Bid Tabulations
Letting of
09/25/2013
LA DOTD Headquarters
| Lead Project: H.001844.6 | |
| Parish: Winn | |
| Routes: LA 34 | |
| Description: IATT CREEK AND REDLAND CREEK BRIDGES | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE SLAB SPAN BRIDGES AND RELATED WORK. | |
| Estimated Construction Cost: $3,463,654.28 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08815 | W. E. Mcdonald & Son, LLC. | $3,097,140.29 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $3,170,407.10 |
| 3 | 34567 | James Construction Group LLC | $3,235,796.15 |
| 4 | 39462 | Jb James Construction Llc | $3,512,684.26 |
| 5 | 00044 | Guinn Construction, LLC | $3,592,591.35 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - W. E. Mcdonald & Son, LLC. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - James Construction Group LLC |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 140,000.00 | 140,000.00 | 33,500.00 | 33,500.00 | 26,500.00 | 26,500.00 | 200,000.00 | 200,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 138+09 (25'x116' Treated Timber Trestle Bridge) | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 16,000.00 | 16,000.00 | 10,000.00 | 10,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 116+03 (25'x133' Treated Timber Trestle Bridge) | 1 | EACH | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 14,000.00 | 14,000.00 | 12,000.00 | 12,000.00 |
| 0005 | 202-02-14500 | Removal of Guard Rail | 510 | LNFT | 3.00 | 1,530.00 | 5.00 | 2,550.00 | 8.50 | 4,335.00 | 4.00 | 2,040.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 6,360 | SQYD | 5.00 | 31,800.00 | 7.00 | 44,520.00 | 0.50 | 3,180.00 | 3.00 | 19,080.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 190,000.00 | 190,000.00 | 250,000.00 | 250,000.00 | 90,000.00 | 90,000.00 | 90,000.00 | 90,000.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 51 | EACH | 125.00 | 6,375.00 | 150.00 | 7,650.00 | 145.00 | 7,395.00 | 125.00 | 6,375.00 |
| 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 21 | EACH | 300.00 | 6,300.00 | 320.00 | 6,720.00 | 280.00 | 5,880.00 | 600.00 | 12,600.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 4,805 | LNFT | 1.75 | 8,408.75 | 2.00 | 9,610.00 | 2.10 | 10,090.50 | 2.00 | 9,610.00 |
| 0011 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 11,396 | SQYD | 12.50 | 142,450.00 | 15.20 | 173,219.20 | 29.00 | 330,484.00 | 12.00 | 136,752.00 |
| 0012 | 304-05-00100 | Lime Treatment (Type E) | 80.77 | TON | 500.00 | 40,385.00 | 300.00 | 24,231.00 | 197.00 | 15,911.69 | 250.00 | 20,192.50 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 455 | CUYD | 30.00 | 13,650.00 | 33.00 | 15,015.00 | 50.00 | 22,750.00 | 75.00 | 34,125.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 600 | CUYD | 1.00 | 600.00 | 40.00 | 24,000.00 | 55.00 | 33,000.00 | 75.00 | 45,000.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 1,998.8 | TON | 100.00 | 199,880.00 | 100.00 | 199,880.00 | 137.00 | 273,835.60 | 140.00 | 279,832.00 |
| 0016 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 482.9 | TON | 135.00 | 65,191.50 | 160.00 | 77,264.00 | 137.00 | 66,157.30 | 160.00 | 77,264.00 |
| 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,444 | SQYD | 4.00 | 9,776.00 | 6.00 | 14,664.00 | 6.50 | 15,886.00 | 6.00 | 14,664.00 |
| 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -51 | CUYD | 0.01 | -0.51 | 1.00 | -51.00 | 1.00 | -51.00 | 0.01 | -0.51 |
| 0019 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 32 | LNFT | 65.00 | 2,080.00 | 58.00 | 1,856.00 | 65.00 | 2,080.00 | 72.00 | 2,304.00 |
| 0020 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 440 | LNFT | 85.00 | 37,400.00 | 51.00 | 22,440.00 | 70.00 | 30,800.00 | 75.00 | 33,000.00 |
