Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 838-03-0024 | |
| Parish: Plaquemines | |
| Routes: LA 406 | |
| Description: WOODLAND HWY. IMPROVEMENTS - PHASE 2 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASHPALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,181,434.35 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., Llc | $1,145,996.52 |
| 2 | 52550 | Gibbs & Register Inc | $1,204,450.70 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $1,243,527.40 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., Llc |
- 2 - Gibbs & Register Inc |
- 3 - Boh Bros. Construction Co., LLC. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 28,000.00 | 28,000.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 250 | SQYD | 14.00 | 3,500.00 | 13.00 | 3,250.00 | 7.00 | 1,750.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,343 | SQYD | 16.00 | 21,488.00 | 9.00 | 12,087.00 | 14.00 | 18,802.00 |
| 0005 | 202-03-38000 | Relocation of Sign EXISTING TYPE A SIGNS TO BE RELOCATED AS DIRECTED BY PROJECT ENGINEER. | 14 | EACH | 82.00 | 1,148.00 | 90.00 | 1,260.00 | 80.00 | 1,120.00 |
| 0006 | 203-01-00100 | General Excavation | 3,520 | CUYD | 11.75 | 41,360.00 | 2.50 | 8,800.00 | 15.00 | 52,800.00 |
| 0007 | 203-02-00100 | Drainage Excavation | 2,800 | CUYD | 12.25 | 34,300.00 | 6.50 | 18,200.00 | 15.00 | 42,000.00 |
| 0008 | 203-04-00100 | Nonplastic Embankment | 4,300 | CUYD | 24.00 | 103,200.00 | 14.00 | 60,200.00 | 25.00 | 107,500.00 |
| 0009 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 2,610 | CUYD | 20.00 | 52,200.00 | 18.00 | 46,980.00 | 30.00 | 78,300.00 |
| 0010 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 65.00 | 1,300.00 | 16.00 | 320.00 | 16.00 | 320.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 230 | LNFT | 3.50 | 805.00 | 6.00 | 1,380.00 | 6.00 | 1,380.00 |
| 0012 | 302-02-06120 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete) | 4,950 | SQYD | 19.50 | 96,525.00 | 30.00 | 148,500.00 | 22.00 | 108,900.00 |
| 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 40 | CUYD | 69.00 | 2,760.00 | 50.00 | 2,000.00 | 33.00 | 1,320.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 2,693.2 | TON | 110.00 | 296,252.00 | 110.00 | 296,252.00 | 90.00 | 242,388.00 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 60 | TON | 200.00 | 12,000.00 | 200.00 | 12,000.00 | 90.00 | 5,400.00 |
| 0016 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 24 | LNFT | 83.00 | 1,992.00 | 120.00 | 2,880.00 | 300.00 | 7,200.00 |
| 0017 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,572 | LNFT | 51.00 | 80,172.00 | 95.00 | 149,340.00 | 100.00 | 157,200.00 |
| 0018 | 701-14-00100 | Cleaning Existing Pipes | 200 | LNFT | 10.00 | 2,000.00 | 9.00 | 1,800.00 | 12.00 | 2,400.00 |
| 0019 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,500.00 | 3,000.00 | 800.00 | 1,600.00 | 1,800.00 | 3,600.00 |
| 0020 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 4,000.00 | 12,000.00 | 3,100.00 | 9,300.00 | 5,000.00 | 15,000.00 |
| 0021 | 702-03-00500 | Catch Basins (CB-06) | 10 | EACH | 6,400.00 | 64,000.00 | 4,450.00 | 44,500.00 | 5,200.00 | 52,000.00 |
| 0022 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 500.00 | 1,000.00 | 1,100.00 | 2,200.00 | 1,200.00 | 2,400.00 |
| 0023 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 4 | SQYD | 63.00 | 252.00 | 150.00 | 600.00 | 825.00 | 3,300.00 |
| 0024 | 707-01-00200 | Concrete Curb (Barrier) | 80 | LNFT | 23.50 | 1,880.00 | 34.00 | 2,720.00 | 45.00 | 3,600.00 |
| 0025 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,000 | LNFT | 22.00 | 44,000.00 | 32.00 | 64,000.00 | 23.00 | 46,000.00 |
| 0026 | 711-01-02000 | Riprap (10 lb, 10" Thick) | 15 | SQYD | 90.00 | 1,350.00 | 61.00 | 915.00 | 180.00 | 2,700.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 60,000.00 | 60,000.00 | 29,000.00 | 29,000.00 |
| 0028 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,200 | LNFT | 0.15 | 780.00 | 0.30 | 1,560.00 | 0.25 | 1,300.00 |
