Bid Tabulations
Letting of
06/13/2012
LA DOTD Headquarters
| Lead Project: H.001817.6 | |
| Parish: Vernon | |
| Routes: LA 117 | |
| Description: LA 117 CURVE REALIGNMENT | |
| Type Const: GRADING, DRAINAGE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $1,258,954.41 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $1,059,167.79 |
| 2 | 30774 | Progressive Construction Co., LLC | $1,087,975.17 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,090,056.18 |
| 4 | 08815 | W. E. Mcdonald & Son, LLC. | $1,149,536.89 |
| 5 | 35849 | T.L. Construction LLC | $1,225,515.13 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Progressive Construction Co., LLC |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - W. E. Mcdonald & Son, LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 40,000.00 | 40,000.00 | 33,500.00 | 33,500.00 | 20,000.00 | 20,000.00 | 120,000.00 | 120,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 6,500.00 | 6,500.00 | 2,150.00 | 2,150.00 | 5,000.00 | 5,000.00 |
| 0003 | 202-02-02020 | Removal of Asphalt Pavement | 6,010.4 | SQYD | 3.50 | 21,036.40 | 5.00 | 30,052.00 | 8.00 | 48,083.20 | 2.80 | 16,829.12 |
| 0004 | 203-01-00100 | General Excavation | 29,049 | CUYD | 5.00 | 145,245.00 | 4.50 | 130,720.50 | 5.20 | 151,054.80 | 7.00 | 203,343.00 |
| 0005 | 203-03-00100 | Embankment | 6,819 | CUYD | 6.00 | 40,914.00 | 6.50 | 44,323.50 | 5.50 | 37,504.50 | 7.00 | 47,733.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 35 | EACH | 165.00 | 5,775.00 | 130.00 | 4,550.00 | 200.00 | 7,000.00 | 1.00 | 35.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 5,025 | LNFT | 1.10 | 5,527.50 | 2.00 | 10,050.00 | 1.50 | 7,537.50 | 0.25 | 1,256.25 |
| 0008 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 10,899.9 | SQYD | 22.00 | 239,797.80 | 22.00 | 239,797.80 | 23.50 | 256,147.65 | 19.85 | 216,363.02 |
| 0009 | 304-05-00100 | Lime Treatment (Type E) | 30.9 | TON | 380.00 | 11,742.00 | 250.00 | 7,725.00 | 242.00 | 7,477.80 | 1.00 | 30.90 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14 | CUYD | 100.00 | 1,400.00 | 75.00 | 1,050.00 | 36.00 | 504.00 | 50.00 | 700.00 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 300 | CUYD | 17.00 | 5,100.00 | 75.00 | 22,500.00 | 32.00 | 9,600.00 | 1.00 | 300.00 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 3,468.9 | TON | 90.00 | 312,201.00 | 111.00 | 385,047.90 | 98.00 | 339,952.20 | 108.00 | 374,641.20 |
| 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 151.7 | TON | 130.00 | 19,721.00 | 170.00 | 25,789.00 | 112.00 | 16,990.40 | 148.00 | 22,451.60 |
| 0014 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 176 | LNFT | 100.00 | 17,600.00 | 76.50 | 13,464.00 | 92.00 | 16,192.00 | 95.00 | 16,720.00 |
| 0015 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 58.00 | 4,640.00 | 59.00 | 4,720.00 | 75.00 | 6,000.00 | 75.00 | 6,000.00 |
| 0016 | 705-01-00100 | Barbed Wire Fence | 1,900 | LNFT | 6.75 | 12,825.00 | 9.00 | 17,100.00 | 5.50 | 10,450.00 | 7.00 | 13,300.00 |
| 0017 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 550.00 | 550.00 | 850.00 | 850.00 | 310.00 | 310.00 | 800.00 | 800.00 |
| 0018 | 708-01-00100 | Right-of-Way Monument | 18 | EACH | 500.00 | 9,000.00 | 150.00 | 2,700.00 | 150.00 | 2,700.00 | 175.00 | 3,150.00 |
| 0019 | 708-02-00100 | Right-of-Way Monument Witness Post | 18 | EACH | 500.00 | 9,000.00 | 150.00 | 2,700.00 | 55.00 | 990.00 | 175.00 | 3,150.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,300.00 | 5,300.00 | 6,750.00 | 6,750.00 | 10,000.00 | 10,000.00 | 8,500.00 | 8,500.00 |
| 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 1.00 | 24.00 | 0.60 | 14.40 | 0.80 | 19.20 | 0.50 | 12.00 |
| 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.942 | MILE | 300.00 | 282.60 | 300.00 | 282.60 | 155.00 | 146.01 | 450.00 | 423.90 |
| 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.942 | MILE | 500.00 | 471.00 | 300.00 | 282.60 | 500.00 | 471.00 | 250.00 | 235.50 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.791 | MILE | 1.00 | 3.79 | 470.00 | 1,781.77 | 550.00 | 2,085.05 | 400.00 | 1,516.40 |
| 0025 | 716-01-00100 | Mulch (Vegetative) | 8 | TON | 360.00 | 2,880.00 | 1,000.00 | 8,000.00 | 335.00 | 2,680.00 | 400.00 | 3,200.00 |
| 0026 | 717-01-00100 | Seeding | 320 | LB | 8.40 | 2,688.00 | 8.25 | 2,640.00 | 8.00 | 2,560.00 | 8.00 | 2,560.00 |
| 0027 | 718-01-00100 | Fertilizer | 4,000 | LB | 0.60 | 2,400.00 | 0.80 | 3,200.00 | 0.60 | 2,400.00 | 0.70 | 2,800.00 |
