Bid Tabulations
Letting of
09/12/2012
LA DOTD Headquarters
| Lead Project: H.001635.6 | |
| Parish: Bossier | |
| Routes: LA 157 | |
| Description: FOX SKIN BAYOU BRIDGE | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, LIME TREATMENT, PRECAST PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK | |
| Estimated Construction Cost: $2,612,189.48 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 39462 | Jb James Construction Llc | $2,530,934.69 |
| 2 | 34567 | James Construction Group LLC | $2,536,178.90 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $2,783,126.62 |
| 4 | 12135 | Blount Bros. Construction, Inc. | $2,964,148.78 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jb James Construction Llc |
- 2 - James Construction Group LLC |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Blount Bros. Construction, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 120,000.00 | 120,000.00 | 45,000.00 | 45,000.00 | 100,000.00 | 100,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STA. 112+23.85(119' X 27') CONCRETE PRECAST SLAB SPAN BRIDGE | 1 | EACH | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 45,000.00 | 45,000.00 | 35,000.00 | 35,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge STA. 116+21.05 (20' X 27') CONCRETE PRECAST SLAB BRIDGE | 1 | EACH | 8,000.00 | 8,000.00 | 7,500.00 | 7,500.00 | 20,000.00 | 20,000.00 | 12,000.00 | 12,000.00 |
| 0005 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 2,500.00 | 2,500.00 | 3,500.00 | 3,500.00 | 10,000.00 | 10,000.00 | 8,500.00 | 8,500.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 1,080 | LNFT | 3.00 | 3,240.00 | 9.00 | 9,720.00 | 6.00 | 6,480.00 | 3.00 | 3,240.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,519.7 | SQYD | 4.00 | 10,078.80 | 3.00 | 7,559.10 | 6.00 | 15,118.20 | 7.00 | 17,637.90 |
| 0008 | 203-01-00100 | General Excavation | 6,445 | CUYD | 6.00 | 38,670.00 | 6.00 | 38,670.00 | 8.00 | 51,560.00 | 7.00 | 45,115.00 |
| 0009 | 203-02-00100 | Drainage Excavation | 641.67 | CUYD | 9.00 | 5,775.03 | 10.00 | 6,416.70 | 9.00 | 5,775.03 | 14.00 | 8,983.38 |
| 0010 | 203-03-00100 | Embankment | 20,888 | CUYD | 12.00 | 250,656.00 | 8.50 | 177,548.00 | 18.00 | 375,984.00 | 12.00 | 250,656.00 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 25 | EACH | 125.00 | 3,125.00 | 140.00 | 3,500.00 | 150.00 | 3,750.00 | 30.00 | 750.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 5,300 | LNFT | 2.00 | 10,600.00 | 2.50 | 13,250.00 | 1.50 | 7,950.00 | 3.00 | 15,900.00 |
| 0013 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 7,592.6 | SQYD | 21.00 | 159,444.60 | 25.00 | 189,815.00 | 23.00 | 174,629.80 | 21.00 | 159,444.60 |
| 0014 | 304-05-00100 | Lime Treatment (Type E) | 18.79 | TON | 180.00 | 3,382.20 | 250.00 | 4,697.50 | 600.00 | 11,274.00 | 400.00 | 7,516.00 |
| 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 53 | CUYD | 100.00 | 5,300.00 | 55.00 | 2,915.00 | 110.00 | 5,830.00 | 45.00 | 2,385.00 |
| 0016 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 50.00 | 10,000.00 | 65.00 | 13,000.00 | 40.00 | 8,000.00 | 45.00 | 9,000.00 |
