Bid Tabulations
Letting of
01/25/2012
LA DOTD Headquarters
| Lead Project: H.001214.6-R1 | |
| Parish: Washington | |
| Routes: LA 10 | |
| Description: Lawrence, Bogue Lusa & Coburn Creek Bridges | |
| Type Const: GRADING, CLASS II BASE COURSE, DRAINAGE STRUCTURES, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, QUAD BEAM GIRDER BRIDGES, AND RELATED WORK. | |
| Estimated Construction Cost: $11,230,247.80 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $1,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 34567 | James Construction Group LLC | $8,764,782.76 | 559 | $9,323,782.76 |
| 2 | 36827 | Shavers-Whittle Construction LLC | $9,083,726.36 | 378 | $9,461,726.36 |
| 3 | 00755 | L & A Contracting Co. | $9,221,393.27 | 300 | $9,521,393.27 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $9,899,949.55 | 390 | $10,289,949.55 |
| 5 | 12370 | Hill Brothers Construction Co., Inc | $10,032,863.44 | 450 | $10,482,863.44 |
| 6 | 39670 | Eutaw Construction Co. Inc. | $10,140,077.01 | 650 | $10,790,077.01 |
| 7 | 14422 | T. L. Wallace Construction, Inc. | $10,444,725.34 | 510 | $10,954,725.34 |
| 8 | 06276 | Barriere Construction Co., LLC | $10,770,986.16 | 630 | $11,400,986.16 |
| 9 | 39462 | Jb James Construction Llc | $11,370,778.61 | 720 | $12,090,778.61 |
| 10 | 00481 | Coastal Bridge Co., L.L.C. | $11,809,586.61 | 700 | $12,509,586.61 |
| 11 | 54683 | Conti Enterprises, Inc. | $12,297,777.00 | 365 | $12,662,777.00 |
| 12 | 36961 | Cycle Construction Co. L.L.C. | $13,544,231.61 | 540 | $14,084,231.61 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - James Construction Group LLC |
- 2 - Shavers-Whittle Construction LLC |
- 3 - L & A Contracting Co. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 80,000.00 | 80,000.00 | 85,000.00 | 85,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 250,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 14,000.00 | 14,000.00 | 35,000.00 | 35,000.00 | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 121+17, 24' x 458' Timber Bridge w/Concrete Deck | 1 | EACH | 55,000.00 | 55,000.00 | 65,000.00 | 65,000.00 | 110,000.00 | 110,000.00 | 100,000.00 | 100,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta 117+36, 24'x249' Concrete Deck Girder Bridge | 1 | EACH | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 58,000.00 | 58,000.00 | 100,000.00 | 100,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge Sta 110+10, 24'x280' Concrete Deck Girder Bridge | 1 | EACH | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | 71,000.00 | 71,000.00 | 110,000.00 | 110,000.00 |
| 0006 | 202-02-05000 | Removal of Building Sta. 316+11 Rt., 16' x 20' Cinder Block Fish Market | 1 | EACH | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 640.00 | 640.00 | 100.00 | 100.00 |
| 0007 | 202-02-05000 | Removal of Building Sta. 317+50 Rt., 36' x 40' Cinder Block Bait Shop | 1 | EACH | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 | 2,880.00 | 2,880.00 | 100.00 | 100.00 |
| 0008 | 202-02-05000 | Removal of Building Sta. 316+32 Rt., 12' x 23' Wood Frame Tin Roof Shed | 1 | EACH | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 | 552.00 | 552.00 | 100.00 | 100.00 |
| 0009 | 202-02-05000 | Removal of Building Sta. 316+50 Rt., 25' x 57' Wood Frame Tin Roof Residence | 1 | EACH | 1.00 | 1.00 | 3,500.00 | 3,500.00 | 2,850.00 | 2,850.00 | 100.00 | 100.00 |
| 0010 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 62.2 | SQYD | 50.00 | 3,110.00 | 7.50 | 466.50 | 15.00 | 933.00 | 20.00 | 1,244.00 |
| 0011 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,145.8 | SQYD | 14.00 | 16,041.20 | 4.00 | 4,583.20 | 6.25 | 7,161.25 | 13.00 | 14,895.40 |
| 0012 | 203-01-00100 | General Excavation | 7,296 | CUYD | 8.00 | 58,368.00 | 5.25 | 38,304.00 | 6.00 | 43,776.00 | 8.50 | 62,016.00 |
| 0013 | 203-02-00100 | Drainage Excavation | 90 | CUYD | 40.00 | 3,600.00 | 9.70 | 873.00 | 11.00 | 990.00 | 20.00 | 1,800.00 |
| 0014 | 203-03-00100 | Embankment | 22,446 | CUYD | 16.50 | 370,359.00 | 18.00 | 404,028.00 | 11.00 | 246,906.00 | 15.00 | 336,690.00 |
| 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 28 | EACH | 19.00 | 532.00 | 15.00 | 420.00 | 17.91 | 501.48 | 30.00 | 840.00 |
| 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 56 | EACH | 335.00 | 18,760.00 | 275.00 | 15,400.00 | 450.00 | 25,200.00 | 400.00 | 22,400.00 |
| 0017 | 204-06-00100 | Temporary Silt Fencing | 12,416 | LNFT | 2.60 | 32,281.60 | 1.50 | 18,624.00 | 2.25 | 27,936.00 | 1.65 | 20,486.40 |
| 0019 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 393.1 | SQYD | 27.00 | 10,613.70 | 65.00 | 25,551.50 | 23.33 | 9,171.02 | 50.00 | 19,655.00 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 185 | CUYD | 78.00 | 14,430.00 | 65.00 | 12,025.00 | 84.00 | 15,540.00 | 75.00 | 13,875.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 600 | CUYD | 60.00 | 36,000.00 | 30.00 | 18,000.00 | 60.00 | 36,000.00 | 30.00 | 18,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 7,682.7 | TON | 98.00 | 752,904.60 | 115.00 | 883,510.50 | 98.00 | 752,904.60 | 100.00 | 768,270.00 |
