Bid Tabulations
Letting of
12/12/2012
LA DOTD Headquarters
| Lead Project: H.000314.6 | |
| Parish: Jefferson | |
| Routes: US 61 | |
| Description: US 61: LABARRE RD - TRANSCONTINENTAL BLVD | |
| Type Const: GRADING, COLD PLANING ASPALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $2,144,452.43 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,040,713.35 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,165,100.86 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $2,471,107.97 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barber Bros. Contracting Co., L.L.C |
- 2 - Barriere Construction Co., LLC |
- 3 - Boh Bros. Construction Co., LLC. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 30 | LNFT | 12.00 | 360.00 | 35.00 | 1,050.00 | 17.00 | 510.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 300 | SQYD | 20.00 | 6,000.00 | 10.00 | 3,000.00 | 12.00 | 3,600.00 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 50 | LNFT | 25.00 | 1,250.00 | 30.00 | 1,500.00 | 17.00 | 850.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 156 | LNFT | 18.00 | 2,808.00 | 16.00 | 2,496.00 | 6.00 | 936.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 10,330.1 | TON | 90.00 | 929,709.00 | 100.00 | 1,033,010.00 | 110.00 | 1,136,311.00 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 170.5 | TON | 165.00 | 28,132.50 | 235.00 | 40,067.50 | 200.00 | 34,100.00 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 86,370 | SQYD | 2.00 | 172,740.00 | 2.00 | 172,740.00 | 3.50 | 302,295.00 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,600 | CUYD | 0.00 | 0.00 | 10.00 | -36,000.00 | 15.00 | -54,000.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,000 | SQYD | 80.00 | 80,000.00 | 65.00 | 65,000.00 | 100.00 | 100,000.00 |
| 0010 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 150 | SQYD | 160.00 | 24,000.00 | 150.00 | 22,500.00 | 150.00 | 22,500.00 |
| 0011 | 702-04-00100 | Adjusting Manholes | 10 | EACH | 1,500.00 | 15,000.00 | 1,200.00 | 12,000.00 | 1,000.00 | 10,000.00 |
| 0012 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 5 | EACH | 500.00 | 2,500.00 | 250.00 | 1,250.00 | 175.00 | 875.00 |
| 0013 | 702-04-00200 | Adjusting Catch Basins | 10 | EACH | 2,500.00 | 25,000.00 | 2,500.00 | 25,000.00 | 1,500.00 | 15,000.00 |
| 0014 | 704-03-00100 | Blocked Out Guard Rail | 25 | LNFT | 25.00 | 625.00 | 21.00 | 525.00 | 25.00 | 625.00 |
| 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 70.00 | 3,500.00 | 65.00 | 3,250.00 | 70.00 | 3,500.00 |
| 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,300.00 | 4,600.00 | 2,100.00 | 4,200.00 | 2,500.00 | 5,000.00 |
| 0017 | 706-01-00100 | Concrete Walk (4" Thick) | 300 | SQYD | 40.00 | 12,000.00 | 75.00 | 22,500.00 | 75.00 | 22,500.00 |
| 0018 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 120 | SQYD | 50.00 | 6,000.00 | 75.00 | 9,000.00 | 75.00 | 9,000.00 |
| 0019 | 706-04-00100 | Handicapped Curb Ramps | 60 | EACH | 1,500.00 | 90,000.00 | 2,600.00 | 156,000.00 | 2,200.00 | 132,000.00 |
| 0020 | 707-01-00300 | Concrete Curb (Mountable) | 50 | LNFT | 90.00 | 4,500.00 | 45.00 | 2,250.00 | 30.00 | 1,500.00 |
| 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | 30 | LNFT | 110.00 | 3,300.00 | 65.00 | 1,950.00 | 70.00 | 2,100.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 |
