Bid Tabulations
Letting of
10/10/2012
LA DOTD Headquarters
| Lead Project: H.001752.6 | |
| Parish: Desoto | |
| Routes: LA 5 | |
| Description: LA 5: US 171 TO KCS RAILROAD TRACKS | |
| Type Const: DRAINAGE STURUCTURES, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $4,546,633.22 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $4,120,842.22 |
| 2 | 36374 | Best-Yet Builders, Llc | $4,144,414.58 |
| 3 | 17464 | Benton & Brown, LLC. | $4,749,262.14 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Best-Yet Builders, Llc |
- 3 - Benton & Brown, LLC. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 72 | SQYD | 35.00 | 2,520.00 | 20.00 | 1,440.00 | 35.00 | 2,520.00 |
| 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove pipe | 412 | LNFT | 50.00 | 20,600.00 | 20.00 | 8,240.00 | 8.00 | 3,296.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,750 | CUYD | 17.50 | 83,125.00 | 12.00 | 57,000.00 | 22.00 | 104,500.00 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 145 | CUYD | 100.00 | 14,500.00 | 50.00 | 7,250.00 | 125.00 | 18,125.00 |
| 0006 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 20 | CUYD | 100.00 | 2,000.00 | 100.00 | 2,000.00 | 70.00 | 1,400.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 31,119.2 | TON | 91.50 | 2,847,406.80 | 93.40 | 2,906,533.28 | 110.00 | 3,423,112.00 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,150 | TON | 64.50 | 138,675.00 | 97.80 | 210,270.00 | 110.00 | 236,500.00 |
| 0009 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 10,573.5 | GAL | 3.20 | 33,835.20 | 3.40 | 35,949.90 | 3.20 | 33,835.20 |
| 0010 | 507-02-00200 | Aggregate (S2) | 15,549.3 | SQYD | 1.69 | 26,278.32 | 1.80 | 27,988.74 | 1.70 | 26,433.81 |
| 0011 | 507-02-00300 | Aggregate (S3) | 15,549.3 | SQYD | 1.50 | 23,323.95 | 1.60 | 24,878.88 | 1.50 | 23,323.95 |
| 0012 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 3,500 | SQYD | 50.00 | 175,000.00 | 60.00 | 210,000.00 | 60.00 | 210,000.00 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 70.50 | 105,750.00 | 90.00 | 135,000.00 | 90.00 | 135,000.00 |
| 0014 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 92 | LNFT | 150.00 | 13,800.00 | 68.00 | 6,256.00 | 200.00 | 18,400.00 |
| 0015 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 92 | LNFT | 200.00 | 18,400.00 | 130.00 | 11,960.00 | 300.00 | 27,600.00 |
| 0016 | 701-08-00100 | Relaying Pipe | 42 | LNFT | 150.00 | 6,300.00 | 100.00 | 4,200.00 | 100.00 | 4,200.00 |
| 0017 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 46 | LNFT | 175.00 | 8,050.00 | 68.00 | 3,128.00 | 115.00 | 5,290.00 |
| 0018 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 96 | LNFT | 200.00 | 19,200.00 | 96.00 | 9,216.00 | 165.00 | 15,840.00 |
| 0019 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 128 | LNFT | 225.00 | 28,800.00 | 130.00 | 16,640.00 | 215.00 | 27,520.00 |
| 0020 | 701-15-00100 | Concrete Collar | 29 | EACH | 750.00 | 21,750.00 | 800.00 | 23,200.00 | 1,000.00 | 29,000.00 |
| 0021 | 706-02-00200 | Concrete Drive (6" Thick) | 43 | SQYD | 75.00 | 3,225.00 | 100.00 | 4,300.00 | 135.00 | 5,805.00 |
| 0022 | 712-04-00100 | Flexible Revetment | 505 | SQYD | 80.00 | 40,400.00 | 60.00 | 30,300.00 | 100.00 | 50,500.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 86,000.00 | 86,000.00 | 20,000.00 | 20,000.00 | 67,000.00 | 67,000.00 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 44 | LNFT | 0.60 | 26.40 | 5.00 | 220.00 | 0.10 | 4.40 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 28.77 | MILE | 325.00 | 9,350.25 | 500.00 | 14,385.00 | 350.00 | 10,069.50 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.228 | MILE | 200.00 | 845.60 | 350.00 | 1,479.80 | 150.00 | 634.20 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 70.714 | MILE | 500.00 | 35,357.00 | 250.00 | 17,678.50 | 250.00 | 17,678.50 |
| 0028 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 1 | EACH | 100.00 | 100.00 | 200.00 | 200.00 | 10.00 | 10.00 |
| 0029 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 292 | EACH | 2.25 | 657.00 | 2.00 | 584.00 | 1.90 | 554.80 |
| 0030 | 716-01-00100 | Mulch (Vegetative) | 48 | TON | 600.00 | 28,800.00 | 1,650.00 | 79,200.00 | 700.00 | 33,600.00 |
| 0031 | 717-01-00100 | Seeding | 931 | LB | 12.00 | 11,172.00 | 8.50 | 7,913.50 | 7.00 | 6,517.00 |
| 0032 | 718-01-00100 | Fertilizer | 23,246 | LB | 1.00 | 23,246.00 | 0.58 | 13,482.68 | 0.55 | 12,785.30 |
| 0033 | 726-01-00100 | Bedding Material | 44 | CUYD | 100.00 | 4,400.00 | 100.00 | 4,400.00 | 65.00 | 2,860.00 |
| 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 86,000.00 | 86,000.00 | 100,000.00 | 100,000.00 | 67,000.00 | 67,000.00 |
| 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 75.00 | 300.00 |
| 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 125.00 | 500.00 | 125.00 | 500.00 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,986 | EACH | 4.50 | 8,937.00 | 4.00 | 7,944.00 | 4.00 | 7,944.00 |
| 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 69 | LNFT | 4.00 | 276.00 | 10.00 | 690.00 | 10.00 | 690.00 |
| 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 33.496 | MILE | 2,400.00 | 80,390.40 | 2,700.00 | 90,439.20 | 2,300.00 | 77,040.80 |
| 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.069 | MILE | 700.00 | 2,848.30 | 900.00 | 3,662.10 | 575.00 | 2,339.68 |
| 0041 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 375.00 | 375.00 | 500.00 | 500.00 | 475.00 | 475.00 |
| 0042 | 735-01-00100 | Mailboxes | 37 | EACH | 1.00 | 37.00 | 50.00 | 1,850.00 | 1.00 | 37.00 |
| 0043 | 735-02-00100 | Mailbox Supports (Single) | 33 | EACH | 125.00 | 4,125.00 | 75.00 | 2,475.00 | 117.00 | 3,861.00 |
| 0044 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 175.00 | 350.00 | 100.00 | 200.00 | 160.00 | 320.00 |
| 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 12,500.00 | 12,500.00 | 21,000.00 | 21,000.00 |
| 0046 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 1.7 | CUYD | 1,500.00 | 2,550.00 | 1,000.00 | 1,700.00 | 4,000.00 | 6,800.00 |
| 0047 | 806-01-00100 | Deformed Reinforcing Steel | 180 | LB | 3.00 | 540.00 | 1.00 | 180.00 | 2.00 | 360.00 |
| 0048 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 240 | INLF | 3.00 | 720.00 | 4.50 | 1,080.00 | 7.00 | 1,680.00 |
| CONTRACTOR TOTAL | 4,120,842.22 | 4,144,414.58 | 4,749,262.14 | |||||||