Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: H.000680.6 | |
| Parish: St. Tammany | |
| Routes: US 11 | |
| Description: US 11 BRIDGE RAIL REHABILITATION | |
| Type Const: GUARD RAIL, SIGNAGE AND RELATED WORK | |
| Estimated Construction Cost: $10,637,778.94 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $5,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $5,579,169.70 | 120 | $6,179,169.70 |
| 2 | 26435 | C.E.C., Inc. | $6,191,087.10 | 150 | $6,941,087.10 |
| 3 | 07779 | Rosiek Construction Co Inc | $6,450,975.50 | 170 | $7,300,975.50 |
| 4 | 00755 | L & A Contracting Co. | $6,210,297.50 | 255 | $7,485,297.50 |
| 5 | 48896 | Command Construction Industries LLC | $6,696,151.00 | 180 | $7,596,151.00 |
| 6 | 47347 | Kiewit Louisiana Co | $7,587,615.00 | 71 | $7,942,615.00 |
| 7 | 43371 | RMD Holdings Ltd | $7,636,656.67 | 250 | $8,886,656.67 |
| 8 | 46547 | Interstate Improvement, Inc. | $9,219,786.50 | 50 | $9,469,786.50 |
| 9 | 02179 | Boh Bros. Construction Co., LLC. | $8,717,555.00 | 175 | $9,592,555.00 |
| 10 | 36961 | Cycle Construction Co. L.L.C. | $8,622,780.85 | 210 | $9,672,780.85 |
| 11 | 12069 | B & K Construction Co. | $10,571,143.80 | 180 | $11,471,143.80 |
| 12 | 38936 | Southern Industrial Contractors Llc | $11,424,860.40 | 365 | $13,249,860.40 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - C.E.C., Inc. |
- 3 - Rosiek Construction Co Inc |
- 4 - L & A Contracting Co. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-04001 | Removal of Bridge (Partial Removal) EXISTING CONCRETE POST AND CONCRETE RAILING TO BE REMOVED = 47,600 FT.. EXISTING STEEL W-BEAM RAILING TO BE REMOVED = 47,600 FT. | 1 | LUMP | 421,000.00 | 421,000.00 | 650,000.00 | 650,000.00 | 455,000.00 | 455,000.00 | 800,000.00 | 800,000.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 360 | LNFT | 3.00 | 1,080.00 | 3.00 | 1,080.00 | 12.00 | 4,320.00 | 5.00 | 1,800.00 |
| 0003 | 202-02-38240 | Removal of Signs and Supports | 49 | EACH | 88.00 | 4,312.00 | 83.00 | 4,067.00 | 150.00 | 7,350.00 | 85.00 | 4,165.00 |
| 0004 | 704-03-00100 | Blocked Out Guard Rail | 162.5 | LNFT | 21.00 | 3,412.50 | 20.00 | 3,250.00 | 21.00 | 3,412.50 | 35.00 | 5,687.50 |
| 0005 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 83.8 | LNFT | 64.00 | 5,363.20 | 77.00 | 6,452.60 | 35.00 | 2,933.00 | 70.00 | 5,866.00 |
| 0006 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,500.00 | 10,000.00 | 2,420.00 | 9,680.00 | 2,100.00 | 8,400.00 | 3,000.00 | 12,000.00 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 12,000.00 | 12,000.00 | 70,000.00 | 70,000.00 | 30,000.00 | 30,000.00 |
| 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 450,000.00 | 450,000.00 | 530,000.00 | 530,000.00 | 400,000.00 | 400,000.00 |
| 0009 | 729-01-00100 | Sign (Type A) | 281 | SQFT | 14.00 | 3,934.00 | 13.50 | 3,793.50 | 100.00 | 28,100.00 | 15.00 | 4,215.00 |
| 0010 | 729-03-00100 | Sign (Type C) | 48 | SQFT | 16.00 | 768.00 | 15.50 | 744.00 | 100.00 | 4,800.00 | 18.00 | 864.00 |
| 0011 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 48 | EACH | 1,600.00 | 76,800.00 | 1,540.00 | 73,920.00 | 925.00 | 44,400.00 | 2,000.00 | 96,000.00 |
| 0012 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 490.00 | 1,960.00 | 100.00 | 400.00 |
| 0013 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 150,000.00 | 150,000.00 |
| 0014 | 810-02-00100 | Steel Railing | 47,600 | LNFT | 93.00 | 4,426,800.00 | 96.50 | 4,593,400.00 | 93.00 | 4,426,800.00 | 90.00 | 4,284,000.00 |
| 0015 | NS-805-00027 | Structural Concrete Patching | 2,500 | SQFT | 50.00 | 125,000.00 | 55.00 | 137,500.00 | 253.50 | 633,750.00 | 65.00 | 162,500.00 |