| 0021 | 702-08-00100 | Side Drain Safety End (Type I) | 6 | EACH | 2,000.00 | 12,000.00 | 1,600.00 | 9,600.00 | 1,300.00 | 7,800.00 | 1,400.00 | 8,400.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 525 | LNFT | 19.50 | 10,237.50 | 21.00 | 11,025.00 | 19.50 | 10,237.50 | 20.00 | 10,500.00 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 59.00 | 11,800.00 | 62.00 | 12,400.00 | 59.00 | 11,800.00 | 60.00 | 12,000.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 1,950.00 | 15,600.00 | 2,100.00 | 16,800.00 | 1,950.00 | 15,600.00 | 2,000.00 | 16,000.00 |
| 0025 | 705-01-00100 | Barbed Wire Fence | 105 | LNFT | 10.00 | 1,050.00 | 11.00 | 1,155.00 | 12.00 | 1,260.00 | 10.00 | 1,050.00 |
| 0026 | 708-01-00100 | Right-of-Way Monument | 44 | EACH | 200.00 | 8,800.00 | 150.00 | 6,600.00 | 200.00 | 8,800.00 | 150.00 | 6,600.00 |
| 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 44 | EACH | 200.00 | 8,800.00 | 55.00 | 2,420.00 | 120.00 | 5,280.00 | 150.00 | 6,600.00 |
| 0028 | 712-04-00100 | Flexible Revetment | 3,295 | SQYD | 44.00 | 144,980.00 | 38.00 | 125,210.00 | 50.00 | 164,750.00 | 40.00 | 131,800.00 |
| 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | 4,700.00 | 4,700.00 | 50,000.00 | 50,000.00 |
| 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.494 | MILE | 400.00 | 597.60 | 300.00 | 448.20 | 200.00 | 298.80 | 600.00 | 896.40 |
| 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.494 | MILE | 200.00 | 298.80 | 500.00 | 747.00 | 200.00 | 298.80 | 200.00 | 298.80 |
| 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.366 | MILE | 400.00 | 2,146.40 | 650.00 | 3,487.90 | 400.00 | 2,146.40 | 400.00 | 2,146.40 |
| 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 178 | EACH | 2.50 | 445.00 | 7.00 | 1,246.00 | 4.00 | 712.00 | 8.00 | 1,424.00 |
| 0034 | 716-01-00100 | Mulch (Vegetative) | 16.3 | TON | 525.00 | 8,557.50 | 550.00 | 8,965.00 | 681.00 | 11,100.30 | 660.00 | 10,758.00 |
| 0035 | 717-01-00100 | Seeding | 650 | LB | 10.00 | 6,500.00 | 11.00 | 7,150.00 | 7.10 | 4,615.00 | 7.00 | 4,550.00 |
| 0036 | 718-01-00100 | Fertilizer | 8,150 | LB | 0.45 | 3,667.50 | 0.50 | 4,075.00 | 0.45 | 3,667.50 | 0.44 | 3,586.00 |
| 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 5,353 | SQYD | 1.25 | 6,691.25 | 1.35 | 7,226.55 | 1.20 | 6,423.60 | 1.20 | 6,423.60 |
| 0038 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 2,249 | SQYD | 2.25 | 5,060.25 | 2.50 | 5,622.50 | 1.65 | 3,710.85 | 1.70 | 3,823.30 |
| 0039 | 725-01-00100 | Temporary Detour Roads | 8,450 | SQYD | 70.00 | 591,500.00 | 52.00 | 439,400.00 | 82.00 | 692,900.00 | 72.00 | 608,400.00 |
| 0040 | 725-02-00100 | Temporary Detour Bridging | 120 | LNFT | 850.00 | 102,000.00 | 1,450.00 | 174,000.00 | 1,400.00 | 168,000.00 | 2,000.00 | 240,000.00 |
| 0041 | 726-01-00100 | Bedding Material | 54.8 | CUYD | 130.00 | 7,124.00 | 120.00 | 6,576.00 | 115.00 | 6,302.00 | 100.00 | 5,480.00 |
| 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 306,500.00 | 306,500.00 | 230,000.00 | 230,000.00 | 350,000.00 | 350,000.00 |
| 0043 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 65.00 | 260.00 | 65.00 | 260.00 | 60.00 | 240.00 | 65.00 | 260.00 |
| 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 75.00 | 600.00 | 80.00 | 640.00 | 75.00 | 600.00 | 75.00 | 600.00 |
| 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 99 | EACH | 4.00 | 396.00 | 7.00 | 693.00 | 4.00 | 396.00 | 4.00 | 396.00 |
| 0046 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 4.00 | 192.00 | 11.00 | 528.00 | 4.00 | 192.00 | 4.00 | 192.00 |
| 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.896 | MILE | 2,200.00 | 6,371.20 | 3,000.00 | 8,688.00 | 2,200.00 | 6,371.20 | 2,200.00 | 6,371.20 |
| 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 600.00 | 141.60 | 1,100.00 | 259.60 | 585.00 | 138.06 | 620.00 | 146.32 |
