Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 852-26-0017 | |
| Parish: St. Tammany | |
| Routes: LA 1090 | |
| Description: LA 1090 AT BROWNSWITCH | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, SIGNALIZATION, AND RELATED WORK. | |
| Estimated Construction Cost: $811,473.89 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 38610 | Three C's Properties Inc | $650,993.42 |
| 2 | 06276 | Barriere Construction Co., Llc | $686,596.32 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $701,482.05 |
| 4 | 16724 | Stranco, Inc. | $727,684.55 |
| 5 | 25088 | RCS Contractors, Inc. | $837,832.70 |
| 6 | 14807 | Richard Price Contracting Co, Llc | $841,284.94 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Three C's Properties Inc |
- 2 - Barriere Construction Co., Llc |
- 3 - Boh Bros. Construction Co., LLC. |
- 4 - Stranco, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 7,800.00 | 7,800.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,337.33 | SQYD | 8.85 | 20,685.37 | 1.00 | 2,337.33 | 12.00 | 28,047.96 | 10.00 | 23,373.30 |
| 0003 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,985.00 | 1,985.00 | 2,000.00 | 2,000.00 | 1,600.00 | 1,600.00 | 2,500.00 | 2,500.00 |
| 0004 | 202-03-38000 | Relocation of Sign REHAB OF I/S REQUIRES MOVING SIGN | 3 | EACH | 185.00 | 555.00 | 200.00 | 600.00 | 180.00 | 540.00 | 1,400.00 | 4,200.00 |
| 0005 | 203-01-00100 | General Excavation | 1,165.05 | CUYD | 8.50 | 9,902.93 | 20.00 | 23,301.00 | 15.00 | 17,475.75 | 20.00 | 23,301.00 |
| 0006 | 203-03-00100 | Embankment | 922.62 | CUYD | 24.00 | 22,142.88 | 25.00 | 23,065.50 | 20.00 | 18,452.40 | 20.00 | 18,452.40 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 180.00 | 1,440.00 | 145.00 | 1,160.00 | 130.00 | 1,040.00 | 100.00 | 800.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 3,347.58 | LNFT | 2.50 | 8,368.95 | 1.60 | 5,356.13 | 1.50 | 5,021.37 | 2.00 | 6,695.16 |
| 0009 | 302-02-05120 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) | 3,808.25 | SQYD | 17.00 | 64,740.25 | 18.00 | 68,548.50 | 25.00 | 95,206.25 | 27.50 | 104,726.88 |
| 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 238.71 | CUYD | 53.00 | 12,651.63 | 1.00 | 238.71 | 100.00 | 23,871.00 | 50.00 | 11,935.50 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 2,206.94 | TON | 103.00 | 227,314.82 | 99.00 | 218,487.06 | 95.00 | 209,659.30 | 100.00 | 220,694.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,368.49 | SQYD | 2.60 | 11,358.07 | 2.50 | 10,921.23 | 3.00 | 13,105.47 | 3.65 | 15,944.99 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -242.69 | CUYD | 1.00 | -242.69 | 1.00 | -242.69 | 10.00 | -2,426.90 | 1.00 | -242.69 |
| 0014 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 85 | LNFT | 97.00 | 8,245.00 | 100.00 | 8,500.00 | 110.00 | 9,350.00 | 42.00 | 3,570.00 |
| 0015 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 231 | LNFT | 102.00 | 23,562.00 | 110.00 | 25,410.00 | 130.00 | 30,030.00 | 60.00 | 13,860.00 |
| 0016 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 28 | LNFT | 175.00 | 4,900.00 | 160.00 | 4,480.00 | 170.00 | 4,760.00 | 120.00 | 3,360.00 |
