Bid Tabulations
Letting of
10/10/2012
LA DOTD Headquarters
| Lead Project: H.001616.6 | |
| Parish: Ascension | |
| Routes: LA 3038, LA 429 | |
| Description: LA 429/LA 3038 @ LA 44 INTERSECTION IMPROVEMENTS | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION AND RELATED WORK | |
| Estimated Construction Cost: $674,679.35 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05693 | Industrial Enterprises, Inc. | $692,688.86 |
| 2 | 48896 | Command Construction Industries LLC | $749,867.00 |
| 3 | 00481 | Coastal Bridge Co., L.L.C. | $885,696.14 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Industrial Enterprises, Inc. |
- 2 - Command Construction Industries LLC |
- 3 - Coastal Bridge Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 2,300.00 | 2,300.00 | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 431 | LNFT | 5.75 | 2,478.25 | 10.00 | 4,310.00 | 10.00 | 4,310.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 959 | SQYD | 9.60 | 9,206.40 | 10.00 | 9,590.00 | 12.00 | 11,508.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 120 | SQYD | 30.00 | 3,600.00 | 10.00 | 1,200.00 | 20.00 | 2,400.00 |
| 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,878.33 | 4,878.33 | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 |
| 0007 | 202-03-38000 | Relocation of Sign (Shell Gas Station Sign) | 1 | EACH | 110.00 | 110.00 | 3,500.00 | 3,500.00 | 15,000.00 | 15,000.00 |
| 0008 | 203-01-00100 | General Excavation | 2,793 | CUYD | 10.74 | 29,996.82 | 1.00 | 2,793.00 | 10.00 | 27,930.00 |
| 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 202 | CUYD | 10.00 | 2,020.00 | 1.00 | 202.00 | 15.00 | 3,030.00 |
| 0010 | 204-02-00100 | Temporary Hay or Straw Bales | 6 | EACH | 22.00 | 132.00 | 50.00 | 300.00 | 10.00 | 60.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 1,010 | LNFT | 2.20 | 2,222.00 | 1.00 | 1,010.00 | 1.50 | 1,515.00 |
| 0012 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,535.9 | SQYD | 44.21 | 67,902.14 | 30.00 | 46,077.00 | 25.00 | 38,397.50 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 25 | TON | 300.00 | 7,500.00 | 1.00 | 25.00 | 400.00 | 10,000.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 84 | CUYD | 50.00 | 4,200.00 | 50.00 | 4,200.00 | 1.00 | 84.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 1,180.5 | TON | 120.06 | 141,730.83 | 110.00 | 129,855.00 | 150.00 | 177,075.00 |
| 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 3,916 | SQYD | 5.75 | 22,517.00 | 10.00 | 39,160.00 | 3.00 | 11,748.00 |
| 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -286 | CUYD | 0.10 | -28.60 | 1.00 | -286.00 | 0.01 | -2.86 |
| 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 10 | SQYD | 100.00 | 1,000.00 | 400.00 | 4,000.00 | 140.00 | 1,400.00 |
| 0019 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 213.3 | SQYD | 92.00 | 19,623.60 | 100.00 | 21,330.00 | 70.00 | 14,931.00 |
| 0020 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 1 | EACH | 115.00 | 115.00 | 200.00 | 200.00 | 1,000.00 | 1,000.00 |
| 0021 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 166 | LNFT | 3.12 | 517.92 | 10.00 | 1,660.00 | 3.50 | 581.00 |
| 0022 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 312 | LNFT | 77.82 | 24,279.84 | 100.00 | 31,200.00 | 90.00 | 28,080.00 |
| 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 96 | LNFT | 96.11 | 9,226.56 | 125.00 | 12,000.00 | 100.00 | 9,600.00 |
| 0024 | 701-07-00300 | Yard Drain Pipe (8") (PVC) | 8 | LNFT | 10.80 | 86.40 | 50.00 | 400.00 | 200.00 | 1,600.00 |
