Bid Tabulations
Letting of
09/29/2010
LA DOTD Headquarters
| Lead Project: 840-10-0010 | |
| Parish: Rapides | |
| Routes: LA 121 | |
| Description: JCT. LA 496 - JCT. LA 1 | |
| Type Const: COLD PLANING ASPHALTIC PAVEMENT, ASPHALTIC CONCRETE WEARING COURSE, DRAINAGE STRUCTURE, AGGREGATE SURFACE COURSE, PAVEMENT PATCHING. | |
| Estimated Construction Cost: $1,796,310.49 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,653,536.60 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,669,717.09 |
| 3 | 05789 | D & J Construction Co., Inc. | $1,857,465.09 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - D & J Construction Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,200.00 | 5,200.00 | 650.00 | 650.00 | 3,000.00 | 3,000.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 10 | CUYD | 90.00 | 900.00 | 50.00 | 500.00 | 40.00 | 400.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4,440 | CUYD | 60.00 | 266,400.00 | 50.00 | 222,000.00 | 35.00 | 155,400.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 13,146.3 | TON | 61.00 | 801,924.30 | 65.00 | 854,509.50 | 80.00 | 1,051,704.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 749.1 | TON | 100.00 | 74,910.00 | 110.00 | 82,401.00 | 114.00 | 85,397.40 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 466 | SQYD | 10.00 | 4,660.00 | 4.00 | 1,864.00 | 22.00 | 10,252.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -13 | CUYD | 0.10 | -1.30 | 10.00 | -130.00 | 0.10 | -1.30 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,850 | SQYD | 69.00 | 265,650.00 | 65.00 | 250,250.00 | 80.00 | 308,000.00 |
| 0009 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 100 | LNFT | 145.00 | 14,500.00 | 200.00 | 20,000.00 | 90.00 | 9,000.00 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 34,000.00 | 34,000.00 |
| 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.475 | MILE | 150.00 | 1,421.25 | 250.00 | 2,368.75 | 225.00 | 2,131.88 |
| 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.575 | MILE | 290.00 | 1,616.75 | 1.00 | 5.58 | 275.00 | 1,533.13 |
| 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.961 | MILE | 395.00 | 4,329.60 | 1.00 | 10.96 | 375.00 | 4,110.38 |
| 0014 | 716-01-00100 | Mulch (Vegetative) | 3 | TON | 450.00 | 1,350.00 | 460.00 | 1,380.00 | 400.00 | 1,200.00 |
| 0015 | 717-01-00100 | Seeding | 45 | LB | 9.00 | 405.00 | 9.50 | 427.50 | 8.00 | 360.00 |
| 0016 | 718-01-00100 | Fertilizer | 1,500 | LB | 0.55 | 825.00 | 0.50 | 750.00 | 0.40 | 600.00 |
| 0017 | 726-01-00100 | Bedding Material | 19.6 | CUYD | 100.00 | 1,960.00 | 80.00 | 1,568.00 | 100.00 | 1,960.00 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 52,000.00 | 52,000.00 | 100,000.00 | 100,000.00 | 65,000.00 | 65,000.00 |
| 0019 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | 78.00 | 312.00 | 100.00 | 400.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,251 | EACH | 5.00 | 6,255.00 | 5.50 | 6,880.50 | 5.00 | 6,255.00 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.961 | MILE | 2,000.00 | 21,922.00 | 2,300.00 | 25,210.30 | 2,100.00 | 23,018.10 |
| 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.575 | MILE | 800.00 | 4,460.00 | 1,200.00 | 6,690.00 | 900.00 | 5,017.50 |
| 0023 | 735-01-00100 | Mailboxes | 74 | EACH | 1.00 | 74.00 | 9.50 | 703.00 | 5.00 | 370.00 |
| 0024 | 735-02-00100 | Mailbox Supports (Single) | 62 | EACH | 100.00 | 6,200.00 | 100.00 | 6,200.00 | 125.00 | 7,750.00 |
| 0025 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 125.00 | 625.00 | 130.00 | 650.00 | 175.00 | 875.00 |
| 0026 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 200.00 | 400.00 | 200.00 | 400.00 | 250.00 | 500.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,000.00 | 9,000.00 | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 |
| 0028 | NS-200-00020 | Cleaning Existing Ditches | 40 | LNFT | 10.00 | 400.00 | 20.00 | 800.00 | 15.00 | 600.00 |
| 0029 | NS-500-00280 | Surface Preparation | 1 | LUMP | 80,000.00 | 80,000.00 | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 |
| 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 83,160 | INLF | 0.25 | 20,790.00 | 0.10 | 8,316.00 | 0.20 | 16,632.00 |
| CONTRACTOR TOTAL | 1,653,536.60 | 1,669,717.09 | 1,857,465.09 | |||||||