | 1,600.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,900 | EACH | 4.80 | 13,920.00 | 4.25 | 12,325.00 | 5.00 | 14,500.00 |
| 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,100 | LNFT | 2.20 | 2,420.00 | 1.00 | 1,100.00 | 2.50 | 2,750.00 |
| 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 500 | LNFT | 4.40 | 2,200.00 | 3.10 | 1,550.00 | 4.50 | 2,250.00 |
| 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 72 | LNFT | 4.40 | 316.80 | 5.25 | 378.00 | 4.50 | 324.00 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16 | MILE | 2,800.00 | 44,800.00 | 2,700.00 | 43,200.00 | 2,650.00 | 42,400.00 |
| 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3 | MILE | 830.00 | 2,490.00 | 825.00 | 2,475.00 | 800.00 | 2,400.00 |
| 0031 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 12 | EACH | 220.00 | 2,640.00 | 210.00 | 2,520.00 | 250.00 | 3,000.00 |
| 0032 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 275.00 | 2,200.00 | 210.00 | 1,680.00 | 250.00 | 2,000.00 |
| 0033 | 735-01-00100 | Mailboxes | 112 | EACH | 11.00 | 1,232.00 | 1.00 | 112.00 | 5.00 | 560.00 |
| 0034 | 735-02-00100 | Mailbox Supports (Single) | 90 | EACH | 110.00 | 9,900.00 | 100.00 | 9,000.00 | 100.00 | 9,000.00 |
| 0035 | 735-03-00100 | Mailbox Supports (Double) | 15 | EACH | 130.00 | 1,950.00 | 125.00 | 1,875.00 | 125.00 | 1,875.00 |
| 0036 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 215.00 | 215.00 | 200.00 | 200.00 | 200.00 | 200.00 |
| 0037 | 739-01-00100 | Hydro-Seeding | 4.7 | ACRE | 1,400.00 | 6,580.00 | 1,100.00 | 5,170.00 | 1,200.00 | 5,640.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 3,500.00 | 3,500.00 |
| 0039 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 27,000 | INLF | 0.40 | 10,800.00 | 0.25 | 6,750.00 | 0.25 | 6,750.00 |
| 0040 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 7 | MILE | 790.00 | 5,530.00 | 575.00 | 4,025.00 | 1,250.00 | 8,750.00 |
| CONTRACTOR TOTAL | 2,694,823.90 | 2,772,537.55 | 3,258,223.30 | |||||||