Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 846-01-0009 | |
| Parish: St. Helena | |
| Routes: LA 1041, LA 1036 | |
| Description: LIV. P/L-N. JCT. LA 441 & JCT. LA 1036-JCT. WILLIAMS RD. | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $2,303,632.21 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC. | $1,848,341.38 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,002,152.00 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,566,808.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC. |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - Barber Bros. Contracting Co., L.L.C |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 1,050 | LNFT | 3.00 | 3,150.00 | 2.00 | 2,100.00 | 8.00 | 8,400.00 |
| 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) LA 1041; Stations 10+50 & 19+30 | 101 | LNFT | 1.00 | 101.00 | 21.00 | 2,121.00 | 30.00 | 3,030.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) LA 1036; Stations 132+40, 154+90, 208+35 & 218+10 | 349 | LNFT | 1.00 | 349.00 | 21.00 | 7,329.00 | 30.00 | 10,470.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,700 | CUYD | 5.00 | 8,500.00 | 21.00 | 35,700.00 | 10.00 | 17,000.00 |
| 0005 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 2,029 | CUYD | 5.00 | 10,145.00 | 18.00 | 36,522.00 | 5.00 | 10,145.00 |
| 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 84 | EACH | 7.00 | 588.00 | 22.00 | 1,848.00 | 10.00 | 840.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 7,720 | LNFT | 1.50 | 11,580.00 | 3.00 | 23,160.00 | 1.60 | 12,352.00 |
| 0008 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 71,641 | SQYD | 5.50 | 394,025.50 | 6.50 | 465,666.50 | 6.00 | 429,846.00 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,016 | CUYD | 20.00 | 40,320.00 | 24.00 | 48,384.00 | 40.00 | 80,640.00 |
| 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 10.00 | 5,000.00 | 11.50 | 5,750.00 | 40.00 | 20,000.00 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 13,809.7 | TON | 60.00 | 828,582.00 | 57.00 | 787,152.90 | 85.00 | 1,173,824.50 |
| 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,606.3 | TON | 1.00 | 1,606.30 | 109.00 | 175,086.70 | 100.00 | 160,630.00 |
| 0013 | 509-01-00100 | Cold Planing Asphaltic Pavement | 58,926 | SQYD | 1.25 | 73,657.50 | 1.50 | 88,389.00 | 2.60 | 153,207.60 |
| 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,455 | CUYD | 15.00 | -36,825.00 | 0.10 | -245.50 | 0.00 | 0.00 |
| 0015 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 96 | LNFT | 200.00 | 19,200.00 | 140.00 | 13,440.00 | 120.00 | 11,520.00 |
| 0016 | 701-02-02001 | Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) | 44 | LNFT | 210.00 | 9,240.00 | 135.00 | 5,940.00 | 140.00 | 6,160.00 |
| 0017 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 112 | LNFT | 225.00 | 25,200.00 | 175.00 | 19,600.00 | 150.00 | 16,800.00 |
| 0018 | 701-02-02220 | Cross Drain Pipe Arch (60" Equiv. RCPA or 72" Equiv. CMPA) | 212 | LNFT | 230.00 | 48,760.00 | 275.00 | 58,300.00 | 350.00 | 74,200.00 |
| 0019 | 701-08-00100 | Relaying Pipe | 40 | LNFT | 60.00 | 2,400.00 | 52.00 | 2,080.00 | 150.00 | 6,000.00 |
| 0020 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 125 | LNFT | 32.00 | 4,000.00 | 33.00 | 4,125.00 | 40.00 | 5,000.00 |
| 0021 | 704-03-00100 | Blocked Out Guard Rail | 562.5 | LNFT | 15.00 | 8,437.50 | 16.00 | 9,000.00 | 20.00 | 11,250.00 |
| 0022 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 31.00 | 1,550.00 | 42.00 | 2,100.00 | 50.00 | 2,500.00 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 32.00 | 3,200.00 | 62.00 | 6,200.00 | 65.00 | 6,500.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 17 | EACH | 2,100.00 | 35,700.00 | 2,000.00 | 34,000.00 | 2,200.00 | 37,400.00 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 76,900.00 | 76,900.00 | 13,000.00 | 13,000.00 | 40,000.00 | 40,000.00 |
| 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 165 | LNFT | 0.50 | 82.50 | 1.00 | 165.00 | 2.00 | 330.00 |
| 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.943 | MILE | 10.00 | 149.43 | 150.00 | 2,241.45 | 400.00 | 5,977.20 |
| 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.429 | MILE | 10.00 | 104.29 | 300.00 | 3,128.70 | 500.00 | 5,214.50 |
| 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 45.586 | MILE | 10.00 | 455.86 | 575.00 | 26,211.95 | 400.00 | 18,234.40 |
| 0030 | 717-01-00100 | Seeding | 30 | LB | 20.00 | 600.00 | 26.00 | 780.00 | 25.00 | 750.00 |
| 0031 | 718-01-00100 | Fertilizer | 1,000 | LB | 0.51 | 510.00 | 1.00 | 1,000.00 | 1.00 | 1,000.00 |
| 0032 | 726-01-00100 | Bedding Material | 148.9 | CUYD | 40.00 | 5,956.00 | 82.00 | 12,209.80 | 60.00 | 8,934.00 |
| 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | 42,000.00 | 42,000.00 | 150,000.00 | 150,000.00 |
| 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 34 | EACH | 80.00 | 2,720.00 | 75.00 | 2,550.00 | 85.00 | 2,890.00 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 662 | EACH | 5.30 | 3,508.60 | 5.00 | 3,310.00 | 6.00 | 3,972.00 |
| 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 55 | LNFT | 5.00 | 275.00 | 3.50 | 192.50 | 6.00 | 330.00 |
| 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.195 | MILE | 2,600.00 | 39,507.00 | 2,600.00 | 39,507.00 | 3,000.00 | 45,585.00 |
| 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.476 | MILE | 900.00 | 3,128.40 | 750.00 | 2,607.00 | 1,000.00 | 3,476.00 |
| 0039 | 735-01-00100 | Mailboxes | 25 | EACH | 110.00 | 2,750.00 | 1.00 | 25.00 | 2.00 | 50.00 |
| 0040 | 735-02-00100 | Mailbox Supports (Single) | 25 | EACH | 1.10 | 27.50 | 115.00 | 2,875.00 | 150.00 | 3,750.00 |
| 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 52,000.00 | 52,000.00 | 12,700.00 | 12,700.00 | 15,000.00 | 15,000.00 |
| 0042 | NS-200-00020 | Cleaning Existing Ditches | 1,200 | LNFT | 1.00 | 1,200.00 | 3.25 | 3,900.00 | 3.00 | 3,600.00 |
| CONTRACTOR TOTAL | 1,848,341.38 | 2,002,152.00 | 2,566,808.20 | |||||||