Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.000486.6 | |
| Parish: St. Tammany | |
| Routes: LA 21 | |
| Description: Boston Street Beautification | |
| Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE, PORTLAND CEMENT CONCRETE PAVEMENT & SIDEWALKS, PRECAST CONCRETE PEDESTRIAN BRIDGE, LANDSCAPING, AND RELATED WORK. | |
| Estimated Construction Cost: $867,177.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 14914 | Kass Bros. Inc. | $550,742.85 |
| 2 | 36827 | Shavers-Whittle Construction LLC | $614,488.81 |
| 3 | 49356 | Kort's Trucking Inc. | $669,740.50 |
| 4 | 14807 | Richard Price Contracting Co, Llc | $717,011.27 |
| 5 | 38610 | Three C's Properties Inc | $803,427.12 |
| 6 | 38590 | J.C. Patin Group, LLC | $815,917.70 |
| 7 | 16724 | Stranco, Inc. | $849,082.50 |
| 8 | 00935 | Fleming Construction Co., Inc. | $858,562.50 |
| 9 | 30774 | Progressive Construction Co., LLC | $868,429.75 |
| 10 | 48896 | Command Construction Industries LLC | $994,042.00 |
| 11 | 16378 | Mcdonald Const. Inc. of Slidell | $1,132,652.80 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Kass Bros. Inc. |
- 2 - Shavers-Whittle Construction LLC |
- 3 - Kort's Trucking Inc. |
- 4 - Richard Price Contracting Co, Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 1,400.00 | 1,400.00 | 400.00 | 400.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | 150.7 | SQYD | 12.00 | 1,808.40 | 7.50 | 1,130.25 | 15.00 | 2,260.50 | 10.00 | 1,507.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,978.6 | SQYD | 12.90 | 38,423.94 | 8.50 | 25,318.10 | 13.00 | 38,721.80 | 6.00 | 17,871.60 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,400.00 | 15,400.00 | 15,750.00 | 15,750.00 | 18,000.00 | 18,000.00 | 40,000.00 | 40,000.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 833.3 | CUYD | 12.75 | 10,624.58 | 27.20 | 22,665.76 | 18.00 | 14,999.40 | 18.00 | 14,999.40 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 2,700 | LNFT | 1.60 | 4,320.00 | 0.25 | 675.00 | 1.50 | 4,050.00 | 2.00 | 5,400.00 |
| 0007 | 302-01-00700 | Class II Base Course (Stone) | 22.4 | CUYD | 66.00 | 1,478.40 | 80.00 | 1,792.00 | 65.00 | 1,456.00 | 27.60 | 618.24 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 31.7 | TON | 155.00 | 4,913.50 | 350.00 | 11,095.00 | 300.00 | 9,510.00 | 510.00 | 16,167.00 |
| 0009 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 533 | SQYD | 63.40 | 33,792.20 | 97.00 | 51,701.00 | 70.00 | 37,310.00 | 55.00 | 29,315.00 |
| 0010 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 250.00 | 1,250.00 | 500.00 | 2,500.00 | 450.00 | 2,250.00 | 250.00 | 1,250.00 |
| 0011 | 702-04-00200 | Adjusting Catch Basins | 14 | EACH | 270.00 | 3,780.00 | 500.00 | 7,000.00 | 450.00 | 6,300.00 | 500.00 | 7,000.00 |
| 0012 | 706-01-00300 | Concrete Walk (6" Thick) | 2,936.1 | SQYD | 50.30 | 147,685.83 | 46.00 | 135,060.60 | 58.00 | 170,293.80 | 52.00 | 152,677.20 |
| 0013 | 706-04-00100 | Handicapped Curb Ramps | 71 | EACH | 1,045.00 | 74,195.00 | 1,150.00 | 81,650.00 | 800.00 | 56,800.00 | 450.00 | 31,950.00 |
