Bid Tabulations
Letting of
01/25/2012
LA DOTD Headquarters
| Lead Project: H.001541.6 | |
| Parish: Jackson | |
| Routes: LA 4 | |
| Description: LA 4: FIREWOOD ROAD - JIMMIE DAVIS BOULEVARD | |
| Type Const: CLEARING AND GRUBBING, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,192,424.24 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $942,436.95 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,091,937.75 |
| 3 | 27948 | Diamond B Testing, Inc. | $1,557,227.73 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Diamond B Testing, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 | 9,715.09 | 9,715.09 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 173 | SQYD | 3.00 | 519.00 | 12.00 | 2,076.00 | 26.64 | 4,608.72 |
| 0003 | 202-02-32000 | Removal of Paved Ditches | 39 | SQYD | 10.00 | 390.00 | 12.00 | 468.00 | 31.34 | 1,222.26 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,000 | CUYD | 1.00 | 1,000.00 | 17.00 | 17,000.00 | 39.99 | 39,990.00 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 25 | CUYD | 50.00 | 1,250.00 | 120.00 | 3,000.00 | 86.12 | 2,153.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 4,795 | TON | 93.50 | 448,332.50 | 98.00 | 469,910.00 | 120.00 | 575,400.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 611.9 | TON | 70.00 | 42,833.00 | 175.00 | 107,082.50 | 120.00 | 73,428.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 23,897 | SQYD | 5.00 | 119,485.00 | 1.00 | 23,897.00 | 3.92 | 93,676.24 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -975 | CUYD | 0.10 | -97.50 | 1.00 | -975.00 | 1.00 | -975.00 |
| 0010 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 750 | SQYD | 45.00 | 33,750.00 | 60.00 | 45,000.00 | 102.75 | 77,062.50 |
| 0011 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,000 | SQYD | 1.00 | 1,000.00 | 122.00 | 122,000.00 | 165.03 | 165,030.00 |
| 0012 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 14 | EACH | 1,300.00 | 18,200.00 | 795.00 | 11,130.00 | 1,331.91 | 18,646.74 |
| 0013 | 706-02-00200 | Concrete Drive (6" Thick) | 174.1 | SQYD | 65.00 | 11,316.50 | 75.00 | 13,057.50 | 104.99 | 18,278.76 |
| 0014 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 39 | SQYD | 100.00 | 3,900.00 | 50.00 | 1,950.00 | 180.20 | 7,027.80 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 47,000.00 | 47,000.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 |
| 0016 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 320 | LNFT | 0.25 | 80.00 | 1.00 | 320.00 | 0.39 | 124.80 |
| 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.036 | MILE | 1.00 | 4.04 | 400.00 | 1,614.40 | 241.55 | 974.90 |
| 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.691 | MILE | 1.00 | 2.69 | 150.00 | 403.65 | 313.39 | 843.33 |
| 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.661 | MILE | 1.00 | 8.66 | 150.00 | 1,299.15 | 470.09 | 4,071.45 |
| 0020 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 1.00 | 4.00 | 35.00 | 140.00 | 39.18 | 156.72 |
| 0021 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 1.00 | 4.00 | 35.00 | 140.00 | 39.18 | 156.72 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 4 | TON | 1,000.00 | 4,000.00 | 630.00 | 2,520.00 | 861.82 | 3,447.28 |
| 0023 | 717-01-00100 | Seeding | 120 | LB | 10.00 | 1,200.00 | 8.35 | 1,002.00 | 11.75 | 1,410.00 |
| 0024 | 718-01-00100 | Fertilizer | 1,990 | LB | 1.00 | 1,990.00 | 0.60 | 1,194.00 | 0.86 | 1,711.40 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 47,000.00 | 47,000.00 | 78,000.00 | 78,000.00 | 150,000.00 | 150,000.00 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,474 | EACH | 4.50 | 6,633.00 | 5.00 | 7,370.00 | 7.05 | 10,391.70 |
| 0027 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 420 | LNFT | 2.00 | 840.00 | 2.25 | 945.00 | 3.13 | 1,314.60 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.672 | MILE | 2,650.00 | 15,030.80 | 2,900.00 | 16,448.80 | 4,152.42 | 23,552.53 |
| 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.961 | MILE | 700.00 | 1,372.70 | 790.00 | 1,549.19 | 1,096.86 | 2,150.94 |
| 0030 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 200.00 | 400.00 | 225.00 | 450.00 | 313.39 | 626.78 |
| 0031 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 225.00 | 450.00 | 250.00 | 500.00 | 352.57 | 705.14 |
| 0032 | 732-05-00100 | Removal of Existing Markings | 0.673 | MILE | 1,000.00 | 673.00 | 1,200.00 | 807.60 | 1,566.95 | 1,054.56 |
| 0033 | 735-01-00100 | Mailboxes | 27 | EACH | 1.00 | 27.00 | 15.00 | 405.00 | 1.57 | 42.39 |
| 0034 | 735-02-00100 | Mailbox Supports (Single) | 27 | EACH | 125.00 | 3,375.00 | 100.00 | 2,700.00 | 195.87 | 5,288.49 |
| 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 6,000.00 | 6,000.00 | 7,521.36 | 7,521.36 |
| 0036 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 300.00 | 300.00 | 750.00 | 750.00 | 1,566.95 | 1,566.95 |
| 0037 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 24,226 | LNFT | 1.25 | 30,282.50 | 1.45 | 35,127.70 | 1.88 | 45,544.88 |
| 0038 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 13,932 | LNFT | 1.25 | 17,415.00 | 1.58 | 22,012.56 | 2.04 | 28,421.28 |
| 0039 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 38,158 | LNFT | 0.85 | 32,434.30 | 0.65 | 24,802.70 | 1.41 | 53,802.78 |
| 0040 | NS-500-00280 | Surface Preparation | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 37,414.56 | 37,414.56 |
| 0041 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 16,000 | INLF | 0.01 | 160.00 | 0.45 | 7,200.00 | 0.40 | 6,400.00 |
| 0042 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 62,000 | INLF | 0.01 | 620.00 | 0.45 | 27,900.00 | 0.13 | 8,060.00 |
| 0043 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,176 | INLF | 0.01 | 11.76 | 1.25 | 1,470.00 | 7.83 | 9,208.08 |
| 0044 | 706-04-00100 | Handicapped Curb Ramps | 4 | EACH | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | 2,500.00 | 10,000.00 |
| 0045 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 60 | LNFT | 4.00 | 240.00 | 4.50 | 270.00 | 100.00 | 6,000.00 |
| CONTRACTOR TOTAL | 942,436.95 | 1,091,937.75 | 1,557,227.73 | |||||||