| 0023 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 551.5 | TON | 122.00 | 67,283.00 | 135.00 | 74,452.50 | 122.00 | 67,283.00 | 165.00 | 90,997.50 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 11,245 | SQYD | 2.30 | 25,863.50 | 2.50 | 28,112.50 | 2.30 | 25,863.50 | 4.50 | 50,602.50 |
| 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -209 | CUYD | 0.01 | -2.09 | 0.01 | -2.09 | 0.01 | -2.09 | 1.00 | -209.00 |
| 0026 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 430 | LNFT | 64.00 | 27,520.00 | 34.00 | 14,620.00 | 27.84 | 11,971.20 | 55.00 | 23,650.00 |
| 0027 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 224 | LNFT | 130.00 | 29,120.00 | 25.00 | 5,600.00 | 18.17 | 4,070.08 | 50.00 | 11,200.00 |
| 0028 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 36 | LNFT | 155.00 | 5,580.00 | 50.00 | 1,800.00 | 30.25 | 1,089.00 | 95.00 | 3,420.00 |
| 0029 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 232 | LNFT | 153.00 | 35,496.00 | 85.00 | 19,720.00 | 54.31 | 12,599.92 | 105.00 | 24,360.00 |
| 0030 | 701-13-01100 | Corrugated Metal Pipe Arch (Extension) (42" Equiv.) | 60 | LNFT | 183.00 | 10,980.00 | 110.00 | 6,600.00 | 100.00 | 6,000.00 | 150.00 | 9,000.00 |
| 0031 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,800.00 | 3,600.00 | 500.00 | 1,000.00 | 1,000.00 | 2,000.00 | 750.00 | 1,500.00 |
| 0032 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 7,260.00 | 7,260.00 | 5,400.00 | 5,400.00 | 3,900.00 | 3,900.00 | 7,500.00 | 7,500.00 |
| 0033 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,060.00 | 9,180.00 | 2,700.00 | 8,100.00 | 2,200.00 | 6,600.00 | 4,000.00 | 12,000.00 |
| 0034 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,180.00 | 2,180.00 | 750.00 | 750.00 | 1,500.00 | 1,500.00 | 1,300.00 | 1,300.00 |
| 0035 | 702-06-01040 | Side Drain End Treatment (1 Barrel, 30" RCP/PP or 36" CMP) | 1 | EACH | 3,950.00 | 3,950.00 | 3,200.00 | 3,200.00 | 3,500.00 | 3,500.00 | 4,600.00 | 4,600.00 |
| 0036 | 704-03-00100 | Blocked Out Guard Rail | 1,200 | LNFT | 20.00 | 24,000.00 | 20.00 | 24,000.00 | 18.00 | 21,600.00 | 25.00 | 30,000.00 |
| 0037 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 60.00 | 18,000.00 | 60.00 | 18,000.00 | 54.00 | 16,200.00 | 62.00 | 18,600.00 |
| 0038 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 2,230.00 | 26,760.00 | 2,500.00 | 30,000.00 | 2,000.00 | 24,000.00 | 1,500.00 | 18,000.00 |
| 0039 | 706-02-00200 | Concrete Drive (6" Thick) | 62 | SQYD | 83.00 | 5,146.00 | 60.00 | 3,720.00 | 83.00 | 5,146.00 | 85.00 | 5,270.00 |
| 0040 | 708-01-00100 | Right-of-Way Monument | 39 | EACH | 178.00 | 6,942.00 | 160.00 | 6,240.00 | 210.00 | 8,190.00 | 200.00 | 7,800.00 |
| 0041 | 708-02-00100 | Right-of-Way Monument Witness Post | 39 | EACH | 130.00 | 5,070.00 | 60.00 | 2,340.00 | 126.00 | 4,914.00 | 200.00 | 7,800.00 |
| 0042 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 12 | SQYD | 78.00 | 936.00 | 85.00 | 1,020.00 | 51.72 | 620.64 | 215.00 | 2,580.00 |
| 0043 | 711-04-00100 | Geotextile Fabric | 12 | SQYD | 3.00 | 36.00 | 5.00 | 60.00 | 5.85 | 70.20 | 10.00 | 120.00 |
| 0044 | 712-04-00100 | Flexible Revetment | 5,680 | SQYD | 50.00 | 284,000.00 | 70.00 | 397,600.00 | 52.98 | 300,926.40 | 55.00 | 312,400.00 |
| 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 46,000.00 | 46,000.00 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | 170,000.00 | 170,000.00 |
| 0046 | 716-01-00100 | Mulch (Vegetative) | 1.9 | TON | 2,660.00 | 5,054.00 | 2,500.00 | 4,750.00 | 1,000.00 | 1,900.00 | 1,100.00 | 2,090.00 |
| 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 366 | SQYD | 1.30 | 475.80 | 1.50 | 549.00 | 1.25 | 457.50 | 1.25 | 457.50 |
| 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 684 | SQYD | 1.50 | 1,026.00 | 1.80 | 1,231.20 | 1.75 | 1,197.00 | 1.35 | 923.40 |
| 0049 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 684 | SQYD | 1.85 | 1,265.40 | 2.20 | 1,504.80 | 1.75 | 1,197.00 | 2.25 | 1,539.00 |
| 0050 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 245 | SQYD | 2.55 | 624.75 | 3.00 | 735.00 | 1.75 | 428.75 | 3.45 | 845.25 |
| 0051 | 725-01-00100 | Temporary Detour Roads | 18,166.8 | SQYD | 67.00 | 1,217,175.60 | 60.00 | 1,090,008.00 | 80.00 | 1,453,344.00 | 70.00 | 1,271,676.00 |
| 0052 | 725-02-00100 | Temporary Detour Bridging | 540 | LNFT | 1,200.00 | 648,000.00 | 1,750.00 | 945,000.00 | 1,250.00 | 675,000.00 | 1,500.00 | 810,000.00 |
| 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 875,000.00 | 875,000.00 | 265,000.00 | 265,000.00 | 700,000.00 | 700,000.00 | 980,000.00 | 980,000.00 |
| 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 85.00 | 1,020.00 | 85.00 | 1,020.00 | 76.00 | 912.00 | 65.00 | 780.00 |
| 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 278 | EACH | 5.00 | 1,390.00 | 5.00 | 1,390.00 | 5.00 | 1,390.00 | 6.00 | 1,668.00 |
| 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.516 | MILE | 2,600.00 | 11,741.60 | 3,000.00 | 13,548.00 | 2,600.00 | 11,741.60 | 3,200.00 | 14,451.20 |
