Bid Tabulations
Letting of
02/08/2012
LA DOTD Headquarters
| Lead Project: H.000658.6 | |
| Parish: Ouachita | |
| Routes: US 165 | |
| Description: US 165: BREARD - 1.7 MI. S LA 134 (SB) | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $2,041,455.13 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $2,117,829.63 |
| 2 | 05789 | D & J Construction Co., Inc. | $2,350,869.96 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $2,598,087.18 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - D & J Construction Co., Inc. |
- 3 - Gilchrist Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 502-01-00100 | Superpave Asphaltic Concrete | 13,501.7 | TON | 93.00 | 1,255,658.10 | 99.00 | 1,336,668.30 | 105.00 | 1,417,678.50 |
| 0002 | 509-01-00100 | Cold Planing Asphaltic Pavement | 122,404 | SQYD | 1.60 | 195,846.40 | 2.50 | 306,010.00 | 1.20 | 146,884.80 |
| 0003 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -5,111 | CUYD | 0.10 | -511.10 | 0.10 | -511.10 | 1.00 | -5,111.00 |
| 0004 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 200 | SQYD | 180.00 | 36,000.00 | 175.00 | 35,000.00 | 185.00 | 37,000.00 |
| 0005 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 1,500.00 | 1,500.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 102,000.00 | 102,000.00 | 100,000.00 | 100,000.00 | 225,000.00 | 225,000.00 |
| 0007 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.434 | MILE | 175.00 | 2,350.95 | 250.00 | 3,358.50 | 350.00 | 4,701.90 |
| 0008 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.434 | MILE | 225.00 | 3,022.65 | 250.00 | 3,358.50 | 235.00 | 3,156.99 |
| 0009 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.868 | MILE | 550.00 | 14,777.40 | 350.00 | 9,403.80 | 425.00 | 11,418.90 |
| 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 115,000.00 | 115,000.00 | 130,000.00 | 130,000.00 | 250,000.00 | 250,000.00 |
| 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,156 | EACH | 5.00 | 5,780.00 | 6.00 | 6,936.00 | 5.90 | 6,820.40 |
| 0012 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.434 | MILE | 3,000.00 | 40,302.00 | 3,000.00 | 40,302.00 | 3,200.00 | 42,988.80 |
| 0013 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.543 | MILE | 4,250.00 | 2,307.75 | 9,000.00 | 4,887.00 | 10,000.00 | 5,430.00 |
| 0014 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.106 | MILE | 17,000.00 | 1,802.00 | 21,000.00 | 2,226.00 | 24,000.00 | 2,544.00 |
| 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.717 | MILE | 750.00 | 5,037.75 | 1,000.00 | 6,717.00 | 1,000.00 | 6,717.00 |
| 0016 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 22 | EACH | 225.00 | 4,950.00 | 200.00 | 4,400.00 | 200.00 | 4,400.00 |
| 0017 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 22 | EACH | 225.00 | 4,950.00 | 300.00 | 6,600.00 | 265.00 | 5,830.00 |
| 0018 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 400.00 | 800.00 | 500.00 | 1,000.00 | 475.00 | 950.00 |
| 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,400.00 | 8,400.00 | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 |
| 0020 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 107,388 | LNFT | 1.10 | 118,126.80 | 1.25 | 134,235.00 | 1.40 | 150,343.20 |
| 0021 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 44,000.7 | LNFT | 1.25 | 55,000.88 | 1.30 | 57,200.91 | 1.70 | 74,801.19 |
| 0022 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 155,082 | LNFT | 0.85 | 131,819.70 | 0.90 | 139,573.80 | 1.15 | 178,344.30 |
| 0023 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 2,862 | INLF | 0.80 | 2,289.60 | 1.25 | 3,577.50 | 1.70 | 4,865.40 |
| 0024 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 4.8 | MILE | 1,350.00 | 6,480.00 | 1,600.00 | 7,680.00 | 800.00 | 3,840.00 |
| 0025 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,867 | LNFT | 0.25 | 716.75 | 0.25 | 716.75 | 0.40 | 1,146.80 |
| 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 560 | LNFT | 0.70 | 392.00 | 0.50 | 280.00 | 0.60 | 336.00 |
| 0027 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 22 | EACH | 55.00 | 1,210.00 | 25.00 | 550.00 | 30.00 | 660.00 |
| 0028 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 22 | EACH | 55.00 | 1,210.00 | 25.00 | 550.00 | 30.00 | 660.00 |
| 0029 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 55.00 | 110.00 | 75.00 | 150.00 | 90.00 | 180.00 |
| CONTRACTOR TOTAL | 2,117,829.63 | 2,350,869.96 | 2,598,087.18 | |||||||