Bid Tabulations
Letting of
08/04/2010
LA DOTD Headquarters
| Lead Project: 840-43-0001 | |
| Parish: Rapides | |
| Routes: US 71/US165 | |
| Description: FORT BUHLOW BRIDGE AND APPROACHES | |
| Type Const: CLR & GRUB, GRAD, DRAIN STR, COLD PLAN ASPH CONC, CLASS II BSE CRSE, LIME TRMT, PRCAST PRESTRESS CONC GRDR SPAN BR, TRAF SIGNAL; ALT. 1, CLASS II BASE CRSE, SUPAVE ASPH CONC PVMT; ALT. 2, CLASS II BASE CRSE, SUPAVE ASPH CONC PVMT, PCCP, AND RELATED WK. | |
| Estimated Construction Cost: $114,271,679.26 | |
| Maximum Number of Days Allowed for Construction: 1120 | |
| Calculated Daily User Cost: $5,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Life Cycle Cost |
Total Bid |
|---|---|---|---|---|---|---|
| 1 | 12395 | Jensen Construction Co. | $82,861,116.04 | 1120 | $982,800.00 | $89,443,916.04 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $86,648,157.95 | 1086 | $331,300.00 | $92,409,457.95 |
| 3 | 42076 | Austin Bridge & Road, Lp | $96,988,800.00 | 1120 | $331,300.00 | $102,920,100.00 |
| 4 | 00271 | Massman/Kiewit La A Joint Venture | $101,126,066.95 | 850 | $982,800.00 | $106,358,866.95 |
| 5 | 34567 | James Construction Group Llc | $108,849,455.64 | 1120 | $331,300.00 | $114,780,755.64 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jensen Construction Co. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Austin Bridge & Road, Lp |
- 4 - Massman/Kiewit La A Joint Venture |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 1,000,000.00 | 1,000,000.00 | 2,210,000.00 | 2,210,000.00 | 1,067,200.00 | 1,067,200.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 43,000.00 | 43,000.00 | 200,000.00 | 200,000.00 | 205,000.00 | 205,000.00 | 43,000.00 | 43,000.00 |
| 0003 | 202-02-00010 | Removal of of Truck Scale (Sta. 90+50) | 1 | EACH | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 6,300.00 | 6,300.00 | 5,000.00 | 5,000.00 |
| 0004 | 202-02-00010 | Removal of of Wood Frame Shed (Rt. Sta. 66+38, 10' x 15') | 1 | EACH | 250.00 | 250.00 | 1,800.00 | 1,800.00 | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 |
| 0005 | 202-02-04000 | Removal of Bridge Sta. 107+40 (Survey Line) 24' x 534' Steel Girder Spans | 1 | EACH | 345,000.00 | 345,000.00 | 500,000.00 | 500,000.00 | 85,000.00 | 85,000.00 | 150,000.00 | 150,000.00 |
| 0006 | 202-02-04000 | Removal of Bridge Sta. 32+60 (Survey Line) 24' x 1920' Steel Truss & Concrete Girder Spans | 1 | EACH | 3,000,000.00 | 3,000,000.00 | 1,400,000.00 | 1,400,000.00 | 590,000.00 | 590,000.00 | 800,000.00 | 800,000.00 |
| 0007 | 202-02-04000 | Removal of Bridge (Sta. 87+36, 107' Lt., 8' Long x 16' Wide) | 1 | EACH | 3,500.00 | 3,500.00 | 1,500.00 | 1,500.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0008 | 202-02-05000 | Removal of Building (Sta. 65+23 Rt., 200' x 50', 2-Story Brick) | 1 | EACH | 125,000.00 | 125,000.00 | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 |
| 0009 | 202-02-06020 | Removal of Concrete Box Culverts (Sta. 107+41, 8' x 3' x 205') | 1 | EACH | 17,000.00 | 17,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 |
| 0010 | 202-02-06020 | Removal of Concrete Box Culverts (Sta. 108+37, 3' x 12' x 92') | 1 | EACH | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | 23,000.00 | 23,000.00 | 17,000.00 | 17,000.00 |
| 0011 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,400.00 | 2,800.00 | 500.00 | 1,000.00 | 2,100.00 | 4,200.00 | 1,400.00 | 2,800.00 |
| 0012 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 824.2 | LNFT | 7.50 | 6,181.50 | 7.00 | 5,769.40 | 14.00 | 11,538.80 | 7.50 | 6,181.50 |
| 0013 | 202-02-06100 | Removal of Concrete Walks and Drives | 527 | SQYD | 8.75 | 4,611.25 | 7.00 | 3,689.00 | 20.00 | 10,540.00 | 8.75 | 4,611.25 |
| 0014 | 202-02-14500 | Removal of Guard Rail | 1,950 | LNFT | 8.00 | 15,600.00 | 9.50 | 18,525.00 | 14.00 | 27,300.00 | 5.00 | 9,750.00 |
| 0015 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 28,824 | SQYD | 4.75 | 136,914.00 | 4.50 | 129,708.00 | 4.50 | 129,708.00 | 4.75 | 136,914.00 |
| 0016 | 202-02-38200 | Removal of Signs | 12 | EACH | 50.00 | 600.00 | 135.00 | 1,620.00 | 300.00 | 3,600.00 | 50.00 | 600.00 |
| 0017 | 202-02-38240 | Removal of Signs and Supports | 22 | EACH | 100.00 | 2,200.00 | 115.00 | 2,530.00 | 400.00 | 8,800.00 | 225.00 | 4,950.00 |
| 0018 | 202-02-38380 | Removal of Sign Truss and Footings | 1 | EACH | 4,000.00 | 4,000.00 | 4,500.00 | 4,500.00 | 4,500.00 | 4,500.00 | 3,400.00 | 3,400.00 |
| 0019 | 202-02-38500 | Removal of Surfacing and Stablized Base | 48,544.8 | SQYD | 4.17 | 202,431.82 | 3.50 | 169,906.80 | 4.50 | 218,451.60 | 4.20 | 203,888.16 |
| 0020 | 203-01-00100 | General Excavation | 177,463 | CUYD | 5.00 | 887,315.00 | 5.00 | 887,315.00 | 4.50 | 798,583.50 | 5.00 | 887,315.00 |
| 0021 | 203-03-00100 | Embankment | 321,303 | CUYD | 7.00 | 2,249,121.00 | 10.00 | 3,213,030.00 | 10.25 | 3,293,355.75 | 7.00 | 2,249,121.00 |
| 0022 | 203-04-00200 | Nonplastic Embankment (Sand) | 28,332 | CUYD | 9.00 | 254,988.00 | 35.00 | 991,620.00 | 29.00 | 821,628.00 | 9.00 | 254,988.00 |
| 0023 | 203-04-00300 | Nonplastic Embankment (Stone) | 120 | CUYD | 97.00 | 11,640.00 | 180.00 | 21,600.00 | 250.00 | 30,000.00 | 97.00 | 11,640.00 |
| 0024 | 204-02-00100 | Temporary Hay or Straw Bales | 140 | EACH | 32.00 | 4,480.00 | 30.00 | 4,200.00 | 16.50 | 2,310.00 | 32.00 | 4,480.00 |
| 0025 | 204-03-00100 | Temporary Slope Drains | 1,000 | LNFT | 23.00 | 23,000.00 | 10.00 | 10,000.00 | 22.00 | 22,000.00 | 23.00 | 23,000.00 |
| 0026 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 81 | EACH | 175.00 | 14,175.00 | 450.00 | 36,450.00 | 110.00 | 8,910.00 | 175.00 | 14,175.00 |
| 0027 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 6 | EACH | 1,900.00 | 11,400.00 | 700.00 | 4,200.00 | 750.00 | 4,500.00 | 1,900.00 | 11,400.00 |
| 0028 | 204-06-00100 | Temporary Silt Fencing | 17,300 | LNFT | 5.75 | 99,475.00 | 2.00 | 34,600.00 | 1.65 | 28,545.00 | 3.75 | 64,875.00 |
| 0029 | 204-07-00100 | Temporary Stone Construction Entrance | 6 | EACH | 5,000.00 | 30,000.00 | 3,500.00 | 21,000.00 | 1,500.00 | 9,000.00 | 5,000.00 | 30,000.00 |
| 0030 | 302-02-01560 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) | 9,878.8 | SQYD | 12.80 | 126,448.64 | 12.00 | 118,545.60 | 17.50 | 172,879.00 | 12.80 | 126,448.64 |
| 0031 | 302-02-02100 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete) | 2,952.5 | SQYD | 13.25 | 39,120.63 | 14.00 | 41,335.00 | 22.00 | 64,955.00 | 13.25 | 39,120.63 |
| 0032 | 302-02-04500 | Class II Base Course (9" Thick) (Stone or Recycled Portland Cement Concrete) | 23,367.6 | SQYD | 19.00 | 443,984.40 | 18.00 | 420,616.80 | 26.50 | 619,241.40 | 19.00 | 443,984.40 |
| 0033 | 304-05-00100 | Lime Treatment (Type E) | 816 | TON | 300.00 | 244,800.00 | 100.00 | 81,600.00 | 375.00 | 306,000.00 | 300.00 | 244,800.00 |
| 0034 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 81 | CUYD | 82.00 | 6,642.00 | 100.00 | 8,100.00 | 250.00 | 20,250.00 | 82.00 | 6,642.00 |
| 0035 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 750 | CUYD | 10.00 | 7,500.00 | 50.00 | 37,500.00 | 150.00 | 112,500.00 | 10.00 | 7,500.00 |
| 0036 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,744 | SQYD | 7.50 | 20,580.00 | 5.00 | 13,720.00 | 9.00 | 24,696.00 | 7.50 | 20,580.00 |
| 0037 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | 152 | CUYD | 0.10 | 15.20 | 1.00 | 152.00 | 1.00 | 152.00 | 0.10 | 15.20 |
| 0038 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 364 | LNFT | 93.00 | 33,852.00 | 105.00 | 38,220.00 | 100.00 | 36,400.00 | 93.00 | 33,852.00 |
