Bid Tabulations
Letting of
09/12/2012
LA DOTD Headquarters
| Lead Project: H.000336.6 | |
| Parish: Ascension | |
| Routes: LA 431, LA 934, US 61, LA 931, LA 935, LA 30 | |
| Description: LA 431 INTERSECTION IMPROVEMENTS | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $4,594,954.62 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 48896 | Command Construction Industries LLC | $3,968,969.92 |
| 2 | 14807 | Richard Price Contracting Co, Llc | $4,158,253.30 |
| 3 | 00481 | Coastal Bridge Co., L.L.C. | $4,481,053.87 |
| 4 | 06276 | Barriere Construction Co., LLC | $4,678,702.77 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Command Construction Industries LLC |
- 2 - Richard Price Contracting Co, Llc |
- 3 - Coastal Bridge Co., L.L.C. |
- 4 - Barriere Construction Co., LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 29,916.99 | 29,916.99 | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 47,101.86 | 47,101.86 | 50,000.00 | 50,000.00 | 1,000.00 | 1,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 1,390 | SQYD | 10.00 | 13,900.00 | 11.50 | 15,985.00 | 15.00 | 20,850.00 | 12.00 | 16,680.00 |
| 0004 | 202-02-02020 | Removal of Asphalt Pavement | 1,387.8 | SQYD | 10.00 | 13,878.00 | 7.50 | 10,408.50 | 15.00 | 20,817.00 | 14.00 | 19,429.20 |
| 0005 | 202-02-06040 | Removal of Concrete Box Headwall Headwall | 2 | EACH | 1,000.00 | 2,000.00 | 3,800.00 | 7,600.00 | 3,000.00 | 6,000.00 | 1,800.00 | 3,600.00 |
| 0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 405.4 | LNFT | 5.00 | 2,027.00 | 8.00 | 3,243.20 | 5.00 | 2,027.00 | 9.00 | 3,648.60 |
| 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,278 | SQYD | 10.00 | 12,780.00 | 8.00 | 10,224.00 | 15.00 | 19,170.00 | 12.00 | 15,336.00 |
| 0008 | 202-02-12000 | Removal of Fence | 210 | LNFT | 5.00 | 1,050.00 | 6.00 | 1,260.00 | 5.00 | 1,050.00 | 6.00 | 1,260.00 |
| 0009 | 202-02-32180 | Removal of Pipe Headwalls | 4 | EACH | 500.00 | 2,000.00 | 1,150.00 | 4,600.00 | 2,000.00 | 8,000.00 | 910.00 | 3,640.00 |
| 0010 | 202-02-38500 | Removal of Surfacing and Stablized Base | 167.5 | SQYD | 10.00 | 1,675.00 | 7.50 | 1,256.25 | 15.00 | 2,512.50 | 14.00 | 2,345.00 |
| 0011 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,000.00 | 1,000.00 | 950.00 | 950.00 | 15,000.00 | 15,000.00 | 1,000.00 | 1,000.00 |
| 0012 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 1,000.00 | 1,000.00 | 950.00 | 950.00 | 350.00 | 350.00 | 1,000.00 | 1,000.00 |
| 0013 | 202-03-38000 | Relocation of Sign Relocate | 34 | EACH | 100.00 | 3,400.00 | 140.00 | 4,760.00 | 125.00 | 4,250.00 | 60.00 | 2,040.00 |
| 0014 | 202-03-38020 | Relocation of Sign Pole Relocate | 34 | EACH | 100.00 | 3,400.00 | 140.00 | 4,760.00 | 500.00 | 17,000.00 | 60.00 | 2,040.00 |
| 0015 | 203-01-00100 | General Excavation | 3,925 | CUYD | 1.00 | 3,925.00 | 13.00 | 51,025.00 | 10.00 | 39,250.00 | 20.00 | 78,500.00 |