| 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 360 | LNFT | 0.30 | 108.00 | 0.01 | 3.60 | 0.20 | 72.00 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,611 | LNFT | 0.90 | 1,449.90 | 0.01 | 16.11 | 0.75 | 1,208.25 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 16.4 | MILE | 400.00 | 6,560.00 | 300.00 | 4,920.00 | 300.00 | 4,920.00 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 16.56 | MILE | 10.00 | 165.60 | 300.00 | 4,968.00 | 300.00 | 4,968.00 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.4 | MILE | 10.00 | 164.00 | 350.00 | 5,740.00 | 350.00 | 5,740.00 |
| 0028 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 78 | EACH | 50.00 | 3,900.00 | 5.00 | 390.00 | 45.00 | 3,510.00 |
| 0029 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 6 | EACH | 60.00 | 360.00 | 5.00 | 30.00 | 55.00 | 330.00 |
| 0030 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 24 | EACH | 50.00 | 1,200.00 | 5.00 | 120.00 | 45.00 | 1,080.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 245,000.00 | 245,000.00 |
| 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 90.00 | 180.00 | 80.00 | 160.00 | 75.00 | 150.00 |
| 0033 | 729-19-00100 | Dead End Road Installations (Type A) | 4 | EACH | 1,500.00 | 6,000.00 | 1,500.00 | 6,000.00 | 1,200.00 | 4,800.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,712 | EACH | 4.60 | 7,875.20 | 4.25 | 7,276.00 | 4.00 | 6,848.00 |
| 0035 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 144 | LNFT | 1.35 | 194.40 | 1.25 | 180.00 | 1.15 | 165.60 |
| 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 806 | LNFT | 6.00 | 4,836.00 | 5.25 | 4,231.50 | 5.00 | 4,030.00 |
| 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.2 | MILE | 2,700.00 | 22,140.00 | 2,700.00 | 22,140.00 | 2,350.00 | 19,270.00 |
| 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.28 | MILE | 980.00 | 8,114.40 | 1,000.00 | 8,280.00 | 850.00 | 7,038.00 |
| 0039 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.379 | MILE | 1,500.00 | 568.50 | 1,500.00 | 568.50 | 1,250.00 | 473.75 |
| 0040 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.227 | MILE | 3,500.00 | 794.50 | 3,500.00 | 794.50 | 3,000.00 | 681.00 |
| 0041 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 300.00 | 900.00 | 275.00 | 825.00 | 265.00 | 795.00 |
| 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 30 | EACH | 225.00 | 6,750.00 | 215.00 | 6,450.00 | 195.00 | 5,850.00 |
| 0043 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 9 | EACH | 225.00 | 2,025.00 | 215.00 | 1,935.00 | 195.00 | 1,755.00 |
| 0044 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 12 | EACH | 230.00 | 2,760.00 | 500.00 | 6,000.00 | 200.00 | 2,400.00 |
| 0045 | 736-09-00100 | Loop Detector | 848 | LNFT | 20.00 | 16,960.00 | 15.00 | 12,720.00 | 15.00 | 12,720.00 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 |
| 0047 | 741-11-00200 | Adjusting Water Valve and Meter Box | 2 | EACH | 1,350.00 | 2,700.00 | 250.00 | 500.00 | 500.00 | 1,000.00 |
| 0048 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 74,764.8 | LNFT | 1.25 | 93,456.00 | 1.00 | 74,764.80 | 2.18 | 162,987.26 |
| 0049 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 33,644.2 | LNFT | 1.50 | 50,466.30 | 1.00 | 33,644.20 | 2.18 | 73,344.36 |
| 0050 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 108,409 | LNFT | 0.95 | 102,988.55 | 0.35 | 37,943.15 | 0.75 | 81,306.75 |
| 0051 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,686 | INLF | 1.25 | 4,607.50 | 1.50 | 5,529.00 | 1.00 | 3,686.00 |
| 0052 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,980 | INLF | 1.75 | 3,465.00 | 0.85 | 1,683.00 | 1.15 | 2,277.00 |
| 0053 | NS-602-00001 | Milling Concrete Pavement | 100 | SQYD | 50.00 | 5,000.00 | 40.00 | 4,000.00 | 35.00 | 3,500.00 |
| CONTRACTOR TOTAL | 2,040,713.35 | 2,165,100.86 | 2,471,107.97 | |||||||