Bid Tabulations
Letting of
01/09/2013
LA DOTD Headquarters
| Lead Project: H.001875.6 | |
| Parish: Vernon | |
| Routes: LA 8 | |
| Description: LA 8: JCT. LA 121 - JCT. LA 465 | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,625,557.23 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34356 | Prairie Contractors Inc. | $1,502,390.98 |
| 2 | 08815 | W. E. Mcdonald & Son, LLC. | $1,542,939.58 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,618,236.75 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $1,636,672.35 |
| 5 | 27239 | Apeck Construction, Inc. | $1,852,990.36 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Prairie Contractors Inc. |
- 2 - W. E. Mcdonald & Son, LLC. |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | 11,000.00 | 11,000.00 | 3,000.00 | 3,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 9 | SQYD | 200.00 | 1,800.00 | 100.00 | 900.00 | 75.00 | 675.00 | 70.00 | 630.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,500 | CUYD | 10.00 | 15,000.00 | 10.00 | 15,000.00 | 14.00 | 21,000.00 | 19.00 | 28,500.00 |
| 0004 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 63 | CUYD | 25.00 | 1,575.00 | 25.00 | 1,575.00 | 130.00 | 8,190.00 | 30.00 | 1,890.00 |
| 0005 | 304-05-00100 | Lime Treatment (Type E) | 146.48 | TON | 550.00 | 80,564.00 | 525.00 | 76,902.00 | 545.00 | 79,831.60 | 420.00 | 61,521.60 |
| 0006 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 41,334 | SQYD | 7.50 | 310,005.00 | 8.00 | 330,672.00 | 7.00 | 289,338.00 | 7.75 | 320,338.50 |
| 0007 | 308-02-00100 | Removal of Existing Patches | 1,000 | SQYD | 15.00 | 15,000.00 | 15.00 | 15,000.00 | 2.00 | 2,000.00 | 5.00 | 5,000.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 699 | CUYD | 40.00 | 27,960.00 | 1.00 | 699.00 | 62.00 | 43,338.00 | 57.00 | 39,843.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 7,686 | TON | 83.00 | 637,938.00 | 83.00 | 637,938.00 | 87.00 | 668,682.00 | 88.00 | 676,368.00 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 857.5 | TON | 120.00 | 102,900.00 | 120.00 | 102,900.00 | 165.00 | 141,487.50 | 175.00 | 150,062.50 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 39,405 | SQYD | 1.45 | 57,137.25 | 1.55 | 61,077.75 | 1.50 | 59,107.50 | 1.60 | 63,048.00 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,152 | CUYD | 0.01 | -11.52 | 0.01 | -11.52 | 20.00 | -23,040.00 | 0.10 | -115.20 |
| 0013 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 80 | LNFT | 85.00 | 6,800.00 | 118.10 | 9,448.00 | 120.00 | 9,600.00 | 160.00 | 12,800.00 |
| 0014 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 64 | LNFT | 200.00 | 12,800.00 | 222.54 | 14,242.56 | 250.00 | 16,000.00 | 200.00 | 12,800.00 |
| 0015 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 48 | LNFT | 200.00 | 9,600.00 | 239.00 | 11,472.00 | 265.00 | 12,720.00 | 248.00 | 11,904.00 |
| 0016 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 48 | LNFT | 350.00 | 16,800.00 | 380.00 | 18,240.00 | 415.00 | 19,920.00 | 324.00 | 15,552.00 |
| 0017 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 100.00 | 800.00 | 200.00 | 1,600.00 | 225.00 | 1,800.00 | 324.00 | 2,592.00 |
| 0018 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 24 | LNFT | 115.00 | 2,760.00 | 200.00 | 4,800.00 | 225.00 | 5,400.00 | 330.00 | 7,920.00 |
| 0019 | 701-15-00100 | Concrete Collar | 4 | EACH | 700.00 | 2,800.00 | 1,400.00 | 5,600.00 | 1,500.00 | 6,000.00 | 800.00 | 3,200.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 5,600.00 | 5,600.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.97 | MILE | 400.00 | 4,788.00 | 400.00 | 4,788.00 | 155.00 | 1,855.35 | 225.00 | 2,693.25 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.244 | MILE | 1.00 | 6.24 | 185.00 | 1,155.14 | 155.00 | 967.82 | 160.00 | 999.04 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.811 | MILE | 1.00 | 38.81 | 295.00 | 11,449.25 | 275.00 | 10,673.03 | 260.00 | 10,090.86 |
| 0024 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 650.00 | 1,300.00 | 500.00 | 1,000.00 | 550.00 | 1,100.00 | 550.00 | 1,100.00 |
| 0025 | 717-01-00100 | Seeding | 30 | LB | 20.00 | 600.00 | 12.00 | 360.00 | 13.50 | 405.00 | 13.00 | 390.00 |
| 0026 | 718-01-00100 | Fertilizer | 1,000 | LB | 0.75 | 750.00 | 0.50 | 500.00 | 0.50 | 500.00 | 0.55 | 550.00 |
| 0027 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 | 4,000.00 | 4,000.00 | 5,500.00 | 5,500.00 | 2,500.00 | 2,500.00 |
| 0028 | 726-01-00100 | Bedding Material | 68.1 | CUYD | 95.00 | 6,469.50 | 95.00 | 6,469.50 | 95.00 | 6,469.50 | 97.00 | 6,605.70 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 86,500.00 | 86,500.00 | 115,000.00 | 115,000.00 | 125,000.00 | 125,000.00 | 95,000.00 | 95,000.00 |