| 0014 | 707-03-00100 | Combination Concrete Curb and Gutter | 796 | LNFT | 30.75 | 24,477.00 | 17.25 | 13,731.00 | 25.00 | 19,900.00 | 17.00 | 13,532.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,600.00 | 8,600.00 | 5,500.00 | 5,500.00 | 30,000.00 | 30,000.00 | 9,500.00 | 9,500.00 |
| 0016 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 3,630 | SQYD | 3.90 | 14,157.00 | 3.25 | 11,797.50 | 5.00 | 18,150.00 | 6.75 | 24,502.50 |
| 0017 | 719-01-02020 | Plants (Tree) (Container) (1 1/2" cal) Drake Elm | 2 | EACH | 940.00 | 1,880.00 | 200.00 | 400.00 | 350.00 | 700.00 | 907.00 | 1,814.00 |
| 0018 | 719-01-02020 | Plants (Tree) (Container) (1 1/2" cal) Savannah Holly | 3 | EACH | 940.00 | 2,820.00 | 200.00 | 600.00 | 350.00 | 1,050.00 | 907.00 | 2,721.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000.00 | 10,000.00 | 10,500.00 | 10,500.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0020 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) White | 4,580 | LNFT | 1.00 | 4,580.00 | 0.90 | 4,122.00 | 1.50 | 6,870.00 | 0.57 | 2,610.60 |
| 0021 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) White | 1,340 | LNFT | 1.90 | 2,546.00 | 1.70 | 2,278.00 | 1.65 | 2,211.00 | 1.70 | 2,278.00 |
| 0022 | 732-05-00100 | Removal of Existing Markings | 0.3 | MILE | 6,575.00 | 1,972.50 | 5,700.00 | 1,710.00 | 10,000.00 | 3,000.00 | 3,686.10 | 1,105.83 |
| 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,500.00 | 1,500.00 | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 |
| 0024 | 741-11-00200 | Adjusting Water Valve and Meter Box | 9 | EACH | 59.00 | 531.00 | 500.00 | 4,500.00 | 100.00 | 900.00 | 230.00 | 2,070.00 |
| 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 19,490 | INLF | 0.75 | 14,617.50 | 1.00 | 19,490.00 | 0.95 | 18,515.50 | 0.96 | 18,710.40 |
| 0026 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 8,700 | INLF | 1.10 | 9,570.00 | 0.90 | 7,830.00 | 1.00 | 8,700.00 | 1.42 | 12,354.00 |
| 0027 | NS-ENH-01020 | Adjusting In-Ground Utility Access Boxes Complete and Installed | 4 | EACH | 140.00 | 560.00 | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 1,000.00 | 4,000.00 |
| 0028 | NS-ENH-08000 | Handrails Complete and Installed | 219.5 | LNFT | 62.00 | 13,609.00 | 66.00 | 14,487.00 | 55.00 | 12,072.50 | 85.00 | 18,657.50 |
| 0029 | NS-ENH-16040 | Pedestrian Bridge Precast Concrete | 1 | LUMP | 31,000.00 | 31,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 45,000.00 | 45,000.00 |
| 0030 | NS-ENH-16090 | Planter Fibercrete Complete and Installed | 99 | EACH | 325.00 | 32,175.00 | 900.00 | 89,100.00 | 700.00 | 69,300.00 | 1,600.00 | 158,400.00 |
| 0031 | NS-ENH-20000 | Temporary Business Entrances Boston St. | 1 | LUMP | 6,900.00 | 6,900.00 | 16,000.00 | 16,000.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 |
| 0032 | NS-ENH-20080 | Tree Well Planter Complete and Installed | 16 | EACH | 1,190.00 | 19,040.00 | 1,500.00 | 24,000.00 | 1,500.00 | 24,000.00 | 1,500.00 | 24,000.00 |
| 0033 | NS-ENH-20100 | Trench Drains Complete and Installed | 48 | LNFT | 232.00 | 11,136.00 | 139.70 | 6,705.60 | 165.00 | 7,920.00 | 250.00 | 12,000.00 |
| CONTRACTOR TOTAL | 550,742.85 | 614,488.81 | 669,740.50 | 717,011.27 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Three C's Properties Inc |
- 6 - J.C. Patin Group, LLC |
- 7 - Stranco, Inc. |