| 0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,900 | SQYD | 1.10 | 3,190.00 | 1.30 | 3,770.00 | 1.10 | 3,190.00 | 1.50 | 4,350.00 |
| 0029 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 3,825 | SQYD | 1.70 | 6,502.50 | 2.00 | 7,650.00 | 1.55 | 5,928.75 | 2.00 | 7,650.00 |
| 0030 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 3,600.00 | 3,600.00 | 1,000.00 | 1,000.00 |
| 0031 | 726-01-00100 | Bedding Material | 74.2 | CUYD | 80.00 | 5,936.00 | 75.00 | 5,565.00 | 105.00 | 7,791.00 | 90.00 | 6,678.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 46,000.00 | 46,000.00 | 92,000.00 | 92,000.00 | 46,000.00 | 46,000.00 |
| 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 80.00 | 320.00 | 88.00 | 352.00 | 110.00 | 440.00 | 125.00 | 500.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 63 | EACH | 6.00 | 378.00 | 8.25 | 519.75 | 5.50 | 346.50 | 7.00 | 441.00 |
| 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 5.60 | 67.20 | 9.50 | 114.00 | 5.50 | 66.00 | 8.00 | 96.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.895 | MILE | 3,200.00 | 6,064.00 | 3,530.00 | 6,689.35 | 3,000.00 | 5,685.00 | 3,000.00 | 5,685.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 5,500.00 | 5,500.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0038 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 362 | INLF | 3.00 | 1,086.00 | 2.00 | 724.00 | 0.01 | 3.62 | 3.00 | 1,086.00 |
| CONTRACTOR TOTAL | 1,059,167.79 | 1,087,975.17 | 1,090,056.18 | 1,149,536.89 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - T.L. Construction LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,000.00 | 8,000.00 |
| 0003 | 202-02-02020 | Removal of Asphalt Pavement | 6,010.4 | SQYD | 6.00 | 36,062.40 |
| 0004 | 203-01-00100 | General Excavation | 29,049 | CUYD | 7.00 | 203,343.00 |
| 0005 | 203-03-00100 | Embankment | 6,819 | CUYD | 12.00 | 81,828.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 35 | EACH | 110.00 | 3,850.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 5,025 | LNFT | 1.50 | 7,537.50 |
| 0008 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 10,899.9 | SQYD | 22.00 | 239,797.80 |
| 0009 | 304-05-00100 | Lime Treatment (Type E) | 30.9 | TON | 200.00 | 6,180.00 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14 | CUYD | 100.00 | 1,400.00 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 300 | CUYD | 30.00 | 9,000.00 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 3,468.9 | TON | 115.00 | 398,923.50 |
| 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 151.7 | TON | 140.00 | 21,238.00 |
| 0014 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 176 | LNFT | 55.00 | 9,680.00 |
| 0015 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 55.00 | 4,400.00 |
| 0016 | 705-01-00100 | Barbed Wire Fence | 1,900 | LNFT | 9.00 | 17,100.00 |
| 0017 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 1,100.00 | 1,100.00 |
| 0018 | 708-01-00100 | Right-of-Way Monument | 18 | EACH | 160.00 | 2,880.00 |
| 0019 | 708-02-00100 | Right-of-Way Monument Witness Post | 18 | EACH | 160.00 | 2,880.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.60 | 14.40 |
| 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.942 | MILE | 100.00 | 94.20 |
| 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.942 | MILE | 285.00 | 268.47 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.791 | MILE | 460.00 | 1,743.86 |
| 0025 | 716-01-00100 | Mulch (Vegetative) | 8 | TON | 850.00 | 6,800.00 |
| 0026 | 717-01-00100 | Seeding | 320 | LB | 10.00 | 3,200.00 |
| 0027 | 718-01-00100 | Fertilizer | 4,000 | LB | 1.00 | 4,000.00 |
| 0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,900 | SQYD | 2.50 | 7,250.00 |
| 0029 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 3,825 | SQYD | 2.50 | 9,562.50 |
| 0030 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 |
| 0031 | 726-01-00100 | Bedding Material | 74.2 | CUYD | 75.00 | 5,565.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 100.00 | 400.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 63 | EACH | 8.00 | 504.00 |
| 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 9.00 | 108.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.895 | MILE | 3,500.00 | 6,632.50 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 |
| 0038 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 362 | INLF | 6.00 | 2,172.00 |
| CONTRACTOR TOTAL | 1,225,515.13 | |||||