Bid Tabulations
Letting of
11/14/2012
LA DOTD Headquarters
| Lead Project: H.001769.6 | |
| Parish: Caddo | |
| Routes: LA 511 | |
| Description: LA 511: LA 523 - Fern Avenue | |
| Type Const: GRADING, DRAINAGE STRUCTURES, ASPHALT TREATED BASE COURSE, PAVEMENT PATCHING, BRIDGE WIDENING, OPEN GRADED FRICTION COURSE, SIGNALIZATION AND RELATED WORK. | |
| Estimated Construction Cost: $3,392,052.55 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $3,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 28218 | F. J. Burnell, Inc. | $4,461,951.90 | 275 | $5,286,951.90 |
| 2 | 36374 | Best-Yet Builders, Llc | $4,765,217.44 | 250 | $5,515,217.44 |
| 3 | 39462 | Jb James Construction Llc | $5,935,397.57 | 480 | $7,375,397.57 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - F. J. Burnell, Inc. |
- 2 - Best-Yet Builders, Llc |
- 3 - Jb James Construction Llc |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 80,000.00 | 80,000.00 | 150,000.00 | 150,000.00 | 60,000.00 | 60,000.00 |
| 0003 | 202-02-04001 | Removal of Bridge (Partial Removal) Removal of Existing Wingwall, Railing, and Sidewalk | 1 | LUMP | 180,000.00 | 180,000.00 | 331,500.00 | 331,500.00 | 300,000.00 | 300,000.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 750.00 | 750.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,903 | SQYD | 8.00 | 31,224.00 | 10.00 | 39,030.00 | 12.00 | 46,836.00 |
| 0006 | 202-02-12020 | Removal of Fence (Chain Link) | 210 | LNFT | 5.00 | 1,050.00 | 10.00 | 2,100.00 | 12.00 | 2,520.00 |
| 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 2,780 | SQYD | 10.00 | 27,800.00 | 10.00 | 27,800.00 | 12.00 | 33,360.00 |
| 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 75,000.00 | 75,000.00 | 200,000.00 | 200,000.00 | 515,000.00 | 515,000.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 12,417 | LNFT | 2.00 | 24,834.00 | 2.00 | 24,834.00 | 2.00 | 24,834.00 |
| 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 337.5 | CUYD | 85.00 | 28,687.50 | 50.00 | 16,875.00 | 95.00 | 32,062.50 |
| 0011 | 501-01-00006 | Thin Asphaltic Concrete (OGFC) | 1,436.8 | TON | 275.00 | 395,120.00 | 225.65 | 324,213.92 | 275.00 | 395,120.00 |
| 0012 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 88 | SQYD | 165.00 | 14,520.00 | 110.00 | 9,680.00 | 400.00 | 35,200.00 |
| 0013 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 240 | SQYD | 150.00 | 36,000.00 | 100.00 | 24,000.00 | 350.00 | 84,000.00 |
| 0014 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) PP only | 57 | LNFT | 125.00 | 7,125.00 | 80.00 | 4,560.00 | 100.00 | 5,700.00 |
| 0015 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) PP only | 4 | LNFT | 250.00 | 1,000.00 | 112.00 | 448.00 | 130.00 | 520.00 |
| 0016 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) PP only | 16 | LNFT | 300.00 | 4,800.00 | 600.00 | 9,600.00 | 200.00 | 3,200.00 |
| 0017 | 702-03-00500 | Catch Basins (CB-06) | 4 | EACH | 5,500.00 | 22,000.00 | 3,500.00 | 14,000.00 | 4,500.00 | 18,000.00 |
| 0018 | 702-03-00700 | Catch Basins (CB-08) | 13 | EACH | 7,500.00 | 97,500.00 | 5,000.00 | 65,000.00 | 6,000.00 | 78,000.00 |
| 0019 | 702-03-00700 | Catch Basins (CB-08) CB-SD08 | 1 | EACH | 11,000.00 | 11,000.00 | 7,500.00 | 7,500.00 | 6,500.00 | 6,500.00 |
