Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: 835-01-0008 | |
| Parish: Natchitoches | |
| Routes: LA 486 | |
| Description: Coulee Bridge | |
| Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT OVERLAY, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $752,593.62 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 09090 | Guinn Brothers, LLC. | $682,279.60 |
| 2 | 18546 | C W & W Contractors, Inc. | $691,265.03 |
| 3 | 48925 | David V. Temple | $696,289.47 |
| 4 | 12136 | Shiloh Contractors, Inc. | $761,278.60 |
| 5 | 12135 | Blount Bros. Construction, Inc. | $764,434.40 |
| 6 | 01012 | Cecil D. Gassiott, LLC | $795,197.35 |
| 7 | 39580 | Gerace Construction Llc | $813,305.30 |
| 8 | 39462 | Jb James Construction Llc | $868,724.30 |
| 9 | 12312 | Gilchrist Construction Co. LLC | $882,476.48 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Guinn Brothers, LLC. |
- 2 - C W & W Contractors, Inc. |
- 3 - David V. Temple |
- 4 - Shiloh Contractors, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 8,000.00 | 8,000.00 | 30,000.00 | 30,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | 7,880.06 | 7,880.06 | 7,000.00 | 7,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Str. No. 08358350102381 ; STA 108+06.85 ; 78' x 19' Timber Trestle Bridge | 1 | EACH | 14,000.00 | 14,000.00 | 7,000.00 | 7,000.00 | 8,965.52 | 8,965.52 | 2,500.00 | 2,500.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 240 | LNFT | 8.00 | 1,920.00 | 2.00 | 480.00 | 4.71 | 1,130.40 | 17.00 | 4,080.00 |
| 0005 | 203-01-00100 | General Excavation | 276.9 | CUYD | 4.00 | 1,107.60 | 19.99 | 5,535.23 | 20.00 | 5,538.00 | 8.00 | 2,215.20 |
| 0006 | 203-02-00100 | Drainage Excavation | 530 | CUYD | 4.00 | 2,120.00 | 10.00 | 5,300.00 | 15.00 | 7,950.00 | 10.00 | 5,300.00 |
| 0007 | 203-03-00100 | Embankment | 614 | CUYD | 10.00 | 6,140.00 | 30.00 | 18,420.00 | 20.00 | 12,280.00 | 18.00 | 11,052.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 100.00 | 200.00 | 150.00 | 300.00 | 200.00 | 400.00 | 150.00 | 300.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,455 | LNFT | 2.00 | 2,910.00 | 3.00 | 4,365.00 | 1.75 | 2,546.25 | 3.50 | 5,092.50 |
| 0010 | 302-02-04120 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete) | 1,869.7 | SQYD | 20.00 | 37,394.00 | 30.00 | 56,091.00 | 20.00 | 37,394.00 | 20.00 | 37,394.00 |
| 0011 | 304-05-00100 | Lime Treatment (Type E) | 9.7 | TON | 500.00 | 4,850.00 | 200.00 | 1,940.00 | 575.00 | 5,577.50 | 350.00 | 3,395.00 |
| 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 45.00 | 4,500.00 | 50.00 | 5,000.00 | 85.00 | 8,500.00 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 232.7 | TON | 170.00 | 39,559.00 | 160.00 | 37,232.00 | 190.00 | 44,213.00 | 200.00 | 46,540.00 |
| 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 135.7 | TON | 180.00 | 24,426.00 | 185.00 | 25,104.50 | 200.00 | 27,140.00 | 215.00 | 29,175.50 |
| 0015 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 48 | LNFT | 160.00 | 7,680.00 | 75.00 | 3,600.00 | 100.00 | 4,800.00 | 75.00 | 3,600.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 175 | LNFT | 20.00 | 3,500.00 | 20.00 | 3,500.00 | 20.00 | 3,500.00 | 20.00 | 3,500.00 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 58.00 | 5,800.00 | 51.00 | 5,100.00 | 75.00 | 7,500.00 | 75.00 | 7,500.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 2,200.00 | 6,600.00 | 1,800.00 | 5,400.00 | 2,200.00 | 6,600.00 | 2,200.00 | 6,600.00 |
| 0019 | 705-01-00100 | Barbed Wire Fence | 392 | LNFT | 8.00 | 3,136.00 | 10.00 | 3,920.00 | 15.00 | 5,880.00 | 10.00 | 3,920.00 |
| 0020 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 385 | LNFT | 13.00 | 5,005.00 | 12.00 | 4,620.00 | 18.90 | 7,276.50 | 14.00 | 5,390.00 |