| 0039 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 76 | LNFT | 130.00 | 9,880.00 | 140.00 | 10,640.00 | 150.00 | 11,400.00 | 138.00 | 10,488.00 |
| 0040 | 701-01-01100 | Cross Drain Pipe (54" RCP) | 424 | LNFT | 256.00 | 108,544.00 | 275.00 | 116,600.00 | 280.00 | 118,720.00 | 256.00 | 108,544.00 |
| 0041 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 88 | LNFT | 280.00 | 24,640.00 | 280.00 | 24,640.00 | 320.00 | 28,160.00 | 280.00 | 24,640.00 |
| 0042 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,700 | LNFT | 50.00 | 85,000.00 | 65.00 | 110,500.00 | 55.00 | 93,500.00 | 50.00 | 85,000.00 |
| 0043 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 664 | LNFT | 72.00 | 47,808.00 | 75.00 | 49,800.00 | 80.00 | 53,120.00 | 72.00 | 47,808.00 |
| 0044 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 418 | LNFT | 91.00 | 38,038.00 | 98.00 | 40,964.00 | 100.00 | 41,800.00 | 91.00 | 38,038.00 |
| 0045 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 84 | LNFT | 122.00 | 10,248.00 | 98.00 | 8,232.00 | 140.00 | 11,760.00 | 122.00 | 10,248.00 |
| 0046 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 205 | LNFT | 135.00 | 27,675.00 | 180.00 | 36,900.00 | 150.00 | 30,750.00 | 135.00 | 27,675.00 |
| 0047 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 434 | LNFT | 163.00 | 70,742.00 | 250.00 | 108,500.00 | 180.00 | 78,120.00 | 163.00 | 70,742.00 |
| 0048 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 138 | LNFT | 80.00 | 11,040.00 | 90.00 | 12,420.00 | 90.00 | 12,420.00 | 80.00 | 11,040.00 |
| 0049 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 46 | LNFT | 132.00 | 6,072.00 | 165.00 | 7,590.00 | 145.00 | 6,670.00 | 132.00 | 6,072.00 |
| 0050 | 701-03-02100 | Storm Drain Pipe (Outfall) (42" PP or 48" CMP) | 140 | LNFT | 135.00 | 18,900.00 | 175.00 | 24,500.00 | 150.00 | 21,000.00 | 135.00 | 18,900.00 |
| 0051 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 70 | LNFT | 143.00 | 10,010.00 | 220.00 | 15,400.00 | 160.00 | 11,200.00 | 143.00 | 10,010.00 |
| 0052 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 60 | LNFT | 78.00 | 4,680.00 | 60.00 | 3,600.00 | 85.00 | 5,100.00 | 78.00 | 4,680.00 |
| 0053 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 32 | LNFT | 152.00 | 4,864.00 | 100.00 | 3,200.00 | 170.00 | 5,440.00 | 152.00 | 4,864.00 |
| 0054 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 24 | LNFT | 200.00 | 4,800.00 | 118.00 | 2,832.00 | 220.00 | 5,280.00 | 200.00 | 4,800.00 |
| 0055 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 36 | LNFT | 97.00 | 3,492.00 | 105.00 | 3,780.00 | 110.00 | 3,960.00 | 97.00 | 3,492.00 |
| 0056 | 702-02-00100 | Manholes (MH-06) | 3 | EACH | 8,800.00 | 26,400.00 | 7,800.00 | 23,400.00 | 10,000.00 | 30,000.00 | 8,800.00 | 26,400.00 |
| 0057 | 702-02-00800 | Manholes (R-CB-38) | 2 | EACH | 9,100.00 | 18,200.00 | 6,500.00 | 13,000.00 | 10,500.00 | 21,000.00 | 9,100.00 | 18,200.00 |
| 0058 | 702-03-00100 | Catch Basins (CB-01) | 33 | EACH | 3,200.00 | 105,600.00 | 3,000.00 | 99,000.00 | 3,600.00 | 118,800.00 | 3,200.00 | 105,600.00 |
| 0059 | 702-03-00600 | Catch Basins (CB-07) | 2 | EACH | 11,000.00 | 22,000.00 | 8,000.00 | 16,000.00 | 12,500.00 | 25,000.00 | 11,000.00 | 22,000.00 |
| 0060 | 703-03-00100 | Perforated Pipe Underdrains (6") | 1,170 | LNFT | 15.00 | 17,550.00 | 40.00 | 46,800.00 | 16.50 | 19,305.00 | 15.00 | 17,550.00 |
| 0061 | 703-04-00100 | Nonperforated Pipe Underdrains (6") | 36 | LNFT | 800.00 | 28,800.00 | 60.00 | 2,160.00 | 900.00 | 32,400.00 | 800.00 | 28,800.00 |
| 0062 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 89.6 | LNFT | 45.50 | 4,076.80 | 55.00 | 4,928.00 | 50.00 | 4,480.00 | 55.00 | 4,928.00 |
| 0063 | 704-03-00100 | Blocked Out Guard Rail | 3,049 | LNFT | 15.50 | 47,259.50 | 20.00 | 60,980.00 | 17.00 | 51,833.00 | 20.00 | 60,980.00 |
| 0064 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 18.8 | LNFT | 65.00 | 1,222.00 | 84.00 | 1,579.20 | 75.00 | 1,410.00 | 95.00 | 1,786.00 |
| 0065 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 306.3 | LNFT | 54.00 | 16,540.20 | 65.00 | 19,909.50 | 60.00 | 18,378.00 | 60.00 | 18,378.00 |
| 0066 | 704-11-00100 | Guard Rail End Treatment (Flared) | 10 | EACH | 1,900.00 | 19,000.00 | 2,300.00 | 23,000.00 | 2,000.00 | 20,000.00 | 2,250.00 | 22,500.00 |
| 0067 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 2,300.00 | 2,300.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 |
| 0068 | 704-11-00300 | Guard Rail End Treatment (Bi-Directional) | 2 | EACH | 4,500.00 | 9,000.00 | 5,200.00 | 10,400.00 | 5,000.00 | 10,000.00 | 4,500.00 | 9,000.00 |
| 0069 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 20 | LNFT | 28.00 | 560.00 | 55.00 | 1,100.00 | 55.00 | 1,100.00 | 28.00 | 560.00 |
| 0070 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 310 | LNFT | 27.50 | 8,525.00 | 35.00 | 10,850.00 | 35.00 | 10,850.00 | 27.50 | 8,525.00 |
| 0071 | 705-06-00500 | Chain Link Fence (8 Foot Height) | 1,080 | LNFT | 83.00 | 89,640.00 | 40.00 | 43,200.00 | 40.00 | 43,200.00 | 83.00 | 89,640.00 |
| 0072 | 705-08-10020 | 22-Foot Double Gates for Chain Link Fence (5-Foot Height) | 1 | DBGT | 1,900.00 | 1,900.00 | 2,800.00 | 2,800.00 | 2,000.00 | 2,000.00 | 1,900.00 | 1,900.00 |
| 0073 | 706-01-00100 | Concrete Walk (4" Thick) | 282.5 | SQYD | 26.10 | 7,373.25 | 35.00 | 9,887.50 | 45.00 | 12,712.50 | 28.00 | 7,910.00 |
| 0074 | 706-02-00200 | Concrete Drive (6" Thick) | 730.1 | SQYD | 39.15 | 28,583.42 | 55.00 | 40,155.50 | 60.00 | 43,806.00 | 42.00 | 30,664.20 |
| 0075 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 4,708.2 | SQYD | 26.10 | 122,884.02 | 35.00 | 164,787.00 | 35.00 | 164,787.00 | 28.00 | 131,829.60 |
| 0076 | 708-01-00100 | Right-of-Way Monument | 79 | EACH | 270.00 | 21,330.00 | 450.00 | 35,550.00 | 155.00 | 12,245.00 | 200.00 | 15,800.00 |
| 0077 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 12 | SQYD | 200.00 | 2,400.00 | 150.00 | 1,800.00 | 300.00 | 3,600.00 | 200.00 | 2,400.00 |
| 0078 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 45 | SQYD | 120.00 | 5,400.00 | 100.00 | 4,500.00 | 150.00 | 6,750.00 | 120.00 | 5,400.00 |
| 0079 | 711-04-00100 | Geotextile Fabric | 4,028 | SQYD | 2.00 | 8,056.00 | 2.00 | 8,056.00 | 3.50 | 14,098.00 | 2.00 | 8,056.00 |
| 0080 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,881 | SQYD | 60.30 | 113,424.30 | 70.00 | 131,670.00 | 145.00 | 272,745.00 | 19.40 | 36,491.40 |
| 0081 | 712-02-00100 | Sacked Concrete Revetment | 68 | SQYD | 250.00 | 17,000.00 | 200.00 | 13,600.00 | 300.00 | 20,400.00 | 250.00 | 17,000.00 |
| 0082 | 712-04-00100 | Flexible Revetment | 6,847 | SQYD | 32.00 | 219,104.00 | 40.00 | 273,880.00 | 35.00 | 239,645.00 | 32.00 | 219,104.00 |
| 0083 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 121,500.00 | 121,500.00 | 500,000.00 | 500,000.00 | 500,000.00 | 500,000.00 | 375,000.00 | 375,000.00 |
| 0084 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 43,092 | LNFT | 0.12 | 5,171.04 | 0.15 | 6,463.80 | 0.20 | 8,618.40 | 0.12 | 5,171.04 |
| 0085 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 553 | EACH | 400.00 | 221,200.00 | 700.00 | 387,100.00 | 800.00 | 442,400.00 | 733.00 | 405,349.00 |
| 0086 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 1,386 | EACH | 30.00 | 41,580.00 | 55.00 | 76,230.00 | 200.00 | 277,200.00 | 63.00 | 87,318.00 |
| 0087 | 716-01-00100 | Mulch (Vegetative) | 138 | TON | 400.00 | 55,200.00 | 450.00 | 62,100.00 | 450.00 | 62,100.00 | 450.00 | 62,100.00 |
| 0088 | 717-01-00100 | Seeding | 2,370 | LB | 7.00 | 16,590.00 | 9.00 | 21,330.00 | 8.00 | 18,960.00 | 8.00 | 18,960.00 |
