Bid Tabulations
Letting of
08/08/2012
LA DOTD Headquarters
| Lead Project: H.000943.6 | |
| Parish: Concordia | |
| Routes: US 84 | |
| Description: US 84: LA 3180 - LA 3196 (E.B.) | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVMENT, AND RELATED WORK | |
| Estimated Construction Cost: $1,196,720.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 02214 | W. E. Blain & Sons, Inc. | $1,062,910.37 |
| 2 | 05789 | D & J Construction Co., Inc. | $1,087,484.37 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $1,277,411.08 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - W. E. Blain & Sons, Inc. |
- 2 - D & J Construction Co., Inc. |
- 3 - Gilchrist Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 4 | LNFT | 80.00 | 320.00 | 20.00 | 80.00 | 200.00 | 800.00 |
| 0002 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 2,000.00 | 2,000.00 | 300.00 | 300.00 | 1,400.00 | 1,400.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 56 | CUYD | 26.50 | 1,484.00 | 20.00 | 1,120.00 | 35.00 | 1,960.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 48.00 | 96.00 | 100.00 | 200.00 | 300.00 | 600.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 5,846 | TON | 93.00 | 543,678.00 | 97.00 | 567,062.00 | 100.00 | 584,600.00 |
| 0006 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 5,979 | GAL | 4.10 | 24,513.90 | 3.50 | 20,926.50 | 3.80 | 22,720.20 |
| 0007 | 507-02-00200 | Aggregate (S2) | 14,580 | SQYD | 1.60 | 23,328.00 | 1.50 | 21,870.00 | 1.35 | 19,683.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 52,846 | SQYD | 0.88 | 46,504.48 | 1.80 | 95,122.80 | 1.00 | 52,846.00 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,101 | CUYD | 0.10 | -110.10 | 0.10 | -110.10 | 1.00 | -1,101.00 |
| 0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 200 | SQYD | 130.00 | 26,000.00 | 200.00 | 40,000.00 | 195.00 | 39,000.00 |
| 0011 | 602-03-00100 | Cleaning and Sealing Random cracks | 41,738 | LNFT | 1.50 | 62,607.00 | 0.95 | 39,651.10 | 1.30 | 54,259.40 |
| 0012 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 120.00 | 1,920.00 | 100.00 | 1,600.00 | 250.00 | 4,000.00 |
| 0013 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,800.00 | 1,800.00 | 700.00 | 700.00 | 1,000.00 | 1,000.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 |
| 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.257 | MILE | 260.00 | 1,626.82 | 225.00 | 1,407.83 | 350.00 | 2,189.95 |
| 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.257 | MILE | 250.00 | 1,564.25 | 200.00 | 1,251.40 | 1.00 | 6.26 |
| 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.47 | MILE | 400.00 | 5,788.00 | 1.00 | 14.47 | 1.00 | 14.47 |
| 0018 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 827 | EACH | 3.00 | 2,481.00 | 0.01 | 8.27 | 1.50 | 1,240.50 |
| 0019 | 726-01-00100 | Bedding Material | 6.9 | CUYD | 28.00 | 193.20 | 100.00 | 690.00 | 175.00 | 1,207.50 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 59,500.00 | 59,500.00 | 54,000.00 | 54,000.00 | 110,000.00 | 110,000.00 |
| 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,233 | EACH | 4.00 | 8,932.00 | 4.50 | 10,048.50 | 5.60 | 12,504.80 |
| 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.133 | MILE | 2,400.00 | 19,519.20 | 2,600.00 | 21,145.80 | 2,800.00 | 22,772.40 |
| 0023 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.526 | MILE | 4,800.00 | 2,524.80 | 5,300.00 | 2,787.80 | 7,300.00 | 3,839.80 |
| 0024 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.493 | MILE | 15,840.00 | 7,809.12 | 24,000.00 | 11,832.00 | 25,500.00 | 12,571.50 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.128 | MILE | 700.00 | 2,189.60 | 800.00 | 2,502.40 | 950.00 | 2,971.60 |
| 0026 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 200.00 | 3,600.00 | 200.00 | 3,600.00 | 230.00 | 4,140.00 |
| 0027 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 8 | EACH | 200.00 | 1,600.00 | 200.00 | 1,600.00 | 230.00 | 1,840.00 |
| 0028 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 18 | EACH | 200.00 | 3,600.00 | 350.00 | 6,300.00 | 240.00 | 4,320.00 |
| 0029 | 732-05-00100 | Removal of Existing Markings | 2.95 | MILE | 2,000.00 | 5,900.00 | 2,600.00 | 7,670.00 | 3,500.00 | 10,325.00 |
| 0030 | 739-01-00100 | Hydro-Seeding | 0.13 | ACRE | 3,850.00 | 500.50 | 10,000.00 | 1,300.00 | 10,000.00 | 1,300.00 |
| 0031 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 46,722 | LNFT | 1.40 | 65,410.80 | 1.25 | 58,402.50 | 1.55 | 72,419.10 |
| 0032 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 18,696 | LNFT | 1.45 | 27,109.20 | 1.25 | 23,370.00 | 3.10 | 57,957.60 |
| 0033 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 65,418 | LNFT | 0.95 | 62,147.10 | 0.95 | 62,147.10 | 1.00 | 65,418.00 |
| 0034 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 10,000 | INLF | 1.60 | 16,000.00 | 0.30 | 3,000.00 | 0.75 | 7,500.00 |
| 0035 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 2.21 | MILE | 350.00 | 773.50 | 400.00 | 884.00 | 500.00 | 1,105.00 |
| CONTRACTOR TOTAL | 1,062,910.37 | 1,087,484.37 | 1,277,411.08 | |||||||