| 0021 | 708-01-00100 | Right-of-Way Monument | 11 | EACH | 225.00 | 2,475.00 | 150.00 | 1,650.00 | 150.00 | 1,650.00 | 200.00 | 2,200.00 |
| 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 11 | EACH | 225.00 | 2,475.00 | 50.00 | 550.00 | 100.00 | 1,100.00 | 200.00 | 2,200.00 |
| 0023 | 712-04-00100 | Flexible Revetment | 506 | SQYD | 70.00 | 35,420.00 | 35.00 | 17,710.00 | 46.00 | 23,276.00 | 55.00 | 27,830.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 9,000.00 | 9,000.00 | 7,500.00 | 7,500.00 | 14,000.00 | 14,000.00 |
| 0025 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,000.00 | 2,000.00 | 1,200.00 | 2,400.00 | 895.00 | 1,790.00 | 500.00 | 1,000.00 |
| 0026 | 717-01-00100 | Seeding | 80 | LB | 10.00 | 800.00 | 10.00 | 800.00 | 8.00 | 640.00 | 10.00 | 800.00 |
| 0027 | 718-01-00100 | Fertilizer | 1,000 | LB | 1.00 | 1,000.00 | 0.50 | 500.00 | 0.85 | 850.00 | 1.00 | 1,000.00 |
| 0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 50 | SQYD | 5.00 | 250.00 | 3.00 | 150.00 | 25.00 | 1,250.00 | 15.00 | 750.00 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 |
| 0030 | 726-01-00100 | Bedding Material | 25.2 | CUYD | 100.00 | 2,520.00 | 45.00 | 1,134.00 | 40.00 | 1,008.00 | 100.00 | 2,520.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 87,000.00 | 87,000.00 |
| 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 100.00 | 200.00 | 85.00 | 170.00 | 65.00 | 130.00 | 65.00 | 130.00 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 85.00 | 340.00 | 75.00 | 300.00 | 75.00 | 300.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 50.00 | 650.00 | 15.00 | 195.00 | 100.00 | 1,300.00 | 24.00 | 312.00 |
| 0035 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 14 | LNFT | 30.00 | 420.00 | 50.00 | 700.00 | 6.00 | 84.00 | 30.00 | 420.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.388 | MILE | 6,500.00 | 2,522.00 | 5,500.00 | 2,134.00 | 10,000.00 | 3,880.00 | 11,000.00 | 4,268.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,500.00 | 8,500.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 |
| 0038 | 804-01-00300 | Precast Concrete Piles (16") | 1,008 | LNFT | 75.00 | 75,600.00 | 70.00 | 70,560.00 | 85.00 | 85,680.00 | 75.00 | 75,600.00 |
| 0039 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 15,000.00 | 15,000.00 | 1,500.00 | 1,500.00 | 7,500.00 | 7,500.00 | 3,800.00 | 3,800.00 |
| 0040 | 804-09-00100 | Loading Test Piles | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 |
| 0041 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | 7,500.00 | 7,500.00 | 1,000.00 | 1,000.00 |
| 0042 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | 7,500.00 | 7,500.00 | 500.00 | 500.00 |
| 0043 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | 1,000.00 | 1,000.00 | 100.00 | 100.00 |
| 0044 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 1,000.00 | 5,000.00 | 800.00 | 4,000.00 | 500.00 | 2,500.00 | 1,200.00 | 6,000.00 |
| 0045 | 805-01-00700 | Class A Concrete (Bents) | 34.32 | CUYD | 1,000.00 | 34,320.00 | 850.00 | 29,172.00 | 790.00 | 27,112.80 | 1,100.00 | 37,752.00 |
| 0046 | 805-03-00100 | Class AA Concrete | 135.95 | CUYD | 900.00 | 122,355.00 | 810.00 | 110,119.50 | 850.00 | 115,557.50 | 1,000.00 | 135,950.00 |
| 0047 | 806-01-00100 | Deformed Reinforcing Steel | 30,084 | LB | 1.00 | 30,084.00 | 2.00 | 60,168.00 | 1.20 | 36,100.80 | 0.85 | 25,571.40 |
| 0048 | 810-01-00100 | Concrete Railing (Standard Barrier) | 200 | LNFT | 85.00 | 17,000.00 | 95.00 | 19,000.00 | 65.00 | 13,000.00 | 85.00 | 17,000.00 |
| 0049 | 813-01-00100 | Concrete Approach Slabs | 275.56 | SQYD | 225.00 | 62,001.00 | 230.00 | 63,378.80 | 196.00 | 54,009.76 | 200.00 | 55,112.00 |