| 0025 | 701-13-01140 | Corrugated Metal Pipe Arch (Extension) (54" Equiv.) | 4 | LNFT | 340.26 | 1,361.04 | 600.00 | 2,400.00 | 500.00 | 2,000.00 |
| 0026 | 701-13-01160 | Corrugated Metal Pipe Arch (Extension) (60" Equiv.) | 20 | LNFT | 286.99 | 5,739.80 | 625.00 | 12,500.00 | 300.00 | 6,000.00 |
| 0027 | 701-15-00100 | Concrete Collar | 1 | EACH | 900.00 | 900.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 |
| 0028 | 702-01-00100 | Junction Boxes (STA. 52+28 RT.) | 1 | EACH | 3,507.50 | 3,507.50 | 15,000.00 | 15,000.00 | 3,500.00 | 3,500.00 |
| 0029 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 2,845.10 | 11,380.40 | 3,000.00 | 12,000.00 | 2,500.00 | 10,000.00 |
| 0030 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 3,786.95 | 3,786.95 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 |
| 0031 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 562.12 | 562.12 | 1,250.00 | 1,250.00 | 1,000.00 | 1,000.00 |
| 0032 | 702-03-00500 | Catch Basins (CB-06) | 6 | EACH | 3,224.03 | 19,344.18 | 5,000.00 | 30,000.00 | 3,500.00 | 21,000.00 |
| 0033 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 575.00 | 1,150.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
| 0034 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 862.50 | 2,587.50 | 1,500.00 | 4,500.00 | 1,500.00 | 4,500.00 |
| 0035 | 706-01-00100 | Concrete Walk (4" Thick) | 232.2 | SQYD | 69.00 | 16,021.80 | 55.00 | 12,771.00 | 45.00 | 10,449.00 |
| 0036 | 706-02-00200 | Concrete Drive (6" Thick) | 329.8 | SQYD | 80.50 | 26,548.90 | 75.00 | 24,735.00 | 50.00 | 16,490.00 |
| 0037 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 1,150.00 | 4,600.00 | 1,500.00 | 6,000.00 | 1,000.00 | 4,000.00 |
| 0038 | 707-01-00200 | Concrete Curb (Barrier) | 105.2 | LNFT | 9.20 | 967.84 | 25.00 | 2,630.00 | 10.00 | 1,052.00 |
| 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 595.2 | LNFT | 32.78 | 19,510.66 | 50.00 | 29,760.00 | 45.00 | 26,784.00 |
| 0040 | 708-01-00100 | Right-of-Way Monument | 9 | EACH | 165.00 | 1,485.00 | 150.00 | 1,350.00 | 300.00 | 2,700.00 |
| 0041 | 708-02-00100 | Right-of-Way Monument Witness Post | 9 | EACH | 165.00 | 1,485.00 | 150.00 | 1,350.00 | 250.00 | 2,250.00 |
| 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 23,832.00 | 23,832.00 | 25,000.00 | 25,000.00 | 120,000.00 | 120,000.00 |
| 0043 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.227 | MILE | 2,160.00 | 490.32 | 2,000.00 | 454.00 | 1,500.00 | 340.50 |
| 0044 | 726-01-00100 | Bedding Material | 53.6 | CUYD | 80.50 | 4,314.80 | 100.00 | 5,360.00 | 100.00 | 5,360.00 |
| 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 13,863.00 | 13,863.00 | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 |
| 0046 | 729-01-00100 | Sign (Type A) | 98.1 | SQFT | 10.80 | 1,059.48 | 30.00 | 2,943.00 | 10.00 | 981.00 |
| 0047 | 729-21-00100 | U-Channel Post | 11 | EACH | 151.20 | 1,663.20 | 115.00 | 1,265.00 | 150.00 | 1,650.00 |
| 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 387 | EACH | 5.40 | 2,089.80 | 7.00 | 2,709.00 | 5.00 | 1,935.00 |
| 0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 151 | LNFT | 10.80 | 1,630.80 | 5.00 | 755.00 | 5.00 | 755.00 |
| 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.962 | MILE | 3,240.00 | 3,116.88 | 3,000.00 | 2,886.00 | 2,800.00 | 2,693.60 |
| 0051 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.148 | MILE | 7,560.00 | 1,118.88 | 7,000.00 | 1,036.00 | 6,500.00 | 962.00 |
| 0052 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.105 | MILE | 4,104.00 | 430.92 | 3,000.00 | 315.00 | 3,000.00 | 315.00 |
