Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.000531.6 | |
| Parish: Jefferson Davis | |
| Routes: US 165 | |
| Description: US 165: BNSF OVERPASS - S WOODLAWN | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,636,970.76 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00183 | R. E. Heidt Construction Co., LLC | $1,638,527.42 |
| 2 | 14096 | Bessette Development Corp. | $1,799,236.00 |
| 3 | 34356 | Prairie Contractors Inc. | $1,856,202.33 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $1,875,127.99 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - R. E. Heidt Construction Co., LLC |
- 2 - Bessette Development Corp. |
- 3 - Prairie Contractors Inc. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 78 | CUYD | 35.00 | 2,730.00 | 89.00 | 6,942.00 | 150.00 | 11,700.00 | 55.00 | 4,290.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 15,260 | TON | 87.00 | 1,327,620.00 | 96.00 | 1,464,960.00 | 89.00 | 1,358,140.00 | 93.00 | 1,419,180.00 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 150.2 | TON | 106.00 | 15,921.20 | 107.50 | 16,146.50 | 50.00 | 7,510.00 | 150.00 | 22,530.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 76,511 | SQYD | 0.65 | 49,732.15 | 1.00 | 76,511.00 | 2.75 | 210,405.25 | 1.00 | 76,511.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,170 | CUYD | 0.89 | -2,821.30 | 0.50 | -1,585.00 | 19.00 | -60,230.00 | 1.00 | -3,170.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 43 | SQYD | 97.00 | 4,171.00 | 96.75 | 4,160.25 | 150.00 | 6,450.00 | 100.00 | 4,300.00 |
| 0007 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 292 | SQYD | 115.00 | 33,580.00 | 114.00 | 33,288.00 | 175.00 | 51,100.00 | 125.00 | 36,500.00 |
| 0008 | 510-03-00100 | Pavement Joint Repair | 402.4 | TON | 121.00 | 48,690.40 | 165.00 | 66,396.00 | 20.00 | 8,048.00 | 220.00 | 88,528.00 |
| 0009 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 4,754 | LNFT | 1.50 | 7,131.00 | 1.75 | 8,319.50 | 3.00 | 14,262.00 | 1.40 | 6,655.60 |
| 0010 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 5,705 | LNFT | 1.50 | 8,557.50 | 1.75 | 9,983.75 | 1.50 | 8,557.50 | 1.30 | 7,416.50 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,700.00 | 5,700.00 | 5,700.00 | 5,700.00 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 |
| 0012 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 506 | LNFT | 0.21 | 106.26 | 0.25 | 126.50 | 0.01 | 5.06 | 0.25 | 126.50 |
| 0013 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 280 | LNFT | 0.61 | 170.80 | 0.75 | 210.00 | 0.01 | 2.80 | 0.80 | 224.00 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.673 | MILE | 192.00 | 2,817.22 | 170.00 | 2,494.41 | 10.00 | 146.73 | 350.00 | 5,135.55 |
| 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.847 | MILE | 252.50 | 2,991.37 | 300.00 | 3,554.10 | 0.01 | 0.12 | 1.00 | 11.85 |
| 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.332 | MILE | 505.00 | 12,792.66 | 400.00 | 10,132.80 | 0.01 | 0.25 | 1.00 | 25.33 |
| 0017 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 12 | EACH | 50.50 | 606.00 | 45.00 | 540.00 | 0.01 | 0.12 | 50.00 | 600.00 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 48,600.00 | 48,600.00 | 23,500.29 | 23,500.29 | 130,000.00 | 130,000.00 | 135,000.00 | 135,000.00 |
| 0019 | 731-02-00100 | Reflectorized Raised Pavement Markers | 675 | EACH | 4.55 | 3,071.25 | 5.25 | 3,543.75 | 6.00 | 4,050.00 | 5.80 | 3,915.00 |
| 0020 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 506 | LNFT | 1.01 | 511.06 | 1.35 | 683.10 | 2.00 | 1,012.00 | 1.50 | 759.00 |
| 0021 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 140 | LNFT | 3.03 | 424.20 | 4.50 | 630.00 | 5.00 | 700.00 | 5.00 | 700.00 |
| 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.444 | MILE | 2,626.00 | 22,173.94 | 2,500.00 | 21,110.00 | 4,200.00 | 35,464.80 | 2,800.00 | 23,643.20 |
| 0023 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.949 | MILE | 808.00 | 3,190.79 | 850.00 | 3,356.65 | 4,000.00 | 15,796.00 | 940.00 | 3,712.06 |
| 0024 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 252.50 | 505.00 | 205.00 | 410.00 | 250.00 | 500.00 | 225.00 | 450.00 |
| 0025 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 252.50 | 1,010.00 | 215.00 | 860.00 | 250.00 | 1,000.00 | 225.00 | 900.00 |
| 0026 | 732-05-00100 | Removal of Existing Markings | 0.819 | MILE | 4,040.00 | 3,308.76 | 3,000.00 | 2,457.00 | 3,500.00 | 2,866.50 | 3,200.00 | 2,620.80 |
| 0027 | 735-01-00100 | Mailboxes | 8 | EACH | 12.12 | 96.96 | 12.00 | 96.00 | 15.00 | 120.00 | 15.00 | 120.00 |
| 0028 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 95.95 | 767.60 | 95.00 | 760.00 | 200.00 | 1,600.00 | 100.00 | 800.00 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 5,500.00 | 5,500.00 | 100.00 | 100.00 | 5,000.00 | 5,000.00 |
| 0030 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 12,936 | INLF | 1.50 | 19,404.00 | 1.65 | 21,344.40 | 0.70 | 9,055.20 | 0.10 | 1,293.60 |
| 0031 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 9.8 | MILE | 762.00 | 7,467.60 | 725.00 | 7,105.00 | 800.00 | 7,840.00 | 750.00 | 7,350.00 |
| CONTRACTOR TOTAL | 1,638,527.42 | 1,799,236.00 | 1,856,202.33 | 1,875,127.99 | ||||||||