Type Const: CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost: $2,170,177.77


RankLicenseBidderConstruction Bid
1 08815 W. E. Mcdonald & Son, LLC. $1,696,755.80
2 12312 Gilchrist Construction Co. LLC $1,898,733.05
3 35849 T.L. Construction LLC $1,947,343.20
4 14422 T. L. Wallace Construction, Inc. $2,022,482.49
5 12135 Blount Bros. Construction, Inc. $2,043,875.50
6 39462 Jb James Construction Llc $2,073,570.46
7 01012 Cecil D. Gassiott, LLC $2,195,536.60
8 18546 C W & W Contractors, Inc. $2,469,433.98


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
W. E. Mcdonald & Son, LLC.
- 2 -
Gilchrist Construction Co. LLC
- 3 -
T.L. Construction LLC
- 4 -
T. L. Wallace Construction, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 45,000.00 45,000.00 75,000.00 75,000.00 27,000.00 27,000.00 50,000.00 50,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 3,000.00 3,000.00 5,000.00 5,000.00 6,700.00 6,700.00 9,300.00 9,300.00
0003 202-02-04000 Removal of Bridge (STR. NO. 08401410304741, 39'X20' TREATED TIMBER TRESTLE BRIDGE) 1      EACH 3,000.00 3,000.00 5,000.00 5,000.00 5,500.00 5,500.00 10,600.00 10,600.00
0004 202-02-04000 Removal of Bridge (STR. NO. 08401410304701, 58'X20' TREATED TIMBER TRESTLE BRIDGE) 1      EACH 3,000.00 3,000.00 5,000.00 5,000.00 5,500.00 5,500.00 19,700.00 19,700.00
0005 202-02-14500 Removal of Guard Rail 510      LNFT 2.00 1,020.00 6.00 3,060.00 2.50 1,275.00 2.10 1,071.00
0006 203-01-00100 General Excavation 26,886      CUYD 8.00 215,088.00 5.80 155,938.80 5.00 134,430.00 4.15 111,576.90
0007 203-02-00100 Drainage Excavation 550      CUYD 5.00 2,750.00 10.00 5,500.00 18.00 9,900.00 11.00 6,050.00
0008 203-03-00100 Embankment 18,723      CUYD 12.85 240,590.55 14.00 262,122.00 11.00 205,953.00 3.25 60,849.75
0009 204-05-00100 Temporary Sediment Check Dams (Hay) 56      EACH 1.00 56.00 150.00 8,400.00 100.00 5,600.00 10.00 560.00
0010 204-05-00200 Temporary Sediment Check Dams (Stone) 1      EACH 1.00 1.00 650.00 650.00 1,000.00 1,000.00 1,300.00 1,300.00
0011 204-06-00100 Temporary Silt Fencing 7,590      LNFT 1.50 11,385.00 1.30 9,867.00 1.25 9,487.50 2.90 22,011.00
0012 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 12,226.9    SQYD 21.00 256,764.90 20.00 244,538.00 22.00 268,991.80 22.00 268,991.80
0013 304-05-00100 Lime Treatment (Type E) 33.58   TON 460.00 15,446.80 385.00 12,928.30 100.00 3,358.00 550.00 18,469.00
0014 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 111      CUYD 1.00 111.00 80.00 8,880.00 65.00 7,215.00 115.00 12,765.00
0015 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 1,000      CUYD 1.00 1,000.00 15.00 15,000.00 10.00 10,000.00 165.00 165,000.00
0016 502-01-00100 Superpave Asphaltic Concrete 2,154.5    TON 90.00 193,905.00 90.00 193,905.00 110.00 236,995.00 100.00 215,450.00
0017 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 222.6    TON 130.00 28,938.00 150.00 33,390.00 135.00 30,051.00 180.00 40,068.00
0018 701-01-02000 Cross Drain Pipe (24" RCP/PP or 30" CMP) 232      LNFT 69.00 16,008.00 75.00 17,400.00 55.00 12,760.00 100.00 23,200.00
0019 701-01-02080 Cross Drain Pipe (36" RCP/PP or 42" CMP) 64      LNFT 105.00 6,720.00 115.00 7,360.00 86.00 5,504.00 140.00 8,960.00