| 0050 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 174 | INLF | 14.00 | 2,436.00 | 3.00 | 522.00 | 2.87 | 499.38 | 3.50 | 609.00 |
| 0051 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 |
| CONTRACTOR TOTAL | 682,279.60 | 691,265.03 | 696,289.47 | 761,278.60 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Blount Bros. Construction, Inc. |
- 6 - Cecil D. Gassiott, LLC |
- 7 - Gerace Construction Llc |
- 8 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | 75,000.00 | 75,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 3,000.00 | 3,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Str. No. 08358350102381 ; STA 108+06.85 ; 78' x 19' Timber Trestle Bridge | 1 | EACH | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 240 | LNFT | 7.00 | 1,680.00 | 7.00 | 1,680.00 | 10.00 | 2,400.00 | 5.00 | 1,200.00 |
| 0005 | 203-01-00100 | General Excavation | 276.9 | CUYD | 10.00 | 2,769.00 | 5.00 | 1,384.50 | 15.00 | 4,153.50 | 30.00 | 8,307.00 |
| 0006 | 203-02-00100 | Drainage Excavation | 530 | CUYD | 15.00 | 7,950.00 | 20.00 | 10,600.00 | 15.00 | 7,950.00 | 15.00 | 7,950.00 |
| 0007 | 203-03-00100 | Embankment | 614 | CUYD | 15.00 | 9,210.00 | 24.00 | 14,736.00 | 25.00 | 15,350.00 | 30.00 | 18,420.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 250.00 | 500.00 | 200.00 | 400.00 | 150.00 | 300.00 | 150.00 | 300.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,455 | LNFT | 3.00 | 4,365.00 | 2.50 | 3,637.50 | 1.50 | 2,182.50 | 2.00 | 2,910.00 |
| 0010 | 302-02-04120 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete) | 1,869.7 | SQYD | 22.00 | 41,133.40 | 25.00 | 46,742.50 | 30.00 | 56,091.00 | 22.00 | 41,133.40 |
| 0011 | 304-05-00100 | Lime Treatment (Type E) | 9.7 | TON | 300.00 | 2,910.00 | 350.00 | 3,395.00 | 500.00 | 4,850.00 | 400.00 | 3,880.00 |
| 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 40.00 | 4,000.00 | 75.00 | 7,500.00 | 75.00 | 7,500.00 | 80.00 | 8,000.00 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 232.7 | TON | 150.00 | 34,905.00 | 210.00 | 48,867.00 | 220.00 | 51,194.00 | 190.00 | 44,213.00 |
| 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 135.7 | TON | 150.00 | 20,355.00 | 210.00 | 28,497.00 | 185.00 | 25,104.50 | 200.00 | 27,140.00 |
| 0015 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 48 | LNFT | 150.00 | 7,200.00 | 98.00 | 4,704.00 | 100.00 | 4,800.00 | 120.00 | 5,760.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 175 | LNFT | 30.00 | 5,250.00 | 20.00 | 3,500.00 | 21.00 | 3,675.00 | 19.00 | 3,325.00 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 85.00 | 8,500.00 | 55.00 | 5,500.00 | 65.00 | 6,500.00 | 54.00 | 5,400.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 3,000.00 | 9,000.00 | 2,100.00 | 6,300.00 | 2,250.00 | 6,750.00 | 2,000.00 | 6,000.00 |
| 0019 | 705-01-00100 | Barbed Wire Fence | 392 | LNFT | 10.00 | 3,920.00 | 9.00 | 3,528.00 | 8.25 | 3,234.00 | 7.00 | 2,744.00 |
| 0020 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 385 | LNFT | 9.00 | 3,465.00 | 12.00 | 4,620.00 | 9.00 | 3,465.00 | 10.00 | 3,850.00 |
| 0021 | 708-01-00100 | Right-of-Way Monument | 11 | EACH | 250.00 | 2,750.00 | 300.00 | 3,300.00 | 200.00 | 2,200.00 | 150.00 | 1,650.00 |
| 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 11 | EACH | 200.00 | 2,200.00 | 150.00 | 1,650.00 | 200.00 | 2,200.00 | 150.00 | 1,650.00 |
| 0023 | 712-04-00100 | Flexible Revetment | 506 | SQYD | 55.00 | 27,830.00 | 60.00 | 30,360.00 | 50.00 | 25,300.00 | 52.00 | 26,312.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 7,500.00 | 7,500.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 |
| 0025 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,100.00 | 2,200.00 | 900.00 | 1,800.00 | 500.00 | 1,000.00 | 650.00 | 1,300.00 |