| 0053 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 205.20 | 820.80 | 200.00 | 800.00 | 225.00 | 900.00 |
| 0054 | 736-01-00100 | Trenching and Backfilling | 90 | LNFT | 4.45 | 400.50 | 4.00 | 360.00 | 4.00 | 360.00 |
| 0055 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 260 | LNFT | 14.49 | 3,767.40 | 20.00 | 5,200.00 | 15.00 | 3,900.00 |
| 0056 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 2 | EACH | 10,619.64 | 21,239.28 | 10,000.00 | 20,000.00 | 10,000.00 | 20,000.00 |
| 0057 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 13,684.12 | 27,368.24 | 12,500.00 | 25,000.00 | 12,000.00 | 24,000.00 |
| 0058 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 8 | EACH | 896.40 | 7,171.20 | 900.00 | 7,200.00 | 850.00 | 6,800.00 |
| 0059 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 4 | EACH | 1,407.19 | 5,628.76 | 1,400.00 | 5,600.00 | 1,500.00 | 6,000.00 |
| 0060 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 2,555.13 | 2,555.13 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 |
| 0061 | 736-08-00111 | Sig Cntrlr (TS-2, Type 2)(Type 6E Cabinet)(Furnish & Install) | 1 | EACH | 27,447.62 | 27,447.62 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 |
| 0062 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 479.52 | 1,438.56 | 450.00 | 1,350.00 | 450.00 | 1,350.00 |
| 0063 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 873.22 | 873.22 | 900.00 | 900.00 | 825.00 | 825.00 |
| 0064 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 70 | LNFT | 1.84 | 128.80 | 2.00 | 140.00 | 1.75 | 122.50 |
| 0065 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 20 | LNFT | 2.81 | 56.20 | 3.00 | 60.00 | 2.75 | 55.00 |
| 0066 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 40 | LNFT | 3.26 | 130.40 | 3.00 | 120.00 | 3.00 | 120.00 |
| 0067 | 736-12-04000 | Conductor (6c, #14 awg) | 200 | LNFT | 1.77 | 354.00 | 2.00 | 400.00 | 1.75 | 350.00 |
| 0068 | 736-12-06000 | Conductor (10c, #14 awg) | 1,025 | LNFT | 2.10 | 2,152.50 | 2.00 | 2,050.00 | 2.00 | 2,050.00 |
| 0069 | 739-01-00100 | Hydro-Seeding | 0.259 | ACRE | 4,400.00 | 1,139.60 | 4,000.00 | 1,036.00 | 2,100.00 | 543.90 |
| 0070 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 1,000.00 | 1,000.00 | 15,000.00 | 15,000.00 |
| 0071 | 741-06-00100 | Relocating Fire Hydrant (Includes New Valves) | 2 | EACH | 4,500.00 | 9,000.00 | 2,500.00 | 5,000.00 | 5,000.00 | 10,000.00 |
| 0072 | 741-11-00200 | Adjusting Water Valve and Meter Box | 5 | EACH | 115.00 | 575.00 | 500.00 | 2,500.00 | 1,000.00 | 5,000.00 |
| 0073 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,472 | INLF | 0.94 | 3,263.68 | 1.00 | 3,472.00 | 1.00 | 3,472.00 |
| 0074 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,384 | INLF | 1.10 | 1,522.40 | 1.00 | 1,384.00 | 1.00 | 1,384.00 |
| 0075 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 8,640.11 | 8,640.11 | 7,500.00 | 7,500.00 | 8,000.00 | 8,000.00 |
| 0076 | NS-736-00006 | Video Detection Camera | 4 | EACH | 2,084.55 | 8,338.20 | 1,750.00 | 7,000.00 | 2,000.00 | 8,000.00 |
| 0077 | NS-MSC-00120 | Drainage Structure (PG-DRAIN01/PAVED GUTTER DRAIN) | 4 | EACH | 1,874.50 | 7,498.00 | 1,750.00 | 7,000.00 | 2,500.00 | 10,000.00 |
| 0078 | NS-MSC-00120 | Drainage Structure (CBADJUST/CONVERT EXISTING CATCH BASIN TO CB-01) | 4 | EACH | 2,196.50 | 8,786.00 | 3,000.00 | 12,000.00 | 2,500.00 | 10,000.00 |
| 0079 | NS-MSC-00280 | Adjusting Gas Valves and Valve Boxes | 4 | EACH | 57.50 | 230.00 | 150.00 | 600.00 | 500.00 | 2,000.00 |
| CONTRACTOR TOTAL | 692,688.86 | 749,867.00 | 885,696.14 | |||||||