LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.000102.6
Parish: Caddo
Routes: US 80
Description: CROSS BAYOU AND RELIEF BRIDGES
Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE & RELATED WORK.
Estimated Construction Cost: $4,096,067.95


RankLicenseBidderConstruction Bid
1 39462 Jb James Construction Llc $3,813,433.79
2 12312 Gilchrist Construction Co. LLC $4,258,373.53
3 12135 Blount Bros. Construction, LLC $5,235,301.75


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Jb James Construction Llc
- 2 -
Gilchrist Construction Co. LLC
- 3 -
Blount Bros. Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 240,000.00 240,000.00 76,500.00 76,500.00 100,000.00 100,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 10,000.00 10,000.00 1,600.00 1,600.00 50,000.00 50,000.00
0003 202-02-04000 Removal of Bridge (Sta. 58+10.36, 130' X 28' Concrete Deck Girder Bridge) 1      EACH 10,000.00 10,000.00 30,000.00 30,000.00 80,000.00 80,000.00
0004 202-02-04000 Removal of Bridge (Sta. 62+59.74, 130' X 28' Concrete Deck Girder Bridge) 1      EACH 10,000.00 10,000.00 30,000.00 30,000.00 80,000.00 80,000.00
0005 202-02-14500 Removal of Guard Rail 1,022      LNFT 5.00 5,110.00 5.50 5,621.00 12.00 12,264.00
0006 202-02-32000 Removal of Paved Ditches 422.22   SQYD 8.00 3,377.76 3.75 1,583.33 10.00 4,222.20
0007 202-02-32100 Removal of Pipe (Cross Drain) Sta. 133+98.22, 30"x116' Equalizer 116      LNFT 15.00 1,740.00 5.00 580.00 25.00 2,900.00
0008 202-02-32500 Removal of Portland Cement Concrete Pavement 7,613.01   SQYD 5.00 38,065.05 7.75 59,000.83 10.00 76,130.10
0009 202-02-38500 Removal of Surfacing and Stablized Base 4,890.18   SQYD 4.00 19,560.72 5.50 26,895.99 8.00 39,121.44
0010 203-01-00100 General Excavation 43,650.48   CUYD 2.50 109,126.20 5.80 253,172.78 7.00 305,553.36
0011 203-03-00100 Embankment 35,563.59   CUYD 7.00 248,945.13 14.50 515,672.06 12.00 426,763.08
0012 204-05-00100 Temporary Sediment Check Dams (Hay) 56      EACH 130.00 7,280.00 150.00 8,400.00 150.00 8,400.00
0013 204-05-00200 Temporary Sediment Check Dams (Stone) 8      EACH 700.00 5,600.00 500.00 4,000.00 1,000.00 8,000.00
0014 204-06-00100 Temporary Silt Fencing 5,248      LNFT 2.00 10,496.00 2.25 11,808.00 3.00 15,744.00
0015 302-02-05020 Class II Base Course (10" Thick) (Soil Cement) 10,695.11   SQYD 10.00 106,951.10 12.00 128,341.32 17.00 181,816.87
0016 304-05-00100 Lime Treatment (Type E) 138.71   TON 340.00 47,161.40 100.00 13,871.00 400.00 55,484.00
0017 401-01-00100 Aggregate Surface Course (Net Section) 55.99   CUYD 110.00 6,158.90 100.00 5,599.00 55.00 3,079.45
0018 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 80.00 8,000.00 80.00 8,000.00 55.00 5,500.00
0019 502-01-00100 Superpave Asphaltic Concrete 2,991.37   TON 120.00 358,964.40 130.00 388,878.10 130.00 388,878.10
0020 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 9.2    TON 200.00 1,840.00 210.00 1,932.00 250.00 2,300.00
0021 509-01-00100 Cold Planing Asphaltic Pavement 1,333.33   SQYD 9.00 11,999.97 4.50 5,999.99 5.00 6,666.65
0022 510-01-00200 Pavement Patching (12" Minimum Thickness) 250      SQYD 110.00 27,500.00 82.00 20,500.00 130.00 32,500.00
0023 510-02-00100 Pavement Widening 1,026.79   SQYD 70.00 71,875.30 82.00 84,196.78 60.00 61,607.40
0024 701-01-01020 Cross Drain Pipe (30" RCP/PP) 86      LNFT 90.00 7,740.00 165.00 14,190.00 90.00 7,740.00
0025 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 80      LNFT 50.00 4,000.00 83.00 6,640.00 40.00 3,200.00
0026 704-03-00100 Blocked Out Guard Rail 759      LNFT 20.00 15,180.00 21.00 15,939.00 35.00 26,565.00
0027 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 200      LNFT 65.00 13,000.00 67.00 13,400.00 100.00 20,000.00
0028 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,200.00 8,800.00 2,300.00 9,200.00 3,000.00 12,000.00
0029 708-01-00100 Right-of-Way Monument 14      EACH 150.00 2,100.00 175.00 2,450.00 350.00 4,900.00
0030 708-02-00100 Right-of-Way Monument Witness Post 14      EACH 150.00 2,100.00 60.00 840.00 350.00 4,900.00
0031 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) 5,146.35   SQYD 40.00 205,854.00 38.00 195,561.30 60.00 308,781.00
0032 712-04-00100 Flexible Revetment 4,350      SQYD 46.00 200,100.00 40.00 174,000.00 60.00 261,000.00
0033 713-01-00100 Temporary Signs and Barricades 1      LUMP 70,000.00 70,000.00 20,000.00 20,000.00 29,000.00 29,000.00