| 0026 | 717-01-00100 | Seeding | 80 | LB | 25.00 | 2,000.00 | 9.00 | 720.00 | 9.00 | 720.00 | 15.00 | 1,200.00 |
| 0027 | 718-01-00100 | Fertilizer | 1,000 | LB | 3.00 | 3,000.00 | 1.00 | 1,000.00 | 0.45 | 450.00 | 1.00 | 1,000.00 |
| 0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 50 | SQYD | 15.00 | 750.00 | 2.00 | 100.00 | 2.00 | 100.00 | 10.00 | 500.00 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0030 | 726-01-00100 | Bedding Material | 25.2 | CUYD | 75.00 | 1,890.00 | 80.00 | 2,016.00 | 95.00 | 2,394.00 | 70.00 | 1,764.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 80,000.00 | 80,000.00 | 87,000.00 | 87,000.00 |
| 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 100.00 | 200.00 | 75.00 | 150.00 | 75.00 | 150.00 | 70.00 | 140.00 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 80.00 | 320.00 | 85.00 | 340.00 | 75.00 | 300.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 60.00 | 780.00 | 100.00 | 1,300.00 | 27.00 | 351.00 | 100.00 | 1,300.00 |
| 0035 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 14 | LNFT | 30.00 | 420.00 | 6.50 | 91.00 | 33.00 | 462.00 | 6.00 | 84.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.388 | MILE | 6,000.00 | 2,328.00 | 10,000.00 | 3,880.00 | 11,000.00 | 4,268.00 | 10,000.00 | 3,880.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 6,000.00 | 6,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 |
| 0038 | 804-01-00300 | Precast Concrete Piles (16") | 1,008 | LNFT | 105.00 | 105,840.00 | 65.00 | 65,520.00 | 80.00 | 80,640.00 | 88.00 | 88,704.00 |
| 0039 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 |
| 0040 | 804-09-00100 | Loading Test Piles | 1 | EACH | 2,000.00 | 2,000.00 | 20,000.00 | 20,000.00 | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 |
| 0041 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 2,250.00 | 2,250.00 | 3,000.00 | 3,000.00 | 100.00 | 100.00 | 100.00 | 100.00 |
| 0042 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | 100.00 | 100.00 | 100.00 | 100.00 |
| 0043 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 | 1,000.00 | 1,000.00 | 100.00 | 100.00 |
| 0044 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 2,500.00 | 12,500.00 | 3,500.00 | 17,500.00 | 750.00 | 3,750.00 | 1,200.00 | 6,000.00 |
| 0045 | 805-01-00700 | Class A Concrete (Bents) | 34.32 | CUYD | 600.00 | 20,592.00 | 1,700.00 | 58,344.00 | 1,500.00 | 51,480.00 | 1,300.00 | 44,616.00 |
| 0046 | 805-03-00100 | Class AA Concrete | 135.95 | CUYD | 700.00 | 95,165.00 | 850.00 | 115,557.50 | 900.00 | 122,355.00 | 650.00 | 88,367.50 |
| 0047 | 806-01-00100 | Deformed Reinforcing Steel | 30,084 | LB | 2.00 | 60,168.00 | 0.75 | 22,563.00 | 0.85 | 25,571.40 | 1.10 | 33,092.40 |
| 0048 | 810-01-00100 | Concrete Railing (Standard Barrier) | 200 | LNFT | 100.00 | 20,000.00 | 75.00 | 15,000.00 | 85.00 | 17,000.00 | 70.00 | 14,000.00 |
| 0049 | 813-01-00100 | Concrete Approach Slabs | 275.56 | SQYD | 275.00 | 75,779.00 | 227.85 | 62,786.35 | 190.00 | 52,356.40 | 220.00 | 60,623.20 |
| 0050 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 174 | INLF | 10.00 | 1,740.00 | 2.00 | 348.00 | 7.00 | 1,218.00 | 1.20 | 208.80 |
| 0051 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 2,000.00 | 2,000.00 | 1,300.00 | 1,300.00 | 1,300.00 | 1,300.00 | 1,200.00 | 1,200.00 |
| CONTRACTOR TOTAL | 764,434.40 | 795,197.35 | 813,305.30 | 868,724.30 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Gilchrist Construction Co. LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 37,000.00 | 37,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 900.00 | 900.00 |
| 0003 | 202-02-04000 | Removal of Bridge Str. No. 08358350102381 ; STA 108+06.85 ; 78' x 19' Timber Trestle Bridge | 1 | EACH | 20,000.00 | 20,000.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 240 | LNFT | 10.00 | 2,400.00 |
