Bid Tabulations
Letting of
09/11/2013
LA DOTD Headquarters
| Lead Project: H.001073.6 | |
| Parish: Desoto | |
| Routes: LA 175 | |
| Description: KCS RAILROAD OVERPASS | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK. | |
| Estimated Construction Cost: $2,501,621.29 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12135 | Blount Bros. Construction, LLC | $3,135,584.15 |
| 2 | 39462 | Jb James Construction Llc | $3,337,268.20 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $4,010,384.20 |
| 4 | 34567 | James Construction Group LLC | $4,187,238.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Blount Bros. Construction, LLC |
- 2 - Jb James Construction Llc |
- 3 - Gilchrist Construction Co. LLC |
- 4 - James Construction Group LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 190,000.00 | 190,000.00 | 60,000.00 | 60,000.00 | 310,000.00 | 310,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions Removal of Concrete Drainage Chutes | 1 | LUMP | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 101 | SQYD | 10.00 | 1,010.00 | 9.00 | 909.00 | 10.00 | 1,010.00 | 10.00 | 1,010.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 120+22.98, 160ft x 24ft, concrete deck on steel I-beams | 1 | EACH | 75,000.00 | 75,000.00 | 220,000.00 | 220,000.00 | 75,000.00 | 75,000.00 | 80,000.00 | 80,000.00 |
| 0005 | 202-02-14500 | Removal of Guard Rail | 874 | LNFT | 9.50 | 8,303.00 | 6.00 | 5,244.00 | 6.00 | 5,244.00 | 4.00 | 3,496.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,641.8 | SQYD | 7.00 | 18,492.60 | 8.00 | 21,134.40 | 8.50 | 22,455.30 | 4.00 | 10,567.20 |
| 0007 | 203-01-00100 | General Excavation | 1,206 | CUYD | 10.00 | 12,060.00 | 7.00 | 8,442.00 | 9.00 | 10,854.00 | 8.50 | 10,251.00 |
| 0008 | 203-03-00100 | Embankment | 15,869 | CUYD | 12.00 | 190,428.00 | 14.00 | 222,166.00 | 22.00 | 349,118.00 | 8.50 | 134,886.50 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 24 | EACH | 75.00 | 1,800.00 | 140.00 | 3,360.00 | 175.00 | 4,200.00 | 125.00 | 3,000.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 5,120 | LNFT | 3.00 | 15,360.00 | 2.00 | 10,240.00 | 2.00 | 10,240.00 | 2.50 | 12,800.00 |
| 0011 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 4,798.2 | SQYD | 26.00 | 124,753.20 | 27.00 | 129,551.40 | 30.00 | 143,946.00 | 40.00 | 191,928.00 |
| 0012 | 304-05-00100 | Lime Treatment (Type E) | 6.02 | TON | 350.00 | 2,107.00 | 500.00 | 3,010.00 | 800.00 | 4,816.00 | 390.00 | 2,347.80 |
| 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 50.00 | 2,500.00 | 100.00 | 5,000.00 | 80.00 | 4,000.00 | 100.00 | 5,000.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 1,174.1 | TON | 140.00 | 164,374.00 | 140.00 | 164,374.00 | 125.00 | 146,762.50 | 136.00 | 159,677.60 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 166.4 | TON | 175.00 | 29,120.00 | 165.00 | 27,456.00 | 165.00 | 27,456.00 | 160.00 | 26,624.00 |
| 0016 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 88 | LNFT | 70.00 | 6,160.00 | 88.00 | 7,744.00 | 98.00 | 8,624.00 | 100.00 | 8,800.00 |
| 0017 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 90 | LNFT | 50.00 | 4,500.00 | 74.00 | 6,660.00 | 54.00 | 4,860.00 | 65.00 | 5,850.00 |
| 0018 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 3,500.00 | 7,000.00 | 3,200.00 | 6,400.00 | 1,900.00 | 3,800.00 | 4,635.00 | 9,270.00 |
| 0019 | 704-03-00100 | Blocked Out Guard Rail | 231.25 | LNFT | 25.00 | 5,781.25 | 20.00 | 4,625.00 | 21.00 | 4,856.25 | 20.00 | 4,625.00 |
| 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 75.00 | 7,500.00 | 65.00 | 6,500.00 | 65.00 | 6,500.00 | 63.00 | 6,300.00 |
| 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,500.00 | 10,000.00 | 2,100.00 | 8,400.00 | 2,200.00 | 8,800.00 | 2,012.00 | 8,048.00 |
| 0022 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 342 | LNFT | 45.00 | 15,390.00 | 80.00 | 27,360.00 | 90.00 | 30,780.00 | 83.00 | 28,386.00 |
| 0023 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 300.00 | 3,000.00 | 150.00 | 1,500.00 | 150.00 | 1,500.00 | 200.00 | 2,000.00 |
| 0024 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 300.00 | 3,000.00 | 150.00 | 1,500.00 | 60.00 | 600.00 | 150.00 | 1,500.00 |
| 0025 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 575 | SQYD | 60.00 | 34,500.00 | 70.00 | 40,250.00 | 81.00 | 46,575.00 | 180.00 | 103,500.00 |