| 0057 | 732-05-00100 | Removal of Existing Markings | 0.114 | MILE | 4,000.00 | 456.00 | 4,500.00 | 513.00 | 4,000.00 | 456.00 | 5,500.00 | 627.00 |
| 0058 | 735-01-00100 | Mailboxes | 8 | EACH | 15.00 | 120.00 | 18.00 | 144.00 | 100.00 | 800.00 | 20.00 | 160.00 |
| 0059 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 190.00 | 1,520.00 | 225.00 | 1,800.00 | 100.00 | 800.00 | 220.00 | 1,760.00 |
| 0060 | 739-01-00100 | Hydro-Seeding | 10.36 | ACRE | 1,075.00 | 11,137.00 | 1,650.00 | 17,094.00 | 2,400.00 | 24,864.00 | 1,200.00 | 12,432.00 |
| 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 25,000.00 | 25,000.00 | 205,000.00 | 205,000.00 | 150,000.00 | 150,000.00 |
| 0062 | 804-01-00600 | Precast Concrete Piles (24") | 9,480 | LNFT | 81.00 | 767,880.00 | 95.00 | 900,600.00 | 60.00 | 568,800.00 | 85.00 | 805,800.00 |
| 0063 | 804-05-00600 | Precast Concrete Test Piles (24") | 3 | EACH | 40,000.00 | 120,000.00 | 45,000.00 | 135,000.00 | 10,200.00 | 30,600.00 | 38,000.00 | 114,000.00 |
| 0064 | 804-09-00100 | Loading Test Piles | 3 | EACH | 10,000.00 | 30,000.00 | 8,000.00 | 24,000.00 | 21,300.00 | 63,900.00 | 10,000.00 | 30,000.00 |
| 0065 | 804-10-00100 | Reloading Test Piles | 3 | EACH | 2,000.00 | 6,000.00 | 500.00 | 1,500.00 | 1,530.00 | 4,590.00 | 3,500.00 | 10,500.00 |
| 0066 | 804-11-00100 | Redriving Test Piles | 3 | EACH | 700.00 | 2,100.00 | 500.00 | 1,500.00 | 3,600.00 | 10,800.00 | 1,500.00 | 4,500.00 |
| 0067 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 8,000.00 | 24,000.00 | 500.00 | 1,500.00 | 21,300.00 | 63,900.00 | 1,000.00 | 3,000.00 |
| 0068 | 804-17-00100 | Dynamic Monitoring | 21 | EACH | 500.00 | 10,500.00 | 1,300.00 | 27,300.00 | 1,200.00 | 25,200.00 | 190.00 | 3,990.00 |
| 0069 | 805-01-00700 | Class A Concrete (Bents) | 397.98 | CUYD | 635.00 | 252,717.30 | 950.00 | 378,081.00 | 995.00 | 395,990.10 | 875.00 | 348,232.50 |
| 0070 | 805-03-00100 | Class AA Concrete | 1,119.85 | CUYD | 650.00 | 727,902.50 | 800.00 | 895,880.00 | 515.00 | 576,722.75 | 700.00 | 783,895.00 |
| 0071 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 8,532 | LNFT | 58.00 | 494,856.00 | 70.00 | 597,240.00 | 73.00 | 622,836.00 | 60.00 | 511,920.00 |
| 0072 | 805-11-00100 | Strip Seal Joints | 560 | LNFT | 175.00 | 98,000.00 | 170.00 | 95,200.00 | 215.00 | 120,400.00 | 150.00 | 84,000.00 |
| 0073 | 806-01-00100 | Deformed Reinforcing Steel | 403,461 | LB | 0.85 | 342,941.85 | 0.85 | 342,941.85 | 1.00 | 403,461.00 | 0.80 | 322,768.80 |
| 0074 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 31,000.00 | 31,000.00 | 50,000.00 | 50,000.00 |
| 0075 | 810-01-00100 | Concrete Railing (Standard Barrier) | 2,160 | LNFT | 65.00 | 140,400.00 | 65.00 | 140,400.00 | 58.00 | 125,280.00 | 72.00 | 155,520.00 |
| 0076 | 813-01-00100 | Concrete Approach Slabs | 1,091.64 | SQYD | 200.00 | 218,328.00 | 185.00 | 201,953.40 | 198.00 | 216,144.72 | 225.00 | 245,619.00 |
| 0077 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 2.27 | MILE | 375.00 | 851.25 | 3,000.00 | 6,810.00 | 375.00 | 851.25 | 500.00 | 1,135.00 |
| 0078 | 203-04-00300 | Nonplastic Embankment (Stone) | 245.4 | CUYD | 150.00 | 36,810.00 | 60.00 | 14,724.00 | 30.00 | 7,362.00 | 125.00 | 30,675.00 |
| 0079 | 302-01-00100 | Class II Base Course (Stone or Recycled Portland Cement Concrete or Blended Calcium Sulfate) | 7,637.8 | CUYD | 55.00 | 420,079.00 | 70.00 | 534,646.00 | 84.00 | 641,575.20 | 58.00 | 442,992.40 |
| 0080 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.63 | MILE | 300.00 | 189.00 | 300.00 | 189.00 | 300.00 | 189.00 | 550.00 | 346.50 |
| 0081 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.584 | MILE | 600.00 | 5,750.40 | 700.00 | 6,708.80 | 600.00 | 5,750.40 | 650.00 | 6,229.60 |
| 0082 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 278 | EACH | 0.35 | 97.30 | 0.40 | 111.20 | 0.35 | 97.30 | 6.20 | 1,723.60 |
| 0083 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.63 | MILE | 750.00 | 472.50 | 850.00 | 535.50 | 750.00 | 472.50 | 1,000.00 | 630.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 8,764,782.76 | 9,083,726.36 | 9,221,393.27 | 9,899,949.55 | ||||||||
| NUMBER OF DAYS BID AT $1000 PER DAY. | 559,000.00 | 378,000.00 | 300,000.00 | 390,000.00 | ||||||||
| TOTAL BID | 9,323,782.76 | 9,461,726.36 | 9,521,393.27 | 10,289,949.55 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Hill Brothers Construction Co., Inc |
- 6 - Eutaw Construction Co. Inc. |
- 7 - T. L. Wallace Construction, Inc. |
- 8 - Barriere Construction Co., LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 390,000.00 | 390,000.00 | 240,000.00 | 240,000.00 | 50,000.00 | 50,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 200,000.00 | 200,000.00 | 3,800.00 | 3,800.00 | 20,000.00 | 20,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 121+17, 24' x 458' Timber Bridge w/Concrete Deck | 1 | EACH | 200,000.00 | 200,000.00 | 20,000.00 | 20,000.00 | 69,000.00 | 69,000.00 | 49,000.00 | 49,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta 117+36, 24'x249' Concrete Deck Girder Bridge | 1 | EACH | 150,000.00 | 150,000.00 | 20,000.00 | 20,000.00 | 38,000.00 | 38,000.00 | 43,000.00 | 43,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge Sta 110+10, 24'x280' Concrete Deck Girder Bridge | 1 | EACH | 125,000.00 | 125,000.00 | 45,000.00 | 45,000.00 | 90,000.00 | 90,000.00 | 32,000.00 | 32,000.00 |