0020 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 304      LNFT 65.00 19,760.00 55.00 16,720.00 55.00 16,720.00 64.00 19,456.00
0021 702-03-00100 Catch Basins (CB-01) 1      EACH 3,000.00 3,000.00 3,400.00 3,400.00 2,700.00 2,700.00 2,600.00 2,600.00
0022 704-03-00100 Blocked Out Guard Rail 112.5    LNFT 18.50 2,081.25 20.00 2,250.00 24.00 2,700.00 22.00 2,475.00
0023 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 55.00 5,500.00 60.00 6,000.00 57.00 5,700.00 53.00 5,300.00
0024 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,000.00 8,000.00 2,200.00 8,800.00 2,400.00 9,600.00 2,200.00 8,800.00
0025 705-01-00100 Barbed Wire Fence 1,895      LNFT 6.50 12,317.50 7.00 13,265.00 8.00 15,160.00 11.00 20,845.00
0026 708-01-00100 Right-of-Way Monument 24      EACH 250.00 6,000.00 350.00 8,400.00 165.00 3,960.00 150.00 3,600.00
0027 708-02-00100 Right-of-Way Monument Witness Post 24      EACH 250.00 6,000.00 150.00 3,600.00 165.00 3,960.00 53.00 1,272.00
0028 711-01-04000 Riprap (55 lb, 18" Thick) 300      SQYD 55.00 16,500.00 60.00 18,000.00 80.00 24,000.00 58.00 17,400.00
0029 711-04-00100 Geotextile Fabric 300      SQYD 2.50 750.00 2.50 750.00 3.00 900.00 2.65 795.00
0030 712-04-00100 Flexible Revetment 447      SQYD 47.00 21,009.00 60.00 26,820.00 74.00 33,078.00 49.00 21,903.00
0031 713-01-00100 Temporary Signs and Barricades 1      LUMP 12,000.00 12,000.00 15,000.00 15,000.00 15,000.00 15,000.00 6,900.00 6,900.00
0032 713-02-00400 Temporary Pavement Markings (12" Width) 24      LNFT 3.00 72.00 1.00 24.00 1.15 27.60 1.05 25.20
0033 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.596  MILE 400.00 238.40 325.00 193.70 572.00 340.91 630.00 375.48
0034 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.596  MILE 250.00 149.00 500.00 298.00 572.00 340.91 530.00 315.88
0035 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 1.192  MILE 350.00 417.20 600.00 715.20 852.00 1,015.58 790.00 941.68
0036 716-01-00100 Mulch (Vegetative) 26      TON 500.00 13,000.00 510.00 13,260.00 875.00 22,750.00 750.00 19,500.00
0037 717-01-00100 Seeding 1,040      LB 7.00 7,280.00 7.50 7,800.00 10.00 10,400.00 8.95 9,308.00
0038 718-01-00100 Fertilizer 13,000      LB 0.45 5,850.00 0.50 6,500.00 0.75 9,750.00 0.65 8,450.00
0039 720-01-01000 Erosion Control System (Slope Protection) (Type A) 4,625      SQYD 2.00 9,250.00 2.30 10,637.50 2.30 10,637.50 2.10 9,712.50
0040 722-01-00100 Project Site Laboratory 1      EACH 3,000.00 3,000.00 5,000.00 5,000.00 5,000.00 5,000.00 8,900.00 8,900.00
0041 726-01-00100 Bedding Material 134.9    CUYD 79.00 10,657.10 80.00 10,792.00 65.00 8,768.50 84.00 11,331.60
0042 727-01-00100 Mobilization 1      LUMP 52,000.00 52,000.00 180,000.00 180,000.00 130,000.00 130,000.00 170,000.00 170,000.00
0043 729-16-00200 Object Marker Assembly (Type 2) 8      EACH 65.00 520.00 70.00 560.00 85.00 680.00 79.00 632.00
0044 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 75.00 300.00 80.00 320.00 85.00 340.00 79.00 316.00
0045 729-19-00100 Dead End Road Installations (Type A) 1      EACH 1,500.00 1,500.00 1,600.00 1,600.00 2,500.00 2,500.00 2,300.00 2,300.00
0046 731-02-00100 Reflectorized Raised Pavement Markers 81      EACH 6.00 486.00 6.00 486.00 5.70 461.70 5.25 425.25