| 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 |
| 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.481 | MILE | 1,000.00 | 481.00 | 500.00 | 240.50 | 600.00 | 288.60 | 500.00 | 240.50 |
| 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.481 | MILE | 1,000.00 | 481.00 | 500.00 | 240.50 | 1,400.00 | 673.40 | 500.00 | 240.50 |
| 0029 | 716-01-00100 | Mulch (Vegetative) | 16 | TON | 500.00 | 8,000.00 | 700.00 | 11,200.00 | 1,000.00 | 16,000.00 | 850.00 | 13,600.00 |
| 0030 | 717-01-00100 | Seeding | 640 | LB | 12.00 | 7,680.00 | 9.00 | 5,760.00 | 11.00 | 7,040.00 | 10.50 | 6,720.00 |
| 0031 | 718-01-00100 | Fertilizer | 8,000 | LB | 1.00 | 8,000.00 | 0.45 | 3,600.00 | 0.70 | 5,600.00 | 0.60 | 4,800.00 |
| 0032 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 120 | SQYD | 2.00 | 240.00 | 3.00 | 360.00 | 2.75 | 330.00 | 2.50 | 300.00 |
| 0033 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 |
| 0034 | 725-01-00100 | Temporary Detour Roads | 7,529.8 | SQYD | 87.00 | 655,092.60 | 68.00 | 512,026.40 | 139.00 | 1,046,642.20 | 130.00 | 978,874.00 |
| 0035 | 725-02-00200 | Temp Detour Bridging (Steel Panel Bridge, LADOTD Supplied) | 180 | LNFT | 2,000.00 | 360,000.00 | 1,500.00 | 270,000.00 | 3,200.00 | 576,000.00 | 3,800.00 | 684,000.00 |
| 0036 | 726-01-00100 | Bedding Material | 57.3 | CUYD | 75.00 | 4,297.50 | 90.00 | 5,157.00 | 120.00 | 6,876.00 | 75.00 | 4,297.50 |
| 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 140,000.00 | 140,000.00 | 330,000.00 | 330,000.00 | 400,000.00 | 400,000.00 | 415,000.00 | 415,000.00 |
| 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 75.00 | 150.00 | 60.00 | 120.00 | 65.00 | 130.00 | 60.00 | 120.00 |
| 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 75.00 | 300.00 | 80.00 | 320.00 | 75.00 | 300.00 |
| 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 127 | EACH | 18.00 | 2,286.00 | 4.00 | 508.00 | 9.25 | 1,174.75 | 4.00 | 508.00 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.925 | MILE | 2,500.00 | 4,812.50 | 3,000.00 | 5,775.00 | 4,000.00 | 7,700.00 | 3,000.00 | 5,775.00 |
| 0042 | 735-01-00100 | Mailboxes | 1 | EACH | 150.00 | 150.00 | 1.00 | 1.00 | 14.00 | 14.00 | 20.00 | 20.00 |
| 0043 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 100.00 | 100.00 | 250.00 | 250.00 | 700.00 | 700.00 | 220.00 | 220.00 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 |
| 0045 | 804-01-00200 | Precast Concrete Piles (14") | 260 | LNFT | 95.00 | 24,700.00 | 110.00 | 28,600.00 | 115.00 | 29,900.00 | 110.00 | 28,600.00 |
| 0046 | 804-01-00600 | Precast Concrete Piles (24") | 1,120 | LNFT | 180.00 | 201,600.00 | 130.00 | 145,600.00 | 119.00 | 133,280.00 | 170.00 | 190,400.00 |
| 0047 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,500.00 | 2,500.00 | 100.00 | 100.00 | 2,700.00 | 2,700.00 | 4,000.00 | 4,000.00 |
| 0048 | 805-01-00700 | Class A Concrete (Bents) | 246.67 | CUYD | 750.00 | 185,002.50 | 800.00 | 197,336.00 | 1,000.00 | 246,670.00 | 750.00 | 185,002.50 |
| 0049 | 805-04-00100 | Class AA(M) Concrete | 196.92 | CUYD | 800.00 | 157,536.00 | 880.00 | 173,289.60 | 840.00 | 165,412.80 | 750.00 | 147,690.00 |
| 0050 | 805-08-00200 | Precast-Prestressed Concrete Girder (Type II) | 495 | LNFT | 155.00 | 76,725.00 | 105.00 | 51,975.00 | 108.00 | 53,460.00 | 100.00 | 49,500.00 |
| 0051 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 372.5 | LNFT | 200.00 | 74,500.00 | 125.00 | 46,562.50 | 116.00 | 43,210.00 | 120.00 | 44,700.00 |
| 0052 | 805-11-00100 | Strip Seal Joints | 160 | LNFT | 175.00 | 28,000.00 | 160.00 | 25,600.00 | 160.00 | 25,600.00 | 170.00 | 27,200.00 |
| 0053 | 806-01-00100 | Deformed Reinforcing Steel | 91,190 | LB | 1.50 | 136,785.00 | 0.95 | 86,630.50 | 0.82 | 74,775.80 | 1.00 | 91,190.00 |
| 0054 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 |
| 0055 | 810-01-00100 | Concrete Railing (Standard Barrier) | 414 | LNFT | 100.00 | 41,400.00 | 75.00 | 31,050.00 | 70.00 | 28,980.00 | 65.00 | 26,910.00 |
| 0056 | 813-01-00100 | Concrete Approach Slabs | 355.56 | SQYD | 350.00 | 124,446.00 | 210.00 | 74,667.60 | 260.00 | 92,445.60 | 230.00 | 81,778.80 |
| 0057 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 308 | INLF | 10.00 | 3,080.00 | 1.60 | 492.80 | 8.00 | 2,464.00 | 1.25 | 385.00 |
| CONTRACTOR TOTAL | 3,135,584.15 | 3,337,268.20 | 4,010,384.20 | 4,187,238.90 | ||||||||