| 0017 | 502-01-00100 | Superpave Asphaltic Concrete | 4,680.5 | TON | 105.00 | 491,452.50 | 104.20 | 487,708.10 | 98.00 | 458,689.00 | 115.00 | 538,257.50 |
| 0018 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 372.4 | TON | 108.00 | 40,219.20 | 107.25 | 39,939.90 | 155.00 | 57,722.00 | 120.00 | 44,688.00 |
| 0019 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,604 | SQYD | 2.00 | 5,208.00 | 3.00 | 7,812.00 | 6.00 | 15,624.00 | 4.00 | 10,416.00 |
| 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -150 | CUYD | 0.01 | -1.50 | 1.00 | -150.00 | 1.00 | -150.00 | 1.00 | -150.00 |
| 0021 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 56 | LNFT | 95.00 | 5,320.00 | 78.00 | 4,368.00 | 95.00 | 5,320.00 | 100.00 | 5,600.00 |
| 0022 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 64 | LNFT | 100.00 | 6,400.00 | 78.00 | 4,992.00 | 85.00 | 5,440.00 | 100.00 | 6,400.00 |
| 0023 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 112 | LNFT | 30.00 | 3,360.00 | 42.00 | 4,704.00 | 40.00 | 4,480.00 | 40.00 | 4,480.00 |
| 0024 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 40 | LNFT | 55.00 | 2,200.00 | 50.00 | 2,000.00 | 65.00 | 2,600.00 | 50.00 | 2,000.00 |
| 0025 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 56 | LNFT | 95.00 | 5,320.00 | 82.00 | 4,592.00 | 88.00 | 4,928.00 | 100.00 | 5,600.00 |
| 0026 | 702-03-00100 | Catch Basins (CB-01) (GRATE TYPE "B") | 1 | EACH | 3,500.00 | 3,500.00 | 1,800.00 | 1,800.00 | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 |
| 0027 | 704-03-00100 | Blocked Out Guard Rail | 312.5 | LNFT | 20.00 | 6,250.00 | 19.00 | 5,937.50 | 22.00 | 6,875.00 | 30.00 | 9,375.00 |
| 0028 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 65.00 | 6,500.00 | 70.00 | 7,000.00 |
| 0029 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,015.00 | 8,060.00 | 2,200.00 | 8,800.00 | 2,700.00 | 10,800.00 |
| 0030 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 125.00 | 1,500.00 | 250.00 | 3,000.00 | 200.00 | 2,400.00 | 250.00 | 3,000.00 |
| 0031 | 708-02-00100 | Right-of-Way Monument Witness Post | 12 | EACH | 125.00 | 1,500.00 | 250.00 | 3,000.00 | 200.00 | 2,400.00 | 150.00 | 1,800.00 |
| 0032 | 712-04-00100 | Flexible Revetment | 714 | SQYD | 51.00 | 36,414.00 | 60.00 | 42,840.00 | 61.00 | 43,554.00 | 80.00 | 57,120.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 12 | LNFT | 0.50 | 6.00 | 1.00 | 12.00 | 100.00 | 1,200.00 | 2.00 | 24.00 |
| 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.009 | MILE | 610.00 | 615.49 | 450.00 | 454.05 | 1,400.00 | 1,412.60 | 700.00 | 706.30 |
| 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.017 | MILE | 610.00 | 1,230.37 | 250.00 | 504.25 | 650.00 | 1,311.05 | 600.00 | 1,210.20 |
| 0037 | 716-01-00100 | Mulch (Vegetative) | 13.8 | TON | 800.00 | 11,040.00 | 500.00 | 6,900.00 | 910.00 | 12,558.00 | 800.00 | 11,040.00 |
| 0038 | 717-01-00100 | Seeding | 552 | LB | 9.25 | 5,106.00 | 10.00 | 5,520.00 | 10.00 | 5,520.00 | 10.00 | 5,520.00 |
| 0039 | 718-01-00100 | Fertilizer | 6,900 | LB | 0.60 | 4,140.00 | 0.50 | 3,450.00 | 0.70 | 4,830.00 | 1.00 | 6,900.00 |
