Bid Tabulations
Letting of
07/10/2013
LA DOTD Headquarters
| Lead Project: H.000327.6 | |
| Parish: St. John | |
| Routes: US 61 | |
| Description: US 61 @ Belle Terre Boulevard | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,973,741.36 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,994,912.95 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $2,188,677.07 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,231,487.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Coastal Bridge Co., L.L.C. |
- 3 - Barber Bros. Contracting Co., L.L.C |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of FOOTING (STA. 115+62.90 EB, RT.) | 1 | EACH | 3,000.00 | 3,000.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 450 | SQYD | 5.00 | 2,250.00 | 30.00 | 13,500.00 | 10.00 | 4,500.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 873.2 | LNFT | 5.00 | 4,366.00 | 15.00 | 13,098.00 | 10.00 | 8,732.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,545 | SQYD | 5.00 | 7,725.00 | 20.00 | 30,900.00 | 15.00 | 23,175.00 |
| 0005 | 202-02-14500 | Removal of Guard Rail (STA. 115+25.12 EB, RT.) | 136.6 | LNFT | 10.00 | 1,366.00 | 10.00 | 1,366.00 | 8.00 | 1,092.80 |
| 0006 | 202-02-32140 | Removal of Pipe (Storm Drain) (3" - 30") | 523 | LNFT | 10.00 | 5,230.00 | 15.00 | 7,845.00 | 25.00 | 13,075.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 4,809.8 | SQYD | 5.00 | 24,049.00 | 10.00 | 48,098.00 | 10.00 | 48,098.00 |
| 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0009 | 202-03-00010 | Relocation OF TRAFFIC SIGNAL SUPPORT | 2 | EACH | 5,000.00 | 10,000.00 | 2,500.00 | 5,000.00 | 5,000.00 | 10,000.00 |
| 0010 | 202-03-00010 | Relocation OF SIGNAL CONTROL | 1 | EACH | 5,000.00 | 5,000.00 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 |
| 0011 | 202-03-38000 | Relocation of Sign (GUIDE SIGN - STREET NAME) | 1 | EACH | 500.00 | 500.00 | 100.00 | 100.00 | 1,500.00 | 1,500.00 |
| 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 60,000.00 | 60,000.00 |
| 0013 | 204-02-00100 | Temporary Hay or Straw Bales | 126 | EACH | 5.00 | 630.00 | 12.50 | 1,575.00 | 20.00 | 2,520.00 |
| 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 150.00 | 600.00 | 150.00 | 600.00 | 400.00 | 1,600.00 |
| 0015 | 204-06-00100 | Temporary Silt Fencing | 3,786 | LNFT | 0.50 | 1,893.00 | 2.00 | 7,572.00 | 2.50 | 9,465.00 |
| 0016 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 6,294.4 | SQYD | 20.00 | 125,888.00 | 30.00 | 188,832.00 | 28.00 | 176,243.20 |
| 0017 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 586.7 | CUYD | 25.00 | 14,667.50 | 60.00 | 35,202.00 | 90.00 | 52,803.00 |
| 0018 | 502-01-00100 | Superpave Asphaltic Concrete | 3,390.5 | TON | 100.00 | 339,050.00 | 100.00 | 339,050.00 | 95.00 | 322,097.50 |
| 0019 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,020.5 | TON | 100.00 | 102,050.00 | 125.00 | 127,562.50 | 125.00 | 127,562.50 |
| 0020 | 509-01-00100 | Cold Planing Asphaltic Pavement | 11,613 | SQYD | 2.25 | 26,129.25 | 3.00 | 34,839.00 | 3.00 | 34,839.00 |
| 0021 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -373 | CUYD | 1.00 | -373.00 | 0.01 | -3.73 | 0.00 | 0.00 |
| 0022 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 82 | LNFT | 90.00 | 7,380.00 | 50.00 | 4,100.00 | 55.00 | 4,510.00 |
| 0023 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 640 | LNFT | 100.00 | 64,000.00 | 60.00 | 38,400.00 | 65.00 | 41,600.00 |
| 0024 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 28 | LNFT | 140.00 | 3,920.00 | 90.00 | 2,520.00 | 95.00 | 2,660.00 |
| 0025 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 228 | LNFT | 140.00 | 31,920.00 | 100.00 | 22,800.00 | 120.00 | 27,360.00 |
| 0026 | 702-03-00100 | Catch Basins (CB-01) | 18 | EACH | 3,500.00 | 63,000.00 | 1,800.00 | 32,400.00 | 2,600.00 | 46,800.00 |