| 0006 | 202-02-05000 | Removal of Building Sta. 316+11 Rt., 16' x 20' Cinder Block Fish Market | 1 | EACH | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 13,000.00 | 13,000.00 |
| 0007 | 202-02-05000 | Removal of Building Sta. 317+50 Rt., 36' x 40' Cinder Block Bait Shop | 1 | EACH | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 16,000.00 | 16,000.00 |
| 0008 | 202-02-05000 | Removal of Building Sta. 316+32 Rt., 12' x 23' Wood Frame Tin Roof Shed | 1 | EACH | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 5,900.00 | 5,900.00 |
| 0009 | 202-02-05000 | Removal of Building Sta. 316+50 Rt., 25' x 57' Wood Frame Tin Roof Residence | 1 | EACH | 3,500.00 | 3,500.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 9,000.00 | 9,000.00 |
| 0010 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 62.2 | SQYD | 17.00 | 1,057.40 | 30.50 | 1,897.10 | 16.00 | 995.20 | 10.00 | 622.00 |
| 0011 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,145.8 | SQYD | 7.00 | 8,020.60 | 7.60 | 8,708.08 | 7.00 | 8,020.60 | 10.00 | 11,458.00 |
| 0012 | 203-01-00100 | General Excavation | 7,296 | CUYD | 8.00 | 58,368.00 | 3.55 | 25,900.80 | 7.50 | 54,720.00 | 12.00 | 87,552.00 |
| 0013 | 203-02-00100 | Drainage Excavation | 90 | CUYD | 17.00 | 1,530.00 | 14.00 | 1,260.00 | 36.00 | 3,240.00 | 30.00 | 2,700.00 |
| 0014 | 203-03-00100 | Embankment | 22,446 | CUYD | 13.00 | 291,798.00 | 9.70 | 217,726.20 | 17.00 | 381,582.00 | 17.00 | 381,582.00 |
| 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 28 | EACH | 13.00 | 364.00 | 14.25 | 399.00 | 11.00 | 308.00 | 12.00 | 336.00 |
| 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 56 | EACH | 900.00 | 50,400.00 | 724.50 | 40,572.00 | 920.00 | 51,520.00 | 275.00 | 15,400.00 |
| 0017 | 204-06-00100 | Temporary Silt Fencing | 12,416 | LNFT | 1.50 | 18,624.00 | 4.50 | 55,872.00 | 1.50 | 18,624.00 | 1.50 | 18,624.00 |
| 0019 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 393.1 | SQYD | 16.00 | 6,289.60 | 31.50 | 12,382.65 | 31.00 | 12,186.10 | 18.00 | 7,075.80 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 185 | CUYD | 90.00 | 16,650.00 | 120.00 | 22,200.00 | 130.00 | 24,050.00 | 64.00 | 11,840.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 600 | CUYD | 90.00 | 54,000.00 | 88.00 | 52,800.00 | 89.00 | 53,400.00 | 20.00 | 12,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 7,682.7 | TON | 109.00 | 837,414.30 | 99.00 | 760,587.30 | 98.00 | 752,904.60 | 95.00 | 729,856.50 |
| 0023 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 551.5 | TON | 136.00 | 75,004.00 | 123.25 | 67,972.38 | 98.00 | 54,047.00 | 95.00 | 52,392.50 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 11,245 | SQYD | 2.55 | 28,674.75 | 2.40 | 26,988.00 | 3.00 | 33,735.00 | 3.00 | 33,735.00 |
| 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -209 | CUYD | 0.01 | -2.09 | 0.01 | -2.09 | 0.00 | 0.00 | 0.01 | -2.09 |
| 0026 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 430 | LNFT | 49.00 | 21,070.00 | 51.00 | 21,930.00 | 70.00 | 30,100.00 | 50.00 | 21,500.00 |
| 0027 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 224 | LNFT | 42.00 | 9,408.00 | 45.25 | 10,136.00 | 70.00 | 15,680.00 | 60.00 | 13,440.00 |
| 0028 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 36 | LNFT | 63.00 | 2,268.00 | 61.00 | 2,196.00 | 100.00 | 3,600.00 | 80.00 | 2,880.00 |
| 0029 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 232 | LNFT | 81.00 | 18,792.00 | 68.75 | 15,950.00 | 120.00 | 27,840.00 | 85.00 | 19,720.00 |
| 0030 | 701-13-01100 | Corrugated Metal Pipe Arch (Extension) (42" Equiv.) | 60 | LNFT | 128.00 | 7,680.00 | 109.50 | 6,570.00 | 170.00 | 10,200.00 | 70.00 | 4,200.00 |
| 0031 | 701-15-00100 | Concrete Collar | 2 | EACH | 550.00 | 1,100.00 | 2,750.00 | 5,500.00 | 1,600.00 | 3,200.00 | 1,500.00 | 3,000.00 |
| 0032 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 6,750.00 | 6,750.00 | 3,850.00 | 3,850.00 | 4,800.00 | 4,800.00 | 5,400.00 | 5,400.00 |
| 0033 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 4,000.00 | 12,000.00 | 2,950.00 | 8,850.00 | 2,300.00 | 6,900.00 | 4,700.00 | 14,100.00 |
| 0034 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,800.00 | 1,800.00 | 1,500.00 | 1,500.00 | 320.00 | 320.00 | 600.00 | 600.00 |
| 0035 | 702-06-01040 | Side Drain End Treatment (1 Barrel, 30" RCP/PP or 36" CMP) | 1 | EACH | 4,750.00 | 4,750.00 | 2,750.00 | 2,750.00 | 2,600.00 | 2,600.00 | 4,000.00 | 4,000.00 |
| 0036 | 704-03-00100 | Blocked Out Guard Rail | 1,200 | LNFT | 20.00 | 24,000.00 | 18.00 | 21,600.00 | 17.00 | 20,400.00 | 18.00 | 21,600.00 |