0034 713-02-00500 Temporary Pavement Markings (24" Width) 24      LNFT 0.60 14.40 1.00 24.00 2.00 48.00
0035 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 1.5    MILE 400.00 600.00 500.00 750.00 1,000.00 1,500.00
0036 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1.5    MILE 800.00 1,200.00 170.00 255.00 1,000.00 1,500.00
0037 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 1.5    MILE 2,000.00 3,000.00 260.00 390.00 1,000.00 1,500.00
0038 716-01-00100 Mulch (Vegetative) 26.103  TON 600.00 15,661.80 650.00 16,966.95 700.00 18,272.10
0039 717-01-00100 Seeding 522.06   LB 12.00 6,264.72 13.00 6,786.78 10.00 5,220.60
0040 718-01-00100 Fertilizer 17,402      LB 0.50 8,701.00 0.50 8,701.00 1.00 17,402.00
0041 720-01-01000 Erosion Control System (Slope Protection) (Type A) 849.76   SQYD 1.50 1,274.64 1.60 1,359.62 2.50 2,124.40
0042 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 1,000      SQYD 2.00 2,000.00 2.10 2,100.00 3.00 3,000.00
0043 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 25,000.00 25,000.00 5,000.00 5,000.00 25,000.00 25,000.00
0044 727-01-00100 Mobilization 1      LUMP 360,000.00 360,000.00 420,000.00 420,000.00 250,000.00 250,000.00
0045 729-16-00200 Object Marker Assembly (Type 2) 2      EACH 70.00 140.00 75.00 150.00 100.00 200.00
0046 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 80.00 640.00 80.00 640.00 150.00 1,200.00
0047 731-02-00100 Reflectorized Raised Pavement Markers 75      EACH 10.00 750.00 8.00 600.00 25.00 1,875.00
0049 732-05-00100 Removal of Existing Markings 0.199  MILE 5,000.00 995.00 4,000.00 796.00 6,000.00 1,194.00
0050 740-01-00100 Construction Layout 1      LUMP 40,000.00 40,000.00 15,000.00 15,000.00 60,000.00 60,000.00
0051 804-01-00200 Precast Concrete Piles (14") 200      LNFT 85.00 17,000.00 80.00 16,000.00 110.00 22,000.00
0052 804-01-00600 Precast Concrete Piles (24") 2,160      LNFT 90.00 194,400.00 100.00 216,000.00 170.00 367,200.00
0053 804-01-00700 Precast Concrete Piles (30") 944      LNFT 130.00 122,720.00 220.00 207,680.00 190.00 179,360.00
0054 804-12-00100 Loading Permanent Piles 2      EACH 100.00 200.00 1,500.00 3,000.00 1,000.00 2,000.00
0055 804-17-00100 Dynamic Monitoring 24      EACH 800.00 19,200.00 450.00 10,800.00 750.00 18,000.00
0056 805-01-00700 Class A Concrete (Bents) 233.68   CUYD 780.00 182,270.40 780.00 182,270.40 800.00 186,944.00
0057 805-04-00100 Class AA(M) Concrete 402.27   CUYD 650.00 261,475.50 710.00 285,611.70 800.00 321,816.00
0059 805-11-00100 Strip Seal Joints 160      LNFT 140.00 22,400.00 160.00 25,600.00 200.00 32,000.00
0060 806-01-00100 Deformed Reinforcing Steel 167,316      LB 0.90 150,584.40 0.80 133,852.80 1.50 250,974.00
0061 807-08-00100 Structural Metalwork 950 lbs (paid for in lump sum) 1      LUMP 8,000.00 8,000.00 14,000.00 14,000.00 30,000.00 30,000.00
0062 810-01-00100 Concrete Railing (Standard Barrier) 844      LNFT 70.00 59,080.00 70.00 59,080.00 100.00 84,400.00
0063 813-01-00100 Concrete Approach Slabs 711.2    SQYD 200.00 142,240.00 220.00 156,464.00 350.00 248,920.00
0064 NS-500-00240 Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay 152      LNFT 4.00 608.00 8.00 1,216.00 2.00 304.00
0065 NS-500-00360 Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement 2,000      INLF 1.00 2,000.00 2.30 4,600.00 10.00 20,000.00
0066 NS-700-00180 Impact Attenuator (Construction Zone) 1      EACH 5,000.00 5,000.00 8,000.00 8,000.00 30,000.00 30,000.00
0067 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 1      EACH 8,000.00 8,000.00 1,800.00 1,800.00 2,500.00 2,500.00
0069 NS-724-00001 Rumble Strips (Centerline Ground-In) 0.502  MILE 3,000.00 1,506.00 1,200.00 602.40 2,000.00 1,004.00
0070 NS-724-00002 Rumble Strips (Shoulder Ground-In) 1.004  MILE 3,000.00 3,012.00 1,200.00 1,204.80 2,000.00 2,008.00
0071 NS-MSC-00120 Drainage Structure (Sta. 125+90.00, 2-18" X 170' CMP) 2      EACH 9,000.00 18,000.00 8,000.00 16,000.00 8,000.00 16,000.00
0072 NS-713-00008 Portable Changeable Message Sign 6      EACH 3,000.00 18,000.00 10,000.00 60,000.00 20,000.00 120,000.00
0073 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.273  MILE 2,500.00 5,682.50 2,700.00 6,137.10 3,000.00 6,819.00
0074 NS-800-00181 Precast Prestressed Concrete Girder (Type III) Class P (HPC) 1,737.5    LNFT 125.00 217,187.50 135.00 234,562.50 160.00 278,000.00
                     
    CONTRACTOR TOTAL       3,813,433.79   4,258,373.53   5,235,301.75