| 0027 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 1,000.00 | 2,000.00 | 1,200.00 | 2,400.00 | 3,500.00 | 7,000.00 |
| 0028 | 702-04-00300 | Adjusting Junction Boxes | 3 | EACH | 1,000.00 | 3,000.00 | 1,200.00 | 3,600.00 | 3,200.00 | 9,600.00 |
| 0029 | 706-02-00300 | Concrete Drive (8" Thick) | 1,237.5 | SQYD | 75.00 | 92,812.50 | 60.00 | 74,250.00 | 75.00 | 92,812.50 |
| 0030 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 2,214.8 | SQYD | 42.00 | 93,021.60 | 35.00 | 77,518.00 | 35.00 | 77,518.00 |
| 0031 | 707-03-00100 | Combination Concrete Curb and Gutter | 6,916.6 | LNFT | 23.00 | 159,081.80 | 25.00 | 172,915.00 | 45.00 | 311,247.00 |
| 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 92,000.00 | 92,000.00 | 150,000.00 | 150,000.00 | 60,000.00 | 60,000.00 |
| 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,482 | LNFT | 0.25 | 370.50 | 0.25 | 370.50 | 0.50 | 741.00 |
| 0034 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.601 | MILE | 1,100.00 | 661.10 | 300.00 | 180.30 | 15,000.00 | 9,015.00 |
| 0035 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 1.341 | MILE | 2,500.00 | 3,352.50 | 2,500.00 | 3,352.50 | 3,500.00 | 4,693.50 |
| 0036 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 2.942 | MILE | 9,000.00 | 26,478.00 | 8,100.00 | 23,830.20 | 9,500.00 | 27,949.00 |
| 0037 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 50.00 | 200.00 | 45.00 | 180.00 | 30.00 | 120.00 |
| 0038 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 3 | EACH | 50.00 | 150.00 | 45.00 | 135.00 | 60.00 | 180.00 |
| 0039 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 80 | EACH | 6.00 | 480.00 | 5.25 | 420.00 | 6.00 | 480.00 |
| 0040 | 716-01-00100 | Mulch (Vegetative) | 0.7 | TON | 1,000.00 | 700.00 | 1,400.00 | 980.00 | 1,200.00 | 840.00 |
| 0041 | 717-01-00100 | Seeding | 130 | LB | 12.00 | 1,560.00 | 7.00 | 910.00 | 12.00 | 1,560.00 |
| 0042 | 718-01-00100 | Fertilizer | 1,750 | LB | 2.00 | 3,500.00 | 1.00 | 1,750.00 | 1.50 | 2,625.00 |
| 0043 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 359 | SQYD | 5.00 | 1,795.00 | 1.30 | 466.70 | 4.00 | 1,436.00 |
| 0044 | 726-01-00100 | Bedding Material | 110.2 | CUYD | 80.00 | 8,816.00 | 50.00 | 5,510.00 | 10.00 | 1,102.00 |
| 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 190,000.00 | 190,000.00 | 200,000.00 | 200,000.00 | 75,000.00 | 75,000.00 |
| 0046 | 729-01-00100 | Sign (Type A) | 180.7 | SQFT | 50.00 | 9,035.00 | 15.00 | 2,710.50 | 40.00 | 7,228.00 |
| 0047 | 729-21-00100 | U-Channel Post | 12 | EACH | 100.00 | 1,200.00 | 30.00 | 360.00 | 125.00 | 1,500.00 |
| 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 229 | EACH | 6.00 | 1,374.00 | 5.25 | 1,202.25 | 7.00 | 1,603.00 |
| 0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 332 | LNFT | 6.00 | 1,992.00 | 5.00 | 1,660.00 | 10.00 | 3,320.00 |
| 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.602 | MILE | 2,500.00 | 4,005.00 | 2,500.00 | 4,005.00 | 4,600.00 | 7,369.20 |
| 0051 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.174 | MILE | 6,500.00 | 1,131.00 | 6,500.00 | 1,131.00 | 12,000.00 | 2,088.00 |
| 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.666 | MILE | 900.00 | 599.40 | 850.00 | 566.10 | 2,000.00 | 1,332.00 |
| 0053 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.145 | MILE | 1,300.00 | 188.50 | 1,250.00 | 181.25 | 6,000.00 | 870.00 |
| 0054 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.077 | MILE | 2,500.00 | 192.50 | 1,250.00 | 96.25 | 15,000.00 | 1,155.00 |
| 0055 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 300.00 | 1,200.00 | 265.00 | 1,060.00 | 325.00 | 1,300.00 |
| 0056 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 250.00 | 2,000.00 | 215.00 | 1,720.00 | 250.00 | 2,000.00 |
| 0057 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 250.00 | 1,250.00 | 215.00 | 1,075.00 | 250.00 | 1,250.00 |