0047 732-01-02060 Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) 24      LNFT 12.00 288.00 2.80 67.20 5.70 136.80 5.25 126.00
0048 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.369  MILE 2,800.00 6,633.20 3,000.00 7,107.00 3,000.00 7,107.00 2,700.00 6,396.30
0049 735-01-00100 Mailboxes 6      EACH 1.00 6.00 13.00 78.00 15.00 90.00 13.00 78.00
0050 735-02-00100 Mailbox Supports (Single) 6      EACH 250.00 1,500.00 100.00 600.00 140.00 840.00 100.00 600.00
0051 740-01-00100 Construction Layout 1      LUMP 9,000.00 9,000.00 20,000.00 20,000.00 12,000.00 12,000.00 16,700.00 16,700.00
0052 804-01-00300 Precast Concrete Piles (16") 2,275      LNFT 62.00 141,050.00 53.00 120,575.00 85.00 193,375.00 52.00 118,300.00
0053 804-12-00100 Loading Permanent Piles 1      EACH 1.00 1.00 100.00 100.00 1.15 1.15 30,900.00 30,900.00
0054 805-01-00700 Class A Concrete (Bents) 53.56   CUYD 700.00 37,492.00 875.00 46,865.00 965.00 51,685.40 1,100.00 58,916.00
0055 805-03-00100 Class AA Concrete 210.18   CUYD 500.00 105,090.00 565.00 118,751.70 740.00 155,533.20 1,100.00 231,198.00
0056 806-01-00100 Deformed Reinforcing Steel 59,957      LB 0.70 41,969.90 0.85 50,963.45 1.45 86,937.65 0.95 56,959.15
0057 810-01-00100 Concrete Railing (Standard Barrier) 120      LNFT 79.00 9,480.00 81.50 9,780.00 92.00 11,040.00 91.00 10,920.00
0058 810-01-00200 Concrete Railing (Slotted Barrier) 120      LNFT 79.00 9,480.00 81.50 9,780.00 92.00 11,040.00 91.00 10,920.00
0059 813-01-00100 Concrete Approach Slabs 364.44   SQYD 200.00 72,888.00 230.00 83,821.20 250.00 91,110.00 220.00 80,176.80
0060 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 228      INLF 2.00 456.00 0.50 114.00 12.00 2,736.00 2.15 490.20
                         
    CONTRACTOR TOTAL       1,696,755.80   1,898,733.05   1,947,343.20   2,022,482.49



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Blount Bros. Construction, Inc.
- 6 -
Jb James Construction Llc
- 7 -
Cecil D. Gassiott, LLC
- 8 -
C W & W Contractors, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 31,200.00 31,200.00 205,000.00 205,000.00 50,000.00 50,000.00 105,000.00 105,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 4,000.00 4,000.00 6,000.00 6,000.00 25,000.00 25,000.00 15,000.00 15,000.00
0003 202-02-04000 Removal of Bridge (STR. NO. 08401410304741, 39'X20' TREATED TIMBER TRESTLE BRIDGE) 1      EACH 6,000.00 6,000.00 4,000.00 4,000.00 10,000.00 10,000.00 4,000.00 4,000.00
0004 202-02-04000 Removal of Bridge (STR. NO. 08401410304701, 58'X20' TREATED TIMBER TRESTLE BRIDGE) 1      EACH 8,000.00 8,000.00 8,500.00 8,500.00 10,000.00 10,000.00 6,000.00 6,000.00
0005 202-02-14500 Removal of Guard Rail 510      LNFT 10.00 5,100.00 2.00 1,020.00 5.00 2,550.00 3.00 1,530.00
0006 203-01-00100 General Excavation 26,886      CUYD 3.50 94,101.00 5.00 134,430.00 5.00 134,430.00 11.00 295,746.00
0007 203-02-00100 Drainage Excavation 550      CUYD 12.00 6,600.00 14.00 7,700.00 10.00 5,500.00 20.00 11,000.00
0008 203-03-00100 Embankment 18,723      CUYD 12.00 224,676.00 14.00 262,122.00 12.50 234,037.50 15.00 280,845.00
0009 204-05-00100 Temporary Sediment Check Dams (Hay) 56      EACH 200.00 11,200.00 4.00 224.00 15.00 840.00 100.00 5,600.00