| 0037 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 60.00 | 18,000.00 | 54.00 | 16,200.00 | 51.00 | 15,300.00 | 55.00 | 16,500.00 |
| 0038 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 2,225.00 | 26,700.00 | 2,000.00 | 24,000.00 | 2,100.00 | 25,200.00 | 2,250.00 | 27,000.00 |
| 0039 | 706-02-00200 | Concrete Drive (6" Thick) | 62 | SQYD | 250.00 | 15,500.00 | 65.00 | 4,030.00 | 62.00 | 3,844.00 | 100.00 | 6,200.00 |
| 0040 | 708-01-00100 | Right-of-Way Monument | 39 | EACH | 175.00 | 6,825.00 | 146.50 | 5,713.50 | 150.00 | 5,850.00 | 100.00 | 3,900.00 |
| 0041 | 708-02-00100 | Right-of-Way Monument Witness Post | 39 | EACH | 150.00 | 5,850.00 | 146.50 | 5,713.50 | 150.00 | 5,850.00 | 100.00 | 3,900.00 |
| 0042 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 12 | SQYD | 45.00 | 540.00 | 50.75 | 609.00 | 72.00 | 864.00 | 150.00 | 1,800.00 |
| 0043 | 711-04-00100 | Geotextile Fabric | 12 | SQYD | 3.00 | 36.00 | 6.40 | 76.80 | 13.00 | 156.00 | 10.00 | 120.00 |
| 0044 | 712-04-00100 | Flexible Revetment | 5,680 | SQYD | 65.00 | 369,200.00 | 45.00 | 255,600.00 | 57.00 | 323,760.00 | 40.00 | 227,200.00 |
| 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 151,320.00 | 151,320.00 | 33,000.00 | 33,000.00 | 150,000.00 | 150,000.00 |
| 0046 | 716-01-00100 | Mulch (Vegetative) | 1.9 | TON | 255.00 | 484.50 | 1,000.00 | 1,900.00 | 240.00 | 456.00 | 250.00 | 475.00 |
| 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 366 | SQYD | 1.50 | 549.00 | 1.50 | 549.00 | 1.50 | 549.00 | 1.50 | 549.00 |
| 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 684 | SQYD | 1.50 | 1,026.00 | 2.00 | 1,368.00 | 1.50 | 1,026.00 | 1.50 | 1,026.00 |
| 0049 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 684 | SQYD | 1.50 | 1,026.00 | 3.00 | 2,052.00 | 1.50 | 1,026.00 | 1.50 | 1,026.00 |
| 0050 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 245 | SQYD | 1.50 | 367.50 | 4.00 | 980.00 | 1.50 | 367.50 | 1.50 | 367.50 |
| 0051 | 725-01-00100 | Temporary Detour Roads | 18,166.8 | SQYD | 45.00 | 817,506.00 | 57.50 | 1,044,591.00 | 84.00 | 1,526,011.20 | 60.00 | 1,090,008.00 |
| 0052 | 725-02-00100 | Temporary Detour Bridging | 540 | LNFT | 2,250.00 | 1,215,000.00 | 2,817.00 | 1,521,180.00 | 3,100.00 | 1,674,000.00 | 2,740.00 | 1,479,600.00 |
| 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 750,000.00 | 750,000.00 | 718,500.00 | 718,500.00 | 500,000.00 | 500,000.00 | 980,000.00 | 980,000.00 |
| 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 85.00 | 1,020.00 | 76.00 | 912.00 | 180.00 | 2,160.00 | 80.00 | 960.00 |
| 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 278 | EACH | 5.50 | 1,529.00 | 5.00 | 1,390.00 | 10.00 | 2,780.00 | 10.00 | 2,780.00 |
| 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.516 | MILE | 2,900.00 | 13,096.40 | 2,600.00 | 11,741.60 | 3,400.00 | 15,354.40 | 3,500.00 | 15,806.00 |
| 0057 | 732-05-00100 | Removal of Existing Markings | 0.114 | MILE | 4,500.00 | 513.00 | 4,000.00 | 456.00 | 11,000.00 | 1,254.00 | 11,000.00 | 1,254.00 |
| 0058 | 735-01-00100 | Mailboxes | 8 | EACH | 30.50 | 244.00 | 5.00 | 40.00 | 10.00 | 80.00 | 5.00 | 40.00 |
| 0059 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 150.00 | 1,200.00 | 135.00 | 1,080.00 | 160.00 | 1,280.00 | 140.00 | 1,120.00 |
| 0060 | 739-01-00100 | Hydro-Seeding | 10.36 | ACRE | 1,900.00 | 19,684.00 | 1,100.00 | 11,396.00 | 1,700.00 | 17,612.00 | 1,800.00 | 18,648.00 |
| 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 250,000.00 | 250,000.00 | 200,000.00 | 200,000.00 | 156,146.00 | 156,146.00 | 100,000.00 | 100,000.00 |
| 0062 | 804-01-00600 | Precast Concrete Piles (24") | 9,480 | LNFT | 123.00 | 1,166,040.00 | 91.00 | 862,680.00 | 95.00 | 900,600.00 | 107.00 | 1,014,360.00 |
| 0063 | 804-05-00600 | Precast Concrete Test Piles (24") | 3 | EACH | 15,000.00 | 45,000.00 | 14,486.00 | 43,458.00 | 23,000.00 | 69,000.00 | 100,000.00 | 300,000.00 |
| 0064 | 804-09-00100 | Loading Test Piles | 3 | EACH | 8,200.00 | 24,600.00 | 10,000.00 | 30,000.00 | 23,000.00 | 69,000.00 | 5,000.00 | 15,000.00 |
| 0065 | 804-10-00100 | Reloading Test Piles | 3 | EACH | 4,500.00 | 13,500.00 | 5,000.00 | 15,000.00 | 120.00 | 360.00 | 100.00 | 300.00 |
| 0066 | 804-11-00100 | Redriving Test Piles | 3 | EACH | 7,700.00 | 23,100.00 | 1,140.00 | 3,420.00 | 1,500.00 | 4,500.00 | 5,000.00 | 15,000.00 |
| 0067 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 8,150.00 | 24,450.00 | 5,000.00 | 15,000.00 | 21,000.00 | 63,000.00 | 5,000.00 | 15,000.00 |
| 0068 | 804-17-00100 | Dynamic Monitoring | 21 | EACH | 1,500.00 | 31,500.00 | 1,500.00 | 31,500.00 | 1,300.00 | 27,300.00 | 1,500.00 | 31,500.00 |
| 0069 | 805-01-00700 | Class A Concrete (Bents) | 397.98 | CUYD | 900.00 | 358,182.00 | 685.00 | 272,616.30 | 730.00 | 290,525.40 | 900.00 | 358,182.00 |
| 0070 | 805-03-00100 | Class AA Concrete | 1,119.85 | CUYD | 490.00 | 548,726.50 | 637.50 | 713,904.38 | 690.00 | 772,696.50 | 975.00 | 1,091,853.75 |
| 0071 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 8,532 | LNFT | 76.00 | 648,432.00 | 61.50 | 524,718.00 | 55.00 | 469,260.00 | 77.00 | 656,964.00 |