| 0089 | 718-01-00100 | Fertilizer | 79,000 | LB | 0.40 | 31,600.00 | 0.50 | 39,500.00 | 0.50 | 39,500.00 | 0.46 | 36,340.00 |
| 0090 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 15,946 | SQYD | 1.25 | 19,932.50 | 1.60 | 25,513.60 | 1.30 | 20,729.80 | 1.10 | 17,540.60 |
| 0091 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,820 | SQYD | 1.25 | 2,275.00 | 1.60 | 2,912.00 | 1.30 | 2,366.00 | 1.45 | 2,639.00 |
| 0092 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 3,560 | SQYD | 1.25 | 4,450.00 | 1.60 | 5,696.00 | 1.30 | 4,628.00 | 1.45 | 5,162.00 |
| 0093 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 183 | SQYD | 2.50 | 457.50 | 3.80 | 695.40 | 4.00 | 732.00 | 2.50 | 457.50 |
| 0094 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 120,000.00 | 120,000.00 | 85,000.00 | 85,000.00 | 400,000.00 | 400,000.00 | 25,000.00 | 25,000.00 |
| 0095 | 725-01-00100 | Temporary Detour Roads | 13,261 | SQYD | 83.50 | 1,107,293.50 | 55.00 | 729,355.00 | 85.00 | 1,127,185.00 | 83.50 | 1,107,293.50 |
| 0096 | 726-01-00100 | Bedding Material | 1,011.5 | CUYD | 52.00 | 52,598.00 | 80.00 | 80,920.00 | 60.00 | 60,690.00 | 52.00 | 52,598.00 |
| 0097 | 727-01-00100 | Mobilization | 1 | LUMP | 8,000,000.00 | 8,000,000.00 | 8,000,000.00 | 8,000,000.00 | 9,000,000.00 | 9,000,000.00 | 9,103,000.00 | 9,103,000.00 |
| 0098 | 729-01-00100 | Sign (Type A) | 846.8 | SQFT | 18.00 | 15,242.40 | 20.00 | 16,936.00 | 20.00 | 16,936.00 | 21.00 | 17,782.80 |
| 0099 | 729-04-00100 | Sign (Type D) | 618 | SQFT | 20.00 | 12,360.00 | 22.00 | 13,596.00 | 22.00 | 13,596.00 | 24.00 | 14,832.00 |
| 0100 | 729-05-00100 | Sign (Type E) | 48 | SQFT | 27.00 | 1,296.00 | 30.00 | 1,440.00 | 30.00 | 1,440.00 | 25.00 | 1,200.00 |
| 0101 | 729-06-00100 | Sign (Overhead Mounted) | 120 | SQFT | 22.00 | 2,640.00 | 25.00 | 3,000.00 | 25.00 | 3,000.00 | 28.00 | 3,360.00 |
| 0102 | 729-08-00100 | Mounting (2 1/2" Size Post) | 54 | EACH | 700.00 | 37,800.00 | 780.00 | 42,120.00 | 800.00 | 43,200.00 | 765.00 | 41,310.00 |
| 0103 | 729-08-00200 | Mounting (3 1/2" Size Post) | 28 | EACH | 890.00 | 24,920.00 | 950.00 | 26,600.00 | 950.00 | 26,600.00 | 895.00 | 25,060.00 |
| 0104 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 2 | EACH | 1,200.00 | 2,400.00 | 1,300.00 | 2,600.00 | 1,400.00 | 2,800.00 | 3,575.00 | 7,150.00 |
| 0105 | 729-08-00500 | Mounting (S3 x 5.7 Size Post) | 4 | EACH | 820.00 | 3,280.00 | 900.00 | 3,600.00 | 1,000.00 | 4,000.00 | 785.00 | 3,140.00 |
| 0106 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 24 | EACH | 975.00 | 23,400.00 | 1,150.00 | 27,600.00 | 1,200.00 | 28,800.00 | 925.00 | 22,200.00 |
| 0107 | 729-09-00600 | Mounting (Overhead Truss) (Ground Mounted) (90' Span) | 1 | EACH | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 90,000.00 | 90,000.00 |
| 0108 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 70.00 | 840.00 | 75.00 | 900.00 | 80.00 | 960.00 | 75.00 | 900.00 |
| 0109 | 729-19-00100 | Dead End Road Installations (Type A) | 3 | EACH | 1,450.00 | 4,350.00 | 1,600.00 | 4,800.00 | 3,500.00 | 10,500.00 | 1,275.00 | 3,825.00 |
| 0110 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 2 | EACH | 18,000.00 | 36,000.00 | 20,000.00 | 40,000.00 | 20,000.00 | 40,000.00 | 5,000.00 | 10,000.00 |
| 0111 | 729-21-00100 | U-Channel Post | 3 | EACH | 95.00 | 285.00 | 105.00 | 315.00 | 100.00 | 300.00 | 75.00 | 225.00 |
| 0112 | 730-01-00100 | Trenching and Backfilling | 1,000 | LNFT | 3.81 | 3,810.00 | 4.40 | 4,400.00 | 4.00 | 4,000.00 | 3.50 | 3,500.00 |
| 0113 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 4-#12 AWG XHHW-2 | 1,000 | LNFT | 3.14 | 3,140.00 | 3.40 | 3,400.00 | 3.50 | 3,500.00 | 4.75 | 4,750.00 |
| 0114 | 730-02-02040 | Conduit with Conductors (Rigid Aluminum) (1") 3-#12 AWG XHHW-2 | 1,250 | LNFT | 14.00 | 17,500.00 | 15.50 | 19,375.00 | 16.00 | 20,000.00 | 11.00 | 13,750.00 |
| 0115 | 730-08-00100 | Electrical Service Point (Pedestal) | 1 | EACH | 6,272.00 | 6,272.00 | 12,400.00 | 12,400.00 | 7,000.00 | 7,000.00 | 500.00 | 500.00 |
| 0116 | 730-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 7,092.00 | 7,092.00 | 2,600.00 | 2,600.00 | 8,000.00 | 8,000.00 | 4,960.00 | 4,960.00 |
| 0117 | 730-16-00200 | Underground Junction Box (11" x 18") | 1 | EACH | 383.00 | 383.00 | 550.00 | 550.00 | 450.00 | 450.00 | 617.00 | 617.00 |
| 0118 | 730-17-00100 | Structure Junction Box (8" x 8" x 4") (Cast Aluminum) | 13 | EACH | 736.00 | 9,568.00 | 600.00 | 7,800.00 | 800.00 | 10,400.00 | 746.00 | 9,698.00 |
| 0119 | 730-18-00100 | Service Pole | 1 | EACH | 1,075.00 | 1,075.00 | 890.00 | 890.00 | 1,200.00 | 1,200.00 | 1,775.00 | 1,775.00 |
| 0120 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,924 | EACH | 8.50 | 16,354.00 | 9.50 | 18,278.00 | 11.00 | 21,164.00 | 8.50 | 16,354.00 |
| 0121 | 731-02-00100 | Reflectorized Raised Pavement Markers | 758 | EACH | 5.00 | 3,790.00 | 5.50 | 4,169.00 | 6.00 | 4,548.00 | 5.00 | 3,790.00 |
| 0122 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,581 | LNFT | 0.90 | 1,422.90 | 1.00 | 1,581.00 | 1.50 | 2,371.50 | 0.90 | 1,422.90 |
| 0123 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 192 | LNFT | 2.90 | 556.80 | 3.25 | 624.00 | 5.00 | 960.00 | 2.90 | 556.80 |
| 0124 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.2 | MILE | 2,200.00 | 29,040.00 | 2,400.00 | 31,680.00 | 2,750.00 | 36,300.00 | 2,200.00 | 29,040.00 |
| 0125 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 160.00 | 160.00 | 175.00 | 175.00 | 225.00 | 225.00 | 160.00 | 160.00 |
| 0126 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 160.00 | 480.00 | 175.00 | 525.00 | 240.00 | 720.00 | 160.00 | 480.00 |
| 0127 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 160.00 | 800.00 | 175.00 | 875.00 | 240.00 | 1,200.00 | 160.00 | 800.00 |
| 0128 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 180.00 | 1,440.00 | 200.00 | 1,600.00 | 240.00 | 1,920.00 | 180.00 | 1,440.00 |
| 0129 | 733-01-00100 | Concrete Roadway Barrier (Single Faced) (32" High) | 2,448.6 | LNFT | 85.61 | 209,624.65 | 104.00 | 254,654.40 | 80.00 | 195,888.00 | 75.00 | 183,645.00 |
| 0130 | 733-01-00100 | Concrete Roadway Barrier (Single Faced) (54" High) | 1,305.6 | LNFT | 149.27 | 194,886.91 | 185.00 | 241,536.00 | 150.00 | 195,840.00 | 150.00 | 195,840.00 |
| 0131 | 736-01-00100 | Trenching and Backfilling | 925 | LNFT | 3.80 | 3,515.00 | 3.15 | 2,913.75 | 4.00 | 3,700.00 | 3.50 | 3,237.50 |
| 0132 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 490 | LNFT | 16.00 | 7,840.00 | 11.70 | 5,733.00 | 20.00 | 9,800.00 | 11.10 | 5,439.00 |
| 0133 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 285 | LNFT | 19.60 | 5,586.00 | 14.80 | 4,218.00 | 25.00 | 7,125.00 | 14.85 | 4,232.25 |
| 0134 | 736-04-03080 | Signal Support (30' Steel Strain Pole) | 4 | EACH | 4,110.00 | 16,440.00 | 3,400.00 | 13,600.00 | 5,000.00 | 20,000.00 | 6,418.00 | 25,672.00 |
| 0136 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 8,995.00 | 17,990.00 | 4,400.00 | 8,800.00 | 10,000.00 | 20,000.00 | 9,575.00 | 19,150.00 |
| 0137 | 736-04-10000 | Signal Support (Foundation Only) | 6 | EACH | 2,260.00 | 13,560.00 | 3,100.00 | 18,600.00 | 2,500.00 | 15,000.00 | 1,750.00 | 10,500.00 |
| 0138 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 15 | EACH | 1,087.00 | 16,305.00 | 1,100.00 | 16,500.00 | 1,200.00 | 18,000.00 | 850.00 | 12,750.00 |
| 0139 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT, Y, LT. G) | 8 | EACH | 1,116.00 | 8,928.00 | 1,100.00 | 8,800.00 | 1,300.00 | 10,400.00 | 810.00 | 6,480.00 |