| 0020 | 702-04-00100 | Adjusting Manholes | 25 | EACH | 750.00 | 18,750.00 | 1,000.00 | 25,000.00 | 1,250.00 | 31,250.00 |
| 0021 | 702-04-00200 | Adjusting Catch Basins | 24 | EACH | 2,500.00 | 60,000.00 | 1,200.00 | 28,800.00 | 2,000.00 | 48,000.00 |
| 0022 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 210 | LNFT | 18.00 | 3,780.00 | 20.00 | 4,200.00 | 25.00 | 5,250.00 |
| 0023 | 705-09-00100 | Rebuilt Fence | 306 | LNFT | 25.00 | 7,650.00 | 30.00 | 9,180.00 | 60.00 | 18,360.00 |
| 0024 | 706-01-00100 | Concrete Walk (4" Thick) | 1,965.1 | SQYD | 44.00 | 86,464.40 | 50.00 | 98,255.00 | 45.00 | 88,429.50 |
| 0025 | 706-02-00200 | Concrete Drive (6" Thick) | 1,398 | SQYD | 52.00 | 72,696.00 | 60.00 | 83,880.00 | 55.00 | 76,890.00 |
| 0026 | 706-03-00100 | Incidental Concrete Paving (4" Thick) PATCHING OF PAVED DITCH | 20 | SQYD | 100.00 | 2,000.00 | 250.00 | 5,000.00 | 100.00 | 2,000.00 |
| 0027 | 706-04-00100 | Handicapped Curb Ramps | 26 | EACH | 1,000.00 | 26,000.00 | 2,000.00 | 52,000.00 | 800.00 | 20,800.00 |
| 0028 | 707-01-00200 | Concrete Curb (Barrier) | 5,284.6 | LNFT | 7.75 | 40,955.65 | 10.00 | 52,846.00 | 6.00 | 31,707.60 |
| 0029 | 710-01-00100 | Flowable Fill | 193 | CUYD | 175.00 | 33,775.00 | 100.00 | 19,300.00 | 150.00 | 28,950.00 |
| 0030 | 712-02-00100 | Sacked Concrete Revetment | 1,209 | SQYD | 75.00 | 90,675.00 | 50.00 | 60,450.00 | 90.00 | 108,810.00 |
| 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 190,000.00 | 190,000.00 | 125,000.00 | 125,000.00 |
| 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.176 | MILE | 2,000.00 | 2,352.00 | 800.00 | 940.80 | 620.00 | 729.12 |
| 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.116 | MILE | 340.00 | 1,399.44 | 600.00 | 2,469.60 | 620.00 | 2,551.92 |
| 0034 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 64 | EACH | 150.00 | 9,600.00 | 250.00 | 16,000.00 | 900.00 | 57,600.00 |
| 0035 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 7,141 | SQYD | 3.50 | 24,993.50 | 6.00 | 42,846.00 | 7.00 | 49,987.00 |
| 0036 | 726-01-00100 | Bedding Material | 209.47 | CUYD | 100.00 | 20,947.00 | 60.00 | 12,568.20 | 85.00 | 17,804.95 |
| 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | 315,000.00 | 315,000.00 | 500,000.00 | 500,000.00 |
| 0038 | 729-01-00100 | Sign (Type A) | 150 | SQFT | 50.00 | 7,500.00 | 50.00 | 7,500.00 | 25.00 | 3,750.00 |
| 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 274 | EACH | 5.35 | 1,465.90 | 5.00 | 1,370.00 | 5.00 | 1,370.00 |
| 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.008 | MILE | 3,000.00 | 6,024.00 | 3,000.00 | 6,024.00 | 3,000.00 | 6,024.00 |
| 0041 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.09 | MILE | 11,300.00 | 1,017.00 | 5,000.00 | 450.00 | 5,000.00 | 450.00 |
| 0042 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.116 | MILE | 30,000.00 | 3,480.00 | 15,000.00 | 1,740.00 | 16,000.00 | 1,856.00 |
| 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.016 | MILE | 760.00 | 3,052.16 | 800.00 | 3,212.80 | 800.00 | 3,212.80 |
| 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 200.00 | 3,600.00 | 200.00 | 3,600.00 | 220.00 | 3,960.00 |