| 0072 | 805-11-00100 | Strip Seal Joints | 560 | LNFT | 250.00 | 140,000.00 | 300.00 | 168,000.00 | 180.00 | 100,800.00 | 250.00 | 140,000.00 |
| 0073 | 806-01-00100 | Deformed Reinforcing Steel | 403,461 | LB | 0.92 | 371,184.12 | 0.70 | 282,422.70 | 0.80 | 322,768.80 | 0.80 | 322,768.80 |
| 0074 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 35,000.00 | 35,000.00 | 80,000.00 | 80,000.00 | 21,000.00 | 21,000.00 | 17,200.00 | 17,200.00 |
| 0075 | 810-01-00100 | Concrete Railing (Standard Barrier) | 2,160 | LNFT | 78.00 | 168,480.00 | 63.00 | 136,080.00 | 67.00 | 144,720.00 | 75.00 | 162,000.00 |
| 0076 | 813-01-00100 | Concrete Approach Slabs | 1,091.64 | SQYD | 235.00 | 256,535.40 | 225.00 | 245,619.00 | 230.00 | 251,077.20 | 240.00 | 261,993.60 |
| 0077 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 2.27 | MILE | 3,000.00 | 6,810.00 | 2,643.00 | 5,999.61 | 380.00 | 862.60 | 4,350.00 | 9,874.50 |
| 0078 | 203-04-00300 | Nonplastic Embankment (Stone) | 245.4 | CUYD | 80.00 | 19,632.00 | 80.00 | 19,632.00 | 110.00 | 26,994.00 | 68.00 | 16,687.20 |
| 0079 | 302-01-00100 | Class II Base Course (Stone or Recycled Portland Cement Concrete or Blended Calcium Sulfate) | 7,637.8 | CUYD | 53.00 | 404,803.40 | 80.00 | 611,024.00 | 74.00 | 565,197.20 | 64.00 | 488,819.20 |
| 0080 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.63 | MILE | 350.00 | 220.50 | 300.00 | 189.00 | 260.00 | 163.80 | 500.00 | 315.00 |
| 0081 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.584 | MILE | 665.00 | 6,373.36 | 600.00 | 5,750.40 | 360.00 | 3,450.24 | 600.00 | 5,750.40 |
| 0082 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 278 | EACH | 11.00 | 3,058.00 | 0.35 | 97.30 | 11.00 | 3,058.00 | 5.00 | 1,390.00 |
| 0083 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.63 | MILE | 840.00 | 529.20 | 750.00 | 472.50 | 1,100.00 | 693.00 | 3,550.00 | 2,236.50 |
| ITEM TOTAL (CONSTRUCTION BID) | 10,032,863.44 | 10,140,077.01 | 10,444,725.34 | 10,770,986.16 | ||||||||
| NUMBER OF DAYS BID AT $1000 PER DAY. | 450,000.00 | 650,000.00 | 510,000.00 | 630,000.00 | ||||||||
| TOTAL BID | 10,482,863.44 | 10,790,077.01 | 10,954,725.34 | 11,400,986.16 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Jb James Construction Llc |
- 10 - Coastal Bridge Co., L.L.C. |
- 11 - Conti Enterprises, Inc. |
- 12 - Cycle Construction Co. L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 720,000.00 | 720,000.00 | 600,000.00 | 600,000.00 | 75,000.00 | 75,000.00 | 450,000.00 | 450,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 50,000.00 | 50,000.00 | 1,000.00 | 1,000.00 | 450,000.00 | 450,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 121+17, 24' x 458' Timber Bridge w/Concrete Deck | 1 | EACH | 200,000.00 | 200,000.00 | 90,000.00 | 90,000.00 | 300,000.00 | 300,000.00 | 50,000.00 | 50,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta 117+36, 24'x249' Concrete Deck Girder Bridge | 1 | EACH | 200,000.00 | 200,000.00 | 65,000.00 | 65,000.00 | 200,000.00 | 200,000.00 | 50,000.00 | 50,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge Sta 110+10, 24'x280' Concrete Deck Girder Bridge | 1 | EACH | 200,000.00 | 200,000.00 | 75,000.00 | 75,000.00 | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 |
| 0006 | 202-02-05000 | Removal of Building Sta. 316+11 Rt., 16' x 20' Cinder Block Fish Market | 1 | EACH | 1.00 | 1.00 | 5,700.00 | 5,700.00 | 15,000.00 | 15,000.00 | 2,400.00 | 2,400.00 |
| 0007 | 202-02-05000 | Removal of Building Sta. 317+50 Rt., 36' x 40' Cinder Block Bait Shop | 1 | EACH | 1.00 | 1.00 | 5,700.00 | 5,700.00 | 35,000.00 | 35,000.00 | 6,200.00 | 6,200.00 |
| 0008 | 202-02-05000 | Removal of Building Sta. 316+32 Rt., 12' x 23' Wood Frame Tin Roof Shed | 1 | EACH | 1.00 | 1.00 | 5,700.00 | 5,700.00 | 15,000.00 | 15,000.00 | 1,300.00 | 1,300.00 |
| 0009 | 202-02-05000 | Removal of Building Sta. 316+50 Rt., 25' x 57' Wood Frame Tin Roof Residence | 1 | EACH | 1.00 | 1.00 | 5,700.00 | 5,700.00 | 35,000.00 | 35,000.00 | 4,800.00 | 4,800.00 |
| 0010 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 62.2 | SQYD | 11.00 | 684.20 | 34.00 | 2,114.80 | 75.00 | 4,665.00 | 18.00 | 1,119.60 |
| 0011 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,145.8 | SQYD | 6.25 | 7,161.25 | 11.00 | 12,603.80 | 13.00 | 14,895.40 | 10.00 | 11,458.00 |
| 0012 | 203-01-00100 | General Excavation | 7,296 | CUYD | 7.50 | 54,720.00 | 5.00 | 36,480.00 | 15.00 | 109,440.00 | 9.00 | 65,664.00 |
| 0013 | 203-02-00100 | Drainage Excavation | 90 | CUYD | 20.00 | 1,800.00 | 73.00 | 6,570.00 | 38.00 | 3,420.00 | 20.00 | 1,800.00 |
| 0014 | 203-03-00100 | Embankment | 22,446 | CUYD | 23.00 | 516,258.00 | 17.00 | 381,582.00 | 29.00 | 650,934.00 | 16.50 | 370,359.00 |
| 0015 | 204-02-00100 | Temporary Hay or Straw Bales | 28 | EACH | 15.00 | 420.00 | 17.00 | 476.00 | 60.00 | 1,680.00 | 11.00 | 308.00 |
| 0016 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 56 | EACH | 500.00 | 28,000.00 | 340.00 | 19,040.00 | 70.00 | 3,920.00 | 330.00 | 18,480.00 |
