Bid Tabulations
Letting of
08/28/2013
LA DOTD Headquarters
| Lead Project: H.000102.6 | |
| Parish: Caddo | |
| Routes: US 80 | |
| Description: CROSS BAYOU AND RELIEF BRIDGES | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE & RELATED WORK. | |
| Estimated Construction Cost: $4,096,067.95 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 39462 | Jb James Construction Llc | $3,813,433.79 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $4,258,373.53 |
| 3 | 12135 | Blount Bros. Construction, LLC | $5,235,301.75 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jb James Construction Llc |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Blount Bros. Construction, LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 240,000.00 | 240,000.00 | 76,500.00 | 76,500.00 | 100,000.00 | 100,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 1,600.00 | 1,600.00 | 50,000.00 | 50,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Sta. 58+10.36, 130' X 28' Concrete Deck Girder Bridge) | 1 | EACH | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 80,000.00 | 80,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge (Sta. 62+59.74, 130' X 28' Concrete Deck Girder Bridge) | 1 | EACH | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 80,000.00 | 80,000.00 |
| 0005 | 202-02-14500 | Removal of Guard Rail | 1,022 | LNFT | 5.00 | 5,110.00 | 5.50 | 5,621.00 | 12.00 | 12,264.00 |
| 0006 | 202-02-32000 | Removal of Paved Ditches | 422.22 | SQYD | 8.00 | 3,377.76 | 3.75 | 1,583.33 | 10.00 | 4,222.20 |
| 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) Sta. 133+98.22, 30"x116' Equalizer | 116 | LNFT | 15.00 | 1,740.00 | 5.00 | 580.00 | 25.00 | 2,900.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 7,613.01 | SQYD | 5.00 | 38,065.05 | 7.75 | 59,000.83 | 10.00 | 76,130.10 |
| 0009 | 202-02-38500 | Removal of Surfacing and Stablized Base | 4,890.18 | SQYD | 4.00 | 19,560.72 | 5.50 | 26,895.99 | 8.00 | 39,121.44 |
| 0010 | 203-01-00100 | General Excavation | 43,650.48 | CUYD | 2.50 | 109,126.20 | 5.80 | 253,172.78 | 7.00 | 305,553.36 |
| 0011 | 203-03-00100 | Embankment | 35,563.59 | CUYD | 7.00 | 248,945.13 | 14.50 | 515,672.06 | 12.00 | 426,763.08 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 56 | EACH | 130.00 | 7,280.00 | 150.00 | 8,400.00 | 150.00 | 8,400.00 |
| 0013 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 700.00 | 5,600.00 | 500.00 | 4,000.00 | 1,000.00 | 8,000.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 5,248 | LNFT | 2.00 | 10,496.00 | 2.25 | 11,808.00 | 3.00 | 15,744.00 |
| 0015 | 302-02-05020 | Class II Base Course (10" Thick) (Soil Cement) | 10,695.11 | SQYD | 10.00 | 106,951.10 | 12.00 | 128,341.32 | 17.00 | 181,816.87 |
| 0016 | 304-05-00100 | Lime Treatment (Type E) | 138.71 | TON | 340.00 | 47,161.40 | 100.00 | 13,871.00 | 400.00 | 55,484.00 |
| 0017 | 401-01-00100 | Aggregate Surface Course (Net Section) | 55.99 | CUYD | 110.00 | 6,158.90 | 100.00 | 5,599.00 | 55.00 | 3,079.45 |
| 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 80.00 | 8,000.00 | 80.00 | 8,000.00 | 55.00 | 5,500.00 |
| 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 2,991.37 | TON | 120.00 | 358,964.40 | 130.00 | 388,878.10 | 130.00 | 388,878.10 |
