Bid Tabulations
Letting of
05/09/2012
LA DOTD Headquarters
| Lead Project: H.000450.6 | |
| Parish: East Baton Rouge | |
| Routes: US 190 | |
| Description: US 190: FOSTER BLVD. - US 61 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, RUBBLIZING PORTLAND CEMENT CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $7,101,264.55 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $8,502,463.14 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $8,848,154.44 |
| 3 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $8,997,983.42 |
| 4 | 00481 | Coastal Bridge Co., L.L.C. | $10,846,220.56 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Barber Bros. Contracting Co., L.L.C |
- 3 - F.G. Sullivan, Jr. Contractor LLC |
- 4 - Coastal Bridge Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 969 | LNFT | 5.00 | 4,845.00 | 10.00 | 9,690.00 | 5.00 | 4,845.00 | 7.00 | 6,783.00 |
| 0003 | 202-02-38500 | Removal of Surfacing and Stablized Base | 797 | SQYD | 6.00 | 4,782.00 | 20.00 | 15,940.00 | 10.00 | 7,970.00 | 47.00 | 37,459.00 |
| 0004 | 203-01-00100 | General Excavation | 560 | CUYD | 25.00 | 14,000.00 | 25.00 | 14,000.00 | 10.00 | 5,600.00 | 27.50 | 15,400.00 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 60,000.00 | 60,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 26,500.00 | 26,500.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 701.3 | CUYD | 17.00 | 11,922.10 | 25.00 | 17,532.50 | 20.00 | 14,026.00 | 25.25 | 17,707.83 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 36,000 | LNFT | 0.35 | 12,600.00 | 1.50 | 54,000.00 | 1.65 | 59,400.00 | 1.50 | 54,000.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 44,931.8 | TON | 94.00 | 4,223,589.20 | 98.00 | 4,403,316.40 | 100.00 | 4,493,180.00 | 120.00 | 5,391,816.00 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,771.7 | TON | 105.00 | 291,028.50 | 135.00 | 374,179.50 | 135.00 | 374,179.50 | 150.00 | 415,755.00 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 144,758.5 | SQYD | 1.15 | 166,472.28 | 4.00 | 579,034.00 | 3.00 | 434,275.50 | 3.25 | 470,465.13 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,950 | CUYD | 2.00 | -7,900.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.10 | -395.00 |
| 0013 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 6,314 | LNFT | 2.35 | 14,837.90 | 2.30 | 14,522.20 | 2.50 | 15,785.00 | 2.50 | 15,785.00 |
| 0014 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 2,525 | LNFT | 2.35 | 5,933.75 | 2.50 | 6,312.50 | 2.50 | 6,312.50 | 2.50 | 6,312.50 |
| 0015 | 602-03-00100 | Cleaning and Sealing Random cracks | 1,263 | LNFT | 2.35 | 2,968.05 | 3.00 | 3,789.00 | 3.75 | 4,736.25 | 4.00 | 5,052.00 |
| 0016 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 334.7 | SQYD | 170.00 | 56,899.00 | 200.00 | 66,940.00 | 213.00 | 71,291.10 | 225.00 | 75,307.50 |
| 0017 | 703-01-00100 | Shoulder Underdrain Systems | 27,350.4 | LNFT | 11.00 | 300,854.40 | 14.00 | 382,905.60 | 2.30 | 62,905.92 | 13.00 | 355,555.20 |
| 0018 | 703-02-00100 | Shoulder Outlet Underdrains | 110 | EACH | 280.00 | 30,800.00 | 500.00 | 55,000.00 | 450.00 | 49,500.00 | 450.00 | 49,500.00 |
| 0019 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,544 | LNFT | 26.00 | 40,144.00 | 40.00 | 61,760.00 | 25.00 | 38,600.00 | 40.00 | 61,760.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 | 100,000.00 | 100,000.00 | 750,000.00 | 750,000.00 | 450,000.00 | 450,000.00 |
| 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 19,875 | LNFT | 0.26 | 5,167.50 | 0.25 | 4,968.75 | 0.22 | 4,372.50 | 0.25 | 4,968.75 |
| 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,646 | LNFT | 0.85 | 2,249.10 | 1.00 | 2,646.00 | 0.75 | 1,984.50 | 1.00 | 2,646.00 |
| 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.999 | MILE | 285.00 | 3,419.72 | 300.00 | 3,599.70 | 250.00 | 2,999.75 | 3,000.00 | 35,997.00 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 37.092 | MILE | 315.00 | 11,683.98 | 350.00 | 12,982.20 | 275.00 | 10,200.30 | 300.00 | 11,127.60 |
| 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 318 | EACH | 50.00 | 15,900.00 | 60.00 | 19,080.00 | 45.00 | 14,310.00 | 50.00 | 15,900.00 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 800,000.00 | 800,000.00 | 360,000.00 | 360,000.00 | 460,000.00 | 460,000.00 | 1,000,000.00 | 1,000,000.00 |