| 0140 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,540.00 | 4,620.00 | 1,500.00 | 4,500.00 | 1,700.00 | 5,100.00 | 1,330.00 | 3,990.00 |
| 0141 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 1,270.00 | 1,270.00 | 1,600.00 | 1,600.00 | 1,500.00 | 1,500.00 | 1,550.00 | 1,550.00 |
| 0142 | 736-06-00600 | Signal Service (Existing Pole) | 1 | EACH | 1,144.00 | 1,144.00 | 1,200.00 | 1,200.00 | 1,500.00 | 1,500.00 | 850.00 | 850.00 |
| 0143 | 736-08-00110 | Sig Cntrlr (TS-2, Type 2)(Type 6 Cabinet)(Furnish & Install) | 1 | EACH | 22,240.00 | 22,240.00 | 26,800.00 | 26,800.00 | 25,000.00 | 25,000.00 | 22,500.00 | 22,500.00 |
| 0144 | 736-09-00100 | Loop Detector | 752 | LNFT | 11.00 | 8,272.00 | 16.25 | 12,220.00 | 12.00 | 9,024.00 | 11.00 | 8,272.00 |
| 0145 | 736-10-00100 | Underground Junction Box (Type D) | 3 | EACH | 395.00 | 1,185.00 | 405.00 | 1,215.00 | 450.00 | 1,350.00 | 350.00 | 1,050.00 |
| 0146 | 736-10-00200 | Underground Junction Box (Type E) | 3 | EACH | 481.00 | 1,443.00 | 560.00 | 1,680.00 | 550.00 | 1,650.00 | 391.00 | 1,173.00 |
| 0147 | 736-10-00300 | Underground Junction Box (Type F) | 11 | EACH | 540.00 | 5,940.00 | 560.00 | 6,160.00 | 600.00 | 6,600.00 | 455.00 | 5,005.00 |
| 0148 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 932.00 | 932.00 | 1,200.00 | 1,200.00 | 1,100.00 | 1,100.00 | 882.00 | 882.00 |
| 0149 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 705 | LNFT | 0.90 | 634.50 | 1.90 | 1,339.50 | 1.00 | 705.00 | 3.00 | 2,115.00 |
| 0150 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 230 | LNFT | 1.20 | 276.00 | 3.80 | 874.00 | 1.50 | 345.00 | 4.05 | 931.50 |
| 0151 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 120 | LNFT | 2.30 | 276.00 | 7.90 | 948.00 | 3.00 | 360.00 | 5.25 | 630.00 |
| 0152 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 1,720 | LNFT | 1.00 | 1,720.00 | 0.75 | 1,290.00 | 1.10 | 1,892.00 | 1.25 | 2,150.00 |
| 0153 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 350 | LNFT | 3.00 | 1,050.00 | 3.10 | 1,085.00 | 3.50 | 1,225.00 | 5.75 | 2,012.50 |
| 0154 | 736-12-02020 | Conductor (3c, #14 awg) | 1,700 | LNFT | 1.05 | 1,785.00 | 1.10 | 1,870.00 | 1.25 | 2,125.00 | 1.35 | 2,295.00 |
| 0155 | 736-13-00400 | Cable (6C Signal) | 730 | LNFT | 1.50 | 1,095.00 | 2.50 | 1,825.00 | 1.65 | 1,204.50 | 1.60 | 1,168.00 |
| 0156 | 736-13-00500 | Cable (10C Signal) | 3,800 | LNFT | 2.00 | 7,600.00 | 3.00 | 11,400.00 | 2.25 | 8,550.00 | 1.85 | 7,030.00 |
| 0157 | 740-01-00100 | Construction Layout | 1 | LUMP | 750,000.00 | 750,000.00 | 590,000.00 | 590,000.00 | 3,200,000.00 | 3,200,000.00 | 100,000.00 | 100,000.00 |
| 0158 | 741-01-02100 | Water Main (16" Ductile Iron) Storm Water Pump Outfall Pipe | 124 | LNFT | 200.00 | 24,800.00 | 260.00 | 32,240.00 | 175.00 | 21,700.00 | 250.00 | 31,000.00 |
| 0159 | 802-01-00100 | Structural Excavation | 163.8 | CUYD | 15.00 | 2,457.00 | 12.00 | 1,965.60 | 30.00 | 4,914.00 | 40.00 | 6,552.00 |
| 0160 | 802-02-00100 | Structural Excavation for Intermediate Bents | 17,997.8 | CUYD | 15.00 | 269,967.00 | 17.00 | 305,962.60 | 75.00 | 1,349,835.00 | 110.00 | 1,979,758.00 |
| 0161 | 802-04-00100 | Structural Excavation for Piers (Wet) | 22,614.5 | CUYD | 20.00 | 452,290.00 | 25.00 | 565,362.50 | 28.00 | 633,206.00 | 30.00 | 678,435.00 |
| 0162 | 802-05-00100 | Cofferdams | 1 | LUMP | 6,000,000.00 | 6,000,000.00 | 2,700,000.00 | 2,700,000.00 | 2,200,000.00 | 2,200,000.00 | 3,400,000.00 | 3,400,000.00 |
| 0163 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 500,000.00 | 500,000.00 | 150,000.00 | 150,000.00 | 1,000,000.00 | 1,000,000.00 | 330,000.00 | 330,000.00 |
| 0164 | 804-01-00200 | Precast Concrete Piles (14") | 87,429 | LNFT | 30.00 | 2,622,870.00 | 35.00 | 3,060,015.00 | 57.00 | 4,983,453.00 | 37.00 | 3,234,873.00 |
| 0165 | 804-01-00300 | Precast Concrete Piles (16") | 7,910 | LNFT | 40.00 | 316,400.00 | 49.00 | 387,590.00 | 76.00 | 601,160.00 | 65.00 | 514,150.00 |
| 0166 | 804-01-00700 | Precast Concrete Piles (30") | 11,613 | LNFT | 96.00 | 1,114,848.00 | 112.00 | 1,300,656.00 | 135.00 | 1,567,755.00 | 130.00 | 1,509,690.00 |
| 0167 | 804-03-02120 | Steel Piles (24" Pipe) | 23,312 | LNFT | 95.00 | 2,214,640.00 | 136.00 | 3,170,432.00 | 110.00 | 2,564,320.00 | 120.00 | 2,797,440.00 |
| 0168 | 804-05-00200 | Precast Concrete Test Piles (14") | 6 | EACH | 5,000.00 | 30,000.00 | 25,000.00 | 150,000.00 | 22,000.00 | 132,000.00 | 20,000.00 | 120,000.00 |
| 0169 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 |
| 0170 | 804-05-00700 | Precast Concrete Test Piles (30") | 2 | EACH | 10,000.00 | 20,000.00 | 65,000.00 | 130,000.00 | 26,800.00 | 53,600.00 | 27,000.00 | 54,000.00 |
| 0171 | 804-07-02120 | Steel Test Piles (24" Pipe) | 2 | EACH | 50,000.00 | 100,000.00 | 45,000.00 | 90,000.00 | 35,000.00 | 70,000.00 | 100,000.00 | 200,000.00 |
| 0172 | 804-09-00100 | Loading Test Piles | 11 | EACH | 20,000.00 | 220,000.00 | 40,000.00 | 440,000.00 | 58,000.00 | 638,000.00 | 100,000.00 | 1,100,000.00 |
| 0173 | 804-10-00100 | Reloading Test Piles | 2 | EACH | 2,000.00 | 4,000.00 | 3,500.00 | 7,000.00 | 8,500.00 | 17,000.00 | 30,000.00 | 60,000.00 |
| 0174 | 804-11-00100 | Redriving Test Piles | 2 | EACH | 1,000.00 | 2,000.00 | 1,600.00 | 3,200.00 | 4,000.00 | 8,000.00 | 2,000.00 | 4,000.00 |
| 0175 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 10,000.00 | 20,000.00 | 3,000.00 | 6,000.00 | 66,000.00 | 132,000.00 | 50,000.00 | 100,000.00 |
| 0176 | 804-17-00100 | Dynamic Monitoring | 136 | EACH | 100.00 | 13,600.00 | 285.00 | 38,760.00 | 3,000.00 | 408,000.00 | 1,000.00 | 136,000.00 |
| 0177 | 805-01-00500 | Class A Concrete (Footings) | 10,556.33 | CUYD | 390.00 | 4,116,968.70 | 230.00 | 2,427,955.90 | 460.00 | 4,855,911.80 | 335.00 | 3,536,370.55 |
| 0178 | 805-01-00600 | Class A Concrete (Piers) | 6,615.67 | CUYD | 400.00 | 2,646,268.00 | 480.00 | 3,175,521.60 | 400.00 | 2,646,268.00 | 715.00 | 4,730,204.05 |
| 0179 | 805-01-00700 | Class A Concrete (Bents) | 5,563.64 | CUYD | 400.00 | 2,225,456.00 | 675.00 | 3,755,457.00 | 900.00 | 5,007,276.00 | 1,100.00 | 6,120,004.00 |
| 0180 | 805-04-00100 | Class AA(M) Concrete | 12,289.7 | CUYD | 400.00 | 4,915,880.00 | 750.00 | 9,217,275.00 | 550.00 | 6,759,335.00 | 1,050.00 | 12,904,185.00 |
| 0181 | 805-07-00100 | Class S Concrete | 5,813.9 | CUYD | 175.00 | 1,017,432.50 | 150.00 | 872,085.00 | 170.00 | 988,363.00 | 200.00 | 1,162,780.00 |
| 0182 | 805-08-00400 | Precast-Prestressed Concrete Girder (Type IV) | 14,841.9 | LNFT | 140.00 | 2,077,866.00 | 110.00 | 1,632,609.00 | 125.00 | 1,855,237.50 | 150.00 | 2,226,285.00 |
| 0183 | 805-08-00700 | Precast-Prestressed Concrete Girder (Type BT-72) | 22,821.1 | LNFT | 150.00 | 3,423,165.00 | 145.00 | 3,309,059.50 | 130.00 | 2,966,743.00 | 155.00 | 3,537,270.50 |
| 0184 | 805-11-00100 | Strip Seal Joints | 1,960.47 | LNFT | 175.00 | 343,082.25 | 180.00 | 352,884.60 | 165.00 | 323,477.55 | 155.00 | 303,872.85 |
| 0185 | 806-01-00100 | Deformed Reinforcing Steel | 7,101,548 | LB | 0.75 | 5,326,161.00 | 0.60 | 4,260,928.80 | 0.65 | 4,616,006.20 | 0.90 | 6,391,393.20 |
| 0186 | 807-08-00100 | Structural Metalwork A 709-HPS-70W | 1 | LUMP | 1,800,000.00 | 1,800,000.00 | 1,500,000.00 | 1,500,000.00 | 1,200,000.00 | 1,200,000.00 | 2,200,000.00 | 2,200,000.00 |
| 0187 | 807-08-00100 | Structural Metalwork A 709-50W | 1 | LUMP | 11,000,000.00 | 11,000,000.00 | 11,200,000.00 | 11,200,000.00 | 11,000,000.00 | 11,000,000.00 | 12,178,142.00 | 12,178,142.00 |