| 0017 | 702-02-00200 | Manholes (R-CB-11) | 3 | EACH | 2,645.00 | 7,935.00 | 2,500.00 | 7,500.00 | 6,000.00 | 18,000.00 | 3,150.00 | 9,450.00 |
| 0018 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 2,500.00 | 17,500.00 | 3,000.00 | 21,000.00 | 3,000.00 | 21,000.00 | 2,700.00 | 18,900.00 |
| 0019 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,100.00 | 1,100.00 | 2,000.00 | 2,000.00 | 500.00 | 500.00 | 1,250.00 | 1,250.00 |
| 0020 | 706-02-00100 | Concrete Drive (4" Thick) | 27.44 | SQYD | 57.00 | 1,564.08 | 60.00 | 1,646.40 | 130.00 | 3,567.20 | 54.00 | 1,481.76 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,000.00 | 7,000.00 | 40,000.00 | 40,000.00 | 6,000.00 | 6,000.00 | 17,000.00 | 17,000.00 |
| 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 135 | LNFT | 0.95 | 128.25 | 0.85 | 114.75 | 1.00 | 135.00 | 1.00 | 135.00 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.495 | MILE | 1,050.00 | 519.75 | 640.00 | 316.80 | 500.00 | 247.50 | 1,100.00 | 544.50 |
| 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 52.50 | 315.00 | 52.00 | 312.00 | 47.00 | 282.00 | 55.00 | 330.00 |
| 0026 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 52.50 | 315.00 | 52.00 | 312.00 | 47.00 | 282.00 | 55.00 | 330.00 |
| 0027 | 726-01-00100 | Bedding Material | 37.43 | CUYD | 71.00 | 2,657.53 | 100.00 | 3,743.00 | 115.00 | 4,304.45 | 60.00 | 2,245.80 |
| 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 64,000.00 | 64,000.00 | 68,000.00 | 68,000.00 | 50,000.00 | 50,000.00 | 62,500.00 | 62,500.00 |
| 0029 | 729-01-00100 | Sign (Type A) | 44 | SQFT | 18.80 | 827.20 | 20.00 | 880.00 | 17.00 | 748.00 | 33.00 | 1,452.00 |
| 0030 | 730-08-00100 | Electrical Service Point (Pedestal) | 1 | EACH | 1,450.00 | 1,450.00 | 1,600.00 | 1,600.00 | 1,500.00 | 1,500.00 | 1,600.00 | 1,600.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 286 | EACH | 6.25 | 1,787.50 | 6.00 | 1,716.00 | 5.00 | 1,430.00 | 6.50 | 1,859.00 |
| 0032 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 90 | LNFT | 21.00 | 1,890.00 | 20.00 | 1,800.00 | 15.00 | 1,350.00 | 22.00 | 1,980.00 |
| 0033 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.33 | MILE | 5,250.00 | 1,732.50 | 20,000.00 | 6,600.00 | 21,000.00 | 6,930.00 | 5,500.00 | 1,815.00 |
| 0034 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 315.00 | 945.00 | 300.00 | 900.00 | 210.00 | 630.00 | 330.00 | 990.00 |
| 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 315.00 | 1,260.00 | 240.00 | 960.00 | 220.00 | 880.00 | 330.00 | 1,320.00 |
| 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 315.00 | 945.00 | 220.00 | 660.00 | 220.00 | 660.00 | 330.00 | 990.00 |
| 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 10 | EACH | 315.00 | 3,150.00 | 230.00 | 2,300.00 | 225.00 | 2,250.00 | 330.00 | 3,300.00 |
| 0038 | 736-01-00100 | Trenching and Backfilling | 660 | LNFT | 1.70 | 1,122.00 | 2.00 | 1,320.00 | 1.60 | 1,056.00 | 4.50 | 2,970.00 |
| 0039 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 305 | LNFT | 17.40 | 5,307.00 | 17.00 | 5,185.00 | 17.00 | 5,185.00 | 15.50 | 4,727.50 |
| 0040 | 736-04-04060 | Signal Support (20' Single Mast Arm) | 2 | EACH | 6,250.00 | 12,500.00 | 6,200.00 | 12,400.00 | 6,000.00 | 12,000.00 | 7,890.00 | 15,780.00 |