| 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 9.2 | TON | 200.00 | 1,840.00 | 210.00 | 1,932.00 | 250.00 | 2,300.00 |
| 0021 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,333.33 | SQYD | 9.00 | 11,999.97 | 4.50 | 5,999.99 | 5.00 | 6,666.65 |
| 0022 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 110.00 | 27,500.00 | 82.00 | 20,500.00 | 130.00 | 32,500.00 |
| 0023 | 510-02-00100 | Pavement Widening | 1,026.79 | SQYD | 70.00 | 71,875.30 | 82.00 | 84,196.78 | 60.00 | 61,607.40 |
| 0024 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 86 | LNFT | 90.00 | 7,740.00 | 165.00 | 14,190.00 | 90.00 | 7,740.00 |
| 0025 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 80 | LNFT | 50.00 | 4,000.00 | 83.00 | 6,640.00 | 40.00 | 3,200.00 |
| 0026 | 704-03-00100 | Blocked Out Guard Rail | 759 | LNFT | 20.00 | 15,180.00 | 21.00 | 15,939.00 | 35.00 | 26,565.00 |
| 0027 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 65.00 | 13,000.00 | 67.00 | 13,400.00 | 100.00 | 20,000.00 |
| 0028 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,200.00 | 8,800.00 | 2,300.00 | 9,200.00 | 3,000.00 | 12,000.00 |
| 0029 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 150.00 | 2,100.00 | 175.00 | 2,450.00 | 350.00 | 4,900.00 |
| 0030 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 150.00 | 2,100.00 | 60.00 | 840.00 | 350.00 | 4,900.00 |
| 0031 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 5,146.35 | SQYD | 40.00 | 205,854.00 | 38.00 | 195,561.30 | 60.00 | 308,781.00 |
| 0032 | 712-04-00100 | Flexible Revetment | 4,350 | SQYD | 46.00 | 200,100.00 | 40.00 | 174,000.00 | 60.00 | 261,000.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 20,000.00 | 20,000.00 | 29,000.00 | 29,000.00 |
| 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.60 | 14.40 | 1.00 | 24.00 | 2.00 | 48.00 |
| 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.5 | MILE | 400.00 | 600.00 | 500.00 | 750.00 | 1,000.00 | 1,500.00 |
| 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.5 | MILE | 800.00 | 1,200.00 | 170.00 | 255.00 | 1,000.00 | 1,500.00 |
| 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.5 | MILE | 2,000.00 | 3,000.00 | 260.00 | 390.00 | 1,000.00 | 1,500.00 |
| 0038 | 716-01-00100 | Mulch (Vegetative) | 26.103 | TON | 600.00 | 15,661.80 | 650.00 | 16,966.95 | 700.00 | 18,272.10 |
| 0039 | 717-01-00100 | Seeding | 522.06 | LB | 12.00 | 6,264.72 | 13.00 | 6,786.78 | 10.00 | 5,220.60 |
| 0040 | 718-01-00100 | Fertilizer | 17,402 | LB | 0.50 | 8,701.00 | 0.50 | 8,701.00 | 1.00 | 17,402.00 |
| 0041 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 849.76 | SQYD | 1.50 | 1,274.64 | 1.60 | 1,359.62 | 2.50 | 2,124.40 |
| 0042 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,000 | SQYD | 2.00 | 2,000.00 | 2.10 | 2,100.00 | 3.00 | 3,000.00 |
| 0043 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 |
| 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 360,000.00 | 360,000.00 | 420,000.00 | 420,000.00 | 250,000.00 | 250,000.00 |
| 0045 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 70.00 | 140.00 | 75.00 | 150.00 | 100.00 | 200.00 |
| 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 80.00 | 640.00 | 80.00 | 640.00 | 150.00 | 1,200.00 |
| 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 75 | EACH | 10.00 | 750.00 | 8.00 | 600.00 | 25.00 | 1,875.00 |