| 0188 | 810-01-00100 | Concrete Railing (Standard Barrier) | 17,509.37 | LNFT | 47.00 | 822,940.39 | 40.00 | 700,374.80 | 30.00 | 525,281.10 | 60.00 | 1,050,562.20 |
| 0189 | 813-01-00100 | Concrete Approach Slabs | 1,548.95 | SQYD | 185.00 | 286,555.75 | 200.00 | 309,790.00 | 200.00 | 309,790.00 | 200.00 | 309,790.00 |
| 0190 | NS-200-00060 | Mechanically Stabilized Earth Wall (MSEW) | 15,450 | SQFT | 40.00 | 618,000.00 | 60.00 | 927,000.00 | 30.00 | 463,500.00 | 36.00 | 556,200.00 |
| 0191 | NS-200-00080 | MSEW Structural Excavation and Backfill | 1 | LUMP | 400,000.00 | 400,000.00 | 25,000.00 | 25,000.00 | 700,000.00 | 700,000.00 | 443,000.00 | 443,000.00 |
| 0192 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 9,500.00 | 19,000.00 | 20,000.00 | 40,000.00 | 30,000.00 | 60,000.00 | 25,000.00 | 50,000.00 |
| 0193 | NS-700-00220 | Impact Attenuator (Kinetic) | 2 | EACH | 18,000.00 | 36,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 60,000.00 | 25,000.00 | 50,000.00 |
| 0194 | NS-700-00240 | Special Guard Rail Anchor Section | 2 | EACH | 1,190.00 | 2,380.00 | 1,300.00 | 2,600.00 | 1,300.00 | 2,600.00 | 950.00 | 1,900.00 |
| 0195 | NS-730-00002 | Bridge Navigational Lighting System | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 16,350.00 | 16,350.00 |
| 0196 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 7,122.00 | 7,122.00 | 11,000.00 | 11,000.00 | 8,000.00 | 8,000.00 | 7,665.00 | 7,665.00 |
| 0197 | NS-736-00006 | Video Detection Camera | 4 | EACH | 1,824.00 | 7,296.00 | 2,400.00 | 9,600.00 | 2,000.00 | 8,000.00 | 2,242.00 | 8,968.00 |
| 0198 | NS-736-00007 | Video Detection Training | 1 | LUMP | 630.00 | 630.00 | 1.15 | 1.15 | 1,000.00 | 1,000.00 | 1.00 | 1.00 |
| 0199 | NS-800-00005 | Embedded Pile Monitoring Instrumentation & Accessories | 1 | LUMP | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | 31,000.00 | 31,000.00 | 50,000.00 | 50,000.00 |
| 0200 | NS-800-00006 | Monitoring of Existing Caisson Bridge Piers | 1 | LUMP | 75,000.00 | 75,000.00 | 16,000.00 | 16,000.00 | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 |
| 0201 | NS-800-00060 | Deck Drainage System | 1 | LUMP | 125,000.00 | 125,000.00 | 160,000.00 | 160,000.00 | 240,000.00 | 240,000.00 | 300,000.00 | 300,000.00 |
| 0202 | NS-800-00160 | Steel Finger Joints | 197 | LNFT | 1,800.00 | 354,600.00 | 1,100.00 | 216,700.00 | 1,200.00 | 236,400.00 | 1,500.00 | 295,500.00 |
| 0203 | NS-800-00420 | Ladders, Cages, and Platforms (Steel) | 1 | LUMP | 200,000.00 | 200,000.00 | 225,000.00 | 225,000.00 | 260,000.00 | 260,000.00 | 200,000.00 | 200,000.00 |
| 0204 | NS-800-00540 | Pile Dynamic Monitoring Instrumentation Accessories | 1 | LUMP | 75,000.00 | 75,000.00 | 12,000.00 | 12,000.00 | 7,500.00 | 7,500.00 | 50,000.00 | 50,000.00 |
| 0205 | NS-811-00004 | Navigational Clearance Gauge (Painted) | 2 | EACH | 30,000.00 | 60,000.00 | 16,000.00 | 32,000.00 | 9,300.00 | 18,600.00 | 40,000.00 | 80,000.00 |
| 0206 | NS-MSC-00001 | Storm Water Pumping Station (Complete) | 1 | LUMP | 285,000.00 | 285,000.00 | 250,000.00 | 250,000.00 | 310,000.00 | 310,000.00 | 75,000.00 | 75,000.00 |
| 0207 | NS-MSC-00120 | Drainage Structure (CB-OPNTOP4-Open Top Catch Basin 4 Grate Openings) | 1 | EACH | 11,000.00 | 11,000.00 | 22,000.00 | 22,000.00 | 12,468.00 | 12,468.00 | 11,000.00 | 11,000.00 |
| 0208 | NS-MSC-00120 | Drainage Structure (Miscellaneous Detail - Paved Gutter Drains) | 21 | EACH | 2,750.00 | 57,750.00 | 3,500.00 | 73,500.00 | 3,000.00 | 63,000.00 | 2,750.00 | 57,750.00 |
| 0227 | 202-05-00100 | Excavation, Disposal and Backfilling of Contaminated Soil | 9,710 | CUYD | 70.00 | 679,700.00 | 70.00 | 679,700.00 | 100.00 | 971,000.00 | 70.00 | 679,700.00 |
| 0228 | 715-01-00100 | Topsoil | 142 | CUYD | 30.00 | 4,260.00 | 30.00 | 4,260.00 | 70.00 | 9,940.00 | 30.00 | 4,260.00 |
| 0229 | 730-02-02040 | Conduit with Conductors (Rigid Aluminum) (1") 4-#12AWG XHHW-2 | 350 | LNFT | 15.00 | 5,250.00 | 15.50 | 5,425.00 | 16.50 | 5,775.00 | 13.50 | 4,725.00 |
| 0230 | 730-02-04040 | Conduit with Conductors (Liquid Tight Flexible Metal) (1") 3-#12AWG XHHW-2 | 10 | LNFT | 51.00 | 510.00 | 27.00 | 270.00 | 60.00 | 600.00 | 14.50 | 145.00 |
| 0231 | 730-02-04040 | Conduit with Conductors (Liquid Tight Flexible Metal) (1") 4-#12AWG XHHW-2 | 5 | LNFT | 52.00 | 260.00 | 24.00 | 120.00 | 65.00 | 325.00 | 15.25 | 76.25 |
| 0232 | 736-04-05160 | Signal Support (Clamp on 45' Arm) | 1 | EACH | 2,704.00 | 2,704.00 | 4,800.00 | 4,800.00 | 3,000.00 | 3,000.00 | 3,715.00 | 3,715.00 |
| 0233 | 736-04-05180 | Signal Support (Clamp on 50' Arm) | 1 | EACH | 3,950.00 | 3,950.00 | 8,600.00 | 8,600.00 | 4,500.00 | 4,500.00 | 4,090.00 | 4,090.00 |
| 0234 | NS-804-00001 | Vibration Monitoring | 192 | EACH | 250.00 | 48,000.00 | 225.00 | 43,200.00 | 450.00 | 86,400.00 | 410.00 | 78,720.00 |
| SUBTOTAL GENERAL | 78,511,949 | 80,904,651 | 90,944,712 | 96,778,954 | ||||||||
| Alternate AA1 | ||||||||||||
| 0209 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 78,975.4 | SQYD | 9.50 | 750,266.30 | 0.00 | 0.00 | 0.00 | 0.00 | 9.50 | 750,266.30 |
| 0210 | 302-02-02020 | Class II Base Course (6" Thick) (Soil Cement) | 117,950.2 | SQYD | 6.00 | 707,701.20 | 0.00 | 0.00 | 0.00 | 0.00 | 6.00 | 707,701.20 |
| 0211 | 502-01-00100 | Superpave Asphaltic Concrete | 39,857.1 | TON | 64.25 | 2,560,818.68 | 0.00 | 0.00 | 0.00 | 0.00 | 64.25 | 2,560,818.68 |
| 0212 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,744.4 | TON | 95.10 | 260,992.44 | 0.00 | 0.00 | 0.00 | 0.00 | 95.10 | 260,992.44 |
| 0213 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,423.9 | LNFT | 18.00 | 61,630.20 | 0.00 | 0.00 | 0.00 | 0.00 | 17.40 | 59,575.86 |
| 0214 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.863 | MILE | 800.00 | 3,090.40 | 0.00 | 0.00 | 0.00 | 0.00 | 800.00 | 3,090.40 |
| 0215 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 1.667 | MILE | 2,800.00 | 4,667.60 | 0.00 | 0.00 | 0.00 | 0.00 | 2,800.00 | 4,667.60 |
| SUBTOTAL ALT AA1 | 4,349,167 | 00 | 00 | 4,347,112 | ||||||||
| Alternate AA2 | ||||||||||||
| 0216 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 79,100.8 | SQYD | 0.00 | 0.00 | 8.50 | 672,356.80 | 13.00 | 1,028,310.40 | 0.00 | 0.00 |
| 0217 | 302-02-02020 | Class II Base Course (6" Thick) (Soil Cement) | 118,075.6 | SQYD | 0.00 | 0.00 | 8.50 | 1,003,642.60 | 8.00 | 944,604.80 | 0.00 | 0.00 |
| 0218 | 502-01-00100 | Superpave Asphaltic Concrete | 12,734.4 | TON | 0.00 | 0.00 | 90.00 | 1,146,096.00 | 82.50 | 1,050,588.00 | 0.00 | 0.00 |
| 0219 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 49,218 | SQYD | 0.00 | 0.00 | 49.00 | 2,411,682.00 | 51.50 | 2,534,727.00 | 0.00 | 0.00 |
| 0220 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 5,648.8 | SQYD | 0.00 | 0.00 | 72.00 | 406,713.60 | 60.00 | 338,928.00 | 0.00 | 0.00 |
| 0221 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 55 | EACH | 0.00 | 0.00 | 100.00 | 5,500.00 | 115.00 | 6,325.00 | 0.00 | 0.00 |
| 0222 | 707-01-00200 | Concrete Curb (Barrier) | 201.7 | LNFT | 0.00 | 0.00 | 19.00 | 3,832.30 | 3.00 | 605.10 | 0.00 | 0.00 |
| 0223 | 707-01-00300 | Concrete Curb (Mountable) | 289.8 | LNFT | 0.00 | 0.00 | 18.00 | 5,216.40 | 4.00 | 1,159.20 | 0.00 | 0.00 |
| 0224 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,933.1 | LNFT | 0.00 | 0.00 | 25.00 | 73,327.50 | 40.00 | 117,324.00 | 0.00 | 0.00 |
| 0225 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.323 | MILE | 0.00 | 0.00 | 950.00 | 1,256.85 | 1,000.00 | 1,323.00 | 0.00 | 0.00 |
| 0226 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 4.207 | MILE | 0.00 | 0.00 | 3,300.00 | 13,883.10 | 4,800.00 | 20,193.60 | 0.00 | 0.00 |