- 8 - Fleming Construction Co., Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 4,496.41 | 4,496.41 | 25,118.00 | 25,118.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | 150.7 | SQYD | 14.90 | 2,245.43 | 9.00 | 1,356.30 | 20.00 | 3,014.00 | 20.00 | 3,014.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,978.6 | SQYD | 8.65 | 25,764.89 | 15.00 | 44,679.00 | 20.00 | 59,572.00 | 20.00 | 59,572.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 6,553.00 | 6,553.00 | 9,675.00 | 9,675.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 833.3 | CUYD | 19.43 | 16,191.02 | 31.00 | 25,832.30 | 25.00 | 20,832.50 | 30.00 | 24,999.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 2,700 | LNFT | 1.77 | 4,779.00 | 1.70 | 4,590.00 | 2.00 | 5,400.00 | 1.50 | 4,050.00 |
| 0007 | 302-01-00700 | Class II Base Course (Stone) | 22.4 | CUYD | 63.28 | 1,417.47 | 88.00 | 1,971.20 | 50.00 | 1,120.00 | 100.00 | 2,240.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 31.7 | TON | 275.28 | 8,726.38 | 191.00 | 6,054.70 | 495.00 | 15,691.50 | 250.00 | 7,925.00 |
| 0009 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 533 | SQYD | 64.66 | 34,463.78 | 69.00 | 36,777.00 | 100.00 | 53,300.00 | 80.00 | 42,640.00 |
| 0010 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 417.62 | 2,088.10 | 652.00 | 3,260.00 | 1,200.00 | 6,000.00 | 300.00 | 1,500.00 |
| 0011 | 702-04-00200 | Adjusting Catch Basins | 14 | EACH | 487.96 | 6,831.44 | 819.00 | 11,466.00 | 1,800.00 | 25,200.00 | 500.00 | 7,000.00 |
| 0012 | 706-01-00300 | Concrete Walk (6" Thick) | 2,936.1 | SQYD | 54.57 | 160,222.98 | 48.00 | 140,932.80 | 75.00 | 220,207.50 | 60.00 | 176,166.00 |
| 0013 | 706-04-00100 | Handicapped Curb Ramps | 71 | EACH | 1,480.63 | 105,124.73 | 1,174.00 | 83,354.00 | 600.00 | 42,600.00 | 2,000.00 | 142,000.00 |
| 0014 | 707-03-00100 | Combination Concrete Curb and Gutter | 796 | LNFT | 27.66 | 22,017.36 | 20.00 | 15,920.00 | 30.00 | 23,880.00 | 30.00 | 23,880.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,874.24 | 4,874.24 | 49,319.00 | 49,319.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 |
| 0016 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 3,630 | SQYD | 5.53 | 20,073.90 | 10.00 | 36,300.00 | 5.50 | 19,965.00 | 5.00 | 18,150.00 |
| 0017 | 719-01-02020 | Plants (Tree) (Container) (1 1/2" cal) Drake Elm | 2 | EACH | 331.99 | 663.98 | 1,347.00 | 2,694.00 | 330.00 | 660.00 | 300.00 | 600.00 |
| 0018 | 719-01-02020 | Plants (Tree) (Container) (1 1/2" cal) Savannah Holly | 3 | EACH | 331.99 | 995.97 | 1,347.00 | 4,041.00 | 330.00 | 990.00 | 300.00 | 900.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 33,198.30 | 33,198.30 | 45,789.00 | 45,789.00 | 65,000.00 | 65,000.00 | 80,000.00 | 80,000.00 |
| 0020 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) White | 4,580 | LNFT | 0.53 | 2,427.40 | 2.00 | 9,160.00 | 1.00 | 4,580.00 | 0.50 | 2,290.00 |
| 0021 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) White | 1,340 | LNFT | 1.59 | 2,130.60 | 3.00 | 4,020.00 | 2.00 | 2,680.00 | 1.50 | 2,010.00 |
| 0022 | 732-05-00100 | Removal of Existing Markings | 0.3 | MILE | 3,445.00 | 1,033.50 | 9,426.00 | 2,827.80 | 5,000.00 | 1,500.00 | 3,250.00 | 975.00 |
