Bid Tabulations
Letting of
02/08/2012
LA DOTD Headquarters
| Lead Project: H.001004.6 | |
| Parish: St. Tammany | |
| Routes: LA 21 | |
| Description: LA 21: LA 1084 - LA 1083 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $1,128,369.95 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06487 | Huey Stockstill, Inc. | $1,035,382.90 |
| 2 | 06276 | Barriere Construction Co., LLC. | $1,130,502.00 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $1,132,132.50 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $1,160,367.55 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Huey Stockstill, Inc. |
- 2 - Barriere Construction Co., LLC. |
- 3 - Boh Bros. Construction Co., LLC. |
- 4 - Diamond B Construction Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) For Removal Of Existing 21"x15"x78' CMPA Cross Drain At Sta. 122+30 | 78 | LNFT | 14.00 | 1,092.00 | 10.00 | 780.00 | 10.00 | 780.00 | 17.00 | 1,326.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,405 | CUYD | 5.00 | 7,025.00 | 24.00 | 33,720.00 | 12.00 | 16,860.00 | 22.00 | 30,910.00 |
| 0003 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 14.00 | 280.00 | 16.00 | 320.00 | 15.00 | 300.00 | 16.00 | 320.00 |
| 0004 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 2.30 | 690.00 | 2.00 | 600.00 | 4.50 | 1,350.00 | 2.00 | 600.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 9,824.9 | TON | 74.00 | 727,042.60 | 78.00 | 766,342.20 | 90.00 | 884,241.00 | 86.00 | 844,941.40 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 379.1 | TON | 130.00 | 49,283.00 | 78.00 | 29,569.80 | 135.00 | 51,178.50 | 145.00 | 54,969.50 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 33,450 | SQYD | 1.30 | 43,485.00 | 2.00 | 66,900.00 | 2.00 | 66,900.00 | 1.60 | 53,520.00 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,045 | CUYD | 0.00 | 0.00 | 20.00 | -20,900.00 | 10.00 | -10,450.00 | 0.10 | -104.50 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 81.00 | 20,250.00 | 90.00 | 22,500.00 | 120.00 | 30,000.00 | 125.00 | 31,250.00 |
| 0010 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 80 | LNFT | 140.00 | 11,200.00 | 160.00 | 12,800.00 | 75.00 | 6,000.00 | 150.00 | 12,000.00 |
| 0011 | 711-02-00300 | Riprap (30 lb) | 12 | CUYD | 160.00 | 1,920.00 | 220.00 | 2,640.00 | 100.00 | 1,200.00 | 170.00 | 2,040.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,400.00 | 20,400.00 | 45,000.00 | 45,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.11 | MILE | 180.00 | 1,279.80 | 200.00 | 1,422.00 | 10.00 | 71.10 | 170.00 | 1,208.70 |
| 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.268 | MILE | 50.00 | 263.40 | 100.00 | 526.80 | 20.00 | 105.36 | 325.00 | 1,712.10 |
| 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 20.013 | MILE | 100.00 | 2,001.30 | 100.00 | 2,001.30 | 30.00 | 600.39 | 450.00 | 9,005.85 |
| 0016 | 717-01-00100 | Seeding | 86.1 | LB | 20.00 | 1,722.00 | 11.00 | 947.10 | 10.00 | 861.00 | 20.00 | 1,722.00 |
| 0017 | 718-01-00100 | Fertilizer | 2,870 | LB | 0.60 | 1,722.00 | 1.60 | 4,592.00 | 0.55 | 1,578.50 | 1.20 | 3,444.00 |
| 0018 | 726-01-00100 | Bedding Material | 16.5 | CUYD | 86.00 | 1,419.00 | 100.00 | 1,650.00 | 100.00 | 1,650.00 | 140.00 | 2,310.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 102,000.00 | 102,000.00 | 99,000.00 | 99,000.00 | 40,000.00 | 40,000.00 | 51,000.00 | 51,000.00 |
| 0020 | 729-01-00100 | Sign (Type A) (W11-1 "Bicycle Traffic" & W16-1P "Share The Road") | 37.1 | SQFT | 16.00 | 593.60 | 18.00 | 667.80 | 15.00 | 556.50 | 31.00 | 1,150.10 |
| 0021 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 75.00 | 150.00 | 80.00 | 160.00 | 75.00 | 150.00 | 115.00 | 230.00 |
| 0022 | 729-21-00100 | U-Channel Post | 8 | EACH | 100.00 | 800.00 | 110.00 | 880.00 | 95.00 | 760.00 | 115.00 | 920.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 315 | EACH | 6.00 | 1,890.00 | 7.00 | 2,205.00 | 5.25 | 1,653.75 | 6.00 | 1,890.00 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.671 | MILE | 2,800.00 | 18,678.80 | 3,000.00 | 20,013.00 | 2,800.00 | 18,678.80 | 3,000.00 | 20,013.00 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.756 | MILE | 900.00 | 1,580.40 | 1,000.00 | 1,756.00 | 850.00 | 1,492.60 | 900.00 | 1,580.40 |
| 0026 | 735-01-00100 | Mailboxes | 49 | EACH | 5.00 | 245.00 | 6.00 | 294.00 | 5.00 | 245.00 | 1.00 | 49.00 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | 49 | EACH | 130.00 | 6,370.00 | 135.00 | 6,615.00 | 130.00 | 6,370.00 | 140.00 | 6,860.00 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 17,500.00 | 17,500.00 | 3,000.00 | 3,000.00 | 13,000.00 | 13,000.00 |
| 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 10,000 | INLF | 0.60 | 6,000.00 | 1.00 | 10,000.00 | 0.10 | 1,000.00 | 0.25 | 2,500.00 |
| CONTRACTOR TOTAL | 1,035,382.90 | 1,130,502.00 | 1,132,132.50 | 1,160,367.55 | ||||||||