| 0016 | 203-03-00100 | Embankment | 8,290 | CUYD | 1.00 | 8,290.00 | 25.25 | 209,322.50 | 25.00 | 207,250.00 | 25.00 | 207,250.00 |
| 0017 | 204-02-00100 | Temporary Hay or Straw Bales | 91 | EACH | 50.00 | 4,550.00 | 24.00 | 2,184.00 | 15.00 | 1,365.00 | 15.00 | 1,365.00 |
| 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 95 | EACH | 100.00 | 9,500.00 | 135.00 | 12,825.00 | 110.00 | 10,450.00 | 120.00 | 11,400.00 |
| 0019 | 204-06-00100 | Temporary Silt Fencing | 9,394 | LNFT | 1.00 | 9,394.00 | 2.50 | 23,485.00 | 2.00 | 18,788.00 | 2.00 | 18,788.00 |
| 0020 | 304-05-00100 | Lime Treatment (Type E) | 202.49 | TON | 1.00 | 202.49 | 320.00 | 64,796.80 | 1.00 | 202.49 | 10.00 | 2,024.90 |
| 0021 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 44.4 | CUYD | 80.00 | 3,552.00 | 92.00 | 4,084.80 | 80.00 | 3,552.00 | 120.00 | 5,328.00 |
| 0022 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 1.00 | 1,000.00 | 78.00 | 78,000.00 | 100.00 | 100,000.00 | 10.00 | 10,000.00 |
| 0023 | 502-01-00100 | Superpave Asphaltic Concrete | 10,139.2 | TON | 125.00 | 1,267,400.00 | 106.25 | 1,077,290.00 | 100.00 | 1,013,920.00 | 112.00 | 1,135,590.40 |
| 0024 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,427.6 | TON | 1.00 | 1,427.60 | 134.25 | 191,655.30 | 110.00 | 157,036.00 | 112.00 | 159,891.20 |
| 0025 | 509-01-00100 | Cold Planing Asphaltic Pavement | 16,585 | SQYD | 4.00 | 66,340.00 | 4.75 | 78,778.75 | 11.00 | 182,435.00 | 4.00 | 66,340.00 |
| 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -461 | CUYD | 1.00 | -461.00 | 1.00 | -461.00 | 0.01 | -4.61 | 20.00 | -9,220.00 |
| 0027 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 318.5 | SQYD | 100.00 | 31,850.00 | 129.25 | 41,166.13 | 115.00 | 36,627.50 | 105.00 | 33,442.50 |
| 0028 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 90 | LNFT | 150.00 | 13,500.00 | 186.52 | 16,786.80 | 115.00 | 10,350.00 | 170.00 | 15,300.00 |
| 0029 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 102 | LNFT | 250.00 | 25,500.00 | 262.27 | 26,751.54 | 170.00 | 17,340.00 | 250.00 | 25,500.00 |
| 0030 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 55 | LNFT | 80.00 | 4,400.00 | 53.97 | 2,968.35 | 90.00 | 4,950.00 | 100.00 | 5,500.00 |
| 0031 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 99 | LNFT | 75.00 | 7,425.00 | 65.93 | 6,527.07 | 90.00 | 8,910.00 | 190.00 | 18,810.00 |
| 0032 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 593 | LNFT | 80.00 | 47,440.00 | 57.95 | 34,364.35 | 75.00 | 44,475.00 | 110.00 | 65,230.00 |
| 0033 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 538 | LNFT | 100.00 | 53,800.00 | 75.03 | 40,366.14 | 90.00 | 48,420.00 | 115.00 | 61,870.00 |
| 0034 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 1,310 | LNFT | 150.00 | 196,500.00 | 89.81 | 117,651.10 | 105.00 | 137,550.00 | 120.00 | 157,200.00 |
| 0035 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 36 | LNFT | 200.00 | 7,200.00 | 134.65 | 4,847.40 | 130.00 | 4,680.00 | 230.00 | 8,280.00 |