| 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,597.12 | 15,597.12 | 16,832.00 | 16,832.00 | 7,500.00 | 7,500.00 | 6,000.00 | 6,000.00 |
| 0024 | 741-11-00200 | Adjusting Water Valve and Meter Box | 9 | EACH | 109.85 | 988.65 | 362.00 | 3,258.00 | 1,000.00 | 9,000.00 | 300.00 | 2,700.00 |
| 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 19,490 | INLF | 3.71 | 72,307.90 | 0.34 | 6,626.60 | 1.00 | 19,490.00 | 0.85 | 16,566.50 |
| 0026 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 8,700 | INLF | 8.48 | 73,776.00 | 1.00 | 8,700.00 | 1.50 | 13,050.00 | 1.25 | 10,875.00 |
| 0027 | NS-ENH-01020 | Adjusting In-Ground Utility Access Boxes Complete and Installed | 4 | EACH | 498.28 | 1,993.12 | 809.00 | 3,236.00 | 1,200.00 | 4,800.00 | 1,000.00 | 4,000.00 |
| 0028 | NS-ENH-08000 | Handrails Complete and Installed | 219.5 | LNFT | 59.36 | 13,029.52 | 70.00 | 15,365.00 | 100.00 | 21,950.00 | 60.00 | 13,170.00 |
| 0029 | NS-ENH-16040 | Pedestrian Bridge Precast Concrete | 1 | LUMP | 15,306.84 | 15,306.84 | 31,965.00 | 31,965.00 | 48,000.00 | 48,000.00 | 40,000.00 | 40,000.00 |
| 0030 | NS-ENH-16090 | Planter Fibercrete Complete and Installed | 99 | EACH | 830.57 | 82,226.43 | 1,039.00 | 102,861.00 | 800.00 | 79,200.00 | 900.00 | 89,100.00 |
| 0031 | NS-ENH-20000 | Temporary Business Entrances Boston St. | 1 | LUMP | 29,269.82 | 29,269.82 | 18,145.00 | 18,145.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 |
| 0032 | NS-ENH-20080 | Tree Well Planter Complete and Installed | 16 | EACH | 1,183.57 | 18,937.12 | 2,131.00 | 34,096.00 | 1,200.00 | 19,200.00 | 2,500.00 | 40,000.00 |
| 0033 | NS-ENH-20100 | Trench Drains Complete and Installed | 48 | LNFT | 284.89 | 13,674.72 | 202.00 | 9,696.00 | 150.00 | 7,200.00 | 130.00 | 6,240.00 |
| CONTRACTOR TOTAL | 803,427.12 | 815,917.70 | 849,082.50 | 858,562.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Progressive Construction Co., LLC |
- 10 - Command Construction Industries LLC |
- 11 - Mcdonald Const. Inc. of Slidell |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 6,000.00 | 6,000.00 | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | 150.7 | SQYD | 8.50 | 1,280.95 | 25.00 | 3,767.50 | 28.00 | 4,219.60 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,978.6 | SQYD | 8.75 | 26,062.75 | 25.00 | 74,465.00 | 18.00 | 53,614.80 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 19,000.00 | 19,000.00 | 43,000.00 | 43,000.00 | 32,000.00 | 32,000.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 833.3 | CUYD | 22.00 | 18,332.60 | 10.00 | 8,333.00 | 21.00 | 17,499.30 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 2,700 | LNFT | 3.00 | 8,100.00 | 1.00 | 2,700.00 | 6.00 | 16,200.00 |
| 0007 | 302-01-00700 | Class II Base Course (Stone) | 22.4 | CUYD | 126.00 | 2,822.40 | 200.00 | 4,480.00 | 100.00 | 2,240.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 31.7 | TON | 258.00 | 8,178.60 | 500.00 | 15,850.00 | 600.00 | 19,020.00 |
| 0009 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 533 | SQYD | 65.75 | 35,044.75 | 125.00 | 66,625.00 | 85.00 | 45,305.00 |
| 0010 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 600.00 | 3,000.00 | 750.00 | 3,750.00 | 1,200.00 | 6,000.00 |