| 0049 | 735-01-00100 | Mailboxes | 5 | EACH | 1.00 | 5.00 | 15.00 | 75.00 | 15.00 | 75.00 | 5.00 | 25.00 |
| 0050 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 300.00 | 1,500.00 | 120.00 | 600.00 | 155.00 | 775.00 | 150.00 | 750.00 |
| 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 12,000.00 | 12,000.00 | 50,000.00 | 50,000.00 |
| 0052 | 804-01-00400 | Precast Concrete Piles (18") | 2,394 | LNFT | 78.00 | 186,732.00 | 85.00 | 203,490.00 | 65.00 | 155,610.00 | 75.00 | 179,550.00 |
| 0053 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 100.00 | 200.00 | 1,300.00 | 2,600.00 | 6,500.00 | 13,000.00 | 100.00 | 200.00 |
| 0054 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 5,000.00 | 5,000.00 | 10,500.00 | 10,500.00 | 14,000.00 | 14,000.00 | 10,000.00 | 10,000.00 |
| 0055 | 804-17-00100 | Dynamic Monitoring | 2 | EACH | 1,500.00 | 3,000.00 | 1,100.00 | 2,200.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
| 0056 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 19.46 | CUYD | 1,400.00 | 27,244.00 | 1,400.00 | 27,244.00 | 1,600.00 | 31,136.00 | 1,300.00 | 25,298.00 |
| 0057 | 805-01-00700 | Class A Concrete (Bents) | 162.93 | CUYD | 800.00 | 130,344.00 | 1,000.00 | 162,930.00 | 750.00 | 122,197.50 | 1,200.00 | 195,516.00 |
| 0058 | 805-03-00100 | Class AA Concrete | 398.06 | CUYD | 700.00 | 278,642.00 | 735.00 | 292,574.10 | 500.00 | 199,030.00 | 580.00 | 230,874.80 |
| 0059 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 104 | LNFT | 500.00 | 52,000.00 | 570.00 | 59,280.00 | 600.00 | 62,400.00 | 540.00 | 56,160.00 |
| 0060 | 806-01-00100 | Deformed Reinforcing Steel | 101,371 | LB | 0.85 | 86,165.35 | 0.75 | 76,028.25 | 1.05 | 106,439.55 | 0.95 | 96,302.45 |
| 0061 | 810-01-00100 | Concrete Railing (Standard Barrier) | 520 | LNFT | 60.00 | 31,200.00 | 65.00 | 33,800.00 | 80.00 | 41,600.00 | 70.00 | 36,400.00 |
| 0062 | 813-01-00100 | Concrete Approach Slabs | 622.24 | SQYD | 190.00 | 118,225.60 | 220.00 | 136,892.80 | 200.00 | 124,448.00 | 200.00 | 124,448.00 |
| 0063 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,620 | INLF | 2.00 | 3,240.00 | 2.10 | 3,402.00 | 1.55 | 2,511.00 | 1.00 | 1,620.00 |
| CONTRACTOR TOTAL | 3,097,140.29 | 3,170,407.10 | 3,235,796.15 | 3,512,684.26 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Guinn Construction, LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 138+09 (25'x116' Treated Timber Trestle Bridge) | 1 | EACH | 20,000.00 | 20,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 116+03 (25'x133' Treated Timber Trestle Bridge) | 1 | EACH | 18,000.00 | 18,000.00 |
| 0005 | 202-02-14500 | Removal of Guard Rail | 510 | LNFT | 2.00 | 1,020.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 6,360 | SQYD | 4.00 | 25,440.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 180,000.00 | 180,000.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 51 | EACH | 100.00 | 5,100.00 |
| 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 21 | EACH | 500.00 | 10,500.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 4,805 | LNFT | 1.50 | 7,207.50 |
| 0011 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 11,396 | SQYD | 19.00 | 216,524.00 |
| 0012 | 304-05-00100 | Lime Treatment (Type E) | 80.77 | TON | 775.00 | 62,596.75 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 455 | CUYD | 100.00 | 45,500.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 600 | CUYD | 50.00 | 30,000.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 1,998.8 | TON | 150.00 | 299,820.00 |
| 0016 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 482.9 | TON | 165.00 | 79,678.50 |
| 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,444 | SQYD | 7.50 | 18,330.00 |