| 0016 | NS-805-00029 | Removal and Repair of Concrete Curb Reinforcing PAY ITEM BASED ON NUMBER OF CONCRETE POST. EACH CONCRETE POST HAS FOUR(4) VERTICAL REBARS TO REMOVE AND REPAIR AS PER SPECIFICATION. | 5,440 | EACH | 40.00 | 217,600.00 | 40.00 | 217,600.00 | 40.00 | 217,600.00 | 45.00 | 244,800.00 |
| 0017 | NS-MSC-00282 | Historical Marker | 1 | LUMP | 2,700.00 | 2,700.00 | 2,200.00 | 2,200.00 | 2,150.00 | 2,150.00 | 8,000.00 | 8,000.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 5,579,169.70 | 6,191,087.10 | 6,450,975.50 | 6,210,297.50 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 600,000.00 | 750,000.00 | 850,000.00 | 1,275,000.00 | ||||||||
| TOTAL BID | 6,179,169.70 | 6,941,087.10 | 7,300,975.50 | 7,485,297.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Command Construction Industries LLC |
- 6 - Kiewit Louisiana Co |
- 7 - RMD Holdings Ltd |
- 8 - Interstate Improvement, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-04001 | Removal of Bridge (Partial Removal) EXISTING CONCRETE POST AND CONCRETE RAILING TO BE REMOVED = 47,600 FT.. EXISTING STEEL W-BEAM RAILING TO BE REMOVED = 47,600 FT. | 1 | LUMP | 1,510,000.00 | 1,510,000.00 | 1,500,000.00 | 1,500,000.00 | 407,399.38 | 407,399.38 | 1,452,000.00 | 1,452,000.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 360 | LNFT | 5.00 | 1,800.00 | 3.00 | 1,080.00 | 6.15 | 2,214.00 | 7.00 | 2,520.00 |
| 0003 | 202-02-38240 | Removal of Signs and Supports | 49 | EACH | 150.00 | 7,350.00 | 200.00 | 9,800.00 | 30.75 | 1,506.75 | 130.00 | 6,370.00 |
| 0004 | 704-03-00100 | Blocked Out Guard Rail | 162.5 | LNFT | 20.00 | 3,250.00 | 20.00 | 3,250.00 | 24.60 | 3,997.50 | 21.00 | 3,412.50 |
| 0005 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 83.8 | LNFT | 70.00 | 5,866.00 | 60.00 | 5,028.00 | 918.70 | 76,987.06 | 35.00 | 2,933.00 |
| 0006 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,300.00 | 9,200.00 | 2,706.03 | 10,824.12 | 2,100.00 | 8,400.00 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,000.00 | 1,000.00 | 70,000.00 | 70,000.00 | 58,823.91 | 58,823.91 | 150,000.00 | 150,000.00 |
| 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 670,000.00 | 670,000.00 | 693,122.00 | 693,122.00 | 876,284.48 | 876,284.48 | 175,000.00 | 175,000.00 |
| 0009 | 729-01-00100 | Sign (Type A) | 281 | SQFT | 25.00 | 7,025.00 | 15.00 | 4,215.00 | 28.29 | 7,949.49 | 100.00 | 28,100.00 |
| 0010 | 729-03-00100 | Sign (Type C) | 48 | SQFT | 25.00 | 1,200.00 | 15.00 | 720.00 | 33.21 | 1,594.08 | 100.00 | 4,800.00 |
| 0011 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 48 | EACH | 1,800.00 | 86,400.00 | 1,500.00 | 72,000.00 | 2,093.48 | 100,487.04 | 925.00 | 44,400.00 |
| 0012 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 65.00 | 260.00 | 100.00 | 400.00 | 98.40 | 393.60 | 69.00 | 276.00 |
| 0013 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 30,000.00 | 30,000.00 | 40,652.10 | 40,652.10 | 50,000.00 | 50,000.00 |
| 0014 | 810-02-00100 | Steel Railing | 47,600 | LNFT | 86.00 | 4,093,600.00 | 98.00 | 4,664,800.00 | 116.49 | 5,544,924.00 | 143.00 | 6,806,800.00 |
| 0015 | NS-805-00027 | Structural Concrete Patching | 2,500 | SQFT | 10.00 | 25,000.00 | 100.00 | 250,000.00 | 73.80 | 184,500.00 | 61.35 | 153,375.00 |
| 0016 | NS-805-00029 | Removal and Repair of Concrete Curb Reinforcing PAY ITEM BASED ON NUMBER OF CONCRETE POST. EACH CONCRETE POST HAS FOUR(4) VERTICAL REBARS TO REMOVE AND REPAIR AS PER SPECIFICATION. | 5,440 | EACH | 50.00 | 272,000.00 | 50.00 | 272,000.00 | 57.80 | 314,432.00 | 60.00 | 326,400.00 |
