Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.001370.6 | |
| Parish: St. Helena | |
| Routes: La 10 | |
| Description: LA 10: S. Jct. La 43 - E. Jct. La 441 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $2,300,969.82 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,877,850.39 |
| 2 | 06276 | Barriere Construction Co., LLC. | $1,969,439.89 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $2,093,875.38 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Barriere Construction Co., LLC. |
- 3 - Gilchrist Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 1,262 | LNFT | 6.00 | 7,572.00 | 6.00 | 7,572.00 | 7.00 | 8,834.00 |
| 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 24 | EACH | 27.00 | 648.00 | 30.00 | 720.00 | 75.00 | 1,800.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,227 | CUYD | 22.00 | 48,994.00 | 6.00 | 13,362.00 | 23.00 | 51,221.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 84 | EACH | 16.00 | 1,344.00 | 12.00 | 1,008.00 | 16.00 | 1,344.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 1,900 | LNFT | 2.00 | 3,800.00 | 2.00 | 3,800.00 | 1.22 | 2,318.00 |
| 0006 | 303-02-00100 | Removal of Existing Patches | 400 | SQYD | 1.00 | 400.00 | 1.00 | 400.00 | 5.00 | 2,000.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete (Roadway) | 12,875.3 | TON | 69.00 | 888,395.70 | 72.00 | 927,021.60 | 82.00 | 1,055,774.60 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete (Shoulder Work) | 6,199.4 | TON | 69.00 | 427,758.60 | 72.00 | 446,356.80 | 75.00 | 464,955.00 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 655.3 | TON | 145.00 | 95,018.50 | 125.00 | 81,912.50 | 150.00 | 98,295.00 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 42,563 | SQYD | 1.35 | 57,460.05 | 2.00 | 85,126.00 | 0.50 | 21,281.50 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,365 | CUYD | 0.10 | -236.50 | 20.00 | -47,300.00 | 1.00 | -2,365.00 |
| 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 750 | SQYD | 106.00 | 79,500.00 | 75.00 | 56,250.00 | 82.00 | 61,500.00 |
| 0013 | 701-08-00100 | Relaying Pipe Station 78+80 - 24" RCP | 4 | LNFT | 320.00 | 1,280.00 | 375.00 | 1,500.00 | 200.00 | 800.00 |
| 0014 | 701-15-00100 | Concrete Collar Station 78+80 | 1 | EACH | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | 900.00 | 900.00 |
| 0015 | 704-03-00100 | Blocked Out Guard Rail | 500 | LNFT | 20.00 | 10,000.00 | 20.00 | 10,000.00 | 19.00 | 9,500.00 |
| 0016 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 42.00 | 2,100.00 | 54.00 | 2,700.00 | 44.00 | 2,200.00 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 60.00 | 18,000.00 | 70.00 | 21,000.00 | 58.00 | 17,400.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 2,100.00 | 25,200.00 | 2,400.00 | 28,800.00 | 2,100.00 | 25,200.00 |
| 0019 | 707-04-00100 | Asphaltic Curb | 80 | LNFT | 20.00 | 1,600.00 | 30.00 | 2,400.00 | 50.00 | 4,000.00 |
| 0020 | 711-02-00300 | Riprap (30 lb) Station 62+55 & Station 78+80 | 8 | CUYD | 260.00 | 2,080.00 | 150.00 | 1,200.00 | 130.00 | 1,040.00 |
| 0021 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) Paved Ditch | 316 | SQYD | 68.00 | 21,488.00 | 140.00 | 44,240.00 | 55.00 | 17,380.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 70,000.00 | 70,000.00 | 30,000.00 | 30,000.00 |
| 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 108 | LNFT | 1.00 | 108.00 | 0.10 | 10.80 | 1.00 | 108.00 |
| 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.455 | MILE | 170.00 | 1,607.35 | 200.00 | 1,891.00 | 400.00 | 3,782.00 |
| 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.641 | MILE | 310.00 | 2,368.71 | 10.00 | 76.41 | 100.00 | 764.10 |
| 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.938 | MILE | 410.00 | 10,634.58 | 10.00 | 259.38 | 100.00 | 2,593.80 |
| 0027 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) Locations of Paved Ditch | 1,272 | SQYD | 2.00 | 2,544.00 | 3.00 | 3,816.00 | 2.00 | 2,544.00 |
| 0028 | 726-01-00100 | Bedding Material Station 78+80 | 0.7 | CUYD | 300.00 | 210.00 | 100.00 | 70.00 | 350.00 | 245.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 104,000.00 | 104,000.00 | 120,000.00 | 120,000.00 | 150,000.00 | 150,000.00 |
| 0030 | 729-01-00100 | Sign (Type A) (W11-1 "Bicycle Traffic" & W16-P "Share The Road") | 37.1 | SQFT | 25.00 | 927.50 | 18.00 | 667.80 | 16.00 | 593.60 |
| 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 80.00 | 2,560.00 | 90.00 | 2,880.00 | 80.00 | 2,560.00 |
| 0032 | 729-21-00100 | U-Channel Post | 4 | EACH | 100.00 | 400.00 | 90.00 | 360.00 | 165.00 | 660.00 |
| 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 417 | EACH | 5.50 | 2,293.50 | 6.00 | 2,502.00 | 5.80 | 2,418.60 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 5.50 | 198.00 | 6.00 | 216.00 | 5.50 | 198.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.646 | MILE | 2,500.00 | 21,615.00 | 2,600.00 | 22,479.60 | 2,700.00 | 23,344.20 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.547 | MILE | 900.00 | 2,292.30 | 1,000.00 | 2,547.00 | 940.00 | 2,394.18 |
| 0037 | 735-01-00100 | Mailboxes | 4 | EACH | 13.00 | 52.00 | 6.00 | 24.00 | 15.00 | 60.00 |
| 0038 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 120.00 | 480.00 | 155.00 | 620.00 | 130.00 | 520.00 |
| 0039 | 739-01-00100 | Hydro-Seeding | 2.3 | ACRE | 1,200.00 | 2,760.00 | 2,000.00 | 4,600.00 | 1,200.00 | 2,760.00 |
| 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 15,000.00 | 15,000.00 | 6,000.00 | 6,000.00 |
| 0041 | NS-200-00020 | Cleaning Existing Ditches | 300 | LNFT | 5.00 | 1,500.00 | 6.00 | 1,800.00 | 20.00 | 6,000.00 |
| 0042 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 26,400 | INLF | 0.20 | 5,280.00 | 1.00 | 26,400.00 | 0.20 | 5,280.00 |
| 0043 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 3.151 | MILE | 2,100.00 | 6,617.10 | 1,000.00 | 3,151.00 | 1,800.00 | 5,671.80 |
| CONTRACTOR TOTAL | 1,877,850.39 | 1,969,439.89 | 2,093,875.38 | |||||||