| 0041 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 1 | EACH | 7,840.00 | 7,840.00 | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 9,540.00 | 9,540.00 |
| 0042 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 6 | EACH | 915.00 | 5,490.00 | 900.00 | 5,400.00 | 950.00 | 5,700.00 | 830.00 | 4,980.00 |
| 0043 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 1 | EACH | 1,420.00 | 1,420.00 | 1,400.00 | 1,400.00 | 1,200.00 | 1,200.00 | 1,325.00 | 1,325.00 |
| 0044 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 2 | EACH | 1,420.00 | 2,840.00 | 1,500.00 | 3,000.00 | 1,200.00 | 2,400.00 | 1,325.00 | 2,650.00 |
| 0045 | 736-06-00100 | Signal Service | 1 | EACH | 1,450.00 | 1,450.00 | 1,500.00 | 1,500.00 | 1,300.00 | 1,300.00 | 870.00 | 870.00 |
| 0046 | 736-08-01000 | Signal Controller (TS-2, Type 1; Type 6 Cabinet) | 1 | EACH | 17,000.00 | 17,000.00 | 17,000.00 | 17,000.00 | 16,000.00 | 16,000.00 | 18,150.00 | 18,150.00 |
| 0047 | 736-09-00100 | Loop Detector | 85 | LNFT | 13.00 | 1,105.00 | 13.00 | 1,105.00 | 13.00 | 1,105.00 | 11.35 | 964.75 |
| 0048 | 736-10-00200 | Underground Junction Box (Type E) | 3 | EACH | 400.00 | 1,200.00 | 400.00 | 1,200.00 | 400.00 | 1,200.00 | 390.00 | 1,170.00 |
| 0049 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 460.00 | 1,380.00 | 500.00 | 1,500.00 | 450.00 | 1,350.00 | 425.00 | 1,275.00 |
| 0050 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 460.00 | 460.00 | 850.00 | 850.00 | 850.00 | 850.00 | 880.00 | 880.00 |
| 0051 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 640 | LNFT | 1.50 | 960.00 | 1.50 | 960.00 | 1.30 | 832.00 | 6.60 | 4,224.00 |
| 0052 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 30 | LNFT | 2.60 | 78.00 | 2.75 | 82.50 | 2.50 | 75.00 | 10.00 | 300.00 |
| 0053 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 830 | LNFT | 1.00 | 830.00 | 1.00 | 830.00 | 1.00 | 830.00 | 2.90 | 2,407.00 |
| 0054 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 70 | LNFT | 3.15 | 220.50 | 3.25 | 227.50 | 3.00 | 210.00 | 9.46 | 662.20 |
| 0055 | 736-12-04000 | Conductor (6c, #14 awg) | 305 | LNFT | 1.50 | 457.50 | 1.50 | 457.50 | 1.00 | 305.00 | 2.90 | 884.50 |
| 0056 | 736-12-06000 | Conductor (10c, #14 awg) | 290 | LNFT | 1.85 | 536.50 | 2.00 | 580.00 | 1.50 | 435.00 | 3.25 | 942.50 |
| 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,500.00 | 11,500.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 19,000.00 | 19,000.00 |
| 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,628 | INLF | 1.30 | 3,416.40 | 0.50 | 1,314.00 | 2.00 | 5,256.00 | 2.00 | 5,256.00 |
| 0059 | NS-736-00020 | Video Detector (MVP) Device | 3 | EACH | 5,600.00 | 16,800.00 | 6,500.00 | 19,500.00 | 5,000.00 | 15,000.00 | 6,370.00 | 19,110.00 |
| 0060 | NS-736-00040 | Video Detection (MVP) System | 1 | EACH | 3,600.00 | 3,600.00 | 4,000.00 | 4,000.00 | 3,714.80 | 3,714.80 | 4,080.00 | 4,080.00 |
| 0061 | 707-03-00100 | Combination Concrete Curb and Gutter | 315.7 | LNFT | 35.00 | 11,049.50 | 23.00 | 7,261.10 | 35.00 | 11,049.50 | 25.00 | 7,892.50 |
| CONTRACTOR TOTAL | 650,993.42 | 686,596.32 | 701,482.05 | 727,684.55 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - RCS Contractors, Inc. |