| 0011 | 702-04-00200 | Adjusting Catch Basins | 14 | EACH | 1,500.00 | 21,000.00 | 750.00 | 10,500.00 | 1,500.00 | 21,000.00 |
| 0012 | 706-01-00300 | Concrete Walk (6" Thick) | 2,936.1 | SQYD | 77.00 | 226,079.70 | 125.00 | 367,012.50 | 80.00 | 234,888.00 |
| 0013 | 706-04-00100 | Handicapped Curb Ramps | 71 | EACH | 1,400.00 | 99,400.00 | 500.00 | 35,500.00 | 1,400.00 | 99,400.00 |
| 0014 | 707-03-00100 | Combination Concrete Curb and Gutter | 796 | LNFT | 31.00 | 24,676.00 | 40.00 | 31,840.00 | 52.00 | 41,392.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 1,000.00 | 1,000.00 | 50,000.00 | 50,000.00 |
| 0016 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 3,630 | SQYD | 7.00 | 25,410.00 | 5.00 | 18,150.00 | 7.50 | 27,225.00 |
| 0017 | 719-01-02020 | Plants (Tree) (Container) (1 1/2" cal) Drake Elm | 2 | EACH | 950.00 | 1,900.00 | 800.00 | 1,600.00 | 1,960.00 | 3,920.00 |
| 0018 | 719-01-02020 | Plants (Tree) (Container) (1 1/2" cal) Savannah Holly | 3 | EACH | 950.00 | 2,850.00 | 800.00 | 2,400.00 | 960.00 | 2,880.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 32,000.00 | 32,000.00 | 100,000.00 | 100,000.00 | 45,000.00 | 45,000.00 |
| 0020 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) White | 4,580 | LNFT | 1.10 | 5,038.00 | 0.50 | 2,290.00 | 0.92 | 4,213.60 |
| 0021 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) White | 1,340 | LNFT | 1.75 | 2,345.00 | 1.50 | 2,010.00 | 1.95 | 2,613.00 |
| 0022 | 732-05-00100 | Removal of Existing Markings | 0.3 | MILE | 3,800.00 | 1,140.00 | 3,000.00 | 900.00 | 6,800.00 | 2,040.00 |
| 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 1,000.00 | 1,000.00 | 15,000.00 | 15,000.00 |
| 0024 | 741-11-00200 | Adjusting Water Valve and Meter Box | 9 | EACH | 350.00 | 3,150.00 | 1,000.00 | 9,000.00 | 600.00 | 5,400.00 |
| 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 19,490 | INLF | 0.90 | 17,541.00 | 0.10 | 1,949.00 | 3.00 | 58,470.00 |
| 0026 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 8,700 | INLF | 1.60 | 13,920.00 | 0.10 | 870.00 | 3.00 | 26,100.00 |
| 0027 | NS-ENH-01020 | Adjusting In-Ground Utility Access Boxes Complete and Installed | 4 | EACH | 350.00 | 1,400.00 | 1,000.00 | 4,000.00 | 2,800.00 | 11,200.00 |
| 0028 | NS-ENH-08000 | Handrails Complete and Installed | 219.5 | LNFT | 74.00 | 16,243.00 | 100.00 | 21,950.00 | 125.00 | 27,437.50 |
| 0029 | NS-ENH-16040 | Pedestrian Bridge Precast Concrete | 1 | LUMP | 34,600.00 | 34,600.00 | 25,000.00 | 25,000.00 | 32,000.00 | 32,000.00 |
| 0030 | NS-ENH-16090 | Planter Fibercrete Complete and Installed | 99 | EACH | 1,295.00 | 128,205.00 | 500.00 | 49,500.00 | 925.00 | 91,575.00 |
| 0031 | NS-ENH-20000 | Temporary Business Entrances Boston St. | 1 | LUMP | 7,750.00 | 7,750.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 |
| 0032 | NS-ENH-20080 | Tree Well Planter Complete and Installed | 16 | EACH | 1,932.00 | 30,912.00 | 1,500.00 | 24,000.00 | 1,700.00 | 27,200.00 |
| 0033 | NS-ENH-20100 | Trench Drains Complete and Installed | 48 | LNFT | 376.00 | 18,048.00 | 200.00 | 9,600.00 | 1,200.00 | 57,600.00 |
| CONTRACTOR TOTAL | 868,429.75 | 994,042.00 | 1,132,652.80 | |||||||