LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 840-43-0018
Parish: Rapides
Routes: US 71
Description: US 71 TURN LANE AT V.A. (TSM)
Type Const: GRADING, PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost: $257,011.04


RankLicenseBidderConstruction Bid
1 12487 Diamond B Construction Co., L.L.C. $278,694.90
2 12312 Gilchrist Construction Co. LLC $279,921.45
3 30774 Progressive Construction Co., LLC $298,808.00
4 35849 T.L. Construction LLC $322,155.95


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Gilchrist Construction Co. LLC
- 3 -
Progressive Construction Co., LLC
- 4 -
T.L. Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-32500 Removal of Portland Cement Concrete Pavement 479      SQYD 16.00 7,664.00 12.00 5,748.00 9.00 4,311.00 12.00 5,748.00
0002 202-02-38500 Removal of Surfacing and Stablized Base 2,477      SQYD 8.50 21,054.50 6.00 14,862.00 10.00 24,770.00 8.00 19,816.00
0003 203-07-00100 Borrow (Vehicular Measurement) 20      CUYD 40.00 800.00 60.00 1,200.00 25.00 500.00 25.00 500.00
0004 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 20      CUYD 40.00 800.00 60.00 1,200.00 25.00 500.00 25.00 500.00
0005 302-02-02000 Class II Base Course (6" Thick) 2,956      SQYD 17.75 52,469.00 23.00 67,988.00 20.00 59,120.00 30.00 88,680.00
0006 502-01-00100 Superpave Asphaltic Concrete 774.4    TON 118.00 91,379.20 100.00 77,440.00 145.00 112,288.00 125.00 96,800.00
0007 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 63      TON 189.00 11,907.00 200.00 12,600.00 235.00 14,805.00 175.00 11,025.00
0008 509-01-00100 Cold Planing Asphaltic Pavement 3,413      SQYD 4.30 14,675.90 4.00 13,652.00 3.00 10,239.00 8.00 27,304.00
0009 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -150      CUYD 0.10 -15.00 1.00 -150.00 5.00 -750.00 1.00 -150.00
0010 510-01-00200 Pavement Patching (12" Minimum Thickness) 10      SQYD 1,200.00 12,000.00 300.00 3,000.00 300.00 3,000.00 200.00 2,000.00
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 8,500.00 8,500.00 20,000.00 20,000.00 4,000.00 4,000.00 15,000.00 15,000.00
0012 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.48   MILE 185.00 88.80 600.00 288.00 3,500.00 1,680.00 550.00 264.00
0013 716-01-00100 Mulch (Vegetative) 0.2    TON 2,100.00 420.00 2,500.00 500.00 500.00 100.00 5,500.00 1,100.00
0014 717-01-00100 Seeding 3      LB 26.00 78.00 32.00 96.00 25.00 75.00 30.00 90.00
0015 718-01-00100 Fertilizer 100      LB 2.10 210.00 2.50 250.00 2.00 200.00 5.00 500.00
0016 727-01-00100 Mobilization 1      LUMP 29,000.00 29,000.00 28,000.00 28,000.00 26,000.00 26,000.00 25,000.00 25,000.00
0017 731-02-00100 Reflectorized Raised Pavement Markers 375      EACH 4.60 1,725.00 6.30 2,362.50 5.50 2,062.50 5.00 1,875.00
0018 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 375      LNFT 2.10 787.50 1.40 525.00 1.20 450.00 2.50 937.50
0019 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 170      LNFT 6.10 1,037.00 5.00 850.00 4.40 748.00 7.25 1,232.50
0020 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 48      LNFT 6.10 292.80 6.30 302.40 5.50 264.00 7.25 348.00
0021 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.852  MILE 3,100.00 2,641.20 4,400.00 3,748.80 4,000.00 3,408.00 3,600.00 3,067.20
0022 740-01-00100 Construction Layout 1      LUMP 7,200.00 7,200.00 10,000.00 10,000.00 6,700.00 6,700.00 5,000.00 5,000.00
0023 NS-500-00220 Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay 3,450      LNFT 1.30 4,485.00 1.25 4,312.50 3.00 10,350.00 1.50 5,175.00
0024 NS-500-00240 Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay 1,375      LNFT 1.30 1,787.50 2.45 3,368.75 3.00 4,125.00 1.50 2,062.50
0025 NS-500-00260 Sawcuts in Asphaltic Concrete Lifts 4,825      LNFT 1.10 5,307.50 1.20 5,790.00 1.50 7,237.50 1.25 6,031.25
0026 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 750      INLF 1.60 1,200.00 1.00 750.00 1.50 1,125.00 1.00 750.00
0027 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 750      INLF 1.60 1,200.00 1.65 1,237.50 2.00 1,500.00 2.00 1,500.00
                         
    CONTRACTOR TOTAL       278,694.90   279,921.45   298,808.00   322,155.95