| 0036 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 84 | LNFT | 250.00 | 21,000.00 | 162.23 | 13,627.32 | 175.00 | 14,700.00 | 230.00 | 19,320.00 |
| 0037 | 701-04-01160 | Storm Drain Pipe Arch (60" Equiv. RCPA) | 56 | LNFT | 350.00 | 19,600.00 | 277.45 | 15,537.20 | 250.00 | 14,000.00 | 350.00 | 19,600.00 |
| 0038 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 282 | LNFT | 80.00 | 22,560.00 | 60.55 | 17,075.10 | 70.00 | 19,740.00 | 62.00 | 17,484.00 |
| 0039 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 208 | LNFT | 100.00 | 20,800.00 | 73.18 | 15,221.44 | 80.00 | 16,640.00 | 74.00 | 15,392.00 |
| 0040 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 102 | LNFT | 150.00 | 15,300.00 | 87.73 | 8,948.46 | 90.00 | 9,180.00 | 100.00 | 10,200.00 |
| 0041 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 72 | LNFT | 200.00 | 14,400.00 | 114.37 | 8,234.64 | 100.00 | 7,200.00 | 110.00 | 7,920.00 |
| 0042 | 701-05-01140 | Side Drain Pipe (48" RCP/PP/CMP) | 34 | LNFT | 250.00 | 8,500.00 | 175.01 | 5,950.34 | 175.00 | 5,950.00 | 150.00 | 5,100.00 |
| 0043 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 136 | LNFT | 80.00 | 10,880.00 | 62.61 | 8,514.96 | 75.00 | 10,200.00 | 100.00 | 13,600.00 |
| 0044 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 66 | LNFT | 100.00 | 6,600.00 | 78.56 | 5,184.96 | 90.00 | 5,940.00 | 120.00 | 7,920.00 |
| 0045 | 701-06-01120 | Side Drain Pipe Arch (48" Equiv. RCPA/CMPA) | 90 | LNFT | 250.00 | 22,500.00 | 163.55 | 14,719.50 | 175.00 | 15,750.00 | 180.00 | 16,200.00 |
| 0046 | 701-07-00300 | Yard Drain Pipe (8") | 81 | LNFT | 50.00 | 4,050.00 | 20.27 | 1,641.87 | 15.00 | 1,215.00 | 80.00 | 6,480.00 |
| 0047 | 701-09-00100 | Fabricating Pipe Fittings | 12 | EACH | 200.00 | 2,400.00 | 750.00 | 9,000.00 | 1,000.00 | 12,000.00 | 1,800.00 | 21,600.00 |
| 0048 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 24 | LNFT | 100.00 | 2,400.00 | 124.17 | 2,980.08 | 100.00 | 2,400.00 | 150.00 | 3,600.00 |
| 0049 | 701-14-00100 | Cleaning Existing Pipes | 2,038 | LNFT | 10.00 | 20,380.00 | 10.00 | 20,380.00 | 20.00 | 40,760.00 | 7.00 | 14,266.00 |
| 0050 | 701-15-00100 | Concrete Collar | 8 | EACH | 1,000.00 | 8,000.00 | 1,000.00 | 8,000.00 | 1,500.00 | 12,000.00 | 1,200.00 | 9,600.00 |
| 0051 | 702-02-00100 | Manholes (MH-06) | 4 | EACH | 4,500.00 | 18,000.00 | 2,824.87 | 11,299.48 | 3,200.00 | 12,800.00 | 6,000.00 | 24,000.00 |
| 0052 | 702-02-00200 | Manholes (R-CB-11) | 6 | EACH | 4,500.00 | 27,000.00 | 2,343.01 | 14,058.06 | 2,700.00 | 16,200.00 | 5,000.00 | 30,000.00 |
| 0053 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 10,000.00 | 20,000.00 | 3,282.32 | 6,564.64 | 6,500.00 | 13,000.00 | 5,500.00 | 11,000.00 |
| 0054 | 702-03-00100 | Catch Basins (CB-01) | 34 | EACH | 3,000.00 | 102,000.00 | 2,141.73 | 72,818.82 | 3,000.00 | 102,000.00 | 3,100.00 | 105,400.00 |
