Bid Tabulations
Letting of
08/31/2011
LA DOTD Headquarters
| Lead Project: H.001054.6 | |
| Parish: Sabine | |
| Routes: LA 6 | |
| Description: PENDLETON BR. - JCT. LA 191 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK | |
| Estimated Construction Cost: $1,655,217.20 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $1,601,910.99 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,799,158.03 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $1,845,840.72 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - Gilchrist Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 1,400.00 | 1,400.00 | 3,492.72 | 3,492.72 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 2,694 | LNFT | 5.50 | 14,817.00 | 6.00 | 16,164.00 | 13.85 | 37,311.90 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 20 | CUYD | 30.00 | 600.00 | 50.00 | 1,000.00 | 27.41 | 548.20 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 233 | CUYD | 1.00 | 233.00 | 91.00 | 21,203.00 | 63.32 | 14,753.56 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 11,376.5 | TON | 90.00 | 1,023,885.00 | 92.00 | 1,046,638.00 | 96.37 | 1,096,353.31 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 956.1 | TON | 50.00 | 47,805.00 | 150.00 | 143,415.00 | 212.18 | 202,865.30 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 83,254 | SQYD | 1.15 | 95,742.10 | 2.50 | 208,135.00 | 0.74 | 61,607.96 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,153 | CUYD | 0.10 | -415.30 | 0.10 | -415.30 | 0.00 | 0.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,050 | SQYD | 76.00 | 79,800.00 | 91.00 | 95,550.00 | 92.94 | 97,587.00 |
| 0010 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 16 | LNFT | 350.00 | 5,600.00 | 250.00 | 4,000.00 | 95.29 | 1,524.64 |
| 0011 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,250.00 | 1,250.00 | 1,500.00 | 1,500.00 | 828.86 | 828.86 |
| 0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 560 | LNFT | 31.00 | 17,360.00 | 32.00 | 17,920.00 | 56.40 | 31,584.00 |
| 0013 | 704-03-00100 | Blocked Out Guard Rail | 2,478 | LNFT | 18.00 | 44,604.00 | 20.00 | 49,560.00 | 22.56 | 55,903.68 |
| 0014 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 40.00 | 1,000.00 | 41.00 | 1,025.00 | 56.40 | 1,410.00 |
| 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 55.00 | 2,750.00 | 56.00 | 2,800.00 | 67.68 | 3,384.00 |
| 0016 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 2,500.00 | 5,000.00 | 2,600.00 | 5,200.00 | 2,819.87 | 5,639.74 |
| 0017 | 707-01-00100 | Concrete Curb | 20 | LNFT | 50.00 | 1,000.00 | 26.00 | 520.00 | 49.38 | 987.60 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 77,000.00 | 77,000.00 | 10,000.00 | 10,000.00 | 6,920.43 | 6,920.43 |
| 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.127 | MILE | 325.00 | 2,316.28 | 155.00 | 1,104.69 | 358.29 | 2,553.53 |
| 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.648 | MILE | 1.00 | 5.65 | 160.00 | 903.68 | 507.57 | 2,866.76 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 20.163 | MILE | 1.00 | 20.16 | 260.00 | 5,242.38 | 620.37 | 12,508.52 |
| 0022 | 726-01-00100 | Bedding Material | 3.5 | CUYD | 100.00 | 350.00 | 125.00 | 437.50 | 121.87 | 426.55 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 77,000.00 | 77,000.00 | 56,800.00 | 56,800.00 | 85,959.08 | 85,959.08 |
| 0024 | 729-01-00100 | Sign (Type A) | 83 | SQFT | 30.00 | 2,490.00 | 31.00 | 2,573.00 | 112.79 | 9,361.57 |
| 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 3 | EACH | 70.00 | 210.00 | 72.00 | 216.00 | 84.60 | 253.80 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 470 | EACH | 4.50 | 2,115.00 | 5.00 | 2,350.00 | 5.92 | 2,782.40 |
| 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.081 | MILE | 2,600.00 | 26,210.60 | 2,700.00 | 27,218.70 | 2,763.46 | 27,858.44 |
| 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.824 | MILE | 750.00 | 2,118.00 | 760.00 | 2,146.24 | 902.35 | 2,548.24 |
| 0029 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 18 | EACH | 150.00 | 2,700.00 | 160.00 | 2,880.00 | 451.18 | 8,121.24 |
| 0030 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 18 | EACH | 225.00 | 4,050.00 | 250.00 | 4,500.00 | 451.18 | 8,121.24 |
| 0031 | 735-01-00100 | Mailboxes | 43 | EACH | 1.00 | 43.00 | 1.00 | 43.00 | 1.13 | 48.59 |
| 0032 | 735-02-00100 | Mailbox Supports (Single) | 35 | EACH | 122.00 | 4,270.00 | 130.00 | 4,550.00 | 140.99 | 4,934.65 |
| 0033 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 172.00 | 344.00 | 180.00 | 360.00 | 208.67 | 417.34 |
| 0034 | 735-04-00100 | Mailbox Supports (Multiple) | 3 | EACH | 322.00 | 966.00 | 325.00 | 975.00 | 225.59 | 676.77 |
| 0035 | 739-01-00100 | Hydro-Seeding | 0.85 | ACRE | 3,500.00 | 2,975.00 | 2,300.00 | 1,955.00 | 2,819.86 | 2,396.88 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 6,000.00 | 6,000.00 | 5,202.26 | 5,202.26 |
| 0037 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 280 | LNFT | 4.00 | 1,120.00 | 4.00 | 1,120.00 | 5.36 | 1,500.80 |
| 0038 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 280 | LNFT | 3.00 | 840.00 | 2.82 | 789.60 | 2.30 | 644.00 |
| 0039 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 28,350 | INLF | 0.01 | 283.50 | 0.23 | 6,520.50 | 0.37 | 10,489.50 |
| 0040 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 2.7 | MILE | 740.00 | 1,998.00 | 1,939.18 | 5,235.79 | 576.47 | 1,556.47 |
| 0041 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 5.5 | MILE | 400.00 | 2,200.00 | 213.17 | 1,172.44 | 573.68 | 3,155.24 |
| 0042 | NS-724-00003 | Rumble Strips (Intersection Ground-In) | 1 | EACH | 3,000.00 | 3,000.00 | 1,598.80 | 1,598.80 | 837.42 | 837.42 |
| 0043 | NS-729-00005 | Square Steel Tubular Sign Posts and Hardware (2" x 2")(2.23lb/ft) | 50 | LNFT | 15.00 | 750.00 | 75.00 | 3,750.00 | 169.19 | 8,459.50 |
| 0044 | NS-729-00006 | Square Steel Tubular Sign Posts and Hardware (2 1/4" x 2 1/4") | 15 | LNFT | 27.00 | 405.00 | 75.00 | 1,125.00 | 169.19 | 2,537.85 |
| 0045 | NS-736-00100 | Radar Traffic Sensor and Recorder System | 1 | EACH | 29,100.00 | 29,100.00 | 31,976.01 | 31,976.01 | 16,919.18 | 16,919.18 |
| CONTRACTOR TOTAL | 1,601,910.99 | 1,799,158.03 | 1,845,840.72 | |||||||