| 0029 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,083 | LNFT | 0.60 | 649.80 | 0.90 | 974.70 | 0.80 | 866.40 |
| 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.468 | MILE | 540.00 | 2,412.72 | 1,000.00 | 4,468.00 | 500.00 | 2,234.00 |
| 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.7 | MILE | 530.00 | 371.00 | 1,100.00 | 770.00 | 500.00 | 350.00 |
| 0032 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 12 | EACH | 42.00 | 504.00 | 50.00 | 600.00 | 47.00 | 564.00 |
| 0033 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 70.00 | 140.00 | 50.00 | 100.00 | 58.00 | 116.00 |
| 0034 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 70.00 | 140.00 | 50.00 | 100.00 | 48.00 | 96.00 |
| 0035 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 5 | EACH | 95.00 | 475.00 | 200.00 | 1,000.00 | 85.00 | 425.00 |
| 0036 | 717-01-00100 | Seeding | 41 | LB | 30.00 | 1,230.00 | 16.00 | 656.00 | 16.00 | 656.00 |
| 0037 | 718-01-00100 | Fertilizer | 1,400 | LB | 1.80 | 2,520.00 | 0.50 | 700.00 | 0.50 | 700.00 |
| 0038 | 726-01-00100 | Bedding Material | 325 | CUYD | 70.00 | 22,750.00 | 75.00 | 24,375.00 | 85.00 | 27,625.00 |
| 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 105,000.00 | 105,000.00 | 100,000.00 | 100,000.00 | 123,000.00 | 123,000.00 |
| 0040 | 729-01-00100 | Sign (Type A) | 32 | SQFT | 22.00 | 704.00 | 20.00 | 640.00 | 19.00 | 608.00 |
| 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 708 | EACH | 7.00 | 4,956.00 | 5.00 | 3,540.00 | 5.25 | 3,717.00 |
| 0042 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,600 | LNFT | 1.70 | 4,420.00 | 2.00 | 5,200.00 | 1.35 | 3,510.00 |
| 0043 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 541 | LNFT | 5.50 | 2,975.50 | 6.00 | 3,246.00 | 4.50 | 2,434.50 |
| 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.884 | MILE | 3,000.00 | 5,652.00 | 3,000.00 | 5,652.00 | 2,500.00 | 4,710.00 |
| 0045 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 0.35 | MILE | 850.00 | 297.50 | 1,100.00 | 385.00 | 650.00 | 227.50 |
| 0046 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 300.00 | 600.00 | 200.00 | 400.00 | 205.00 | 410.00 |
| 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 300.00 | 1,200.00 | 200.00 | 800.00 | 215.00 | 860.00 |
| 0048 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 275.00 | 550.00 | 200.00 | 400.00 | 215.00 | 430.00 |
| 0049 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 4 | EACH | 275.00 | 1,100.00 | 300.00 | 1,200.00 | 250.00 | 1,000.00 |
| 0050 | 732-04-12020 | Plastic Pavement Legends and Symbols (LANE ENDS) | 2 | EACH | 405.00 | 810.00 | 300.00 | 600.00 | 350.00 | 700.00 |
| 0051 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 260.00 | 520.00 | 250.00 | 500.00 | 225.00 | 450.00 |
| 0052 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 5 | EACH | 465.00 | 2,325.00 | 400.00 | 2,000.00 | 400.00 | 2,000.00 |
| 0053 | 735-01-00100 | Mailboxes | 3 | EACH | 20.00 | 60.00 | 50.00 | 150.00 | 6.00 | 18.00 |
| 0054 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 215.00 | 645.00 | 250.00 | 750.00 | 180.00 | 540.00 |
| 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 36,000.00 | 36,000.00 | 14,000.00 | 14,000.00 | 30,000.00 | 30,000.00 |
| 0056 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 600.00 | 600.00 | 300.00 | 300.00 | 500.00 | 500.00 |
| 0057 | NS-200-00040 | Geotextile Fabric | 8,900 | SQYD | 1.00 | 8,900.00 | 2.00 | 17,800.00 | 1.50 | 13,350.00 |
| 0058 | NS-500-00280 | Surface Preparation | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 1,000.00 | 1,000.00 |
| 0059 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,000 | INLF | 1.25 | 1,250.00 | 2.50 | 2,500.00 | 1.50 | 1,500.00 |
| 0060 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.5 | MILE | 950.00 | 475.00 | 10,000.00 | 5,000.00 | 18,500.00 | 9,250.00 |
| CONTRACTOR TOTAL | 1,145,996.52 | 1,204,450.70 | 1,243,527.40 | |||||||