- 6 - Richard Price Contracting Co, Llc |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 65,000.00 | 65,000.00 | 31,000.00 | 31,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,337.33 | SQYD | 10.00 | 23,373.30 | 12.00 | 28,047.96 |
| 0003 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,690.00 | 1,690.00 | 2,250.00 | 2,250.00 |
| 0004 | 202-03-38000 | Relocation of Sign REHAB OF I/S REQUIRES MOVING SIGN | 3 | EACH | 200.00 | 600.00 | 1,725.00 | 5,175.00 |
| 0005 | 203-01-00100 | General Excavation | 1,165.05 | CUYD | 7.00 | 8,155.35 | 25.00 | 29,126.25 |
| 0006 | 203-03-00100 | Embankment | 922.62 | CUYD | 14.00 | 12,916.68 | 40.00 | 36,904.80 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 150.00 | 1,200.00 | 250.00 | 2,000.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 3,347.58 | LNFT | 1.50 | 5,021.37 | 3.00 | 10,042.74 |
| 0009 | 302-02-05120 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) | 3,808.25 | SQYD | 37.50 | 142,809.38 | 23.00 | 87,589.75 |
| 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 238.71 | CUYD | 100.00 | 23,871.00 | 62.00 | 14,800.02 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 2,206.94 | TON | 105.00 | 231,728.70 | 110.00 | 242,763.40 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,368.49 | SQYD | 2.63 | 11,489.13 | 3.63 | 15,857.62 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -242.69 | CUYD | 1.00 | -242.69 | 12.08 | -2,931.70 |
| 0014 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 85 | LNFT | 45.00 | 3,825.00 | 130.00 | 11,050.00 |
| 0015 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 231 | LNFT | 72.13 | 16,662.03 | 90.00 | 20,790.00 |
| 0016 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 28 | LNFT | 99.96 | 2,798.88 | 300.00 | 8,400.00 |
| 0017 | 702-02-00200 | Manholes (R-CB-11) | 3 | EACH | 2,700.00 | 8,100.00 | 3,850.00 | 11,550.00 |
| 0018 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 2,250.00 | 15,750.00 | 3,400.00 | 23,800.00 |
| 0019 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,000.00 | 2,000.00 | 1,250.00 | 1,250.00 |
| 0020 | 706-02-00100 | Concrete Drive (4" Thick) | 27.44 | SQYD | 38.00 | 1,042.72 | 75.00 | 2,058.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,500.00 | 25,500.00 | 14,000.00 | 14,000.00 |
| 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 135 | LNFT | 1.00 | 135.00 | 0.91 | 122.85 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.495 | MILE | 630.00 | 311.85 | 626.00 | 309.87 |
| 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 55.00 | 330.00 | 54.38 | 326.28 |
| 0026 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 55.00 | 330.00 | 54.38 | 326.28 |
| 0027 | 726-01-00100 | Bedding Material | 37.43 | CUYD | 100.00 | 3,743.00 | 65.50 | 2,451.67 |
| 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 74,000.00 | 74,000.00 | 80,000.00 | 80,000.00 |
| 0029 | 729-01-00100 | Sign (Type A) | 44 | SQFT | 35.00 | 1,540.00 | 45.00 | 1,980.00 |
| 0030 | 730-08-00100 | Electrical Service Point (Pedestal) | 1 | EACH | 1,402.00 | 1,402.00 | 1,656.00 | 1,656.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 286 | EACH | 5.00 | 1,430.00 | 6.00 | 1,716.00 |
