LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.001423.6
Parish: Jefferson
Routes: LA 18
Description: LA 18: AVONDALE - JEFFERSON PARISH LINE
Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost: $2,240,030.92


RankLicenseBidderConstruction Bid
1 06276 Barriere Construction Co., LLC $2,267,731.70
2 02179 Boh Bros. Construction Co., LLC. $2,473,310.10
3 00849 F.G. Sullivan, Jr. Contractor LLC $2,824,633.30


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Barriere Construction Co., LLC
- 2 -
Boh Bros. Construction Co., LLC.
- 3 -
F.G. Sullivan, Jr. Contractor LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 203-07-00100 Borrow (Vehicular Measurement) 9,575      CUYD 9.00 86,175.00 12.00 114,900.00 20.00 191,500.00
0002 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 1,998.6    CUYD 12.00 23,983.20 50.00 99,930.00 20.00 39,972.00
0003 502-01-00100 Superpave Asphaltic Concrete 14,178.6    TON 75.00 1,063,395.00 100.00 1,417,860.00 120.00 1,701,432.00
0004 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 985      TON 117.00 115,245.00 150.00 147,750.00 120.00 118,200.00
0005 509-01-00100 Cold Planing Asphaltic Pavement 102,243      SQYD 4.00 408,972.00 2.00 204,486.00 3.00 306,729.00
0006 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,260.13   CUYD 10.00 -42,601.30 10.00 -42,601.30 0.00 0.00
0007 510-01-00200 Pavement Patching (12" Minimum Thickness) 244      SQYD 167.00 40,748.00 100.00 24,400.00 150.00 36,600.00
0008 702-04-00200 Adjusting Catch Basins 8      EACH 1,200.00 9,600.00 800.00 6,400.00 1,500.00 12,000.00
0009 713-01-00100 Temporary Signs and Barricades 1      LUMP 200,000.00 200,000.00 140,000.00 140,000.00 120,000.00 120,000.00
0010 713-02-00300 Temporary Pavement Markings (8" Width) 1,460      LNFT 0.01 14.60 0.10 146.00 0.10 146.00
0011 713-02-00500 Temporary Pavement Markings (24" Width) 558      LNFT 0.10 55.80 0.20 111.60 0.10 55.80
0012 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 28.32   MILE 125.00 3,540.00 10.00 283.20 500.00 14,160.00
0013 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 9.4    MILE 500.00 4,700.00 15.00 141.00 10.00 94.00
0014 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 43.82   MILE 175.00 7,668.50 20.00 876.40 10.00 438.20
0015 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 4      EACH 15.00 60.00 10.00 40.00 10.00 40.00
0016 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 4      EACH 15.00 60.00 10.00 40.00 10.00 40.00
0017 713-05-00500 Temporary Pavement Legends & Symbols (SCHOOL CROSSING) 8      EACH 15.00 120.00 30.00 240.00 10.00 80.00
0018 717-01-00100 Seeding 305      LB 10.00 3,050.00 10.00 3,050.00 10.00 3,050.00
0019 718-01-00100 Fertilizer 10,153      LB 0.50 5,076.50 0.50 5,076.50 0.60 6,091.80
0020 727-01-00100 Mobilization 1      LUMP 220,000.00 220,000.00 245,000.00 245,000.00 120,000.00 120,000.00
0021 729-19-00300 Dead End Road Installations (Type C) STA 191+63.2 1      EACH 2,000.00 2,000.00 1,200.00 1,200.00 1,100.00 1,100.00
0022 731-02-00100 Reflectorized Raised Pavement Markers 1,394      EACH 12.00 16,728.00 5.50 7,667.00 5.25 7,318.50
0023 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 730      LNFT 1.50 1,095.00 1.40 1,022.00 1.35 985.50
0024 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 231      LNFT 6.00 1,386.00 4.70 1,085.70 4.50 1,039.50
0025 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 48      LNFT 7.00 336.00 5.25 252.00 5.00 240.00
0026 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 20.96   MILE 2,100.00 44,016.00 2,800.00 58,688.00 2,750.00 57,640.00
0027 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.7    MILE 1,000.00 4,700.00 900.00 4,230.00 850.00 3,995.00
0028 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 2      EACH 300.00 600.00 225.00 450.00 215.00 430.00
0029 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 2      EACH 300.00 600.00 235.00 470.00 225.00 450.00
0030 732-04-19020 Plastic Pavement Legends and Symbols (SCHOOL ZONE) 4      EACH 500.00 2,000.00 420.00 1,680.00 400.00 1,600.00
0031 735-01-00100 Mailboxes 80      EACH 10.00 800.00 5.00 400.00 5.00 400.00
0032 735-02-00100 Mailbox Supports (Single) 77      EACH 150.00 11,550.00 140.00 10,780.00 138.00 10,626.00
0033 735-03-00100 Mailbox Supports (Double) 2      EACH 175.00 350.00 200.00 400.00 200.00 400.00
0034 735-04-00100 Mailbox Supports (Multiple) 1      EACH 300.00 300.00 370.00 370.00 360.00 360.00
0035 740-01-00100 Construction Layout 1      LUMP 25,000.00 25,000.00 4,000.00 4,000.00 50,000.00 50,000.00
0036 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 8,424      INLF 0.35 2,948.40 0.25 2,106.00 1.00 8,424.00
0037 NS-724-00001 Rumble Strips (Centerline Ground-In) 6.92   MILE 500.00 3,460.00 1,500.00 10,380.00 1,300.00 8,996.00
                     
    CONTRACTOR TOTAL       2,267,731.70   2,473,310.10   2,824,633.30
 Free Tourist Map  
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.