| SUBTOTAL ALT AA2 | 0.00 | 5,743,507.15 | 6,044,088.10 | 0.00 | ||||||||
| ITEM TOTAL (CONSTRUCTION BID) | 82,861,116.04 | 86,648,157.95 | 96,988,800.00 | 101,126,066.95 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 5,600,000.00 | 5,430,000.00 | 5,600,000.00 | 4,250,000.00 | ||||||||
| LIFE CYCLE COST | 982,800.00 | 331,300.00 | 331,300.00 | 982,800.00 | ||||||||
| TOTAL BID | 89,443,916.04 | 92,409,457.95 | 102,920,100.00 | 106,358,866.95 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - James Construction Group Llc |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 3,000,000.00 | 3,000,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 45,000.00 | 45,000.00 |
| 0003 | 202-02-00010 | Removal of of Truck Scale (Sta. 90+50) | 1 | EACH | 5,000.00 | 5,000.00 |
| 0004 | 202-02-00010 | Removal of of Wood Frame Shed (Rt. Sta. 66+38, 10' x 15') | 1 | EACH | 500.00 | 500.00 |
| 0005 | 202-02-04000 | Removal of Bridge Sta. 107+40 (Survey Line) 24' x 534' Steel Girder Spans | 1 | EACH | 250,000.00 | 250,000.00 |
| 0006 | 202-02-04000 | Removal of Bridge Sta. 32+60 (Survey Line) 24' x 1920' Steel Truss & Concrete Girder Spans | 1 | EACH | 1,500,000.00 | 1,500,000.00 |
| 0007 | 202-02-04000 | Removal of Bridge (Sta. 87+36, 107' Lt., 8' Long x 16' Wide) | 1 | EACH | 2,000.00 | 2,000.00 |
| 0008 | 202-02-05000 | Removal of Building (Sta. 65+23 Rt., 200' x 50', 2-Story Brick) | 1 | EACH | 100,000.00 | 100,000.00 |
| 0009 | 202-02-06020 | Removal of Concrete Box Culverts (Sta. 107+41, 8' x 3' x 205') | 1 | EACH | 10,000.00 | 10,000.00 |
| 0010 | 202-02-06020 | Removal of Concrete Box Culverts (Sta. 108+37, 3' x 12' x 92') | 1 | EACH | 8,000.00 | 8,000.00 |
| 0011 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 750.00 | 1,500.00 |
| 0012 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 824.2 | LNFT | 3.00 | 2,472.60 |
| 0013 | 202-02-06100 | Removal of Concrete Walks and Drives | 527 | SQYD | 7.00 | 3,689.00 |
| 0014 | 202-02-14500 | Removal of Guard Rail | 1,950 | LNFT | 3.50 | 6,825.00 |
| 0015 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 28,824 | SQYD | 5.50 | 158,532.00 |
| 0016 | 202-02-38200 | Removal of Signs | 12 | EACH | 50.00 | 600.00 |
| 0017 | 202-02-38240 | Removal of Signs and Supports | 22 | EACH | 100.00 | 2,200.00 |
| 0018 | 202-02-38380 | Removal of Sign Truss and Footings | 1 | EACH | 4,000.00 | 4,000.00 |
| 0019 | 202-02-38500 | Removal of Surfacing and Stablized Base | 48,544.8 | SQYD | 4.00 | 194,179.20 |
| 0020 | 203-01-00100 | General Excavation | 177,463 | CUYD | 5.00 | 887,315.00 |
| 0021 | 203-03-00100 | Embankment | 321,303 | CUYD | 7.00 | 2,249,121.00 |
| 0022 | 203-04-00200 | Nonplastic Embankment (Sand) | 28,332 | CUYD | 9.00 | 254,988.00 |
| 0023 | 203-04-00300 | Nonplastic Embankment (Stone) | 120 | CUYD | 100.00 | 12,000.00 |
| 0024 | 204-02-00100 | Temporary Hay or Straw Bales | 140 | EACH | 38.00 | 5,320.00 |
| 0025 | 204-03-00100 | Temporary Slope Drains | 1,000 | LNFT | 23.00 | 23,000.00 |
| 0026 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 81 | EACH | 200.00 | 16,200.00 |
| 0027 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 6 | EACH | 1,900.00 | 11,400.00 |
| 0028 | 204-06-00100 | Temporary Silt Fencing | 17,300 | LNFT | 3.75 | 64,875.00 |
| 0029 | 204-07-00100 | Temporary Stone Construction Entrance | 6 | EACH | 5,000.00 | 30,000.00 |
| 0030 | 302-02-01560 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) | 9,878.8 | SQYD | 11.00 | 108,666.80 |
| 0031 | 302-02-02100 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete) | 2,952.5 | SQYD | 13.50 | 39,858.75 |
| 0032 | 302-02-04500 | Class II Base Course (9" Thick) (Stone or Recycled Portland Cement Concrete) | 23,367.6 | SQYD | 19.00 | 443,984.40 |
| 0033 | 304-05-00100 | Lime Treatment (Type E) | 816 | TON | 275.00 | 224,400.00 |
| 0034 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 81 | CUYD | 125.00 | 10,125.00 |
| 0035 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 750 | CUYD | 125.00 | 93,750.00 |
| 0036 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,744 | SQYD | 4.50 | 12,348.00 |
| 0037 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | 152 | CUYD | 1.00 | 152.00 |
| 0038 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 364 | LNFT | 66.00 | 24,024.00 |
| 0039 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 76 | LNFT | 109.00 | 8,284.00 |
| 0040 | 701-01-01100 | Cross Drain Pipe (54" RCP) | 424 | LNFT | 205.00 | 86,920.00 |
| 0041 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 88 | LNFT | 245.00 | 21,560.00 |
| 0042 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,700 | LNFT | 42.00 | 71,400.00 |
| 0043 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 664 | LNFT | 49.00 | 32,536.00 |
| 0044 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 418 | LNFT | 77.00 | 32,186.00 |
| 0045 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 84 | LNFT | 80.00 | 6,720.00 |
| 0046 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 205 | LNFT | 100.00 | 20,500.00 |
| 0047 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 434 | LNFT | 170.00 | 73,780.00 |
| 0048 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 138 | LNFT | 75.00 | 10,350.00 |
| 0049 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 46 | LNFT | 112.00 | 5,152.00 |
| 0050 | 701-03-02100 | Storm Drain Pipe (Outfall) (42" PP or 48" CMP) | 140 | LNFT | 145.00 | 20,300.00 |
| 0051 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 70 | LNFT | 160.00 | 11,200.00 |
| 0052 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 60 | LNFT | 85.00 | 5,100.00 |
| 0053 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 32 | LNFT | 82.00 | 2,624.00 |
| 0054 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 24 | LNFT | 83.00 | 1,992.00 |
| 0055 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 36 | LNFT | 36.00 | 1,296.00 |
| 0056 | 702-02-00100 | Manholes (MH-06) | 3 | EACH | 6,800.00 | 20,400.00 |
| 0057 | 702-02-00800 | Manholes (R-CB-38) | 2 | EACH | 5,800.00 | 11,600.00 |
| 0058 | 702-03-00100 | Catch Basins (CB-01) | 33 | EACH | 2,600.00 | 85,800.00 |
| 0059 | 702-03-00600 | Catch Basins (CB-07) | 2 | EACH | 6,200.00 | 12,400.00 |
| 0060 | 703-03-00100 | Perforated Pipe Underdrains (6") | 1,170 | LNFT | 15.00 | 17,550.00 |
| 0061 | 703-04-00100 | Nonperforated Pipe Underdrains (6") | 36 | LNFT | 75.00 | 2,700.00 |
| 0062 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 89.6 | LNFT | 45.50 | 4,076.80 |
| 0063 | 704-03-00100 | Blocked Out Guard Rail | 3,049 | LNFT | 15.50 | 47,259.50 |
| 0064 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 18.8 | LNFT | 65.00 | 1,222.00 |
| 0065 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 306.3 | LNFT | 54.00 | 16,540.20 |
| 0066 | 704-11-00100 | Guard Rail End Treatment (Flared) | 10 | EACH | 1,900.00 | 19,000.00 |
| 0067 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 2,300.00 | 2,300.00 |
| 0068 | 704-11-00300 | Guard Rail End Treatment (Bi-Directional) | 2 | EACH | 4,500.00 | 9,000.00 |
| 0069 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 20 | LNFT | 28.00 | 560.00 |
| 0070 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 310 | LNFT | 27.50 | 8,525.00 |
| 0071 | 705-06-00500 | Chain Link Fence (8 Foot Height) | 1,080 | LNFT | 83.00 | 89,640.00 |
| 0072 | 705-08-10020 | 22-Foot Double Gates for Chain Link Fence (5-Foot Height) | 1 | DBGT | 1,900.00 | 1,900.00 |
| 0073 | 706-01-00100 | Concrete Walk (4" Thick) | 282.5 | SQYD | 40.00 | 11,300.00 |