| 0045 | 732-05-00100 | Removal of Existing Markings | 1.004 | MILE | 4,000.00 | 4,016.00 | 6,000.00 | 6,024.00 | 6,000.00 | 6,024.00 |
| 0046 | 736-01-00100 | Trenching and Backfilling | 572 | LNFT | 6.00 | 3,432.00 | 3.50 | 2,002.00 | 4.00 | 2,288.00 |
| 0047 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 1,233 | LNFT | 27.00 | 33,291.00 | 14.00 | 17,262.00 | 15.00 | 18,495.00 |
| 0048 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 2 | EACH | 11,000.00 | 22,000.00 | 8,750.00 | 17,500.00 | 9,000.00 | 18,000.00 |
| 0049 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 2 | EACH | 12,500.00 | 25,000.00 | 9,800.00 | 19,600.00 | 10,000.00 | 20,000.00 |
| 0050 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 13,000.00 | 26,000.00 | 10,200.00 | 20,400.00 | 12,000.00 | 24,000.00 |
| 0051 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 7 | EACH | 14,300.00 | 100,100.00 | 11,100.00 | 77,700.00 | 13,000.00 | 91,000.00 |
| 0052 | 736-04-05010 | Signal Support (45'span, 30' span add-on arm) | 1 | EACH | 16,000.00 | 16,000.00 | 12,500.00 | 12,500.00 | 14,000.00 | 14,000.00 |
| 0053 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 30 | EACH | 1,600.00 | 48,000.00 | 1,050.00 | 31,500.00 | 1,100.00 | 33,000.00 |
| 0054 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 11 | EACH | 2,400.00 | 26,400.00 | 1,550.00 | 17,050.00 | 1,600.00 | 17,600.00 |
| 0055 | 736-06-00100 | Signal Service | 4 | EACH | 1,700.00 | 6,800.00 | 700.00 | 2,800.00 | 750.00 | 3,000.00 |
| 0056 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 4 | EACH | 31,500.00 | 126,000.00 | 25,000.00 | 100,000.00 | 26,000.00 | 104,000.00 |
| 0057 | 736-10-00300 | Underground Junction Box (Type F) | 12 | EACH | 560.00 | 6,720.00 | 550.00 | 6,600.00 | 600.00 | 7,200.00 |
| 0058 | 736-10-00500 | Underground Junction Box (Type H) | 4 | EACH | 1,350.00 | 5,400.00 | 1,200.00 | 4,800.00 | 1,300.00 | 5,200.00 |
| 0059 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 20 | LNFT | 20.00 | 400.00 | 10.00 | 200.00 | 10.00 | 200.00 |
| 0060 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 552 | LNFT | 16.00 | 8,832.00 | 4.00 | 2,208.00 | 5.00 | 2,760.00 |
| 0061 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 20 | LNFT | 10.00 | 200.00 | 10.00 | 200.00 | 15.00 | 300.00 |
| 0062 | 736-12-06000 | Conductor (10c, #14 awg) | 4,973 | LNFT | 3.75 | 18,648.75 | 2.75 | 13,675.75 | 3.00 | 14,919.00 |
| 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | 145,000.00 | 145,000.00 |
| 0064 | 741-09-00100 | Adjusting Water House Connections | 15 | EACH | 800.00 | 12,000.00 | 1,800.00 | 27,000.00 | 900.00 | 13,500.00 |
| 0065 | 741-11-00100 | Adjusting Water Valve | 20 | EACH | 800.00 | 16,000.00 | 2,000.00 | 40,000.00 | 450.00 | 9,000.00 |
| 0066 | 804-01-00200 | Precast Concrete Piles (14") | 288 | LNFT | 98.00 | 28,224.00 | 95.00 | 27,360.00 | 175.00 | 50,400.00 |
| 0067 | 804-01-00300 | Precast Concrete Piles (16") | 164 | LNFT | 93.00 | 15,252.00 | 90.70 | 14,874.80 | 210.00 | 34,440.00 |
| 0068 | 804-01-00400 | Precast Concrete Piles (18") | 368 | LNFT | 109.00 | 40,112.00 | 105.95 | 38,989.60 | 225.00 | 82,800.00 |
| 0069 | 805-01-00700 | Class A Concrete (Bents) | 22.8 | CUYD | 2,600.00 | 59,280.00 | 2,520.00 | 57,456.00 | 3,000.00 | 68,400.00 |