| 0049 | 732-05-00100 | Removal of Existing Markings | 0.199 | MILE | 5,000.00 | 995.00 | 4,000.00 | 796.00 | 6,000.00 | 1,194.00 |
| 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 | 60,000.00 | 60,000.00 |
| 0051 | 804-01-00200 | Precast Concrete Piles (14") | 200 | LNFT | 85.00 | 17,000.00 | 80.00 | 16,000.00 | 110.00 | 22,000.00 |
| 0052 | 804-01-00600 | Precast Concrete Piles (24") | 2,160 | LNFT | 90.00 | 194,400.00 | 100.00 | 216,000.00 | 170.00 | 367,200.00 |
| 0053 | 804-01-00700 | Precast Concrete Piles (30") | 944 | LNFT | 130.00 | 122,720.00 | 220.00 | 207,680.00 | 190.00 | 179,360.00 |
| 0054 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 100.00 | 200.00 | 1,500.00 | 3,000.00 | 1,000.00 | 2,000.00 |
| 0055 | 804-17-00100 | Dynamic Monitoring | 24 | EACH | 800.00 | 19,200.00 | 450.00 | 10,800.00 | 750.00 | 18,000.00 |
| 0056 | 805-01-00700 | Class A Concrete (Bents) | 233.68 | CUYD | 780.00 | 182,270.40 | 780.00 | 182,270.40 | 800.00 | 186,944.00 |
| 0057 | 805-04-00100 | Class AA(M) Concrete | 402.27 | CUYD | 650.00 | 261,475.50 | 710.00 | 285,611.70 | 800.00 | 321,816.00 |
| 0059 | 805-11-00100 | Strip Seal Joints | 160 | LNFT | 140.00 | 22,400.00 | 160.00 | 25,600.00 | 200.00 | 32,000.00 |
| 0060 | 806-01-00100 | Deformed Reinforcing Steel | 167,316 | LB | 0.90 | 150,584.40 | 0.80 | 133,852.80 | 1.50 | 250,974.00 |
| 0061 | 807-08-00100 | Structural Metalwork 950 lbs (paid for in lump sum) | 1 | LUMP | 8,000.00 | 8,000.00 | 14,000.00 | 14,000.00 | 30,000.00 | 30,000.00 |
| 0062 | 810-01-00100 | Concrete Railing (Standard Barrier) | 844 | LNFT | 70.00 | 59,080.00 | 70.00 | 59,080.00 | 100.00 | 84,400.00 |
| 0063 | 813-01-00100 | Concrete Approach Slabs | 711.2 | SQYD | 200.00 | 142,240.00 | 220.00 | 156,464.00 | 350.00 | 248,920.00 |
| 0064 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 152 | LNFT | 4.00 | 608.00 | 8.00 | 1,216.00 | 2.00 | 304.00 |
| 0065 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 2,000 | INLF | 1.00 | 2,000.00 | 2.30 | 4,600.00 | 10.00 | 20,000.00 |
| 0066 | NS-700-00180 | Impact Attenuator (Construction Zone) | 1 | EACH | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 | 30,000.00 | 30,000.00 |
| 0067 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 1 | EACH | 8,000.00 | 8,000.00 | 1,800.00 | 1,800.00 | 2,500.00 | 2,500.00 |
| 0069 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 0.502 | MILE | 3,000.00 | 1,506.00 | 1,200.00 | 602.40 | 2,000.00 | 1,004.00 |
| 0070 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 1.004 | MILE | 3,000.00 | 3,012.00 | 1,200.00 | 1,204.80 | 2,000.00 | 2,008.00 |
| 0071 | NS-MSC-00120 | Drainage Structure (Sta. 125+90.00, 2-18" X 170' CMP) | 2 | EACH | 9,000.00 | 18,000.00 | 8,000.00 | 16,000.00 | 8,000.00 | 16,000.00 |
| 0072 | NS-713-00008 | Portable Changeable Message Sign | 6 | EACH | 3,000.00 | 18,000.00 | 10,000.00 | 60,000.00 | 20,000.00 | 120,000.00 |
| 0073 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.273 | MILE | 2,500.00 | 5,682.50 | 2,700.00 | 6,137.10 | 3,000.00 | 6,819.00 |
| 0074 | NS-800-00181 | Precast Prestressed Concrete Girder (Type III) Class P (HPC) | 1,737.5 | LNFT | 125.00 | 217,187.50 | 135.00 | 234,562.50 | 160.00 | 278,000.00 |
| CONTRACTOR TOTAL | 3,813,433.79 | 4,258,373.53 | 5,235,301.75 | |||||||