| 0074 | 706-02-00200 | Concrete Drive (6" Thick) | 730.1 | SQYD | 55.00 | 40,155.50 |
| 0075 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 4,708.2 | SQYD | 35.00 | 164,787.00 |
| 0076 | 708-01-00100 | Right-of-Way Monument | 79 | EACH | 150.00 | 11,850.00 |
| 0077 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 12 | SQYD | 80.00 | 960.00 |
| 0078 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 45 | SQYD | 70.00 | 3,150.00 |
| 0079 | 711-04-00100 | Geotextile Fabric | 4,028 | SQYD | 2.75 | 11,077.00 |
| 0080 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,881 | SQYD | 80.00 | 150,480.00 |
| 0081 | 712-02-00100 | Sacked Concrete Revetment | 68 | SQYD | 300.00 | 20,400.00 |
| 0082 | 712-04-00100 | Flexible Revetment | 6,847 | SQYD | 35.00 | 239,645.00 |
| 0083 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 |
| 0084 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 43,092 | LNFT | 0.12 | 5,171.04 |
| 0085 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 553 | EACH | 1,000.00 | 553,000.00 |
| 0086 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 1,386 | EACH | 150.00 | 207,900.00 |
| 0087 | 716-01-00100 | Mulch (Vegetative) | 138 | TON | 450.00 | 62,100.00 |
| 0088 | 717-01-00100 | Seeding | 2,370 | LB | 8.00 | 18,960.00 |
| 0089 | 718-01-00100 | Fertilizer | 79,000 | LB | 0.46 | 36,340.00 |
| 0090 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 15,946 | SQYD | 1.10 | 17,540.60 |
| 0091 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 1,820 | SQYD | 1.45 | 2,639.00 |
| 0092 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 3,560 | SQYD | 1.45 | 5,162.00 |
| 0093 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 183 | SQYD | 2.50 | 457.50 |
| 0094 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 |
| 0095 | 725-01-00100 | Temporary Detour Roads | 13,261 | SQYD | 80.00 | 1,060,880.00 |
| 0096 | 726-01-00100 | Bedding Material | 1,011.5 | CUYD | 60.00 | 60,690.00 |
| 0097 | 727-01-00100 | Mobilization | 1 | LUMP | 10,800,000.00 | 10,800,000.00 |
| 0098 | 729-01-00100 | Sign (Type A) | 846.8 | SQFT | 18.00 | 15,242.40 |
| 0099 | 729-04-00100 | Sign (Type D) | 618 | SQFT | 20.00 | 12,360.00 |
| 0100 | 729-05-00100 | Sign (Type E) | 48 | SQFT | 27.00 | 1,296.00 |
| 0101 | 729-06-00100 | Sign (Overhead Mounted) | 120 | SQFT | 22.00 | 2,640.00 |
| 0102 | 729-08-00100 | Mounting (2 1/2" Size Post) | 54 | EACH | 700.00 | 37,800.00 |
| 0103 | 729-08-00200 | Mounting (3 1/2" Size Post) | 28 | EACH | 890.00 | 24,920.00 |
| 0104 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 2 | EACH | 1,200.00 | 2,400.00 |
| 0105 | 729-08-00500 | Mounting (S3 x 5.7 Size Post) | 4 | EACH | 820.00 | 3,280.00 |
| 0106 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 24 | EACH | 975.00 | 23,400.00 |
| 0107 | 729-09-00600 | Mounting (Overhead Truss) (Ground Mounted) (90' Span) | 1 | EACH | 65,000.00 | 65,000.00 |
| 0108 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 70.00 | 840.00 |
| 0109 | 729-19-00100 | Dead End Road Installations (Type A) | 3 | EACH | 1,450.00 | 4,350.00 |
| 0110 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 2 | EACH | 18,000.00 | 36,000.00 |
| 0111 | 729-21-00100 | U-Channel Post | 3 | EACH | 95.00 | 285.00 |
| 0112 | 730-01-00100 | Trenching and Backfilling | 1,000 | LNFT | 3.50 | 3,500.00 |
| 0113 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 4-#12 AWG XHHW-2 | 1,000 | LNFT | 4.80 | 4,800.00 |
| 0114 | 730-02-02040 | Conduit with Conductors (Rigid Aluminum) (1") 3-#12 AWG XHHW-2 | 1,250 | LNFT | 11.00 | 13,750.00 |
| 0115 | 730-08-00100 | Electrical Service Point (Pedestal) | 1 | EACH | 505.00 | 505.00 |
| 0116 | 730-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 5,000.00 | 5,000.00 |
| 0117 | 730-16-00200 | Underground Junction Box (11" x 18") | 1 | EACH | 625.00 | 625.00 |
| 0118 | 730-17-00100 | Structure Junction Box (8" x 8" x 4") (Cast Aluminum) | 13 | EACH | 750.00 | 9,750.00 |
| 0119 | 730-18-00100 | Service Pole | 1 | EACH | 1,790.00 | 1,790.00 |
| 0120 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,924 | EACH | 8.50 | 16,354.00 |
| 0121 | 731-02-00100 | Reflectorized Raised Pavement Markers | 758 | EACH | 5.00 | 3,790.00 |
| 0122 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,581 | LNFT | 0.90 | 1,422.90 |
| 0123 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 192 | LNFT | 2.90 | 556.80 |
| 0124 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.2 | MILE | 2,200.00 | 29,040.00 |
| 0125 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 160.00 | 160.00 |
| 0126 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 160.00 | 480.00 |
| 0127 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 160.00 | 800.00 |
| 0128 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 180.00 | 1,440.00 |
| 0129 | 733-01-00100 | Concrete Roadway Barrier (Single Faced) (32" High) | 2,448.6 | LNFT | 140.00 | 342,804.00 |
| 0130 | 733-01-00100 | Concrete Roadway Barrier (Single Faced) (54" High) | 1,305.6 | LNFT | 230.00 | 300,288.00 |
| 0131 | 736-01-00100 | Trenching and Backfilling | 925 | LNFT | 3.50 | 3,237.50 |
| 0132 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 490 | LNFT | 12.00 | 5,880.00 |
| 0133 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 285 | LNFT | 15.00 | 4,275.00 |
| 0134 | 736-04-03080 | Signal Support (30' Steel Strain Pole) | 4 | EACH | 6,500.00 | 26,000.00 |
| 0136 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 2 | EACH | 9,500.00 | 19,000.00 |
| 0137 | 736-04-10000 | Signal Support (Foundation Only) | 6 | EACH | 1,800.00 | 10,800.00 |
| 0138 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 15 | EACH | 850.00 | 12,750.00 |
| 0139 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT, Y, LT. G) | 8 | EACH | 820.00 | 6,560.00 |
| 0140 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 3 | EACH | 1,400.00 | 4,200.00 |
| 0141 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 1,600.00 | 1,600.00 |
| 0142 | 736-06-00600 | Signal Service (Existing Pole) | 1 | EACH | 850.00 | 850.00 |
| 0143 | 736-08-00110 | Sig Cntrlr (TS-2, Type 2)(Type 6 Cabinet)(Furnish & Install) | 1 | EACH | 23,000.00 | 23,000.00 |
| 0144 | 736-09-00100 | Loop Detector | 752 | LNFT | 11.00 | 8,272.00 |
| 0145 | 736-10-00100 | Underground Junction Box (Type D) | 3 | EACH | 350.00 | 1,050.00 |
| 0146 | 736-10-00200 | Underground Junction Box (Type E) | 3 | EACH | 400.00 | 1,200.00 |
| 0147 | 736-10-00300 | Underground Junction Box (Type F) | 11 | EACH | 460.00 | 5,060.00 |
| 0148 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 900.00 | 900.00 |
| 0149 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 705 | LNFT | 3.00 | 2,115.00 |
| 0150 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 230 | LNFT | 4.00 | 920.00 |
| 0151 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 120 | LNFT | 5.50 | 660.00 |
| 0152 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 1,720 | LNFT | 2.00 | 3,440.00 |
| 0153 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 350 | LNFT | 6.00 | 2,100.00 |
| 0154 | 736-12-02020 | Conductor (3c, #14 awg) | 1,700 | LNFT | 1.50 | 2,550.00 |
| 0155 | 736-13-00400 | Cable (6C Signal) | 730 | LNFT | 1.70 | 1,241.00 |
| 0156 | 736-13-00500 | Cable (10C Signal) | 3,800 | LNFT | 1.90 | 7,220.00 |
| 0157 | 740-01-00100 | Construction Layout | 1 | LUMP | 500,000.00 | 500,000.00 |
| 0158 | 741-01-02100 | Water Main (16" Ductile Iron) Storm Water Pump Outfall Pipe | 124 | LNFT | 300.00 | 37,200.00 |
| 0159 | 802-01-00100 | Structural Excavation | 163.8 | CUYD | 35.00 | 5,733.00 |