| 0055 | 702-03-00400 | Catch Basins (CB-05) | 9 | EACH | 1,500.00 | 13,500.00 | 1,123.12 | 10,108.08 | 550.00 | 4,950.00 | 1,100.00 | 9,900.00 |
| 0056 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 500.00 | 3,000.00 | 1,270.26 | 7,621.56 | 1,000.00 | 6,000.00 | 2,100.00 | 12,600.00 |
| 0057 | 702-07-00100 | Cross Drain Safety End (Type 1) | 3 | EACH | 3,000.00 | 9,000.00 | 1,226.82 | 3,680.46 | 15,000.00 | 45,000.00 | 2,200.00 | 6,600.00 |
| 0058 | 702-07-00200 | Cross Drain Safety End (Type 2) | 1 | EACH | 10,000.00 | 10,000.00 | 3,832.67 | 3,832.67 | 15,000.00 | 15,000.00 | 7,100.00 | 7,100.00 |
| 0059 | 702-08-00100 | Side Drain Safety End (Type I) | 22 | EACH | 3,000.00 | 66,000.00 | 1,697.87 | 37,353.14 | 1,500.00 | 33,000.00 | 2,200.00 | 48,400.00 |
| 0060 | 702-08-00200 | Side Drain Safety End (Type 2) | 8 | EACH | 5,000.00 | 40,000.00 | 3,117.63 | 24,941.04 | 3,000.00 | 24,000.00 | 3,700.00 | 29,600.00 |
| 0061 | 702-08-00300 | Side Drain Safety End (Type 3) | 3 | EACH | 10,000.00 | 30,000.00 | 4,471.71 | 13,415.13 | 10,000.00 | 30,000.00 | 8,900.00 | 26,700.00 |
| 0062 | 705-01-00100 | Barbed Wire Fence | 100 | LNFT | 20.00 | 2,000.00 | 17.00 | 1,700.00 | 15.00 | 1,500.00 | 18.00 | 1,800.00 |
| 0063 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 110 | LNFT | 20.00 | 2,200.00 | 20.00 | 2,200.00 | 20.00 | 2,200.00 | 22.00 | 2,420.00 |
| 0064 | 705-09-00100 | Rebuilt Fence | 20 | LNFT | 20.00 | 400.00 | 56.00 | 1,120.00 | 50.00 | 1,000.00 | 60.00 | 1,200.00 |
| 0065 | 706-02-00200 | Concrete Drive (6" Thick) | 841.5 | SQYD | 60.00 | 50,490.00 | 40.00 | 33,660.00 | 50.00 | 42,075.00 | 80.00 | 67,320.00 |
| 0066 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 48.5 | SQYD | 60.00 | 2,910.00 | 35.00 | 1,697.50 | 50.00 | 2,425.00 | 75.00 | 3,637.50 |
| 0067 | 707-01-00100 | Concrete Curb | 1,349.5 | LNFT | 20.00 | 26,990.00 | 6.00 | 8,097.00 | 10.00 | 13,495.00 | 18.00 | 24,291.00 |
| 0068 | 707-03-00100 | Combination Concrete Curb and Gutter | 120.2 | LNFT | 50.00 | 6,010.00 | 25.00 | 3,005.00 | 40.00 | 4,808.00 | 47.00 | 5,649.40 |
| 0069 | 708-01-00100 | Right-of-Way Monument | 45 | EACH | 300.00 | 13,500.00 | 160.00 | 7,200.00 | 200.00 | 9,000.00 | 120.00 | 5,400.00 |
| 0070 | 708-02-00100 | Right-of-Way Monument Witness Post | 45 | EACH | 300.00 | 13,500.00 | 56.00 | 2,520.00 | 100.00 | 4,500.00 | 100.00 | 4,500.00 |
| 0071 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 38 | SQYD | 100.00 | 3,800.00 | 68.55 | 2,604.90 | 60.00 | 2,280.00 | 60.00 | 2,280.00 |
| 0072 | 711-04-00100 | Geotextile Fabric | 38 | SQYD | 5.00 | 190.00 | 12.00 | 456.00 | 2.00 | 76.00 | 4.00 | 152.00 |
| 0073 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,000.00 | 1,000.00 | 201,291.41 | 201,291.41 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 |
| 0074 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.464 | MILE | 1.00 | 9.46 | 2,013.64 | 19,057.09 | 400.00 | 3,785.60 | 330.00 | 3,123.12 |
