Bid Tabulations
Letting of
06/13/2012
LA DOTD Headquarters
| Lead Project: H.000985.6 | |
| Parish: Claiborne | |
| Routes: US 79 | |
| Description: US 79: LA 2 TO 850' N. OF STANDPIPE ROAD | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, IN PLACE CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $2,273,187.23 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $2,419,214.74 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove existing pipe | 8 | LNFT | 50.00 | 400.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,500 | CUYD | 13.00 | 32,500.00 |
| 0003 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 250 | CUYD | 15.00 | 3,750.00 |
| 0004 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 13,273 | SQYD | 10.50 | 139,366.50 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 150 | CUYD | 10.00 | 1,500.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 16,425.4 | TON | 95.00 | 1,560,413.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 250 | TON | 50.00 | 12,500.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 134,930 | SQYD | 2.40 | 323,832.00 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -6,175 | CUYD | 0.10 | -617.50 |
| 0010 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 900 | SQYD | 51.50 | 46,350.00 |
| 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 400 | SQYD | 121.25 | 48,500.00 |
| 0012 | 510-03-00100 | Pavement Joint Repair | 200 | TON | 70.00 | 14,000.00 |
| 0013 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 300.00 | 2,400.00 |
| 0014 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,250.00 | 2,500.00 |
| 0015 | 703-03-00100 | Perforated Pipe Underdrains | 50 | LNFT | 1.00 | 50.00 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 71,000.00 | 71,000.00 |
| 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 664 | LNFT | 0.60 | 398.40 |
| 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.206 | MILE | 325.00 | 2,991.95 |
| 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.206 | MILE | 1.00 | 9.21 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 39.028 | MILE | 1.00 | 39.03 |
| 0021 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 20 | EACH | 1.00 | 20.00 |
| 0022 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 1.00 | 6.00 |
| 0023 | 716-01-00100 | Mulch (Vegetative) | 3.91 | TON | 1,000.00 | 3,910.00 |
| 0024 | 717-01-00100 | Seeding | 134 | LB | 15.00 | 2,010.00 |
| 0025 | 718-01-00100 | Fertilizer | 2,233 | LB | 1.00 | 2,233.00 |
| 0026 | 726-01-00100 | Bedding Material | 11.2 | CUYD | 25.00 | 280.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 71,000.00 | 71,000.00 |
| 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,405 | EACH | 3.00 | 4,215.00 |
| 0029 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 658 | LNFT | 1.00 | 658.00 |
| 0030 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 332 | LNFT | 3.00 | 996.00 |
| 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 19.514 | MILE | 2,275.00 | 44,394.35 |
| 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.603 | MILE | 600.00 | 2,761.80 |
| 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 150.00 | 1,950.00 |
| 0034 | 735-01-00100 | Mailboxes | 30 | EACH | 1.00 | 30.00 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 20 | EACH | 128.00 | 2,560.00 |
| 0036 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 175.00 | 875.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0038 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 3.8 | CUYD | 1,000.00 | 3,800.00 |
| 0039 | 806-01-00100 | Deformed Reinforcing Steel | 211 | LB | 3.00 | 633.00 |
| CONTRACTOR TOTAL | 2,419,214.74 | |||||