| 0017 | NS-MSC-00282 | Historical Marker | 1 | LUMP | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 3,687.16 | 3,687.16 | 5,000.00 | 5,000.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 6,696,151.00 | 7,587,615.00 | 7,636,656.67 | 9,219,786.50 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 900,000.00 | 355,000.00 | 1,250,000.00 | 250,000.00 | ||||||||
| TOTAL BID | 7,596,151.00 | 7,942,615.00 | 8,886,656.67 | 9,469,786.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Boh Bros. Construction Co., LLC. |
- 10 - Cycle Construction Co. L.L.C. |
- 11 - B & K Construction Co. |
- 12 - Southern Industrial Contractors Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-04001 | Removal of Bridge (Partial Removal) EXISTING CONCRETE POST AND CONCRETE RAILING TO BE REMOVED = 47,600 FT.. EXISTING STEEL W-BEAM RAILING TO BE REMOVED = 47,600 FT. | 1 | LUMP | 525,000.00 | 525,000.00 | 1,490,000.00 | 1,490,000.00 | 1,069,743.00 | 1,069,743.00 | 642,000.00 | 642,000.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 360 | LNFT | 3.00 | 1,080.00 | 5.00 | 1,800.00 | 7.00 | 2,520.00 | 3.00 | 1,080.00 |
| 0003 | 202-02-38240 | Removal of Signs and Supports | 49 | EACH | 675.00 | 33,075.00 | 145.00 | 7,105.00 | 95.00 | 4,655.00 | 250.00 | 12,250.00 |
| 0004 | 704-03-00100 | Blocked Out Guard Rail | 162.5 | LNFT | 20.00 | 3,250.00 | 22.50 | 3,656.25 | 28.00 | 4,550.00 | 21.60 | 3,510.00 |
| 0005 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 83.8 | LNFT | 60.00 | 5,028.00 | 67.00 | 5,614.60 | 86.00 | 7,206.80 | 66.00 | 5,530.80 |
| 0006 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,450.00 | 9,800.00 | 2,400.00 | 9,600.00 | 3,150.00 | 12,600.00 | 2,640.00 | 10,560.00 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,500.00 | 22,500.00 | 20,000.00 | 20,000.00 | 375,000.00 | 375,000.00 | 35,000.00 | 35,000.00 |
| 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 575,000.00 | 575,000.00 | 398,000.00 | 398,000.00 | 550,000.00 | 550,000.00 |
| 0009 | 729-01-00100 | Sign (Type A) | 281 | SQFT | 18.00 | 5,058.00 | 105.00 | 29,505.00 | 71.00 | 19,951.00 | 14.40 | 4,046.40 |
| 0010 | 729-03-00100 | Sign (Type C) | 48 | SQFT | 18.00 | 864.00 | 105.00 | 5,040.00 | 71.00 | 3,408.00 | 16.80 | 806.40 |
| 0011 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 48 | EACH | 1,550.00 | 74,400.00 | 1,050.00 | 50,400.00 | 3,285.00 | 157,680.00 | 1,700.00 | 81,600.00 |
| 0012 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 85.00 | 340.00 | 700.00 | 2,800.00 | 108.00 | 432.00 |
| 0013 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | 64,000.00 | 64,000.00 | 42,000.00 | 42,000.00 |
| 0014 | 810-02-00100 | Steel Railing | 47,600 | LNFT | 138.00 | 6,568,800.00 | 113.50 | 5,402,600.00 | 151.00 | 7,187,600.00 | 200.00 | 9,520,000.00 |
| 0015 | NS-805-00027 | Structural Concrete Patching | 2,500 | SQFT | 30.00 | 75,000.00 | 62.00 | 155,000.00 | 325.00 | 812,500.00 | 72.00 | 180,000.00 |
| 0016 | NS-805-00029 | Removal and Repair of Concrete Curb Reinforcing PAY ITEM BASED ON NUMBER OF CONCRETE POST. EACH CONCRETE POST HAS FOUR(4) VERTICAL REBARS TO REMOVE AND REPAIR AS PER SPECIFICATION. | 5,440 | EACH | 145.00 | 788,800.00 | 148.00 | 805,120.00 | 82.00 | 446,080.00 | 60.67 | 330,044.80 |
| 0017 | NS-MSC-00282 | Historical Marker | 1 | LUMP | 4,500.00 | 4,500.00 | 2,000.00 | 2,000.00 | 2,850.00 | 2,850.00 | 6,000.00 | 6,000.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 8,717,555.00 | 8,622,780.85 | 10,571,143.80 | 11,424,860.40 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 875,000.00 | 1,050,000.00 | 900,000.00 | 1,825,000.00 | ||||||||
| TOTAL BID | 9,592,555.00 | 9,672,780.85 | 11,471,143.80 | 13,249,860.40 | ||||||||