| 0029 | 730-15-12000 | Relocate Light Poles (40') (Aluminum) | 4 | EACH | 3,400.00 | 13,600.00 | 3,500.00 | 14,000.00 | 1,820.00 | 7,280.00 | 2,000.00 | 8,000.00 |
| 0030 | 730-16-00100 | Underground Junction Box (12" x 12") | 2 | EACH | 345.00 | 690.00 | 350.00 | 700.00 | 365.00 | 730.00 | 400.00 | 800.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,200 | EACH | 6.00 | 13,200.00 | 6.00 | 13,200.00 | 5.25 | 11,550.00 | 5.50 | 12,100.00 |
| 0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 6,625 | LNFT | 1.50 | 9,937.50 | 1.60 | 10,600.00 | 1.35 | 8,943.75 | 1.50 | 9,937.50 |
| 0033 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 470 | LNFT | 5.22 | 2,453.40 | 5.50 | 2,585.00 | 4.50 | 2,115.00 | 4.75 | 2,232.50 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 853 | LNFT | 5.75 | 4,904.75 | 6.00 | 5,118.00 | 5.00 | 4,265.00 | 5.25 | 4,478.25 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.364 | MILE | 2,800.00 | 34,619.20 | 3,000.00 | 37,092.00 | 2,500.00 | 30,910.00 | 2,700.00 | 33,382.80 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.36 | MILE | 975.00 | 10,101.00 | 1,000.00 | 10,360.00 | 850.00 | 8,806.00 | 900.00 | 9,324.00 |
| 0037 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 1.279 | MILE | 3,400.00 | 4,348.60 | 3,500.00 | 4,476.50 | 3,000.00 | 3,837.00 | 3,200.00 | 4,092.80 |
| 0038 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.36 | MILE | 3,400.00 | 1,224.00 | 3,500.00 | 1,260.00 | 3,000.00 | 1,080.00 | 3,200.00 | 1,152.00 |
| 0039 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 68 | EACH | 250.00 | 17,000.00 | 250.00 | 17,000.00 | 215.00 | 14,620.00 | 230.00 | 15,640.00 |
| 0040 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 38 | EACH | 250.00 | 9,500.00 | 250.00 | 9,500.00 | 215.00 | 8,170.00 | 230.00 | 8,740.00 |
| 0041 | 734-01-00100 | Rubblizing Portland Cement Concrete Pavement | 103,261.5 | SQYD | 8.00 | 826,092.00 | 8.00 | 826,092.00 | 8.00 | 826,092.00 | 8.00 | 826,092.00 |
| 0042 | 736-01-00100 | Trenching and Backfilling Loop | 4,800 | LNFT | 3.45 | 16,560.00 | 3.50 | 16,800.00 | 4.00 | 19,200.00 | 4.25 | 20,400.00 |
| 0043 | 736-10-00100 | Underground Junction Box (Type D) Loop | 30 | EACH | 285.00 | 8,550.00 | 300.00 | 9,000.00 | 365.00 | 10,950.00 | 400.00 | 12,000.00 |
| 0044 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 4,805 | LNFT | 1.50 | 7,207.50 | 0.35 | 1,681.75 | 1.40 | 6,727.00 | 1.45 | 6,967.25 |
| 0045 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 4,800 | LNFT | 1.16 | 5,568.00 | 1.25 | 6,000.00 | 1.75 | 8,400.00 | 2.00 | 9,600.00 |
| 0046 | 739-01-00100 | Hydro-Seeding | 3.91 | ACRE | 1,600.00 | 6,256.00 | 1,500.00 | 5,865.00 | 1,500.00 | 5,865.00 | 1,200.00 | 4,692.00 |
| 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 |
| 0048 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 322,397.4 | INLF | 0.44 | 141,854.86 | 0.60 | 193,438.44 | 0.25 | 80,599.35 | 0.50 | 161,198.70 |
| 0049 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 15,000.00 | 60,000.00 | 25,000.00 | 100,000.00 | 5,000.00 | 20,000.00 | 16,500.00 | 66,000.00 |
| 0050 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 5.122 | MILE | 925.00 | 4,737.85 | 1,200.00 | 6,146.40 | 700.00 | 3,585.40 | 625.00 | 3,201.25 |
| 0051 | 736-02-00200 | Conduit with Conductors (1" HPDE, Sch 80) (For Light Pole) | 600 | LNFT | 3.50 | 2,100.00 | 3.50 | 2,100.00 | 1.40 | 840.00 | 2.00 | 1,200.00 |
| 0052 | 736-09-00100 | Loop Detector | 4,805 | LNFT | 12.00 | 57,660.00 | 12.00 | 57,660.00 | 10.00 | 48,050.00 | 12.00 | 57,660.00 |
| 0053 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 600 | LNFT | 4.00 | 2,400.00 | 4.00 | 2,400.00 | 5.00 | 3,000.00 | 5.34 | 3,204.00 |
| 0054 | 302-02-06100 | Class II Base Course (12" Thick) (Stone) | 1,087.7 | SQYD | 40.00 | 43,508.00 | 45.00 | 48,946.50 | 45.00 | 48,946.50 | 70.00 | 76,139.00 |
| 0055 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 1,120.2 | SQYD | 150.00 | 168,030.00 | 185.00 | 207,237.00 | 178.00 | 199,395.60 | 190.00 | 212,838.00 |
| 0056 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 3,609.7 | SQYD | 120.00 | 433,164.00 | 175.00 | 631,697.50 | 160.00 | 577,552.00 | 180.00 | 649,746.00 |
| CONTRACTOR TOTAL | 8,502,463.14 | 8,848,154.44 | 8,997,983.42 | 10,846,220.56 | ||||||||