Bid Tabulations
Letting of
10/12/2011
LA DOTD Headquarters
| Lead Project: H.001507.6 | |
| Parish: Terrebonne | |
| Routes: LA 24 | |
| Description: LA 24: LA 55 - LA 659 | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,770,767.90 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,481,562.20 |
| 2 | 06487 | Huey Stockstill, Inc. | $1,547,209.80 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Huey Stockstill, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 50 | LNFT | 10.00 | 500.00 | 75.00 | 3,750.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 400 | CUYD | 5.00 | 2,000.00 | 5.00 | 2,000.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 9,533.4 | TON | 75.00 | 715,005.00 | 70.00 | 667,338.00 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 649.2 | TON | 75.00 | 48,690.00 | 70.00 | 45,444.00 |
| 0005 | 509-01-00100 | Cold Planing Asphaltic Pavement | 80,699 | SQYD | 0.75 | 60,524.25 | 1.50 | 121,048.50 |
| 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,362 | CUYD | 1.00 | -3,362.00 | 1.00 | -3,362.00 |
| 0007 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 40.00 | 8,000.00 | 70.00 | 14,000.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,450 | SQYD | 75.00 | 108,750.00 | 85.00 | 123,250.00 |
| 0009 | 701-14-00100 | Cleaning Existing Pipes | 1,365 | LNFT | 10.00 | 13,650.00 | 8.00 | 10,920.00 |
| 0010 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 100.00 | 200.00 | 350.00 | 700.00 |
| 0011 | 702-04-00200 | Adjusting Catch Basins | 15 | EACH | 100.00 | 1,500.00 | 100.00 | 1,500.00 |
| 0012 | 707-03-00100 | Combination Concrete Curb and Gutter | 50 | LNFT | 50.00 | 2,500.00 | 100.00 | 5,000.00 |
| 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 100,000.00 | 100,000.00 |
| 0014 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,110 | LNFT | 0.01 | 11.10 | 0.20 | 222.00 |
| 0015 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 96 | LNFT | 0.10 | 9.60 | 0.80 | 76.80 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.96 | MILE | 50.00 | 748.00 | 10.00 | 149.60 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.34 | MILE | 50.00 | 267.00 | 10.00 | 53.40 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 24.02 | MILE | 50.00 | 1,201.00 | 10.00 | 240.20 |
| 0019 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 16 | EACH | 40.00 | 640.00 | 40.00 | 640.00 |
| 0020 | 717-01-00100 | Seeding | 85 | LB | 1.00 | 85.00 | 8.00 | 680.00 |
| 0021 | 718-01-00100 | Fertilizer | 2,800 | LB | 0.10 | 280.00 | 0.40 | 1,120.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 142,000.00 | 142,000.00 | 154,000.00 | 154,000.00 |
| 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | 52 | EACH | 80.00 | 4,160.00 | 80.00 | 4,160.00 |
| 0024 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 500.00 | 500.00 | 900.00 | 900.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers includes 25 blue markers for locations of fire hydrants | 857 | EACH | 5.25 | 4,499.25 | 5.50 | 4,713.50 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 101 | EACH | 5.25 | 530.25 | 5.50 | 555.50 |
| 0027 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 555 | LNFT | 1.35 | 749.25 | 1.40 | 777.00 |
| 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 5.00 | 240.00 | 8.00 | 384.00 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.01 | MILE | 2,700.00 | 32,427.00 | 2,850.00 | 34,228.50 |
| 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.67 | MILE | 850.00 | 2,269.50 | 900.00 | 2,403.00 |
| 0031 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 200.00 | 1,200.00 | 230.00 | 1,380.00 |
| 0032 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 200.00 | 400.00 | 230.00 | 460.00 |
| 0033 | 735-01-00100 | Mailboxes | 104 | EACH | 5.00 | 520.00 | 1.00 | 104.00 |
| 0034 | 735-02-00100 | Mailbox Supports (Single) | 92 | EACH | 100.00 | 9,200.00 | 110.00 | 10,120.00 |
| 0035 | 735-03-00100 | Mailbox Supports (Double) | 6 | EACH | 200.00 | 1,200.00 | 200.00 | 1,200.00 |
| 0036 | 736-09-00100 | Loop Detector | 180 | LNFT | 15.00 | 2,700.00 | 14.00 | 2,520.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 5,000.00 | 5,000.00 |
| 0038 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 58,900 | LNFT | 1.00 | 58,900.00 | 1.25 | 73,625.00 |
| 0039 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 37,320 | LNFT | 0.50 | 18,660.00 | 1.00 | 37,320.00 |
| 0040 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 133,536 | LNFT | 0.50 | 66,768.00 | 0.80 | 106,828.80 |
| 0041 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 6,720 | INLF | 2.00 | 13,440.00 | 1.75 | 11,760.00 |
| CONTRACTOR TOTAL | 1,481,562.20 | 1,547,209.80 | ||||||