| 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 14 | EACH | 100.00 | 1,400.00 | 80.00 | 1,120.00 | 90.00 | 1,260.00 | 85.00 | 1,190.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,312 | EACH | 4.50 | 5,904.00 | 4.00 | 5,248.00 | 3.75 | 4,920.00 | 4.00 | 5,248.00 |
| 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 21.285 | MILE | 2,300.00 | 48,955.50 | 2,300.00 | 48,955.50 | 2,500.00 | 53,212.50 | 2,400.00 | 51,084.00 |
| 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.794 | MILE | 800.00 | 3,035.20 | 600.00 | 2,276.40 | 675.00 | 2,560.95 | 650.00 | 2,466.10 |
| 0034 | 735-01-00100 | Mailboxes | 42 | EACH | 15.00 | 630.00 | 1.00 | 42.00 | 1.00 | 42.00 | 13.00 | 546.00 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 110.00 | 1,650.00 | 119.00 | 1,785.00 | 120.00 | 1,800.00 | 105.00 | 1,575.00 |
| 0036 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 175.00 | 875.00 | 170.00 | 850.00 | 200.00 | 1,000.00 | 125.00 | 625.00 |
| 0037 | 735-04-00100 | Mailbox Supports (Multiple) | 5 | EACH | 285.00 | 1,425.00 | 290.00 | 1,450.00 | 325.00 | 1,625.00 | 255.00 | 1,275.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 10,000.00 | 10,000.00 | 6,500.00 | 6,500.00 | 12,500.00 | 12,500.00 |
| 0039 | NS-200-00020 | Cleaning Existing Ditches | 380 | LNFT | 10.00 | 3,800.00 | 5.00 | 1,900.00 | 16.00 | 6,080.00 | 20.00 | 7,600.00 |
| 0040 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 312 | INLF | 3.00 | 936.00 | 3.00 | 936.00 | 5.50 | 1,716.00 | 2.50 | 780.00 |
| CONTRACTOR TOTAL | 1,502,390.98 | 1,542,939.58 | 1,618,236.75 | 1,636,672.35 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Apeck Construction, Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 11,500.00 | 11,500.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 9 | SQYD | 88.00 | 792.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,500 | CUYD | 20.00 | 30,000.00 |
| 0004 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 63 | CUYD | 100.00 | 6,300.00 |
| 0005 | 304-05-00100 | Lime Treatment (Type E) | 146.48 | TON | 500.00 | 73,240.00 |
| 0006 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 41,334 | SQYD | 6.50 | 268,671.00 |
| 0007 | 308-02-00100 | Removal of Existing Patches | 1,000 | SQYD | 11.00 | 11,000.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 699 | CUYD | 60.00 | 41,940.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 7,686 | TON | 105.00 | 807,030.00 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 857.5 | TON | 220.00 | 188,650.00 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 39,405 | SQYD | 2.00 | 78,810.00 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,152 | CUYD | 1.00 | -1,152.00 |
| 0013 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 80 | LNFT | 125.00 | 10,000.00 |
| 0014 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 64 | LNFT | 235.00 | 15,040.00 |
| 0015 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 48 | LNFT | 255.00 | 12,240.00 |
| 0016 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 48 | LNFT | 425.00 | 20,400.00 |
| 0017 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 210.00 | 1,680.00 |
| 0018 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 24 | LNFT | 215.00 | 5,160.00 |
| 0019 | 701-15-00100 | Concrete Collar | 4 | EACH | 1,500.00 | 6,000.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.97 | MILE | 400.00 | 4,788.00 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.244 | MILE | 170.00 | 1,061.48 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.811 | MILE | 280.00 | 10,867.08 |
| 0024 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 550.00 | 1,100.00 |
| 0025 | 717-01-00100 | Seeding | 30 | LB | 13.00 | 390.00 |
| 0026 | 718-01-00100 | Fertilizer | 1,000 | LB | 0.55 | 550.00 |
| 0027 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 6,500.00 | 6,500.00 |
| 0028 | 726-01-00100 | Bedding Material | 68.1 | CUYD | 110.00 | 7,491.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 67,650.00 | 67,650.00 |
| 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 14 | EACH | 90.00 | 1,260.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,312 | EACH | 4.00 | 5,248.00 |
| 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 21.285 | MILE | 2,500.00 | 53,212.50 |
| 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.794 | MILE | 650.00 | 2,466.10 |
| 0034 | 735-01-00100 | Mailboxes | 42 | EACH | 1.10 | 46.20 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 130.00 | 1,950.00 |
| 0036 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 180.00 | 900.00 |
| 0037 | 735-04-00100 | Mailbox Supports (Multiple) | 5 | EACH | 325.00 | 1,625.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,500.00 | 16,500.00 |
| 0039 | NS-200-00020 | Cleaning Existing Ditches | 380 | LNFT | 17.00 | 6,460.00 |
| 0040 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 312 | INLF | 2.00 | 624.00 |
| CONTRACTOR TOTAL | 1,852,990.36 | |||||