| 0075 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.88 | MILE | 500.00 | 440.00 | 531.60 | 467.81 | 500.00 | 440.00 | 570.00 | 501.60 |
| 0076 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.507 | MILE | 500.00 | 4,753.50 | 615.08 | 5,847.57 | 600.00 | 5,704.20 | 660.00 | 6,274.62 |
| 0077 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 73 | EACH | 50.00 | 3,650.00 | 50.36 | 3,676.28 | 50.00 | 3,650.00 | 54.00 | 3,942.00 |
| 0078 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 78 | SQYD | 10.00 | 780.00 | 3.36 | 262.08 | 3.00 | 234.00 | 3.50 | 273.00 |
| 0079 | 726-01-00100 | Bedding Material | 433.46 | CUYD | 50.00 | 21,673.00 | 99.42 | 43,094.59 | 40.00 | 17,338.40 | 60.00 | 26,007.60 |
| 0080 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | 95,000.00 | 95,000.00 | 400,000.00 | 400,000.00 | 450,000.00 | 450,000.00 |
| 0081 | 729-01-00100 | Sign (Type A) | 150 | SQFT | 45.00 | 6,750.00 | 27.42 | 4,113.00 | 90.00 | 13,500.00 | 50.00 | 7,500.00 |
| 0082 | 730-09-00100 | Electrical System | 1 | LUMP | 1,000.00 | 1,000.00 | 5,595.80 | 5,595.80 | 3,000.00 | 3,000.00 | 207,100.00 | 207,100.00 |
| 0083 | 731-02-00100 | Reflectorized Raised Pavement Markers | 553 | EACH | 5.00 | 2,765.00 | 5.88 | 3,251.64 | 5.50 | 3,041.50 | 7.00 | 3,871.00 |
| 0084 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.624 | MILE | 2,500.00 | 11,560.00 | 2,795.48 | 12,926.30 | 2,700.00 | 12,484.80 | 3,000.00 | 13,872.00 |
| 0085 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.212 | MILE | 5,000.00 | 6,060.00 | 6,703.88 | 8,125.10 | 6,500.00 | 7,878.00 | 7,200.00 | 8,726.40 |
| 0086 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.214 | MILE | 20,000.00 | 4,280.00 | 21,964.81 | 4,700.47 | 20,000.00 | 4,280.00 | 24,000.00 | 5,136.00 |
| 0087 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 250.00 | 4,000.00 | 240.62 | 3,849.92 | 225.00 | 3,600.00 | 260.00 | 4,160.00 |
| 0088 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 11 | EACH | 250.00 | 2,750.00 | 240.62 | 2,646.82 | 225.00 | 2,475.00 | 260.00 | 2,860.00 |
| 0089 | 732-05-00100 | Removal of Existing Markings | 0.464 | MILE | 5,000.00 | 2,320.00 | 5,547.56 | 2,574.07 | 5,000.00 | 2,320.00 | 6,000.00 | 2,784.00 |
| 0090 | 735-01-00100 | Mailboxes | 28 | EACH | 1.00 | 28.00 | 188.02 | 5,264.56 | 1.00 | 28.00 | 7.00 | 196.00 |
| 0091 | 735-02-00100 | Mailbox Supports (Single) | 18 | EACH | 120.00 | 2,160.00 | 134.30 | 2,417.40 | 115.00 | 2,070.00 | 140.00 | 2,520.00 |
| 0092 | 735-04-00100 | Mailbox Supports (Multiple) | 4 | EACH | 350.00 | 1,400.00 | 514.81 | 2,059.24 | 400.00 | 1,600.00 | 550.00 | 2,200.00 |
| 0093 | 736-01-00100 | Trenching and Backfilling | 7,368 | LNFT | 4.00 | 29,472.00 | 4.58 | 33,745.44 | 4.50 | 33,156.00 | 5.00 | 36,840.00 |
| 0094 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 243 | LNFT | 10.00 | 2,430.00 | 13.35 | 3,244.05 | 10.00 | 2,430.00 | 11.00 | 2,673.00 |