| 0017 | 204-06-00100 | Temporary Silt Fencing | 12,416 | LNFT | 2.00 | 24,832.00 | 1.70 | 21,107.20 | 1.60 | 19,865.60 | 1.50 | 18,624.00 |
| 0019 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 393.1 | SQYD | 30.00 | 11,793.00 | 57.00 | 22,406.70 | 31.00 | 12,186.10 | 28.00 | 11,006.80 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 185 | CUYD | 100.00 | 18,500.00 | 85.00 | 15,725.00 | 85.00 | 15,725.00 | 105.00 | 19,425.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 600 | CUYD | 80.00 | 48,000.00 | 57.00 | 34,200.00 | 36.00 | 21,600.00 | 65.00 | 39,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 7,682.7 | TON | 100.00 | 768,270.00 | 109.00 | 837,414.30 | 96.00 | 737,539.20 | 108.00 | 829,731.60 |
| 0023 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 551.5 | TON | 125.00 | 68,937.50 | 109.00 | 60,113.50 | 111.00 | 61,216.50 | 134.00 | 73,901.00 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 11,245 | SQYD | 2.40 | 26,988.00 | 3.40 | 38,233.00 | 2.75 | 30,923.75 | 2.50 | 28,112.50 |
| 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -209 | CUYD | 0.01 | -2.09 | 0.01 | -2.09 | 0.50 | -104.50 | 0.01 | -2.09 |
| 0026 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 430 | LNFT | 45.00 | 19,350.00 | 65.00 | 27,950.00 | 60.00 | 25,800.00 | 70.00 | 30,100.00 |
| 0027 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 224 | LNFT | 40.00 | 8,960.00 | 59.00 | 13,216.00 | 70.00 | 15,680.00 | 63.00 | 14,112.00 |
| 0028 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 36 | LNFT | 75.00 | 2,700.00 | 84.00 | 3,024.00 | 160.00 | 5,760.00 | 120.00 | 4,320.00 |
| 0029 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 232 | LNFT | 100.00 | 23,200.00 | 104.00 | 24,128.00 | 170.00 | 39,440.00 | 130.00 | 30,160.00 |
| 0030 | 701-13-01100 | Corrugated Metal Pipe Arch (Extension) (42" Equiv.) | 60 | LNFT | 100.00 | 6,000.00 | 141.00 | 8,460.00 | 250.00 | 15,000.00 | 236.00 | 14,160.00 |
| 0031 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,300.00 | 4,600.00 | 850.00 | 1,700.00 | 900.00 | 1,800.00 | 650.00 | 1,300.00 |
| 0032 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 4,500.00 | 4,500.00 | 4,200.00 | 4,200.00 | 9,000.00 | 9,000.00 | 7,300.00 | 7,300.00 |
| 0033 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,000.00 | 9,000.00 | 2,700.00 | 8,100.00 | 3,000.00 | 9,000.00 | 3,600.00 | 10,800.00 |
| 0034 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,500.00 | 1,500.00 | 1,100.00 | 1,100.00 | 2,100.00 | 2,100.00 | 800.00 | 800.00 |
| 0035 | 702-06-01040 | Side Drain End Treatment (1 Barrel, 30" RCP/PP or 36" CMP) | 1 | EACH | 4,500.00 | 4,500.00 | 3,600.00 | 3,600.00 | 3,000.00 | 3,000.00 | 3,700.00 | 3,700.00 |
| 0036 | 704-03-00100 | Blocked Out Guard Rail | 1,200 | LNFT | 18.00 | 21,600.00 | 19.25 | 23,100.00 | 17.00 | 20,400.00 | 20.00 | 24,000.00 |
| 0037 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 54.00 | 16,200.00 | 57.00 | 17,100.00 | 57.00 | 17,100.00 | 65.00 | 19,500.00 |
| 0038 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 2,000.00 | 24,000.00 | 2,400.00 | 28,800.00 | 1,900.00 | 22,800.00 | 2,300.00 | 27,600.00 |
| 0039 | 706-02-00200 | Concrete Drive (6" Thick) | 62 | SQYD | 75.00 | 4,650.00 | 100.00 | 6,200.00 | 70.00 | 4,340.00 | 60.00 | 3,720.00 |
| 0040 | 708-01-00100 | Right-of-Way Monument | 39 | EACH | 200.00 | 7,800.00 | 450.00 | 17,550.00 | 100.00 | 3,900.00 | 165.00 | 6,435.00 |
| 0041 | 708-02-00100 | Right-of-Way Monument Witness Post | 39 | EACH | 200.00 | 7,800.00 | 100.00 | 3,900.00 | 125.00 | 4,875.00 | 32.00 | 1,248.00 |
| 0042 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 12 | SQYD | 75.00 | 900.00 | 75.00 | 900.00 | 200.00 | 2,400.00 | 68.00 | 816.00 |
| 0043 | 711-04-00100 | Geotextile Fabric | 12 | SQYD | 3.00 | 36.00 | 2.25 | 27.00 | 30.00 | 360.00 | 1.00 | 12.00 |
| 0044 | 712-04-00100 | Flexible Revetment | 5,680 | SQYD | 55.00 | 312,400.00 | 117.00 | 664,560.00 | 60.00 | 340,800.00 | 47.00 | 266,960.00 |
| 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 110,000.00 | 110,000.00 | 65,000.00 | 65,000.00 | 100,000.00 | 100,000.00 |
| 0046 | 716-01-00100 | Mulch (Vegetative) | 1.9 | TON | 2,700.00 | 5,130.00 | 3,000.00 | 5,700.00 | 560.00 | 1,064.00 | 500.00 | 950.00 |
| 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 366 | SQYD | 2.00 | 732.00 | 1.50 | 549.00 | 1.45 | 530.70 | 2.00 | 732.00 |
| 0048 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 684 | SQYD | 2.00 | 1,368.00 | 1.70 | 1,162.80 | 1.45 | 991.80 | 2.20 | 1,504.80 |
| 0049 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 684 | SQYD | 2.00 | 1,368.00 | 2.10 | 1,436.40 | 3.20 | 2,188.80 | 2.20 | 1,504.80 |
| 0050 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 245 | SQYD | 3.00 | 735.00 | 2.90 | 710.50 | 3.20 | 784.00 | 3.00 | 735.00 |
| 0051 | 725-01-00100 | Temporary Detour Roads | 18,166.8 | SQYD | 80.00 | 1,453,344.00 | 68.00 | 1,235,342.40 | 87.85 | 1,595,953.38 | 80.00 | 1,453,344.00 |
