Bid Tabulations
Letting of
06/27/2012
LA DOTD Headquarters
| Lead Project: H.000738.6 | |
| Parish: Desoto | |
| Routes: US 84 | |
| Description: US 84: LA 175 INTERSECTION IMPROVEMENTS | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANNING ASPHALTIC CONCRETE PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $342,832.90 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 40486 | Regional Construction, LLC | $344,760.90 |
| 2 | 40615 | Specialty Trackhoe & Dozer Serv.Inc | $378,109.25 |
| 3 | 35849 | T.L. Construction LLC | $389,639.05 |
| 4 | 36374 | Best-Yet Builders, Llc | $425,336.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Regional Construction, LLC |
- 2 - Specialty Trackhoe & Dozer Serv.Inc |
- 3 - T.L. Construction LLC |
- 4 - Best-Yet Builders, Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 295 | SQYD | 10.00 | 2,950.00 | 10.00 | 2,950.00 | 21.00 | 6,195.00 | 10.00 | 2,950.00 |
| 0002 | 202-02-32120 | Removal of Pipe (Side Drain) (12") | 57 | LNFT | 10.00 | 570.00 | 20.00 | 1,140.00 | 28.00 | 1,596.00 | 25.00 | 1,425.00 |
| 0003 | 202-02-32140 | Removal of Pipe (Storm Drain) (18") | 84 | LNFT | 12.00 | 1,008.00 | 20.00 | 1,680.00 | 25.00 | 2,100.00 | 25.00 | 2,100.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 22,000.00 | 22,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 16 | EACH | 50.00 | 800.00 | 20.00 | 320.00 | 25.00 | 400.00 | 10.00 | 160.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 1,550 | LNFT | 5.00 | 7,750.00 | 2.00 | 3,100.00 | 1.00 | 1,550.00 | 2.00 | 3,100.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 300 | CUYD | 10.00 | 3,000.00 | 70.00 | 21,000.00 | 25.00 | 7,500.00 | 50.00 | 15,000.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 573.4 | TON | 145.00 | 83,143.00 | 150.00 | 86,010.00 | 175.00 | 100,345.00 | 115.00 | 65,941.00 |
| 0009 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,255 | SQYD | 6.00 | 7,530.00 | 11.00 | 13,805.00 | 13.00 | 16,315.00 | 6.50 | 8,157.50 |
| 0010 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 303 | LNFT | 50.00 | 15,150.00 | 62.00 | 18,786.00 | 75.00 | 22,725.00 | 40.45 | 12,256.35 |
| 0011 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 306 | LNFT | 80.00 | 24,480.00 | 85.00 | 26,010.00 | 92.00 | 28,152.00 | 116.40 | 35,618.40 |
| 0012 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 106 | LNFT | 130.00 | 13,780.00 | 110.00 | 11,660.00 | 111.00 | 11,766.00 | 152.25 | 16,138.50 |
| 0013 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,500.00 | 3,500.00 | 3,800.00 | 3,800.00 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 |
| 0014 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 | 3,600.00 | 3,600.00 | 3,500.00 | 3,500.00 |
| 0015 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 |
| 0016 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 4,000.00 | 4,000.00 | 7,500.00 | 7,500.00 | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 |
| 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 241.2 | SQYD | 60.00 | 14,472.00 | 65.00 | 15,678.00 | 70.00 | 16,884.00 | 65.00 | 15,678.00 |
| 0018 | 707-03-00100 | Combination Concrete Curb and Gutter | 717.1 | LNFT | 34.00 | 24,381.40 | 40.00 | 28,684.00 | 26.00 | 18,644.60 | 30.00 | 21,513.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,000.00 | 14,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 |
| 0020 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.337 | MILE | 1,500.00 | 505.50 | 5,000.00 | 1,685.00 | 8,200.00 | 2,763.40 | 5,000.00 | 1,685.00 |
| 0021 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 975 | SQYD | 7.00 | 6,825.00 | 10.00 | 9,750.00 | 11.00 | 10,725.00 | 12.00 | 11,700.00 |
| 0022 | 726-01-00100 | Bedding Material | 150 | CUYD | 80.00 | 12,000.00 | 90.00 | 13,500.00 | 75.00 | 11,250.00 | 75.00 | 11,250.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 112 | EACH | 7.00 | 784.00 | 5.00 | 560.00 | 7.00 | 784.00 | 10.00 | 1,120.00 |
| 0025 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 230 | LNFT | 4.00 | 920.00 | 8.00 | 1,840.00 | 6.00 | 1,380.00 | 2.00 | 460.00 |
| 0026 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 135 | LNFT | 5.00 | 675.00 | 10.00 | 1,350.00 | 11.00 | 1,485.00 | 7.00 | 945.00 |
| 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.454 | MILE | 3,000.00 | 1,362.00 | 5,000.00 | 2,270.00 | 3,200.00 | 1,452.80 | 5,000.00 | 2,270.00 |
| 0028 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 400.00 | 400.00 | 250.00 | 250.00 | 265.00 | 265.00 | 200.00 | 200.00 |
| 0029 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 400.00 | 400.00 | 250.00 | 250.00 | 265.00 | 265.00 | 200.00 | 200.00 |
| 0030 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 400.00 | 400.00 | 500.00 | 500.00 | 265.00 | 265.00 | 250.00 | 250.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 8,500.00 | 8,500.00 | 5,500.00 | 5,500.00 | 25,000.00 | 25,000.00 |
| 0032 | 741-11-00100 | Adjusting Water Valve | 3 | EACH | 400.00 | 1,200.00 | 500.00 | 1,500.00 | 150.00 | 450.00 | 750.00 | 2,250.00 |
| 0033 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 6,875 | INLF | 1.00 | 6,875.00 | 1.75 | 12,031.25 | 0.95 | 6,531.25 | 2.25 | 15,468.75 |
| 0034 | NS-MSC-00280 | Adjusting Gas Valves and Valve Boxes | 1 | EACH | 400.00 | 400.00 | 1,000.00 | 1,000.00 | 150.00 | 150.00 | 5,000.00 | 5,000.00 |
| 0035 | NS-713-00001 | Dynamic Message Sign Unit | 1 | EACH | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 2,600.00 | 2,600.00 | 3,000.00 | 3,000.00 |
| CONTRACTOR TOTAL | 344,760.90 | 378,109.25 | 389,639.05 | 425,336.50 | ||||||||