| 0032 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 90 | LNFT | 3.30 | 297.00 | 18.13 | 1,631.70 |
| 0033 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.33 | MILE | 16,500.00 | 5,445.00 | 23,000.00 | 7,590.00 |
| 0034 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 3 | EACH | 180.00 | 540.00 | 235.75 | 707.25 |
| 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 180.00 | 720.00 | 247.25 | 989.00 |
| 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 180.00 | 540.00 | 247.25 | 741.75 |
| 0037 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 10 | EACH | 195.00 | 1,950.00 | 258.75 | 2,587.50 |
| 0038 | 736-01-00100 | Trenching and Backfilling | 660 | LNFT | 1.60 | 1,056.00 | 4.83 | 3,187.80 |
| 0039 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 305 | LNFT | 16.60 | 5,063.00 | 16.00 | 4,880.00 |
| 0040 | 736-04-04060 | Signal Support (20' Single Mast Arm) | 2 | EACH | 5,960.00 | 11,920.00 | 8,250.00 | 16,500.00 |
| 0041 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 1 | EACH | 7,485.00 | 7,485.00 | 10,000.00 | 10,000.00 |
| 0042 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 6 | EACH | 874.00 | 5,244.00 | 868.00 | 5,208.00 |
| 0043 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 1 | EACH | 1,354.00 | 1,354.00 | 1,387.00 | 1,387.00 |
| 0044 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 2 | EACH | 1,354.00 | 2,708.00 | 1,387.00 | 2,774.00 |
| 0045 | 736-06-00100 | Signal Service | 1 | EACH | 1,402.00 | 1,402.00 | 909.00 | 909.00 |
| 0046 | 736-08-01000 | Signal Controller (TS-2, Type 1; Type 6 Cabinet) | 1 | EACH | 16,260.00 | 16,260.00 | 19,000.00 | 19,000.00 |
| 0047 | 736-09-00100 | Loop Detector | 85 | LNFT | 12.50 | 1,062.50 | 12.51 | 1,063.35 |
| 0048 | 736-10-00200 | Underground Junction Box (Type E) | 3 | EACH | 383.00 | 1,149.00 | 408.25 | 1,224.75 |
| 0049 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 440.00 | 1,320.00 | 444.00 | 1,332.00 |
| 0050 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 810.00 | 810.00 | 918.00 | 918.00 |
| 0051 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 640 | LNFT | 1.40 | 896.00 | 7.25 | 4,640.00 |
| 0052 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 30 | LNFT | 2.50 | 75.00 | 10.40 | 312.00 |
| 0053 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 830 | LNFT | 0.95 | 788.50 | 3.00 | 2,490.00 |
| 0054 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 70 | LNFT | 3.00 | 210.00 | 9.90 | 693.00 |
| 0055 | 736-12-04000 | Conductor (6c, #14 awg) | 305 | LNFT | 1.40 | 427.00 | 3.00 | 915.00 |
| 0056 | 736-12-06000 | Conductor (10c, #14 awg) | 290 | LNFT | 1.75 | 507.50 | 3.40 | 986.00 |
| 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 27,000.00 | 27,000.00 |
| 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,628 | INLF | 1.25 | 3,285.00 | 1.75 | 4,599.00 |
| 0059 | NS-736-00020 | Video Detector (MVP) Device | 3 | EACH | 5,393.00 | 16,179.00 | 6,658.00 | 19,974.00 |
| 0060 | NS-736-00040 | Video Detection (MVP) System | 1 | EACH | 3,420.00 | 3,420.00 | 4,266.00 | 4,266.00 |
| 0061 | 707-03-00100 | Combination Concrete Curb and Gutter | 315.7 | LNFT | 45.00 | 14,206.50 | 26.50 | 8,366.05 |
| CONTRACTOR TOTAL | 837,832.70 | 841,284.94 | ||||||