| 0095 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 1,372 | LNFT | 10.00 | 13,720.00 | 21.72 | 29,799.84 | 13.00 | 17,836.00 | 13.00 | 17,836.00 |
| 0096 | 736-04-03080 | Signal Support (30' Steel Strain Pole) | 4 | EACH | 8,000.00 | 32,000.00 | 7,134.65 | 28,538.60 | 8,500.00 | 34,000.00 | 8,000.00 | 32,000.00 |
| 0097 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 5 | EACH | 9,000.00 | 45,000.00 | 8,066.91 | 40,334.55 | 9,000.00 | 45,000.00 | 9,000.00 | 45,000.00 |
| 0098 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 5 | EACH | 10,000.00 | 50,000.00 | 7,811.74 | 39,058.70 | 9,500.00 | 47,500.00 | 9,000.00 | 45,000.00 |
| 0099 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 11 | EACH | 10,000.00 | 110,000.00 | 8,545.91 | 94,005.01 | 10,000.00 | 110,000.00 | 10,000.00 | 110,000.00 |
| 0100 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 5 | EACH | 12,000.00 | 60,000.00 | 10,027.68 | 50,138.40 | 10,500.00 | 52,500.00 | 10,000.00 | 50,000.00 |
| 0101 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 12,000.00 | 24,000.00 | 11,471.39 | 22,942.78 | 11,000.00 | 22,000.00 | 12,000.00 | 24,000.00 |
| 0102 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 56 | EACH | 750.00 | 42,000.00 | 956.88 | 53,585.28 | 900.00 | 50,400.00 | 850.00 | 47,600.00 |
| 0103 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 4 | EACH | 800.00 | 3,200.00 | 1,035.22 | 4,140.88 | 925.00 | 3,700.00 | 900.00 | 3,600.00 |
| 0104 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 8 | EACH | 1,300.00 | 10,400.00 | 1,538.85 | 12,310.80 | 1,500.00 | 12,000.00 | 1,400.00 | 11,200.00 |
| 0105 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 2 | EACH | 1,300.00 | 2,600.00 | 1,712.32 | 3,424.64 | 1,500.00 | 3,000.00 | 1,400.00 | 2,800.00 |
| 0106 | 736-06-00200 | Signal Service (Pedestal Required) | 8 | EACH | 2,000.00 | 16,000.00 | 1,368.73 | 10,949.84 | 2,500.00 | 20,000.00 | 2,300.00 | 18,400.00 |
| 0107 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 8 | EACH | 15,000.00 | 120,000.00 | 30,916.80 | 247,334.40 | 25,000.00 | 200,000.00 | 26,000.00 | 208,000.00 |
| 0108 | 736-10-00200 | Underground Junction Box (Type E) | 27 | EACH | 500.00 | 13,500.00 | 409.61 | 11,059.47 | 400.00 | 10,800.00 | 400.00 | 10,800.00 |
| 0109 | 736-10-00300 | Underground Junction Box (Type F) | 22 | EACH | 600.00 | 13,200.00 | 467.81 | 10,291.82 | 475.00 | 10,450.00 | 450.00 | 9,900.00 |
| 0110 | 736-10-00500 | Underground Junction Box (Type H) | 8 | EACH | 900.00 | 7,200.00 | 775.58 | 6,204.64 | 900.00 | 7,200.00 | 850.00 | 6,800.00 |
| 0111 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 71 | LNFT | 1.00 | 71.00 | 4.76 | 337.96 | 1.25 | 88.75 | 1.50 | 106.50 |
| 0112 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 6,030 | LNFT | 2.00 | 12,060.00 | 1.99 | 11,999.70 | 2.00 | 12,060.00 | 2.00 | 12,060.00 |
