Bid Tabulations
Letting of
08/08/2012
LA DOTD Headquarters
| Lead Project: H.000419.6 | |
| Parish: Caddo | |
| Routes: US 71 | |
| Description: US 71: LA 173 - LA 170 | |
| Type Const: COLD PLANING, ASPHALTIC CONCRETE PAVEMENT, PAVEMENT MARKINGS | |
| Estimated Construction Cost: $2,397,306.71 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 17464 | Benton & Brown, LLC. | $2,297,005.49 |
| 2 | 36374 | Best-Yet Builders, Llc | $2,411,145.58 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Benton & Brown, LLC. |
- 2 - Best-Yet Builders, Llc |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 502-01-00100 | Superpave Asphaltic Concrete | 15,596.2 | TON | 95.00 | 1,481,639.00 | 97.80 | 1,525,308.36 |
| 0002 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 38,754 | GAL | 3.30 | 127,888.20 | 3.14 | 121,687.56 |
| 0003 | 507-02-00200 | Aggregate (S2) | 94,523 | SQYD | 1.30 | 122,879.90 | 1.22 | 115,318.06 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 141,784 | SQYD | 1.50 | 212,676.00 | 2.25 | 319,014.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,431 | CUYD | 0.01 | -44.31 | 0.10 | -443.10 |
| 0006 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 709 | SQYD | 65.00 | 46,085.00 | 46.30 | 32,826.70 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,283 | SQYD | 80.00 | 102,640.00 | 72.60 | 93,145.80 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 17,500.00 | 17,500.00 |
| 0009 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.934 | MILE | 350.00 | 3,476.90 | 800.00 | 7,947.20 |
| 0010 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.077 | MILE | 500.00 | 538.50 | 500.00 | 538.50 |
| 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.28 | MILE | 200.00 | 8,056.00 | 200.00 | 8,056.00 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 38,000.00 | 38,000.00 | 65,000.00 | 65,000.00 |
| 0013 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,330 | EACH | 4.00 | 5,320.00 | 4.00 | 5,320.00 |
| 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.14 | MILE | 2,900.00 | 58,406.00 | 2,900.00 | 58,406.00 |
| 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.934 | MILE | 750.00 | 7,450.50 | 750.00 | 7,450.50 |
| 0016 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 |
| 0017 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 5,000.00 | 10,000.00 | 2,000.00 | 4,000.00 |
| 0018 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 10.07 | MILE | 1,340.00 | 13,493.80 | 1,000.00 | 10,070.00 |
| 0019 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 23.00 | 11,500.00 | 20.00 | 10,000.00 |
| CONTRACTOR TOTAL | 2,297,005.49 | 2,411,145.58 | ||||||