| 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -51 | CUYD | 0.00 | 0.00 |
| 0019 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 32 | LNFT | 60.00 | 1,920.00 |
| 0020 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 440 | LNFT | 60.00 | 26,400.00 |
| 0021 | 702-08-00100 | Side Drain Safety End (Type I) | 6 | EACH | 2,500.00 | 15,000.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 525 | LNFT | 23.00 | 12,075.00 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 65.00 | 13,000.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,200.00 | 17,600.00 |
| 0025 | 705-01-00100 | Barbed Wire Fence | 105 | LNFT | 10.00 | 1,050.00 |
| 0026 | 708-01-00100 | Right-of-Way Monument | 44 | EACH | 175.00 | 7,700.00 |
| 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 44 | EACH | 150.00 | 6,600.00 |
| 0028 | 712-04-00100 | Flexible Revetment | 3,295 | SQYD | 50.00 | 164,750.00 |
| 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 |
| 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.494 | MILE | 300.00 | 448.20 |
| 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.494 | MILE | 500.00 | 747.00 |
| 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.366 | MILE | 500.00 | 2,683.00 |
| 0033 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 178 | EACH | 5.00 | 890.00 |
| 0034 | 716-01-00100 | Mulch (Vegetative) | 16.3 | TON | 750.00 | 12,225.00 |
| 0035 | 717-01-00100 | Seeding | 650 | LB | 10.00 | 6,500.00 |
| 0036 | 718-01-00100 | Fertilizer | 8,150 | LB | 0.50 | 4,075.00 |
| 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 5,353 | SQYD | 2.00 | 10,706.00 |
| 0038 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 2,249 | SQYD | 3.00 | 6,747.00 |
| 0039 | 725-01-00100 | Temporary Detour Roads | 8,450 | SQYD | 75.00 | 633,750.00 |
| 0040 | 725-02-00100 | Temporary Detour Bridging | 120 | LNFT | 1,200.00 | 144,000.00 |
| 0041 | 726-01-00100 | Bedding Material | 54.8 | CUYD | 100.00 | 5,480.00 |
| 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 310,000.00 | 310,000.00 |
| 0043 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 100.00 | 400.00 |
| 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 |
| 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 99 | EACH | 6.00 | 594.00 |
| 0046 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 6.00 | 288.00 |
| 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.896 | MILE | 2,600.00 | 7,529.60 |
| 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 800.00 | 188.80 |
| 0049 | 735-01-00100 | Mailboxes | 5 | EACH | 100.00 | 500.00 |
| 0050 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 100.00 | 500.00 |
| 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0052 | 804-01-00400 | Precast Concrete Piles (18") | 2,394 | LNFT | 70.00 | 167,580.00 |
| 0053 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 1.00 | 2.00 |
| 0054 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 10,000.00 | 10,000.00 |
| 0055 | 804-17-00100 | Dynamic Monitoring | 2 | EACH | 1,000.00 | 2,000.00 |
| 0056 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 19.46 | CUYD | 1,250.00 | 24,325.00 |
| 0057 | 805-01-00700 | Class A Concrete (Bents) | 162.93 | CUYD | 1,000.00 | 162,930.00 |
| 0058 | 805-03-00100 | Class AA Concrete | 398.06 | CUYD | 700.00 | 278,642.00 |
| 0059 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 104 | LNFT | 600.00 | 62,400.00 |
| 0060 | 806-01-00100 | Deformed Reinforcing Steel | 101,371 | LB | 1.00 | 101,371.00 |
| 0061 | 810-01-00100 | Concrete Railing (Standard Barrier) | 520 | LNFT | 80.00 | 41,600.00 |
| 0062 | 813-01-00100 | Concrete Approach Slabs | 622.24 | SQYD | 200.00 | 124,448.00 |
| 0063 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,620 | INLF | 1.50 | 2,430.00 |
| CONTRACTOR TOTAL | 3,592,591.35 | |||||