0010 204-05-00200 Temporary Sediment Check Dams (Stone) 1      EACH 500.00 500.00 500.00 500.00 350.00 350.00 150.00 150.00
0011 204-06-00100 Temporary Silt Fencing 7,590      LNFT 4.00 30,360.00 2.00 15,180.00 1.75 13,282.50 2.00 15,180.00
0012 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 12,226.9    SQYD 23.00 281,218.70 21.00 256,764.90 20.00 244,538.00 25.00 305,672.50
0013 304-05-00100 Lime Treatment (Type E) 33.58   TON 275.00 9,234.50 300.00 10,074.00 400.00 13,432.00 1.00 33.58
0014 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 111      CUYD 40.00 4,440.00 85.00 9,435.00 70.00 7,770.00 115.00 12,765.00
0015 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 1,000      CUYD 45.00 45,000.00 15.00 15,000.00 100.00 100,000.00 70.00 70,000.00
0016 502-01-00100 Superpave Asphaltic Concrete 2,154.5    TON 160.00 344,720.00 97.00 208,986.50 155.00 333,947.50 110.00 236,995.00
0017 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 222.6    TON 170.00 37,842.00 125.00 27,825.00 185.00 41,181.00 173.00 38,509.80
0018 701-01-02000 Cross Drain Pipe (24" RCP/PP or 30" CMP) 232      LNFT 70.00 16,240.00 80.00 18,560.00 120.00 27,840.00 75.00 17,400.00
0019 701-01-02080 Cross Drain Pipe (36" RCP/PP or 42" CMP) 64      LNFT 130.00 8,320.00 140.00 8,960.00 180.00 11,520.00 110.00 7,040.00
0020 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 304      LNFT 70.00 21,280.00 55.00 16,720.00 75.00 22,800.00 65.00 19,760.00
0021 702-03-00100 Catch Basins (CB-01) 1      EACH 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,500.00 3,500.00
0022 704-03-00100 Blocked Out Guard Rail 112.5    LNFT 35.00 3,937.50 22.00 2,475.00 19.00 2,137.50 25.00 2,812.50
0023 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 110.00 11,000.00 51.00 5,100.00 57.00 5,700.00 65.00 6,500.00
0024 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 3,500.00 14,000.00 2,200.00 8,800.00 2,100.00 8,400.00 2,500.00 10,000.00
0025 705-01-00100 Barbed Wire Fence 1,895      LNFT 9.00 17,055.00 7.00 13,265.00 7.50 14,212.50 9.00 17,055.00
0026 708-01-00100 Right-of-Way Monument 24      EACH 300.00 7,200.00 125.00 3,000.00 300.00 7,200.00 150.00 3,600.00
0027 708-02-00100 Right-of-Way Monument Witness Post 24      EACH 250.00 6,000.00 125.00 3,000.00 150.00 3,600.00 100.00 2,400.00
0028 711-01-04000 Riprap (55 lb, 18" Thick) 300      SQYD 60.00 18,000.00 65.00 19,500.00 70.00 21,000.00 65.00 19,500.00
0029 711-04-00100 Geotextile Fabric 300      SQYD 3.00 900.00 2.00 600.00 4.00 1,200.00 1.00 300.00
0030 712-04-00100 Flexible Revetment 447      SQYD 55.00 24,585.00 58.00 25,926.00 55.00 24,585.00 65.00 29,055.00
0031 713-01-00100 Temporary Signs and Barricades 1      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 15,000.00 15,000.00 15,000.00 15,000.00
0032 713-02-00400 Temporary Pavement Markings (12" Width) 24      LNFT 2.00 48.00 1.00 24.00 3.00 72.00 12.00 288.00
0033 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.596  MILE 400.00 238.40 505.00 300.98 250.00 149.00 750.00 447.00
0034 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.596  MILE 600.00 357.60 505.00 300.98 250.00 149.00 1,500.00 894.00
0035 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 1.192  MILE 900.00 1,072.80 750.00 894.00 500.00 596.00 1,500.00 1,788.00