| 0052 | 725-02-00100 | Temporary Detour Bridging | 540 | LNFT | 1,625.00 | 877,500.00 | 2,200.00 | 1,188,000.00 | 3,000.00 | 1,620,000.00 | 3,150.00 | 1,701,000.00 |
| 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 1,100,000.00 | 1,100,000.00 | 1,180,000.00 | 1,180,000.00 | 1,099,949.27 | 1,099,949.27 | 1,414,000.00 | 1,414,000.00 |
| 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 75.00 | 900.00 | 85.10 | 1,021.20 | 108.00 | 1,296.00 | 82.00 | 984.00 |
| 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 278 | EACH | 5.00 | 1,390.00 | 6.00 | 1,668.00 | 4.50 | 1,251.00 | 5.50 | 1,529.00 |
| 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.516 | MILE | 2,600.00 | 11,741.60 | 3,100.00 | 13,999.60 | 2,600.00 | 11,741.60 | 2,860.00 | 12,915.76 |
| 0057 | 732-05-00100 | Removal of Existing Markings | 0.114 | MILE | 4,000.00 | 456.00 | 5,500.00 | 627.00 | 4,100.00 | 467.40 | 3,860.00 | 440.04 |
| 0058 | 735-01-00100 | Mailboxes | 8 | EACH | 15.00 | 120.00 | 17.00 | 136.00 | 60.00 | 480.00 | 11.00 | 88.00 |
| 0059 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 250.00 | 2,000.00 | 215.00 | 1,720.00 | 200.00 | 1,600.00 | 115.00 | 920.00 |
| 0060 | 739-01-00100 | Hydro-Seeding | 10.36 | ACRE | 1,100.00 | 11,396.00 | 1,200.00 | 12,432.00 | 1,950.00 | 20,202.00 | 2,150.00 | 22,274.00 |
| 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 |
| 0062 | 804-01-00600 | Precast Concrete Piles (24") | 9,480 | LNFT | 98.00 | 929,040.00 | 97.50 | 924,300.00 | 45.00 | 426,600.00 | 137.00 | 1,298,760.00 |
| 0063 | 804-05-00600 | Precast Concrete Test Piles (24") | 3 | EACH | 60,000.00 | 180,000.00 | 25,000.00 | 75,000.00 | 18,000.00 | 54,000.00 | 91,300.00 | 273,900.00 |
| 0064 | 804-09-00100 | Loading Test Piles | 3 | EACH | 100.00 | 300.00 | 42,000.00 | 126,000.00 | 55,000.00 | 165,000.00 | 105,000.00 | 315,000.00 |
| 0065 | 804-10-00100 | Reloading Test Piles | 3 | EACH | 100.00 | 300.00 | 1,400.00 | 4,200.00 | 55,000.00 | 165,000.00 | 1,100.00 | 3,300.00 |
| 0066 | 804-11-00100 | Redriving Test Piles | 3 | EACH | 100.00 | 300.00 | 4,150.00 | 12,450.00 | 18,000.00 | 54,000.00 | 1,100.00 | 3,300.00 |
| 0067 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 100.00 | 300.00 | 100.00 | 300.00 | 55,000.00 | 165,000.00 | 1,100.00 | 3,300.00 |
| 0068 | 804-17-00100 | Dynamic Monitoring | 21 | EACH | 1,000.00 | 21,000.00 | 1,500.00 | 31,500.00 | 2,400.00 | 50,400.00 | 2,800.00 | 58,800.00 |
| 0069 | 805-01-00700 | Class A Concrete (Bents) | 397.98 | CUYD | 1,100.00 | 437,778.00 | 1,000.00 | 397,980.00 | 950.00 | 378,081.00 | 990.00 | 394,000.20 |
| 0070 | 805-03-00100 | Class AA Concrete | 1,119.85 | CUYD | 825.00 | 923,876.25 | 800.00 | 895,880.00 | 900.00 | 1,007,865.00 | 966.00 | 1,081,775.10 |
| 0071 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 8,532 | LNFT | 63.00 | 537,516.00 | 70.00 | 597,240.00 | 100.00 | 853,200.00 | 73.00 | 622,836.00 |
| 0072 | 805-11-00100 | Strip Seal Joints | 560 | LNFT | 175.00 | 98,000.00 | 200.00 | 112,000.00 | 180.00 | 100,800.00 | 180.00 | 100,800.00 |
| 0073 | 806-01-00100 | Deformed Reinforcing Steel | 403,461 | LB | 1.00 | 403,461.00 | 1.00 | 403,461.00 | 1.00 | 403,461.00 | 0.75 | 302,595.75 |
| 0074 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 |
| 0075 | 810-01-00100 | Concrete Railing (Standard Barrier) | 2,160 | LNFT | 60.00 | 129,600.00 | 66.00 | 142,560.00 | 63.00 | 136,080.00 | 65.00 | 140,400.00 |
| 0076 | 813-01-00100 | Concrete Approach Slabs | 1,091.64 | SQYD | 210.00 | 229,244.40 | 200.00 | 218,328.00 | 220.00 | 240,160.80 | 160.00 | 174,662.40 |
| 0077 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 2.27 | MILE | 1,700.00 | 3,859.00 | 3,000.00 | 6,810.00 | 5,200.00 | 11,804.00 | 400.00 | 908.00 |
| 0078 | 203-04-00300 | Nonplastic Embankment (Stone) | 245.4 | CUYD | 110.00 | 26,994.00 | 142.00 | 34,846.80 | 75.00 | 18,405.00 | 30.00 | 7,362.00 |
| 0079 | 302-01-00100 | Class II Base Course (Stone or Recycled Portland Cement Concrete or Blended Calcium Sulfate) | 7,637.8 | CUYD | 52.00 | 397,165.60 | 82.50 | 630,118.50 | 40.00 | 305,512.00 | 84.50 | 645,394.10 |
| 0080 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.63 | MILE | 300.00 | 189.00 | 540.00 | 340.20 | 1,500.00 | 945.00 | 330.00 | 207.90 |
| 0081 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.584 | MILE | 600.00 | 5,750.40 | 625.00 | 5,990.00 | 1,300.00 | 12,459.20 | 650.00 | 6,229.60 |
| 0082 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 278 | EACH | 5.00 | 1,390.00 | 6.00 | 1,668.00 | 8.00 | 2,224.00 | 5.50 | 1,529.00 |
| 0083 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.63 | MILE | 750.00 | 472.50 | 1,000.00 | 630.00 | 1,300.00 | 819.00 | 825.00 | 519.75 |
| ITEM TOTAL (CONSTRUCTION BID) | 11,370,778.61 | 11,809,586.61 | 12,297,777.00 | 13,544,231.61 | ||||||||
| NUMBER OF DAYS BID AT $1000 PER DAY. | 720,000.00 | 700,000.00 | 365,000.00 | 540,000.00 | ||||||||
| TOTAL BID | 12,090,778.61 | 12,509,586.61 | 12,662,777.00 | 14,084,231.61 | ||||||||