| 0005 | 203-01-00100 | General Excavation | 276.9 | CUYD | 80.00 | 22,152.00 |
| 0006 | 203-02-00100 | Drainage Excavation | 530 | CUYD | 20.00 | 10,600.00 |
| 0007 | 203-03-00100 | Embankment | 614 | CUYD | 30.00 | 18,420.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 340.00 | 680.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,455 | LNFT | 1.90 | 2,764.50 |
| 0010 | 302-02-04120 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete) | 1,869.7 | SQYD | 26.00 | 48,612.20 |
| 0011 | 304-05-00100 | Lime Treatment (Type E) | 9.7 | TON | 1,000.00 | 9,700.00 |
| 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 10.00 | 1,000.00 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 232.7 | TON | 165.00 | 38,395.50 |
| 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 135.7 | TON | 215.00 | 29,175.50 |
| 0015 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 48 | LNFT | 140.00 | 6,720.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 175 | LNFT | 20.00 | 3,500.00 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 2,200.00 | 6,600.00 |
| 0019 | 705-01-00100 | Barbed Wire Fence | 392 | LNFT | 8.25 | 3,234.00 |
| 0020 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 385 | LNFT | 9.00 | 3,465.00 |
| 0021 | 708-01-00100 | Right-of-Way Monument | 11 | EACH | 250.00 | 2,750.00 |
| 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 11 | EACH | 250.00 | 2,750.00 |
| 0023 | 712-04-00100 | Flexible Revetment | 506 | SQYD | 60.00 | 30,360.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0025 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 500.00 | 1,000.00 |
| 0026 | 717-01-00100 | Seeding | 80 | LB | 9.00 | 720.00 |
| 0027 | 718-01-00100 | Fertilizer | 1,000 | LB | 0.45 | 450.00 |
| 0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 50 | SQYD | 2.25 | 112.50 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 2,000.00 | 2,000.00 |
| 0030 | 726-01-00100 | Bedding Material | 25.2 | CUYD | 125.00 | 3,150.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 |
| 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 80.00 | 160.00 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 6.00 | 78.00 |
| 0035 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 14 | LNFT | 2.80 | 39.20 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.388 | MILE | 4,000.00 | 1,552.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0038 | 804-01-00300 | Precast Concrete Piles (16") | 1,008 | LNFT | 84.00 | 84,672.00 |
| 0039 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 33,000.00 | 33,000.00 |
| 0040 | 804-09-00100 | Loading Test Piles | 1 | EACH | 35,000.00 | 35,000.00 |
| 0041 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 2,000.00 | 2,000.00 |
| 0042 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 2,200.00 | 2,200.00 |
| 0043 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 6,814.28 | 6,814.28 |
| 0044 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 1,000.00 | 5,000.00 |
| 0045 | 805-01-00700 | Class A Concrete (Bents) | 34.32 | CUYD | 1,500.00 | 51,480.00 |
| 0046 | 805-03-00100 | Class AA Concrete | 135.95 | CUYD | 900.00 | 122,355.00 |
| 0047 | 806-01-00100 | Deformed Reinforcing Steel | 30,084 | LB | 0.80 | 24,067.20 |
| 0048 | 810-01-00100 | Concrete Railing (Standard Barrier) | 200 | LNFT | 90.00 | 18,000.00 |
| 0049 | 813-01-00100 | Concrete Approach Slabs | 275.56 | SQYD | 210.00 | 57,867.60 |
| 0050 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 174 | INLF | 10.00 | 1,740.00 |
| 0051 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,500.00 | 1,500.00 |
| CONTRACTOR TOTAL | 882,476.48 | |||||