0036 716-01-00100 Mulch (Vegetative) 26      TON 750.00 19,500.00 695.00 18,070.00 700.00 18,200.00 900.00 23,400.00
0037 717-01-00100 Seeding 1,040      LB 10.00 10,400.00 8.50 8,840.00 9.00 9,360.00 10.00 10,400.00
0038 718-01-00100 Fertilizer 13,000      LB 1.00 13,000.00 0.55 7,150.00 0.60 7,800.00 1.00 13,000.00
0039 720-01-01000 Erosion Control System (Slope Protection) (Type A) 4,625      SQYD 2.00 9,250.00 1.10 5,087.50 1.25 5,781.25 4.00 18,500.00
0040 722-01-00100 Project Site Laboratory 1      EACH 10,000.00 10,000.00 7,500.00 7,500.00 10,000.00 10,000.00 15,000.00 15,000.00
0041 726-01-00100 Bedding Material 134.9    CUYD 80.00 10,792.00 55.00 7,419.50 85.00 11,466.50 95.00 12,815.50
0042 727-01-00100 Mobilization 1      LUMP 30,000.00 30,000.00 200,000.00 200,000.00 200,000.00 200,000.00 250,000.00 250,000.00
0043 729-16-00200 Object Marker Assembly (Type 2) 8      EACH 80.00 640.00 75.00 600.00 65.00 520.00 85.00 680.00
0044 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 100.00 400.00 150.00 600.00 70.00 280.00 85.00 340.00
0045 729-19-00100 Dead End Road Installations (Type A) 1      EACH 4,000.00 4,000.00 2,500.00 2,500.00 1,500.00 1,500.00 2,500.00 2,500.00
0046 731-02-00100 Reflectorized Raised Pavement Markers 81      EACH 10.00 810.00 5.00 405.00 5.00 405.00 5.00 405.00
0047 732-01-02060 Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) 24      LNFT 10.00 240.00 5.00 120.00 10.00 240.00 10.00 240.00
0048 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.369  MILE 3,000.00 7,107.00 2,700.00 6,396.30 2,500.00 5,922.50 1,700.00 4,027.30
0049 735-01-00100 Mailboxes 6      EACH 50.00 300.00 25.00 150.00 15.00 90.00 150.00 900.00
0050 735-02-00100 Mailbox Supports (Single) 6      EACH 150.00 900.00 125.00 750.00 100.00 600.00 150.00 900.00
0051 740-01-00100 Construction Layout 1      LUMP 20,000.00 20,000.00 30,000.00 30,000.00 12,000.00 12,000.00 35,000.00 35,000.00
0052 804-01-00300 Precast Concrete Piles (16") 2,275      LNFT 105.00 238,875.00 55.00 125,125.00 60.00 136,500.00 70.00 159,250.00
0053 804-12-00100 Loading Permanent Piles 1      EACH 3,000.00 3,000.00 100.00 100.00 1,000.00 1,000.00 1.00 1.00
0054 805-01-00700 Class A Concrete (Bents) 53.56   CUYD 650.00 34,814.00 1,100.00 58,916.00 1,200.00 64,272.00 750.00 40,170.00
0055 805-03-00100 Class AA Concrete 210.18   CUYD 700.00 147,126.00 560.00 117,700.80 800.00 168,144.00 750.00 157,635.00
0056 806-01-00100 Deformed Reinforcing Steel 59,957      LB 1.00 59,957.00 1.00 59,957.00 0.85 50,963.45 1.00 59,957.00
0057 810-01-00100 Concrete Railing (Standard Barrier) 120      LNFT 100.00 12,000.00 61.00 7,320.00 70.00 8,400.00 90.00 10,800.00
0058 810-01-00200 Concrete Railing (Slotted Barrier) 120      LNFT 100.00 12,000.00 63.00 7,560.00 70.00 8,400.00 95.00 11,400.00
0059 813-01-00100 Concrete Approach Slabs 364.44   SQYD 250.00 91,110.00 200.00 72,888.00 210.00 76,532.40 220.00 80,176.80
0060 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 228      INLF 1.00 228.00 1.00 228.00 5.00 1,140.00 2.50 570.00
                         
    CONTRACTOR TOTAL       2,043,875.50   2,073,570.46   2,195,536.60   2,469,433.98
 Free Tourist Map  
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.