| 0160 | 802-02-00100 | Structural Excavation for Intermediate Bents | 17,997.8 | CUYD | 50.00 | 899,890.00 |
| 0161 | 802-04-00100 | Structural Excavation for Piers (Wet) | 22,614.5 | CUYD | 60.00 | 1,356,870.00 |
| 0162 | 802-05-00100 | Cofferdams | 1 | LUMP | 9,100,000.00 | 9,100,000.00 |
| 0163 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 1,500,000.00 | 1,500,000.00 |
| 0164 | 804-01-00200 | Precast Concrete Piles (14") | 87,429 | LNFT | 45.00 | 3,934,305.00 |
| 0165 | 804-01-00300 | Precast Concrete Piles (16") | 7,910 | LNFT | 65.00 | 514,150.00 |
| 0166 | 804-01-00700 | Precast Concrete Piles (30") | 11,613 | LNFT | 125.00 | 1,451,625.00 |
| 0167 | 804-03-02120 | Steel Piles (24" Pipe) | 23,312 | LNFT | 150.00 | 3,496,800.00 |
| 0168 | 804-05-00200 | Precast Concrete Test Piles (14") | 6 | EACH | 40,000.00 | 240,000.00 |
| 0169 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 60,000.00 | 60,000.00 |
| 0170 | 804-05-00700 | Precast Concrete Test Piles (30") | 2 | EACH | 65,000.00 | 130,000.00 |
| 0171 | 804-07-02120 | Steel Test Piles (24" Pipe) | 2 | EACH | 250,000.00 | 500,000.00 |
| 0172 | 804-09-00100 | Loading Test Piles | 11 | EACH | 15,000.00 | 165,000.00 |
| 0173 | 804-10-00100 | Reloading Test Piles | 2 | EACH | 5,000.00 | 10,000.00 |
| 0174 | 804-11-00100 | Redriving Test Piles | 2 | EACH | 2,000.00 | 4,000.00 |
| 0175 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 15,000.00 | 30,000.00 |
| 0176 | 804-17-00100 | Dynamic Monitoring | 136 | EACH | 2,000.00 | 272,000.00 |
| 0177 | 805-01-00500 | Class A Concrete (Footings) | 10,556.33 | CUYD | 300.00 | 3,166,899.00 |
| 0178 | 805-01-00600 | Class A Concrete (Piers) | 6,615.67 | CUYD | 550.00 | 3,638,618.50 |
| 0179 | 805-01-00700 | Class A Concrete (Bents) | 5,563.64 | CUYD | 740.00 | 4,117,093.60 |
| 0180 | 805-04-00100 | Class AA(M) Concrete | 12,289.7 | CUYD | 550.00 | 6,759,335.00 |
| 0181 | 805-07-00100 | Class S Concrete | 5,813.9 | CUYD | 250.00 | 1,453,475.00 |
| 0182 | 805-08-00400 | Precast-Prestressed Concrete Girder (Type IV) | 14,841.9 | LNFT | 145.00 | 2,152,075.50 |
| 0183 | 805-08-00700 | Precast-Prestressed Concrete Girder (Type BT-72) | 22,821.1 | LNFT | 160.00 | 3,651,376.00 |
| 0184 | 805-11-00100 | Strip Seal Joints | 1,960.47 | LNFT | 150.00 | 294,070.50 |
| 0185 | 806-01-00100 | Deformed Reinforcing Steel | 7,101,548 | LB | 0.80 | 5,681,238.40 |
| 0186 | 807-08-00100 | Structural Metalwork A 709-HPS-70W | 1 | LUMP | 2,200,000.00 | 2,200,000.00 |
| 0187 | 807-08-00100 | Structural Metalwork A 709-50W | 1 | LUMP | 16,000,000.00 | 16,000,000.00 |
| 0188 | 810-01-00100 | Concrete Railing (Standard Barrier) | 17,509.37 | LNFT | 45.00 | 787,921.65 |
| 0189 | 813-01-00100 | Concrete Approach Slabs | 1,548.95 | SQYD | 230.00 | 356,258.50 |
| 0190 | NS-200-00060 | Mechanically Stabilized Earth Wall (MSEW) | 15,450 | SQFT | 35.00 | 540,750.00 |
| 0191 | NS-200-00080 | MSEW Structural Excavation and Backfill | 1 | LUMP | 500,000.00 | 500,000.00 |
| 0192 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 20,000.00 | 40,000.00 |
| 0193 | NS-700-00220 | Impact Attenuator (Kinetic) | 2 | EACH | 30,000.00 | 60,000.00 |
| 0194 | NS-700-00240 | Special Guard Rail Anchor Section | 2 | EACH | 1,190.00 | 2,380.00 |
| 0195 | NS-730-00002 | Bridge Navigational Lighting System | 1 | LUMP | 16,500.00 | 16,500.00 |
| 0196 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 7,700.00 | 7,700.00 |
| 0197 | NS-736-00006 | Video Detection Camera | 4 | EACH | 2,300.00 | 9,200.00 |
| 0198 | NS-736-00007 | Video Detection Training | 1 | LUMP | 1.00 | 1.00 |
| 0199 | NS-800-00005 | Embedded Pile Monitoring Instrumentation & Accessories | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0200 | NS-800-00006 | Monitoring of Existing Caisson Bridge Piers | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0201 | NS-800-00060 | Deck Drainage System | 1 | LUMP | 135,000.00 | 135,000.00 |
| 0202 | NS-800-00160 | Steel Finger Joints | 197 | LNFT | 1,200.00 | 236,400.00 |
| 0203 | NS-800-00420 | Ladders, Cages, and Platforms (Steel) | 1 | LUMP | 500,000.00 | 500,000.00 |
| 0204 | NS-800-00540 | Pile Dynamic Monitoring Instrumentation Accessories | 1 | LUMP | 11,000.00 | 11,000.00 |
| 0205 | NS-811-00004 | Navigational Clearance Gauge (Painted) | 2 | EACH | 3,000.00 | 6,000.00 |
| 0206 | NS-MSC-00001 | Storm Water Pumping Station (Complete) | 1 | LUMP | 275,400.00 | 275,400.00 |
| 0207 | NS-MSC-00120 | Drainage Structure (CB-OPNTOP4-Open Top Catch Basin 4 Grate Openings) | 1 | EACH | 7,000.00 | 7,000.00 |
| 0208 | NS-MSC-00120 | Drainage Structure (Miscellaneous Detail - Paved Gutter Drains) | 21 | EACH | 100.00 | 2,100.00 |
| 0227 | 202-05-00100 | Excavation, Disposal and Backfilling of Contaminated Soil | 9,710 | CUYD | 70.00 | 679,700.00 |
| 0228 | 715-01-00100 | Topsoil | 142 | CUYD | 30.00 | 4,260.00 |
| 0229 | 730-02-02040 | Conduit with Conductors (Rigid Aluminum) (1") 4-#12AWG XHHW-2 | 350 | LNFT | 13.50 | 4,725.00 |
| 0230 | 730-02-04040 | Conduit with Conductors (Liquid Tight Flexible Metal) (1") 3-#12AWG XHHW-2 | 10 | LNFT | 14.50 | 145.00 |
| 0231 | 730-02-04040 | Conduit with Conductors (Liquid Tight Flexible Metal) (1") 4-#12AWG XHHW-2 | 5 | LNFT | 15.30 | 76.50 |
| 0232 | 736-04-05160 | Signal Support (Clamp on 45' Arm) | 1 | EACH | 3,720.00 | 3,720.00 |
| 0233 | 736-04-05180 | Signal Support (Clamp on 50' Arm) | 1 | EACH | 4,100.00 | 4,100.00 |
| 0234 | NS-804-00001 | Vibration Monitoring | 192 | EACH | 375.00 | 72,000.00 |
| SUBTOTAL GENERAL | 102,943,686 | |||||
| Alternate AA1 | ||||||
| 0209 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 78,975.4 | SQYD | 0.00 | 0.00 |
| 0210 | 302-02-02020 | Class II Base Course (6" Thick) (Soil Cement) | 117,950.2 | SQYD | 0.00 | 0.00 |
| 0211 | 502-01-00100 | Superpave Asphaltic Concrete | 39,857.1 | TON | 0.00 | 0.00 |
| 0212 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,744.4 | TON | 0.00 | 0.00 |
| 0213 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,423.9 | LNFT | 0.00 | 0.00 |
| 0214 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.863 | MILE | 0.00 | 0.00 |
| 0215 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 1.667 | MILE | 0.00 | 0.00 |
| SUBTOTAL ALT AA1 | 00 | |||||
| Alternate AA2 | ||||||
| 0216 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 79,100.8 | SQYD | 9.50 | 751,457.60 |
| 0217 | 302-02-02020 | Class II Base Course (6" Thick) (Soil Cement) | 118,075.6 | SQYD | 9.00 | 1,062,680.40 |
| 0218 | 502-01-00100 | Superpave Asphaltic Concrete | 12,734.4 | TON | 75.00 | 955,080.00 |
| 0219 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 49,218 | SQYD | 54.00 | 2,657,772.00 |
| 0220 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 5,648.8 | SQYD | 70.00 | 395,416.00 |
| 0221 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 55 | EACH | 100.00 | 5,500.00 |
| 0222 | 707-01-00200 | Concrete Curb (Barrier) | 201.7 | LNFT | 10.00 | 2,017.00 |
| 0223 | 707-01-00300 | Concrete Curb (Mountable) | 289.8 | LNFT | 15.00 | 4,347.00 |
| 0224 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,933.1 | LNFT | 20.00 | 58,662.00 |
| 0225 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.323 | MILE | 800.00 | 1,058.40 |
| 0226 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 4.207 | MILE | 2,800.00 | 11,779.60 |
| SUBTOTAL ALT AA2 | 5,905,770.00 | |||||
| ITEM TOTAL (CONSTRUCTION BID) | 108,849,455.64 | |||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 5,600,000.00 | |||||
| LIFE CYCLE COST | 331,300.00 | |||||
| TOTAL BID | 114,780,755.64 | |||||