Bid Tabulations
Letting of
04/10/2013
LA DOTD Headquarters
| Lead Project: H.000393.6 | |
| Parish: Red River | |
| Routes: US 71 | |
| Description: US 71: US 84 TO 0.3 MI S. OF FERGUSON | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $2,858,955.67 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $2,621,679.41 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $2,692,700.56 |
| 3 | 36374 | Best-Yet Builders, Llc | $2,973,172.25 |
| 4 | 17464 | Benton & Brown, LLC. | $3,018,096.02 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Best-Yet Builders, Llc |
- 4 - Benton & Brown, LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) Sta 524+79, Remove and Replace pipe | 68 | LNFT | 50.00 | 3,400.00 | 12.00 | 816.00 | 20.00 | 1,360.00 | 11.00 | 748.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 50 | CUYD | 25.00 | 1,250.00 | 40.00 | 2,000.00 | 20.00 | 1,000.00 | 35.00 | 1,750.00 |
| 0003 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 8 | CUYD | 100.00 | 800.00 | 75.00 | 600.00 | 200.00 | 1,600.00 | 100.00 | 800.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 18,460.2 | TON | 85.00 | 1,569,117.00 | 89.00 | 1,642,957.80 | 97.50 | 1,799,869.50 | 105.00 | 1,938,321.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 22.5 | TON | 100.00 | 2,250.00 | 300.00 | 6,750.00 | 93.50 | 2,103.75 | 150.00 | 3,375.00 |
| 0006 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 38,045 | GAL | 2.97 | 112,993.65 | 3.60 | 136,962.00 | 2.97 | 112,993.65 | 3.25 | 123,646.25 |
| 0007 | 507-02-00200 | Aggregate (S2) | 92,793 | SQYD | 1.18 | 109,495.74 | 0.90 | 83,513.70 | 1.18 | 109,495.74 | 1.30 | 120,630.90 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 167,821 | SQYD | 1.50 | 251,731.50 | 1.50 | 251,731.50 | 2.15 | 360,815.15 | 1.50 | 251,731.50 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -6,993.9 | CUYD | 0.01 | -69.94 | 0.10 | -699.39 | 0.10 | -699.39 | 0.01 | -69.94 |
| 0010 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) Shoulder patching | 1,000 | SQYD | 56.25 | 56,250.00 | 63.00 | 63,000.00 | 49.50 | 49,500.00 | 55.00 | 55,000.00 |
| 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) ROADWAY PATCHING | 2,000 | SQYD | 56.25 | 112,500.00 | 85.00 | 170,000.00 | 99.00 | 198,000.00 | 78.00 | 156,000.00 |
| 0012 | 510-03-00100 | Pavement Joint Repair | 50 | TON | 250.00 | 12,500.00 | 360.00 | 18,000.00 | 200.00 | 10,000.00 | 300.00 | 15,000.00 |
| 0013 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 72 | LNFT | 350.00 | 25,200.00 | 175.00 | 12,600.00 | 193.00 | 13,896.00 | 225.00 | 16,200.00 |
| 0014 | 701-08-00100 | Relaying Pipe | 20 | LNFT | 150.00 | 3,000.00 | 120.00 | 2,400.00 | 100.00 | 2,000.00 | 160.00 | 3,200.00 |
| 0015 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 250.00 | 2,000.00 | 190.00 | 1,520.00 | 100.00 | 800.00 | 190.00 | 1,520.00 |
| 0016 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,250.00 | 1,250.00 | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 1,200.00 | 1,200.00 |
| 0017 | 712-04-00100 | Flexible Revetment | 42 | SQYD | 80.00 | 3,360.00 | 64.00 | 2,688.00 | 100.00 | 4,200.00 | 120.00 | 5,040.00 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 107,000.00 | 107,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 80,000.00 | 80,000.00 |
| 0019 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 255 | LNFT | 0.20 | 51.00 | 0.20 | 51.00 | 0.20 | 51.00 | 0.22 | 56.10 |
| 0020 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 679 | LNFT | 0.60 | 407.40 | 0.50 | 339.50 | 0.50 | 339.50 | 0.55 | 373.45 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.8 | MILE | 325.00 | 7,085.00 | 250.00 | 5,450.00 | 350.00 | 7,630.00 | 350.00 | 7,630.00 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 21.8 | MILE | 1.00 | 21.80 | 1.00 | 21.80 | 150.00 | 3,270.00 | 1.00 | 21.80 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 70.91 | MILE | 1.00 | 70.91 | 1.00 | 70.91 | 250.00 | 17,727.50 | 1.00 | 70.91 |
| 0024 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 15 | EACH | 25.00 | 375.00 | 1.00 | 15.00 | 20.00 | 300.00 | 22.00 | 330.00 |
| 0025 | 726-01-00100 | Bedding Material | 11.5 | CUYD | 100.00 | 1,150.00 | 135.00 | 1,552.50 | 100.00 | 1,150.00 | 80.00 | 920.00 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 107,000.00 | 107,000.00 | 160,000.00 | 160,000.00 | 95,000.00 | 95,000.00 | 80,000.00 | 80,000.00 |
| 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,481 | EACH | 4.00 | 9,924.00 | 4.25 | 10,544.25 | 4.00 | 9,924.00 | 4.40 | 10,916.40 |
| 0028 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 255 | LNFT | 1.00 | 255.00 | 1.30 | 331.50 | 1.25 | 318.75 | 1.40 | 357.00 |
| 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 679 | LNFT | 4.00 | 2,716.00 | 4.60 | 3,123.40 | 4.50 | 3,055.50 | 5.00 | 3,395.00 |
| 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 37.387 | MILE | 2,200.00 | 82,251.40 | 2,200.00 | 82,251.40 | 2,150.00 | 80,382.05 | 2,365.00 | 88,420.26 |
| 0031 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.134 | MILE | 5,000.00 | 670.00 | 5,100.00 | 683.40 | 5,000.00 | 670.00 | 5,335.00 | 714.89 |
| 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.529 | MILE | 600.00 | 3,917.40 | 510.00 | 3,329.79 | 500.00 | 3,264.50 | 550.00 | 3,590.95 |
| 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 15 | EACH | 200.00 | 3,000.00 | 180.00 | 2,700.00 | 175.00 | 2,625.00 | 195.00 | 2,925.00 |
| 0034 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 200.00 | 1,400.00 | 260.00 | 1,820.00 | 250.00 | 1,750.00 | 275.00 | 1,925.00 |
| 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 9,500.00 | 9,500.00 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 |
| 0036 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 9.153 | MILE | 1,350.00 | 12,356.55 | 500.00 | 4,576.50 | 850.00 | 7,780.05 | 1,350.00 | 12,356.55 |
| CONTRACTOR TOTAL | 2,621,679.41 | 2,692,700.56 | 2,973,172.25 | 3,018,096.02 | ||||||||