Bid Tabulations
Letting of
10/26/2011
LA DOTD Headquarters
| Lead Project: H.000303.6 | |
| Parish: Orleans | |
| Routes: US 90 | |
| Description: DANZIGER BRIDGE REDECKING AND REHABILITATION | |
| Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, MOVABLE BRIDGE REDECKING AND REHABILITATION, AND RELATED WORK. | |
| Estimated Construction Cost: $5,087,588.80 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $10,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 26435 | C.E.C., Inc. | $7,404,484.32 | 120 | $8,604,484.32 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $8,896,595.45 | 90 | $9,796,595.45 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - C.E.C., Inc. |
- 2 - Boh Bros. Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | 542 | SQYD | 15.00 | 8,130.00 | 12.00 | 6,504.00 |
| 0002 | 202-02-04026 | Removal of Bridge Deck (Hydro Blast) | 64,483 | SFIN | 5.00 | 322,415.00 | 5.50 | 354,656.50 |
| 0003 | 202-02-04030 | Removal of Bridge Joints | 100 | LNFT | 50.00 | 5,000.00 | 110.00 | 11,000.00 |
| 0004 | 202-02-26300 | Removal of Median / Island | 542 | SQYD | 50.00 | 27,100.00 | 45.00 | 24,390.00 |
| 0005 | 203-03-00100 | Embankment | 196 | CUYD | 75.00 | 14,700.00 | 63.00 | 12,348.00 |
| 0006 | 302-01-00100 | Class II Base Course | 173.6 | CUYD | 170.00 | 29,512.00 | 61.00 | 10,589.60 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 261.9 | TON | 210.00 | 54,999.00 | 155.00 | 40,594.50 |
| 0008 | 707-01-00100 | Concrete Curb | 1,140.4 | LNFT | 25.00 | 28,510.00 | 190.00 | 216,676.00 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 75,000.00 | 75,000.00 |
| 0010 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 4.967 | MILE | 10,000.00 | 49,670.00 | 10,500.00 | 52,153.50 |
| 0011 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 159 | EACH | 900.00 | 143,100.00 | 885.00 | 140,715.00 |
| 0012 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 57 | EACH | 480.00 | 27,360.00 | 305.00 | 17,385.00 |
| 0013 | 717-01-00100 | Seeding | 5 | LB | 50.00 | 250.00 | 88.00 | 440.00 |
| 0014 | 719-01-07420 | Plants (Palm) (Balled & Burlapped) (Relocate) (Removal, care, and replanting of existing palm) | 3 | EACH | 2,000.00 | 6,000.00 | 5,800.00 | 17,400.00 |
| 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 162,000.00 | 162,000.00 |
| 0016 | 730-09-00100 | Electrical System | 1 | LUMP | 540,000.00 | 540,000.00 | 600,000.00 | 600,000.00 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 189 | EACH | 5.40 | 1,020.60 | 5.75 | 1,086.75 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.625 | MILE | 3,190.00 | 1,993.75 | 3,400.00 | 2,125.00 |
| 0019 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.054 | MILE | 65,000.00 | 3,510.00 | 69,000.00 | 3,726.00 |
| 0020 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.004 | MILE | 29,000.00 | 116.00 | 31,000.00 | 124.00 |
| 0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.266 | MILE | 1,045.00 | 2,367.97 | 1,200.00 | 2,719.20 |
| 0022 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 200.00 | 800.00 | 210.00 | 840.00 |
| 0023 | 732-05-00100 | Removal of Existing Markings | 2.456 | MILE | 2,750.00 | 6,754.00 | 3,000.00 | 7,368.00 |
| 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 |
| 0025 | 807-08-00100 | Structural Metalwork (Splice Plate Replacement (GR 50)) | 1 | LUMP | 150,000.00 | 150,000.00 | 528,000.00 | 528,000.00 |
| 0026 | 809-01-00100 | Movable Bridge Machinery | 1 | LUMP | 2,600,000.00 | 2,600,000.00 | 3,200,000.00 | 3,200,000.00 |
| 0027 | 809-03-00100 | Operating House | 1 | LUMP | 400,000.00 | 400,000.00 | 440,000.00 | 440,000.00 |
| 0028 | NS-202-00005 | Removal of Debris (Bridge Superstructure) | 1 | LUMP | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 |
| 0029 | NS-202-00006 | Removal of Debris (Bridge Substructure) | 1 | LUMP | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 |
| 0030 | NS-800-00007 | Latex Modified Concrete Overlay | 80,604 | SFIN | 14.00 | 1,128,456.00 | 4.60 | 370,778.40 |
| 0031 | NS-800-00008 | Epoxy Underlayment for Steel Deck Overlay | 29,600 | SQFT | 23.00 | 680,800.00 | 55.00 | 1,628,000.00 |
| 0032 | NS-800-00421 | Ladders, Cages, and Platforms (Aluminum) | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 |
| 0033 | NS-805-00018 | Structural Polymer Concrete (Joint Repairs) | 100 | LNFT | 200.00 | 20,000.00 | 115.00 | 11,500.00 |
| 0034 | NS-807-00010 | BOLT - RIVET REPLACEMENT (STRUCTURAL STEEL) | 4,109 | EACH | 30.00 | 123,270.00 | 64.00 | 262,976.00 |
| 0035 | NS-811-00003 | Painting Existing Steel | 1 | LUMP | 66,000.00 | 66,000.00 | 470,000.00 | 470,000.00 |
| 0036 | NS-700-00180 | Impact Attenuator (Construction Zone) | 7 | EACH | 10,500.00 | 73,500.00 | 12,000.00 | 84,000.00 |
| 0037 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
| 0038 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 1 | EACH | 7,150.00 | 7,150.00 | 7,500.00 | 7,500.00 |
| 0039 | 807-08-00100 | Structural Metalwork (Bearing Stiffener (GR 50) and Access Door (GR 36)) | 1 | LUMP | 80,000.00 | 80,000.00 | 45,000.00 | 45,000.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 7,404,484.32 | 8,896,595.45 | ||||||
| NUMBER OF DAYS BID AT $10000 PER DAY. | 1,200,000.00 | 900,000.00 | ||||||
| TOTAL BID | 8,604,484.32 | 9,796,595.45 | ||||||