| 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 6,350 | SQYD | 1.26 | 8,001.00 | 1.00 | 6,350.00 | 1.30 | 8,255.00 | 2.50 | 15,875.00 |
| 0041 | 726-01-00100 | Bedding Material | 3.3 | CUYD | 265.00 | 874.50 | 90.00 | 297.00 | 300.00 | 990.00 | 100.00 | 330.00 |
| 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 | 280,000.00 | 280,000.00 | 140,000.00 | 140,000.00 |
| 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 130.00 | 520.00 | 125.00 | 500.00 | 150.00 | 600.00 | 125.00 | 500.00 |
| 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 137 | EACH | 6.00 | 822.00 | 6.00 | 822.00 | 6.00 | 822.00 | 10.00 | 1,370.00 |
| 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 12.00 | 144.00 | 5.00 | 60.00 | 5.85 | 70.20 | 22.00 | 264.00 |
| 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.85 | MILE | 2,900.00 | 5,365.00 | 2,000.00 | 3,700.00 | 3,000.00 | 5,550.00 | 3,100.00 | 5,735.00 |
| 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.214 | MILE | 700.00 | 149.80 | 750.00 | 160.50 | 1,200.00 | 256.80 | 1,100.00 | 235.40 |
| 0048 | 735-01-00100 | Mailboxes | 10 | EACH | 25.00 | 250.00 | 5.00 | 50.00 | 20.00 | 200.00 | 20.00 | 200.00 |
| 0049 | 735-02-00100 | Mailbox Supports (Single) | 10 | EACH | 135.00 | 1,350.00 | 200.00 | 2,000.00 | 140.00 | 1,400.00 | 139.00 | 1,390.00 |
| 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 |
| 0051 | 804-01-00600 | Precast Concrete Piles (24") | 2,415 | LNFT | 105.00 | 253,575.00 | 150.00 | 362,250.00 | 100.00 | 241,500.00 | 180.00 | 434,700.00 |
| 0052 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 |
| 0053 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 750.00 | 3,000.00 | 1,000.00 | 4,000.00 | 1,100.00 | 4,400.00 | 2,500.00 | 10,000.00 |
| 0054 | 805-01-00700 | Class A Concrete (Bents) | 97.01 | CUYD | 900.00 | 87,309.00 | 850.00 | 82,458.50 | 900.00 | 87,309.00 | 800.00 | 77,608.00 |
| 0055 | 805-04-00100 | Class AA(M) Concrete | 242.58 | CUYD | 800.00 | 194,064.00 | 750.00 | 181,935.00 | 700.00 | 169,806.00 | 800.00 | 194,064.00 |
| 0056 | 805-11-00100 | Strip Seal Joints | 80 | LNFT | 135.00 | 10,800.00 | 150.00 | 12,000.00 | 165.00 | 13,200.00 | 200.00 | 16,000.00 |
| 0057 | 806-01-00100 | Deformed Reinforcing Steel | 128,803 | LB | 0.90 | 115,922.70 | 1.00 | 128,803.00 | 0.98 | 126,226.94 | 1.50 | 193,204.50 |
| 0058 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 15,000.00 | 15,000.00 |
| 0059 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 62.00 | 29,760.00 | 60.00 | 28,800.00 | 65.00 | 31,200.00 | 100.00 | 48,000.00 |
| 0060 | 813-01-00100 | Concrete Approach Slabs | 363.88 | SQYD | 200.00 | 72,776.00 | 185.00 | 67,317.80 | 200.00 | 72,776.00 | 350.00 | 127,358.00 |
| 0061 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,000 | INLF | 1.00 | 3,000.00 | 1.00 | 3,000.00 | 1.50 | 4,500.00 | 3.00 | 9,000.00 |
| 0062 | NS-800-00182 | Precast Prestressed Concrete Girder (Type Quad Beam) Class P(HPC) | 1,896 | LNFT | 75.00 | 142,200.00 | 90.00 | 170,640.00 | 75.00 | 142,200.00 | 150.00 | 284,400.00 |
| CONTRACTOR TOTAL | 2,530,934.69 | 2,536,178.90 | 2,783,126.62 | 2,964,148.78 | ||||||||