Bid Tabulations
Letting of
02/23/2011
LA DOTD Headquarters
| Lead Project: 840-43-0018 | |
| Parish: Rapides | |
| Routes: US 71 | |
| Description: US 71 TURN LANE AT V.A. (TSM) | |
| Type Const: GRADING, PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $257,011.04 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $278,694.90 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $279,921.45 |
| 3 | 30774 | Progressive Construction Co., LLC | $298,808.00 |
| 4 | 35849 | T.L. Construction LLC | $322,155.95 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Progressive Construction Co., LLC |
- 4 - T.L. Construction LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 479 | SQYD | 16.00 | 7,664.00 | 12.00 | 5,748.00 | 9.00 | 4,311.00 | 12.00 | 5,748.00 |
| 0002 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,477 | SQYD | 8.50 | 21,054.50 | 6.00 | 14,862.00 | 10.00 | 24,770.00 | 8.00 | 19,816.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 20 | CUYD | 40.00 | 800.00 | 60.00 | 1,200.00 | 25.00 | 500.00 | 25.00 | 500.00 |
| 0004 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 20 | CUYD | 40.00 | 800.00 | 60.00 | 1,200.00 | 25.00 | 500.00 | 25.00 | 500.00 |
| 0005 | 302-02-02000 | Class II Base Course (6" Thick) | 2,956 | SQYD | 17.75 | 52,469.00 | 23.00 | 67,988.00 | 20.00 | 59,120.00 | 30.00 | 88,680.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 774.4 | TON | 118.00 | 91,379.20 | 100.00 | 77,440.00 | 145.00 | 112,288.00 | 125.00 | 96,800.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 63 | TON | 189.00 | 11,907.00 | 200.00 | 12,600.00 | 235.00 | 14,805.00 | 175.00 | 11,025.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 3,413 | SQYD | 4.30 | 14,675.90 | 4.00 | 13,652.00 | 3.00 | 10,239.00 | 8.00 | 27,304.00 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -150 | CUYD | 0.10 | -15.00 | 1.00 | -150.00 | 5.00 | -750.00 | 1.00 | -150.00 |
| 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 10 | SQYD | 1,200.00 | 12,000.00 | 300.00 | 3,000.00 | 300.00 | 3,000.00 | 200.00 | 2,000.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,500.00 | 8,500.00 | 20,000.00 | 20,000.00 | 4,000.00 | 4,000.00 | 15,000.00 | 15,000.00 |
| 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.48 | MILE | 185.00 | 88.80 | 600.00 | 288.00 | 3,500.00 | 1,680.00 | 550.00 | 264.00 |
| 0013 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 2,100.00 | 420.00 | 2,500.00 | 500.00 | 500.00 | 100.00 | 5,500.00 | 1,100.00 |
| 0014 | 717-01-00100 | Seeding | 3 | LB | 26.00 | 78.00 | 32.00 | 96.00 | 25.00 | 75.00 | 30.00 | 90.00 |
| 0015 | 718-01-00100 | Fertilizer | 100 | LB | 2.10 | 210.00 | 2.50 | 250.00 | 2.00 | 200.00 | 5.00 | 500.00 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 29,000.00 | 29,000.00 | 28,000.00 | 28,000.00 | 26,000.00 | 26,000.00 | 25,000.00 | 25,000.00 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 375 | EACH | 4.60 | 1,725.00 | 6.30 | 2,362.50 | 5.50 | 2,062.50 | 5.00 | 1,875.00 |
| 0018 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 375 | LNFT | 2.10 | 787.50 | 1.40 | 525.00 | 1.20 | 450.00 | 2.50 | 937.50 |
| 0019 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 170 | LNFT | 6.10 | 1,037.00 | 5.00 | 850.00 | 4.40 | 748.00 | 7.25 | 1,232.50 |
| 0020 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 6.10 | 292.80 | 6.30 | 302.40 | 5.50 | 264.00 | 7.25 | 348.00 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.852 | MILE | 3,100.00 | 2,641.20 | 4,400.00 | 3,748.80 | 4,000.00 | 3,408.00 | 3,600.00 | 3,067.20 |
| 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,200.00 | 7,200.00 | 10,000.00 | 10,000.00 | 6,700.00 | 6,700.00 | 5,000.00 | 5,000.00 |
| 0023 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 3,450 | LNFT | 1.30 | 4,485.00 | 1.25 | 4,312.50 | 3.00 | 10,350.00 | 1.50 | 5,175.00 |
| 0024 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 1,375 | LNFT | 1.30 | 1,787.50 | 2.45 | 3,368.75 | 3.00 | 4,125.00 | 1.50 | 2,062.50 |
| 0025 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 4,825 | LNFT | 1.10 | 5,307.50 | 1.20 | 5,790.00 | 1.50 | 7,237.50 | 1.25 | 6,031.25 |
| 0026 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 750 | INLF | 1.60 | 1,200.00 | 1.00 | 750.00 | 1.50 | 1,125.00 | 1.00 | 750.00 |
| 0027 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 750 | INLF | 1.60 | 1,200.00 | 1.65 | 1,237.50 | 2.00 | 1,500.00 | 2.00 | 1,500.00 |
| CONTRACTOR TOTAL | 278,694.90 | 279,921.45 | 298,808.00 | 322,155.95 | ||||||||