| 0113 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 1,351 | LNFT | 3.00 | 4,053.00 | 2.46 | 3,323.46 | 3.00 | 4,053.00 | 3.00 | 4,053.00 |
| 0114 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 1,269 | LNFT | 15.00 | 19,035.00 | 2.13 | 2,702.97 | 15.00 | 19,035.00 | 14.00 | 17,766.00 |
| 0115 | 736-12-01040 | Conductor (2c, #14 awg) | 6,767 | LNFT | 1.50 | 10,150.50 | 1.56 | 10,556.52 | 1.50 | 10,150.50 | 1.50 | 10,150.50 |
| 0116 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 610 | LNFT | 3.00 | 1,830.00 | 2.53 | 1,543.30 | 3.25 | 1,982.50 | 3.50 | 2,135.00 |
| 0117 | 736-12-04000 | Conductor (6c, #14 awg) | 841 | LNFT | 2.00 | 1,682.00 | 1.49 | 1,253.09 | 1.75 | 1,471.75 | 2.00 | 1,682.00 |
| 0118 | 736-12-06000 | Conductor (10c, #14 awg) | 4,389 | LNFT | 2.00 | 8,778.00 | 1.99 | 8,734.11 | 2.00 | 8,778.00 | 2.50 | 10,972.50 |
| 0119 | 739-01-00100 | Hydro-Seeding | 5.595 | ACRE | 1,500.00 | 8,392.50 | 1,397.70 | 7,820.13 | 1,250.00 | 6,993.75 | 1,300.00 | 7,273.50 |
| 0120 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 60,000.00 | 60,000.00 |
| 0121 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 16.38 | CUYD | 2,000.00 | 32,760.00 | 1,127.89 | 18,474.84 | 1,000.00 | 16,380.00 | 1,200.00 | 19,656.00 |
| 0122 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 104 | LNFT | 300.00 | 31,200.00 | 367.59 | 38,229.36 | 300.00 | 31,200.00 | 480.00 | 49,920.00 |
| 0123 | 806-01-00100 | Deformed Reinforcing Steel | 1,174.12 | LB | 1.00 | 1,174.12 | 2.97 | 3,487.14 | 2.00 | 2,348.24 | 1.50 | 1,761.18 |
| 0124 | NS-201-00004 | Arborist Services | 1 | EACH | 2,500.00 | 2,500.00 | 11,191.61 | 11,191.61 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 |
| 0125 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 68,915 | INLF | 0.25 | 17,228.75 | 0.60 | 41,349.00 | 0.50 | 34,457.50 | 0.45 | 31,011.75 |
| 0126 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 16,596 | INLF | 0.25 | 4,149.00 | 0.60 | 9,957.60 | 1.00 | 16,596.00 | 0.70 | 11,617.20 |
| 0127 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 10,000.00 | 20,000.00 | 9,714.31 | 19,428.62 | 15,000.00 | 30,000.00 | 7,000.00 | 14,000.00 |
| 0128 | NS-736-00001 | GPS | 8 | EACH | 1,000.00 | 8,000.00 | 684.93 | 5,479.44 | 1,000.00 | 8,000.00 | 1,100.00 | 8,800.00 |
| 0129 | NS-736-00005 | Video Detection Cabinet Components | 8 | EACH | 8,000.00 | 64,000.00 | 10,281.72 | 82,253.76 | 8,500.00 | 68,000.00 | 9,600.00 | 76,800.00 |
| 0130 | NS-736-00006 | Video Detection Camera | 26 | EACH | 2,000.00 | 52,000.00 | 1,849.97 | 48,099.22 | 2,000.00 | 52,000.00 | 2,300.00 | 59,800.00 |
| 0131 | NS-736-00007 | Video Detection Training | 1 | LUMP | 100.00 | 100.00 | 1.00 | 1.00 | 0.50 | 0.50 | 0.60 | 0.60 |
| 0132 | NS-MSC-00120 | Drainage Structure CB-CAP | 4 | EACH | 1,500.00 | 6,000.00 | 3,075.00 | 12,300.00 | 2,000.00 | 8,000.00 | 1,500.00 | 6,000.00 |
| CONTRACTOR TOTAL | 3,968,969.92 | 4,158,253.30 | 4,481,053.87 | 4,678,702.77 | ||||||||