| 0070 | 805-04-00100 | Class AA(M) Concrete | 246.45 | CUYD | 1,500.00 | 369,675.00 | 1,440.00 | 354,888.00 | 1,750.00 | 431,287.50 |
| 0071 | 806-01-00100 | Deformed Reinforcing Steel | 63,765 | LB | 1.30 | 82,894.50 | 1.25 | 79,706.25 | 1.50 | 95,647.50 |
| 0072 | 810-04-00100 | Steel and Concrete Railing | 350 | LNFT | 210.00 | 73,500.00 | 203.50 | 71,225.00 | 200.00 | 70,000.00 |
| 0073 | 813-01-00100 | Concrete Approach Slabs | 87.32 | SQYD | 225.00 | 19,647.00 | 250.00 | 21,830.00 | 300.00 | 26,196.00 |
| 0074 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 52,726 | INLF | 1.15 | 60,634.90 | 2.50 | 131,815.00 | 1.00 | 52,726.00 |
| 0075 | NS-602-00004 | Cross-Stitching Random Longitudinal Cracks | 50 | LNFT | 30.00 | 1,500.00 | 150.00 | 7,500.00 | 25.00 | 1,250.00 |
| 0076 | NS-700-00180 | Impact Attenuator (Construction Zone) | 4 | EACH | 13,500.00 | 54,000.00 | 10,000.00 | 40,000.00 | 5,000.00 | 20,000.00 |
| 0077 | NS-736-00001 | GPS | 4 | EACH | 1,500.00 | 6,000.00 | 900.00 | 3,600.00 | 1,000.00 | 4,000.00 |
| 0078 | NS-736-00005 | Video Detection Cabinet Components | 4 | EACH | 10,000.00 | 40,000.00 | 8,000.00 | 32,000.00 | 8,500.00 | 34,000.00 |
| 0079 | NS-736-00006 | Video Detection Camera | 15 | EACH | 2,700.00 | 40,500.00 | 2,200.00 | 33,000.00 | 2,300.00 | 34,500.00 |
| 0080 | NS-736-00010 | LED Pedestrian Countdown Signal Head | 8 | EACH | 1,300.00 | 10,400.00 | 800.00 | 6,400.00 | 850.00 | 6,800.00 |
| 0081 | NS-736-00011 | Pedestrian Push Buttons | 8 | EACH | 275.00 | 2,200.00 | 250.00 | 2,000.00 | 300.00 | 2,400.00 |
| 0082 | NS-802-00004 | Structural Exc & Bkfl for Prcst Segmental Gravity Retaining Wall | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 27,500.00 | 27,500.00 |
| 0083 | NS-805-00032 | Precast Segmental Gravity Retaining Wall (PSGRW) | 2,456.16 | SQFT | 60.00 | 147,369.60 | 40.72 | 100,014.84 | 48.00 | 117,895.68 |
| 0084 | NS-DEV-10714 | On_Board Sound Intensity (OBSI) Evaluation | 1 | LUMP | 8,500.00 | 8,500.00 | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 |
| 0085 | NS-DEV-50204 | Asphalt Treated Base (ATB) | 1,858.22 | TON | 110.00 | 204,404.20 | 104.00 | 193,254.88 | 225.00 | 418,099.50 |
| 0086 | NS-MSC-00280 | Adjusting Gas Valves and Valve Boxes | 15 | EACH | 1,000.00 | 15,000.00 | 1,500.00 | 22,500.00 | 500.00 | 7,500.00 |
| SUBTOTAL GENERAL | 4,055,921 | 4,257,209 | 5,319,924 | |||||||
| Alternate AA1 | ||||||||||
| 0087 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 7,214.4 | SQYD | 56.00 | 404,006.40 | 70.00 | 505,008.00 | 85.00 | 613,224.00 |
| 0088 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 15 | EACH | 135.00 | 2,025.00 | 200.00 | 3,000.00 | 150.00 | 2,250.00 |
| SUBTOTAL ALT AA1 | 406,031 | 508,008 | 615,474 | |||||||
| Alternate AA2 | ||||||||||
| 0089 | NS-DEV-60306 | NS Roller Compacted Concrete (RCC) Pavement (10" Thick) | 7,214.4 | SQYD | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| SUBTOTAL ALT AA2 | 0.00 | 0.00 | 0.00 | |||||||
| ITEM TOTAL (CONSTRUCTION BID) | 4,461,951.90 | 4,765,217.44 | 5,935,397.57 | |||||||
| NUMBER OF DAYS BID AT $3000 PER DAY. | 825,000.00 | 750,000.00 | 1,440,000.00 | |||||||
| TOTAL BID | 5,286,951.90 | 5,515,217.44 | 7,375,397.57 | |||||||