| 0058 | 732-05-00100 | Removal of Existing Markings | 0.53 | MILE | 3,500.00 | 1,855.00 | 3,500.00 | 1,855.00 | 10,000.00 | 5,300.00 |
| 0059 | 736-01-00100 | Trenching and Backfilling | 1,675 | LNFT | 4.00 | 6,700.00 | 8.00 | 13,400.00 | 4.00 | 6,700.00 |
| 0060 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 580 | LNFT | 15.00 | 8,700.00 | 25.00 | 14,500.00 | 17.00 | 9,860.00 |
| 0061 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 1 | EACH | 14,000.00 | 14,000.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 |
| 0062 | 736-04-10000 | Signal Support (Foundation Only) | 1 | EACH | 4,000.00 | 4,000.00 | 2,600.00 | 2,600.00 | 4,500.00 | 4,500.00 |
| 0063 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 12 | EACH | 1,000.00 | 12,000.00 | 1,300.00 | 15,600.00 | 1,025.00 | 12,300.00 |
| 0064 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 4 | EACH | 1,000.00 | 4,000.00 | 1,300.00 | 5,200.00 | 1,075.00 | 4,300.00 |
| 0065 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,300.00 | 2,600.00 | 1,600.00 | 3,200.00 | 1,500.00 | 3,000.00 |
| 0066 | 736-05-03020 | Signal Heads (4 Section, 12" Led Lens, R, Y, G, RT. G) | 1 | EACH | 1,300.00 | 1,300.00 | 1,600.00 | 1,600.00 | 1,500.00 | 1,500.00 |
| 0067 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,500.00 | 3,000.00 | 1,900.00 | 3,800.00 | 1,800.00 | 3,600.00 |
| 0068 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,550.00 | 1,550.00 | 1,900.00 | 1,900.00 | 1,800.00 | 1,800.00 |
| 0069 | 736-09-00100 | Loop Detector | 965 | LNFT | 18.00 | 17,370.00 | 15.00 | 14,475.00 | 18.00 | 17,370.00 |
| 0070 | 736-10-00200 | Underground Junction Box (Type E) | 4 | EACH | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 550.00 | 2,200.00 |
| 0071 | 736-10-00300 | Underground Junction Box (Type F) | 8 | EACH | 550.00 | 4,400.00 | 600.00 | 4,800.00 | 600.00 | 4,800.00 |
| 0072 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 1,000.00 | 2,000.00 | 1,300.00 | 2,600.00 | 1,050.00 | 2,100.00 |
| 0073 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 25 | LNFT | 1.50 | 37.50 | 1.00 | 25.00 | 1.50 | 37.50 |
| 0074 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 700 | LNFT | 1.80 | 1,260.00 | 1.00 | 700.00 | 1.60 | 1,120.00 |
| 0075 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 825 | LNFT | 2.00 | 1,650.00 | 1.75 | 1,443.75 | 2.10 | 1,732.50 |
| 0076 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 170 | LNFT | 3.00 | 510.00 | 4.00 | 680.00 | 3.25 | 552.50 |
| 0077 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 1,680 | LNFT | 1.50 | 2,520.00 | 1.25 | 2,100.00 | 1.60 | 2,688.00 |
| 0078 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 180 | LNFT | 4.00 | 720.00 | 3.25 | 585.00 | 4.00 | 720.00 |
| 0079 | 736-12-06000 | Conductor (10c, #14 awg) | 2,850 | LNFT | 3.00 | 8,550.00 | 2.25 | 6,412.50 | 2.50 | 7,125.00 |
| 0080 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 |
| 0081 | 741-06-00100 | Relocating Fire Hydrant | 1 | EACH | 4,000.00 | 4,000.00 | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 |
| 0082 | NS-200-00020 | Cleaning Existing Ditches | 410 | LNFT | 20.00 | 8,200.00 | 9.00 | 3,690.00 | 15.00 | 6,150.00 |
| 0083 | NS-300-00060 | Geogrid | 3,143 | SQYD | 1.50 | 4,714.50 | 3.50 | 11,000.50 | 4.00 | 12,572.00 |
| 0084 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 70,296 | INLF | 0.10 | 7,029.60 | 0.25 | 17,574.00 | 0.75 | 52,722.00 |
| 0085 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 76,304 | INLF | 0.10 | 7,630.40 | 0.50 | 38,152.00 | 0.75 | 57,228.00 |
| 0086 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,786 | INLF | 0.80 | 2,228.80 | 0.50 | 1,393.00 | 1.20 | 3,343.20 |
| 0087 | NS-MSC-00120 | Drainage Structure (PAVED GUTTER DRAIN, PG-01) | 49 | EACH | 3,000.00 | 147,000.00 | 2,500.00 | 122,500.00 | 4,500.00 | 220,500.00 |
| CONTRACTOR TOTAL | 1,994,912.95 | 2,188,677.07 | 2,231,487.90 | |||||||